Loading...
HomeMy WebLinkAbout20060331 Ver 1_email on DOT site visit and mitigation requirements_20140410Baker, Virginia From: Baker, Virginia Sent: Thursday, April 10, 2014 4:37 PM To: Elliott, Jason C Cc: Wanucha, Dave; Wainwright, David; amy.chapman @ncdenr.gov Subject: RE: NCDOT On -site Mitigation Division's 1 -8 Meeting Minutes Hi Jason, I was mostly fine with everything in the Division 1 -8 meeting minutes. I wanted to make a couple edits to the meeting minutes for Division 1 -8. Please For R-06091A Mile Branch — DOT will mow and chemically treat the lespeza on the left buffer (looking downstream) and the right buffer (if needed) plantings after the 2014 monitoring period to stabilize areas that had bank scour. I can not remember if there was much lespedeza on the right (south) stream buffer so that could just be spot treated if needed. I may have miss understood that treating the buffer might only entail mowing, please do also spray after mowing. Also, I am not sure if DOT has ever tried other forms of bank stabilization like brush - mattresses, that might be another option for those scour areas we looked at in the field. For R- 2606WM UT to Muddy Creek Please also add — "Some concern was noted over the slow stream flow rate and buildup of algae behind stream structures at road crossing. DOT will chemically treat the dense area of Japanese honeysuckle in the buffer." See you next week. Thanks! Ginny From: Elliott, Jason C Sent: Monday, April 07, 2014 12:55 PM To: Baker, Virginia; Brad Shaver ( brad. e.shaver(a)usace. army. mi1); Brittingham, Cathy; Chapman, Amy; Chris Militshcer ( militscher .chrisCa)epamail.epa.Qov); Coggins, Tony C; David Bailey ( David. E.Bailey(a)usace.army.mil); Wainwright, David; Eric Alsmeyer ( Eric. C. Alsmeyer (a)saw02.usace. army. mi1); Fritz Rohde (Fritz. rohde(a)noaa.Qov); Gary Jordan (aary jordan(a)fws.Qov); Green, Matthew L; Griffin, Randy W; Henry Wicker ( Henry. M.Wicker.JR@)usace.army.mil); Johnson, Jay B; King, Art C; Liz Hair ( sarah.e.hair(a)usace.army.mil); Herndon, Mason; Mathis, Stonewall D; Murray, Christopher A; Parker, Jerry A; Rerko, James J; Ridings, Rob; Lane, Stephen; Sollod, Steve; Tom Steffens ( Thomas .A.Steffens(a)usace.army.mil); Tracey Wheeler ( tacey .l.wheeler(a)usace.army.mil); Wilson, Travis W.; Wanucha, Dave; Willis, Thomas C Subject: NCDOT On -site Mitigation Division's 1 -8 Meeting Minutes Good afternoon all, Please see the attached meeting minutes from the Division's 1 -8 monitoring report meeting. I've also included information from the on -site reviews conducted last week as well. Please let me know if you have any comments or additions that need to be added to the meeting minutes. Thanks and have a good day. Jason C. Elliott PDEA Natural Environment Section Natural Environment Engineering Group NC Department of Transportation PDEA' Natural Environment Section 1S9O Mail Service Center Century Center Building B 10Z0 Birch Ridge Drive Raleigh, NCZ7699'1S9O 919-707-6114 (office) 919-212-5785 (fax) ernancormspmnumncmto arid onrri this m^numr/wsubJwct to thmm.u. Public Records Law arid may bmmwc|ospd M H'i/rdpammw.