HomeMy WebLinkAboutSW6220101_Plansheet C-3.0 - Grading_Drainage Plan_20220614KRAMER „» y"I SITE 11 � OP NORTH VICINITY MAP NOT TO SCALE CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE CONSTRUCTION CONFERENCE. 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE, SILT FENCE OUTLETS, AND DIVERSION BERMS WHERE SPECIFIED. 3. CONSTRUCT TEMPORARY SKIMMER BASINS. 4. CLEAR AND GRUB THE SITE AS NEEDED. 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS REMAIN GRASSED. 6. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN. 7. INSTALL UTILITIES. 8. INSTALL INLET PROTECTION ON ALL NEW STORM WATER INLETS. 9. PERFORM FINE GRADING. 10. INSTALL AND PREPARE BASE COURSE. 11. PAVE ROADWAYS. 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. 13. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES. 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. 15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF TERMINATION (NOT). THE NOT IS AVAILABLE AT: HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE OF TERMINATION PROCESS. NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300. N/F FLORENCE C. WELLONS DB 1594, PG 382 GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) \ - \ INV fi-\ -NURSERY ROAD-SR1117___ __ 5.04, -- -- -- -- -- -- -- - __ / r37--nlr 3 3 . 3 3 -3 3 ___s'1']� 3SS3�o` _ __- -_ ■ __ __- --- - - _ _- __ _- 6O' R/W (PUBLIC) o \ \ __ __cs_ _ _ / / / % - / ~IeDia3 T- 3 3 370 18" RCP 3--•.�3F . �� �-• C i 3 • _ _ _ - _ _ _ _ - _. / - _ ` _ _ - _ _ _ -- - 01 5/8 5/8' S/8„ v 6C LOC - __ - -- - - - - - - ■- _ _ _ 01 - 0 , ERB ER g ERB E .� "`� S� �O7 OQL -\��-- l� IN 4 �} - �\'' I I I / (j� I (� ��- l I I I I 5/8" �5/8" I/27/\ __ __ - - __ - - - II I , =1- \�\ \ �. \ \\. `\l \ \ I ` }/ ( / I�// ERB 1 � ERB \ / � Z• �• •.• � � � , � T�� � I � � I ' I (� / o 1 WOODSHIRE PHASE ONE / 1 ff7 PB 2001, PG 1298 \ 4 , 3 , 2\ f 1 z ■ _ \ 1� SF -1 LOC - - �- - - s \ �\ \-� ' \ - \ - \ \ \ \ l � I / / I I 1 5/811 5/8 p 3 335 330 325 w p o� O� A \ L CI �LL\'\ 1 \ 1 WOODSHIRE PHASE ONE I I C ERB ERB 362 . 1' 60 6a 356 yA 2 348 �' 4� d 340 335 N i 0 �0 8 �Z7 I i--\ - c 'CO PB 2001, PG 1298 1 00 1 26 / 3 3 3 35 �y 3q1" ry 0 5/8,. � � o 3 33� ) " ^^� ^� ",ti `, ^n'II r m 524 l 49 I I I I ERe I 523 O 520 519 I 513 M 512 M 511 510 M 509 N 508 N 507 506 = 505 i s/8" w 522 521 518 517 516 515 514 5 8" E ERB N M D O M M M M M M I( l / �� J / O O O • • O O • I • O M O O O i • 1A O O M O O W V" t / J W W W 4 I 1 \ \ \\ \ I \ \ ERB _ _-362 M CO / I MM� III li ��M ` IIII 6' 6' G I I co p DUNBAR DRIVE - SR 2241 3 3s1 I U �I I" I MMM "Nm \� J � 347 ^, o II �ti o _ _10.1/ / II III I II I1 II III \ \ 50' R/W PUBLIC - 351 J � LL LL W I \ / (PUBLIC) CP 6 3S 353 Ob LL W W LL . LLLLLL LL W 4 15" r- _s s LLLLLL LL LLLL LLLL •LL LLW WW\�I�\\\ 1 (I IIIII II I I I I I III \\1 \ \� TIC #68.2 1/2" ,/2" s s HARBORWOOD STREET w w N N o 0 0 0 \ I I I I \ \ TC 368.28 LO ERB ERB 6' p � i9 � t5` r� W -� to O -� O -� tP W O 'Y LL LL W W W INV IN 364.88 1/2„ CI #15001 co 3 ° 50' R/W (PUBLIC & UTILITY ACCESS) _ __ __ LEGEND: INV OUT 364.71 ERe TC 367.78 ° s7 _ PK PK-PK NAIL 1 INV IN 364.55 0 0 I 362 360 52 - - - - - - 3 OS EIP Lo M 1 361 \ 346 344 340 33) w'w fir'>_ 322 ?o ` 310_ 2y Oo EIP-EXISTING IRON PIPE 1 INV OUT_364.49 1 360 358 i ^N o I LL \ \\ \ \ \ 349 f EIS / ,n M �7 M M W r l ' LL W u \M. M MN W M M I I \ \ _ LLA O EIS -EXISTING IRON STAKE 154 i= M M MM co N LL W ENL \'/ - 454 w l M'' M 1 II o ao I II M O \ 2 /_ ERB ENL-EXISTING NAIL � 1/2„ 455 "> °' I � I � M � '' Nol � 3 504 \ \\ \\ \\ \\\ \ \ \\ 456 457 458 459 ,,, 460 I 461 462 463 W 464 465 466 "' 467 M' 468 469 470 N" w'_► w O ERB-EXISTING REBAR ERB �4 I M VA \ 1 I I w�s'o II ♦ �� cp (G�� P v �� v \ \\ VA \ \\\ \ \ \ VA \ VA\ N/F - NOW OR FORMERLY 1 i W, , Q f ; \ R W -RIGHT OF WAY I Xx 153 ; �, 363 / Lu r w �s 3sr a w a w w \ w / Q ~ I w 1 9 4j srs ?sr� u'sr) -O 1?d, wS v�, vp 'S' `\ 316 PVC - POLYVINYL CHLORIDE CI 15085 3so 36o J N 35 \ \ \ \ RCP - REINFORCED CONCRETE PIPE TIC 366.02 1ER6 355 0 5 340 330 0 S� O\� 12, 1GE \ \ \ \\\ \\ INV IN 362.19 358 / 1 O 3 5 340 330 325 321 �� \ CI - CURB INLET / 351 I O PROPERTY LINE 355 � �O 335 325 AG '� g % w O 1/2' -- o fr G 1 ERB i \ 2 483 353 win o� 18 �°�GLp os LL • LL �" \� \\\\\\\\\\ \ \\\ \\\ � �/, ADJACENT PROPERTY LINE 152; O I 482 c Q Ico MI N 471 / / o^� Rio, OQ ; 501 LL W "�LL \\ RIGHT-OF-WAY 484 I M 481 M 480 d U 479 478 477 476 M 475 M 474 M 473 M 472- ss SANITARY SEWER LINE \ I� O I I M \ M O Lo Frn FORCE MAIN LINE �, MT v M M M " / G^pssD STORM DRAINAGE _ INV \ 357 M M o M ICI 19 / O g O^ \` 357.03/ I v 5 \ 32g 25 WETLANDS �151 / / 3 = -- 33 - - op -PERMANENT PERMANENT EASEMENT 65) Q/ s� ss s w, w w WOODPINE WAY X FENCE LINE �G s a t o w h N o w■ o w TREE LINE tx _ 50' R/W (PUBLIC &UTILITY ACCESS) 3° �k x 208.47' SPOT ELEVATION ` �150 BENCHMARK ❑ \-/ CI #8609 \// N WATER VALVE HOOD 361 39 11 \ FIRE HYDRANT ❑❑ WATER METER ® CATCH BASIN TREE 0 GRAVEL SOIL 0 WETLANDS 330 MAJOR CONTOUR 337 MINOR CONTOUR - Loc- Loc- LIMITS OF CONSTRUCTION - SF - SF - SILT FENCE LINE - JN - JN - JUTE NETTING 0INLET PROTECTION WOODSHIRE PHASE FOUR INV OUT 357.62 \ PB 2006, PG 316 INV 351.34�% 149 G� -\ 355 355ul 353 �11 IIN II W m O � rn I •- � 33 3Z9 ■ �` 33 C 485 486 OWO 487 488 M MOB 489 Q ■ CA 7 � ERB 354 0 _ 352 0 � p �- � ■ I If 1481 cA �307 / I I I j 1 i lIi 11 l ll�%II I I I I I I cl #8700 C ERB / ,- , /2"'� Qc� odd'/ HOOD 358.01 / 147 ; / ERB INV OUT 355.00 M 5/8„ '• dERB /--\ ERB �II,IIIIIMI11Iw(r( `\ 5/8 ERE I \183; GRADING NOTES \ 184 , 5/8' 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND ERB ERB MUST BE VERIFIED BY THE GENERAL CONTRACTOR.ALL SPOT ELEVATIONS WOODSHIRE PHASE FIVE / ARE TO THE FINISHED GRADE OF THE CURB, UNLESS OTHERWISE NOTED. PB 2007, PG 948 2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES SHALL HAVE A 5/8„ CROSS SLOPE NO STEEPER THAN 2% AND LONGITUDINAL SLOPE NO ERB / STEEPER THAN 5%. 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND / DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY 5/8„ DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. ERB 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. 13. STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF THE BOX FOR ALL STRUCTURES UNLESS OTHERWISE NOTED. 14. ALL STORM PIPE TO BE CLASS III RCP UNLESS OTHERWISE NOTED. 12. MAINTENANCE OF DRAINAGE EASEMENTS AND DRAINAGE STRUCTURES OUTSIDE OF NCDOT R/W TO BE MAINTAINED BY OTHERS (NOT NCDOT). MAIL KIOSK AND SIDEWALK MAINTENANCE ALSO TO BE PERFORMED BY OTHERS (NOT NCDOT). EROSION CONTROL NOTES 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP AND INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. 910-433-3300 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING OCCURS. 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE CD LO Lo L 495�3 498 cm� �� ���\ N �_ - , �; 2>: ♦ \\ �� \ \ \ _/ I i C� 3p3 ads s110 w 491 / / 34 / o rtI•r�\p \ l W W W YW W W W W W V. W LL 7 �'•:.': � W W W LL W\\ �4 W W W LL W W W W YW W W W `t(%j1 A 2OJ° ���//;j'• � ` �\ \ , �I 4 Y� W �y, �' ' W , W W V VJ QC ■ ` .... .Y W W LL' W V. W W W W W W W W W W W W W V• W W W W LL LL LL`\ .2g2 W IW �' I 5/8" ■ .. W V. W W W LL' W W W W� W W� W W W W V. W W W W W W W W W W LL L CiL� Y �/d W W ERB W W W W W W \ \� \ W W W W W LL W y. y, ,Y W W W W W W y. y. �- •' W ' HERB,WW -WW W WW W WW�LL WLL WV. LL LLLL 5/8 LL W ERB' / \ �... .. ' .. • .� \ �J`l v. ' WLL LL LLLL LL LL _ I LL W W W W LL' W ', v. LL ERB 5/8" � � 419) 5/8 ' S/B, 5/8' I--_� _ - ERB \420 /-_\ � _ \ ERB i--\ \ ERB ERB 434 f�433 \ / / �` ��423 I -� 422 418 ERB - � J 435 WOODSHIRE PHASE SIX PB 2013, PG 5 436 \~� \\ ✓ / / //� \ \ y'1�� i 1 '-� / \c \\\\'\ N/F \� ��\ \ \\ \ \ \ WOODSHIRE PARTNERS, LLC. If 438 ; /\ \ \ \\� _ j �`� �" \\ \� \\ \\ \\ 417 \ I DB 2668, PG 901 C\ _ Ooo I \I \I I- -�_ /III�`NI 11 STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. AND PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK \ CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT ON THIS PROJECT. \ / III BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN COVERED IF LEFT MORE THAN 24 HOURS. ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED L\ IIII I HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER / 1 _ IIIII /f, DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY / DEVICES IMMEDIATELY. EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR \�\\\\I`-11`II I 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED �\ WHICH HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO / 1 1 \ IF / ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS 1 (� WIND AND RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE WITHIN 90 CALENDAR DAYS FOLLOWING COMPLETION OF MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON CONSTRUCTION OR DEVELOPMENT. AREAS TO BE PAVED. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION • 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE FINAL REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF STABILIZATION AND PERMANENT VEGETATION HAS BEEN CONSTRUCTION. GRAPHIC SCALE ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE THE 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS ACTION PRIOR TO REMOVAL. NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN. 100 0 50 100 200 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT Know what's below. CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION ARISE ON SITE IS PJ GAY. CONTACT 910-237-0572. ACTIVITY. 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS 5/8 ERB Call before you dig. ( IN FEET ) 1 inch = 100 ft. 1 400 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com ``�y\ CARo �% 2 : OF SS ..�L SEA02 G I NE .•:���� ''';/ ,O U3-10-22 REVISIONS PROJECT NAME WOODSHIRE SUBDIVISION PHASE 7 OVERALL GRADING AND EROSION CONTROL PLAN CLIENT 1041 B Robeson Street Fayetteville, North Carolina 28305 Phone: (910) 339-6330 Fax: (910)964-9089 PROJECT INFORMATION DESIGNED BY: CALEB DRAWN BY: CALEB CHECKED BY: SCOTT PROJECT NUMBER: 1070 DRAWING SCALE HORIZONTAL: 1 "=100' DATE RELEASED MARCH 10, 2022 SHEET NUMBER THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-3nO