CONSTRUCTION SEQUENCE
1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD
PRE CONSTRUCTION CONFERENCE.
2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT
FENCE, SILT FENCE OUTLETS, AND DIVERSION BERMS WHERE
SPECIFIED.
3. CONSTRUCT TEMPORARY SKIMMER BASINS.
4. CLEAR AND GRUB THE SITE AS NEEDED.
5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO
AREAS REMAIN GRASSED.
6. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN.
7. INSTALL UTILITIES.
8. INSTALL INLET PROTECTION ON ALL NEW STORM WATER INLETS.
9. PERFORM FINE GRADING.
10. INSTALL AND PREPARE BASE COURSE.
11. PAVE ROADWAYS.
12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS.
13. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE
ALL TEMPORARY MEASURES.
14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS
OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING
TO THE NCDEQ EROSION CONTROL MANUAL.
15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL
STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST BE
REQUESTED BY THE PERMITTEE VIA A NOTICE OF TERMINATION
(NOT). THE NOT IS AVAILABLE AT:
HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION.
PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT MUST
BE UPLOADED AS PART OF COMPLETING THE NOTICE OF
TERMINATION PROCESS.
5/8,,,T, 5/8"T - \
ERB ERB ERB 1
5/8" 5/8'
I I ERB ERB
o p 1
1'3\\ I f'2\\�z
/5/8
ER
1 W m 1
I I 5/8" r
I
ERB
5/8„ 1
I- - ERB
DUNBAR DRIVE - SR 2241
inn 75
g
E ERB
1\ 27
DIV
WOODSHIRE PHASE ONE
PB 2001, PG 1298
•
ERB
26
524
5/8"
ERB
w
6i
362
NOTIFICATION OF COMBINED SELF -MONITORING AND
SELF -INSPECTION FORM:
THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN
2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR
LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH
PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED
EROSION AND SEDIMENTATION CONTROL PLAN IS BEING
FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE
INSPECTIONS TOOK EFFECT OCTOBER 1, 2010.
TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS
AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR
DEVELOPED A COMBINED FORM. THE SELF -INSPECTION
PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING
PROGRAM OF THE NPDES STORMWATER PERMIT FOR
CONSTRUCTION ACTIVITIES. THE FOCUS OF THE
SELF -INSPECTION REPORT IS THE INSTALLATION AND
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL
MEASURES ACCORDING TO THE APPROVED PLAN. THE
INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF
THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND
COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT:
HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION
IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM,
PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910)
433-3300.
N/F
FLORENCE C. WELLONS
DB 1594, PG 382
GROUND STABILIZATION CHART
SITE AREA
STABILIZATION
STABILIZATION TIME
DESCRIPTION
TIME FRAME
FRAME EXCEPTIONS
PERIMETER DIKES,
SWALES, DITHCES
7 DAYS
NONE
AND SLOPES
HIGH QUALITY
WATER (HQW)
7 DAYS
NONE
ZONES
IF SLOPES ARE 10' OR
SLOPES STEEPER
7 DAYS
LESS IN LENGTH AND ARE
THAN 3:1
NOT STEEPER THAN 2:1,
14 DAYS ARE ALLOWED
SLOPES 3:1 OR
7-DAYS FOR SLOPES
FLATTER
14 DAYS
GREATER THAN 50 FEET
IN LENGTH
NONE
ALL OTHER AREAS
(EXCEPT FOR
WITH SLOPES FLATTER
14 DAYS
PERIMETERS AND
THAN 4:1
HQW ZONES)
\ INV
----------NURSERY ROAD -SR1117__ 5.04
dRn� 35 --• 973SS3Sq o - --- ■60' R/W (PUBLIC) - -- --_ _ -- -- -- -- -� --- -�-- -�
�� 3y4•'ill
---------- -- ------ -- ■_ _- --ice+- - - __-�-�- -- - - , _.4_ _. _-�--INV ;T-- '`-� ��T�'� �rl�.� __,�LLL��`r�'
OQ-L- OOL 0 �c - i •�_� �__�_ /
- - -- - - -
9 336 335 3 N i w o w wo o /� ��
S -� LOC
362 . 6'p / 3q ' 34> d 340 30 25 o s c� \ \ \ \ \
g61 35a 356 35� 352 p,5 3�1 6 M� ^`� tio' ti� �, ^
C M 3 g3 � � ^� w `5 II ^��
l 49
523 522 = 521 520 519 518 517 0 516 515 514 513 M 512 M 511 510 M 509 N 508 N \ I \ \ \ \ I I \ \ \ \ \ \ I I I \ \ \
M OM MOM O �M O� OM • I OC^ O �II O jM• • i OM O M O� O M `//�/ \.�TOy``k`y<y`kk`<<<k<<<`kk �\\\\
co I M W III � Cl) I��
I
00
\ I II
\ �361 / I 347 r' co
50 R/W (PUBLIC) 15" �CP-
- - -
r3353-CI
;�JIIL �1/2"
I
``kk
�`� ` ` \\ \k` < / / I III I I I I I I \ \ \ `
15077
# 1 /2"
368.28 ERB HARBORWOOD STREET
INVCIN 364 88 LOI 415001 co 3 °50' R/W (PUBLIC & UTILITY ACCESS) N
k`` • •` y` k`
k <` � < < I I I I I I \
�\\ ` `k k` ` <y k` ` ` X/ I IIII I I I I I I \ I \ \
LEGEND: INV OUT 364.71 RB TC 367.78 M M 6/ - - - ` ` ` ` `
PK o PK-PK NAIL - - - - - - - - - - - - ` I • ` �. Y y` <` I \ I I I I \ \ I I I I I I I \ \ \ I I \ \ \. \
EiP Oo EIP-EXISTING IRON PIPE
EIS O EIS -EXISTING IRON STAKE
ENEO ENL-EXISTING NAIL
ERBO ERB-EXISTING REBAR
N/F - NOW OR FORMERLY
R/W - RIGHT OF WAY
PVC - POLYVINYL CHLORIDE
RCP - REINFORCED CONCRETE PIPE
CI - CURB INLET
PROPERTY LINE
ADJACENT PROPERTY LINE
RIGHT-OF-WAY
ss SANITARY SEWER LINE
FM FORCE MAIN LINE
SD STORM DRAINAGE
WETLANDS
PERMANENT EASEMENT
X FENCE LINE
TREE LINE
x 208.47' SPOT ELEVATION
BENCHMARK
N WATER VALVE
FIRE HYDRANT
❑❑ WATER METER
® CATCH BASIN
TREE
0 GRAVEL
SOIL
0 WETLANDS
330 MAJOR CONTOUR
337 MINOR CONTOUR
- i-oc- i-oc- LIMITS OF CONSTRUCTION
- sF - sF - SILT FENCE LINE
- iN - iN - JUTE NETTING
0INLET PROTECTION
1 INV IN 364.55 o p Cl) I 362 360 52 \ 346 344 3 ww '�
1 INV OUT 364.49 co 1 361 360 358 LO 1 0 349 ��N 340 3) W w o >_� 322 296 ❑
1 co. M MN V co r co N �l \ < Y t\\: <• k ` k\ ` \\\ \ \ \ \ \\`\\ \ \ \\ \\
154 454 N W M' M co co I p Nl a/ 504 15 \
O 455 M aN 1 I I M kk-
/2., 456 I In \ W °' M M wrl w \ \ ,. ` ` k k \ 1 \\\ \\ \ \ \ \ \ \ \ \ \
ERB �4 , � 457 458 459 I 460 M 461 462 463 464 465 466 467 468 \ 469 470 I) ;. \\ \ I \ \ w>s �p \ \\ \ II ` \ \\ \ \\ \ \ \ \ \\ \ \\ \
1 1'1 \1 c CWi,'� ` 1 363 W Q\\. \ \ \ \ , \ N I �\ \\ \\ \ \\\ \ \ \ \ \ \
1 53 c 362 / Q I� ww �S' 3g9 �4' pgs pip �A> o p�3 p>s �>p �>o `\ 316 503 III
CI 15085 360 360 _j - 35 5 O
33 rn �--'�� < \ \ \ \ \ \
y \\ \ \
TC 366.02 1ERB 355 0 5 340 330 S� 0. om <o \ \ \\
I 3 340 325 � ✓ �\%`k`yk k J \\\\\\\ \\ \ \\ \\\
INV I� 2� / 358 35� O �'A ` `k k �� k` <` `< • \ \ \
C
y k
1 � /2 �AGB GLO O � s � ,p �` <`k<` k< <k` <` \\ ` `• Y` k` t � � � \ \ \ \ \ \ \ \\ \ \\ \ \ \ \ / i
ERB r' \\ 2r, O 482 F- Iv 471 /' �/� O \ 501 F�� k ` ` ` • y \ \ \ \ \ \ \ \ \ \\ \ \ \ \ i
r 152 , wso 484 • M 481 M 480 d M I 479 478 477 476 M 475 N 474
O II O �O aoO O O"' OM OM 473 oOo w�O
co
w' Cl)LO
M A.
M M M \ b'
INV s, 357 Lo J M M p M l I �N 9C o. op �ry ^
/ --. 357.03/ �/J \� 'n `�o I v 39 / 2 \199 Cl�� �'^�o C(" �� L i �7S �Q
f 151 \ g / - - �� 3 335 33 325 p� `
/
� WOODPINE WAY CO 1 ^� 497 / �\ Gj " • \ \, \ \ -
(F'_� ��) 1�1 q. �GQ ss I o w h N o w■ o w G- 3 287
El �/ `' `� _ 50' R/W (PUBLIC & UTILITY ACCESS) / 30 2s1- 2s3� 2: k`kl•` ` • a \\
150 \
CI #8609 �
HOOD 361.39 WOODSHIRE PHASE FOUR \
INV OUT 357.62 \ PB 2006, PG 316 INV
� � 13 • 3�0 �
LOC LOC •- 495 l 498
3 3 f o > 1 dam\, ` ` k` •` o �D \ / /
493 - - - �� o� ' �� \\ w° y I I , k y` <k `k<k Y Y`k•k < < k ' k e�
O k < << \
woNON
k
Y
k k < k \
\- c, • � � � � _ _ 499 oM w w ; 2a8" 2g3 � � � t y` �< <<` k`�<k` Y k y``y`` k` <` <Y kk y \ � �
- - - � ,� � k k` -^ \ o� ^� 500 `` /2b° 2a� `g5 ,��. ,` < k` <• Y ` y <^� < k` k` k k` <` \�. �
/ / ~ C ` ` k` • Y` ` y` ` � 30� 7� 2 �7 � � Y` ` ` ` k k k .k ` < ` `kkk ` y y ` \ � � `
- � �` k` k`< ` ` << k` <k k` <` \ ^J� � � O 2 Q2`�211 2� �\;�� k k <` ``<• Y` Yk`Yk` k k <k << <Y Y`kkk k< Y<`�\� -� y,
1 148 \ / Log I I _ y ^ �l !k` �� - // k k - < ky ` <` y` <` <`` ` Y`kk` ` ` k< �A 292 4 2gO v > 2$ V - - +�®' ` `< �` `k • y` k y` k` ` 0�0� `� `
\ / CA I I , I I I I i I I I I I ` k k <\ ` k< Y < k - L k k^ < ` Y ` k y` kykk k< Y < k Y` k< ` 2J2
/ 5/8
ig \ GO 03�0 III II II / III I I ■ y < < k� r: �- ��Y`k` <`y` kkkkk y k <` ky k kk Yk < k kk kk y` kkk <` y ` \ /� G ERB 00
355
365
M
rn II
■
(�
485
3S
co
486
486
487
O
M O
488 M
489
�
490
L
A
/
1/2'
ERB
354
c _ 352 p
/
L
o
■
CI #8700 v <RB / 1 /2"'� �oc-�j
HOOD 358.01 N\ / �147; / ERB
INV OUT 355.00 5/8„ ERB'
`d\ERB •�,,//?//
�182,
IIIMIII
1
\183,
GRADING NOTES \
/ 1\ 184 , 5/8'
1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND ERB ERB
MUST BE VERIFIED BY THE GENERAL CONTRACTOR.ALL SPOT ELEVATIONS WOODSHIRE PHASE FIVE
ARE TO THE FINISHED GRADE OF THE CURB, UNLESS OTHERWISE NOTED. \ PB 2007, PG 948
2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES SHALL HAVE A ` 5/a"
CROSS SLOPE NO STEEPER THAN 2% AND LONGITUDINAL SLOPE NO ERB /
STEEPER THAN 5%.
3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND /
DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED
EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL
INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY 5/8„
DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. ERB
4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL
BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS
MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE
EXISTING GROUND HAS BEEN COMPLETED
5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE
OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES
DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY
FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES,
WHETHER SHOWN OR NOT ON THE PLAN
6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE
LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW
GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THEY WILL BE HELD
RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES
CAUSED BY HIS OPERATION.
7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND
AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE
STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A
SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE
NOTIFIED.
8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED
WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE.
9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS
SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS.
10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN
A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL
DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE
CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS.
11. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE
REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF
THE CHANGE.
12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL
BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION
CONTROL BLANKET OR EQUAL SUBSTITUTE.
13. STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF THE BOX FOR
ALL STRUCTURES UNLESS OTHERWISE NOTED.
14. ALL STORM PIPE TO BE CLASS III RCP UNLESS OTHERWISE NOTED.
12. MAINTENANCE OF DRAINAGE EASEMENTS AND DRAINAGE STRUCTURES
OUTSIDE OF NCDOT R/W TO BE MAINTAINED BY OTHERS (NOT NCDOT).
MAIL KIOSK AND SIDEWALK MAINTENANCE ALSO TO BE PERFORMED BY
OTHERS (NOT NCDOT).
EROSION CONTROL NOTES
1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR
MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE.
SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP AND
INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS
BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED
OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS
PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE
SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE
FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO
MAINTAIN A PROPER BARRIER.
2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT
FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH
DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY
EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE
EARLIEST POSSIBLE POINT DURING CONSTRUCTION.
3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL
BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA
EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN
MANUAL.
4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ
OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY
LAND DISTURBING ACTIVITIES. 910-433-3300
5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE
DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS.
REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING
OCCURS.
6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET FROM
ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF
REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE
5/8"-
ERB
/k `` ` <k k` k` k<y<k` <` k<y ` ` ky ` 5/8rrk`<k`k ky y`` k`Y<`` Y k`<k`< k`` <y Y<``<``/ 5/8"
/`y ERB y k k < <k Y k` k < < < k ` k < k k` ` k k ` k 4 k \ _ i ERB
� 5/8�� ky y 1
`5 `8"5/8`k 5/8' ERB r57/8/-- 1419
/ �- ERB 420
ERB i \ \ ERB ERB 11 ��-� R I
-_
' -\�418
\
433 , 5/s" � 423
�J435\
ERB
WOODSHIRE PHASE SIX \\` ` k k `•<` k k ` �1 ` ` `yk
PB 2013, PG 5 N\
/ 436 \ \~� \\ ��l -/// \ `\��\ \\ N/F
/� �\ - -� \ \ \ \ \ \ \ f 417 \ \ WOODSHIRE PARTNERS, LLC` k k k < k
�438 i \ \ �'// \ - / \\ \\ \\ \ \l �\ `-_�' \ I DB 2668, PG 901
o\Gi <
` I fir- e - s°' ��O `rVeee R1w �PUe / - 4-
roOG
Y
/6�'�/ �� III IIIIII l y
STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS.
CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT
BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES
LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE
FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE
COVERED IF LEFT MORE THAN 24 HOURS.
7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL
DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA
HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND
SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE
DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL
DEVICES IMMEDIATELY.
8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS
WHICH HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN
WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS
ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN,
WIND AND RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND
MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND
STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE
MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON
AREAS TO BE PAVED.
9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL
DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE FINAL
STABILIZATION AND PERMANENT VEGETATION HAS BEEN
ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE THE
ACTION PRIOR TO REMOVAL.
10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED
CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION
ACTIVITY.
11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL
TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES.
12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS
AND PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK \ Air
/ \
ON THIS PROJECT. \ I
13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE
CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY
RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN
ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE
IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED.
14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED L.\ IIII\I
SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE
THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER / I _ IIIIII
ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY
EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR
DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED
OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT \ \ \
GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO
RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS \ ��
FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN
EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS , \
WITHIN 90 CALENDAR DAYS FOLLOWING COMPLETION OF /
CONSTRUCTION OR DEVELOPMENT.
15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION • /
CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES
REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF
CONSTRUCTION. GRAPHIC SCALE
16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS
NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN. 100 0 50 100 200
17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT Know what's below.
ARISE ON SITE IS PJ GAY. CONTACT 910-237-0572.
Call before you dig.
( IN FEET )
1 inch = 100 ft.
400
4Dsite
solutions
04 civil engineering I land surveying
409 Chicago Drive, Suite 112, Fayetteville, NC 28306
office 1 910-426-6777 fax 1910-426-5777 license number I C-2354
www.4Dsitesotutions.com
REVISIONS
PROJECT NAME
WOODSHIRE
SUBDIVISION
PH ASE 7
OVERALL
GRADING AND
EROSION
CONTROL PLAN
CLIENT
1041 B Robeson Street
Fayetteville, North Carolina 28305
Phone: (910) 339-6330
Fax: (910)964-9089
PROJECT INFORMATION
DESIGNED BY:
CALEB
DRAWN BY:
CALEB
CHECKED BY:
SCOTT
PROJECT NUMBER:
1070
DRAWING SCALE
HORIZONTAL: 1 "=100'
DATE RELEASED
SEPTEMBER 30, 2022
SHEET NUMBER
THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED
C-3nO