Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3180401_Stormwater Report_20221201
EROSION CONTROL AND STORM DRAINAGE CALCULATION PACKAGE THE TOWNS AT AURDREY PARK XX%I I i u uiii CARO -57 oo i LICENSE NO.: i = F-1407 Prepared for: Pulte Home Company, LLC 11121 Carmel Commons Blvd. Charlotte, NC 28226 (704) 543-4922 Prepared by: ESP Associates, Inc. 3475 Lakemont Blvd Fort Mill, SC 29708 (803) 802-2440 Project Number ER22.400 Original: April 2, 2018 Revised: June 29, 2018 August 17, 2018 August 28, 2018 September 12, 2018 November 23, 2022 k)ESP EA 038830 _- 2022.11.23 08:17:44-05'00' Table of Contents 1. Project Narrative & Summary 2. Location & USGS Map 3. Soils Map & Information 4. FEMA Flood Insurance Map S. Storm Drainage Calculations A. Storm System B Tabulation Report & Profiles B. Inlet Capacity Chart / Spread Calculations 6. Extended Dry Detention BMP Calculations A. Extended Dry Detention BMP Calculations B. Sand Filter Calculations C. 1 INCH — 6 HR Analysis: Water Quality Volume D.10 Year Storm Analysis: Pre & Post Development E. 25 Year Storm Analysis: Pre & Post Development F. 50 Year Storm Analysis: Pre & Post Development 7. Sediment Basin Calculations A. Sediment Basin Skimmer Data 8. Rip Rap Apron Calculations 9. Drainage Map 1. Project Narrative & Summary PROJECT NARRATIVE The project, "The Towns At Audrey Park" is a proposed single-family townhome development located off of Rea Road Union County, North Carolina. The existing 20.93-acre site is being developed as a residential community with private streets and infrastructure. This package details the proposed storm drainage system and erosion control calculations for the project. The project site is located in Zone X and Zone AE per FIRM Map for Union County, North Carolina —Map Numbers 3710445600L with an effective date of February 19, 2014. The overall existing site consists of woods some of area is cleared and Six Mile Creek run through the southwest of the property. The site primarily drains southwest towards a tributary of McBride Branch located at the southwest portion of the site. McBride Branch borders the southwest side of the site. Wetlands exist near the creeks bordering the site; however only temporary impacts are anticipated due to the with the proposed sanitary sewer construction. The proposed stormwater runoff shall be conveyed through closed storm drainage systems, discharged into an extended dry detention BMP system. The proposed extended dry detention BMP system consist forebay, sand filter and detention. The extended dry detention BMP then discharged through riprap aprons and vegetative conveyances while maintaining a minimum 30' undisturbed buffer from the jurisdictional streams and wetlands. Due to the proposed extended detention BMP system and maintained buffers, the proposed project is not anticipated to have negative impacts on downstream or adjacent properties. 2. Location & USGS Map G tdl�l Oil r w �Q 4 17# rrY�c� SITE Cyr ildrens Lighthouse Wexha Rom} 4r� THE TOWNS AT AU RDREY PARK VICINITY MAP SCALE: 1 " = 500' � I d - Q. `-.� �`- 690 Ilk a :� �*k>` , I �@ SITE Cb �-� 600 r G Copyright:© 2013 National Geographic 6ociety,.i=cubed USGS MAP THE TOWNS AT AURDREY PARK UNION COUNTY, NC 1 " = 1,000 ' 3. Soils Map & Information 517000 35o 1' 25" N �K �i u'S r �i r �i r �i u� r �i 8 u� r �i 35o 1' 3" N 517000 517100 517200 517300 517400 517500 Map Scale: 1:4,840 if printed on A landscape (11" x 8.5") sheet Meters $ N 0 50 100 200 500 Feet 0 200 400 800 1200 Map projection: Web Mercator Gonercoordinates: WGS84 Edge tics: UTM Zone 17N WGS84 U5DA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Hydrologic Soil Group —Mecklenburg County, North Carolina, and Union County, North Carolina 517100 517200 517300 517400 517500 517600 517700 517800 517900 517600 517700 517800 517900 0 8 35o 1' 25" N r �i �i r �i r �i r �i u� r �i 8 u� r �i 35o 1' 3" N b 3/16/2018 Page 1 of 5 Hydrologic Soil Group —Mecklenburg County, North Carolina, and Union County, North Carolina (REA ROAD TOWNHOMES) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A A/D ,y B B/D r r C N 0 C/D D r r Not rated or not available Soil Rating Points 0 A 0 A/D ■ B ■ B/D 0 C 0 C/D ■ D 0 Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background . Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Mecklenburg County, North Carolina Survey Area Data: Version 16, Sep 26, 2017 Soil Survey Area: Union County, North Carolina Survey Area Data: Version 17, Oct 3, 2017 Your area of interest (AOI) includes more than one soil survey area. These survey areas may have been mapped at different scales, with a different land use in mind, at different times, or at different levels of detail. This may result in map unit symbols, soil properties, and interpretations that do not completely agree across soil survey area boundaries. Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 14, 2015—Feb 8, 2017 1J5DA Natural Resources Web Soil Survey 3/16/2018 Conservation Service National Cooperative Soil Survey Page 2 of 5 Hydrologic Soil Group —Mecklenburg County, North Carolina, and Union County, North Carolina (REA ROAD TOWNHOMES) MAP LEGEND MAP INFORMATION The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shiftina of map unit boundaries may be evident. 1J5DA Natural Resources Web Soil Survey 3/16/2018 Conservation Service National Cooperative Soil Survey Page 3 of 5 Hydrologic Soil Group —Mecklenburg County, North Carolina, and Union County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI IrA Iredell fine sandy loam, 0 to 1 percent slopes C/D 0.9 1.9% MO Monacan loam, 0 to 2 percent slopes, frequently flooded B/D 1.3 2.7% Subtotals for Soil Survey Area 2.3 4.6% Totals for Area of Interest 60.0 100.0% Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ChA Chewacla silt loam, 0 to B/D 18.0 36.0% 2 percent slopes, frequently flooded IrA Iredell loam, 0 to 3 C/D 25.9 51.7% percent slopes McB2 Mecklenburg sandy clay C 3.9 7.8% loam, 2 to 8 percent slopes, moderately eroded Subtotals for Soil Survey Area 47.7 96.6% Totals for Area of Interest 60.0 100.0% iUSDA Natural Resources Web Soil Survey 3/16/2018 Conservation Service National Cooperative Soil Survey Page 4 of 5 Hydrologic Soil Group —Mecklenburg County, North Carolina, and Union County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher IJSDA Natural Resources Web Soil Survey 3/16/2018 am Conservation Service National Cooperative Soil Survey Page 5 of 5 4. FEMA Flood Insurance Maps National Flood Hazard Layer FI RMette Ou" Y= FEMA Legend SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT Without Base Flood Elevation (BFE) Zone A. V. A99 SPECIAL FLOOD With BFE or Depth HAZARD AREAS Regulatory Floodway Zone AE, AO, AH, VE, AR 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile zone Future Conditions 1% Annual Chance Flood Hazard zone �/'I Area with Reduced Flood Risk due to OTHER AREAS OF Levee. See Notes. zone FLOOD HAZARD ��� Area with Flood Risk due to Levee zone D 0 0 A 0 ro N u, NO SCREEN Area of Minimal Flood Hazard zone x Q Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard zone D GENERAL - — - - Channel, Culvert, or Storm Sewer STRUCTURES uuuIIIIIII Levee, Dike, or Floodwall V Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation o- - - Coastal Transact ,...,,,su.,,w. Base Flood Elevation Line (BFE) Limit of Study Jurisdiction Boundary — --- Coastal Transact Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature ❑ Digital Data Available ^N Q No Digital Data Available MAP PANELS El Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The base map shown complies with FEMA's base map accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 4/3/2018 at 3:03:05 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: base map imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. 0 250 500 1,000 1,500 2,000 5. Storm Drainage Calculations Storm System 6 Tabulation Report & Profiles Project: The Towns At Aurdrey Parks County/City: Union County Designed By: KK Date: 3/15/2018 State: North Carolina Checked By: MRR Date: 3/15/2018 Stom Structure: I DI#B2 Total Drainage Area to Storm Structure: 0.10 Acres 4,356 Sq. Ft. Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 025 0.00 0.00 Grass 0.30 0.02 0.06 Gravel 0.55 0.00 0.00 Impervious 0.95 0.08 0.78 TOTAL: - 0.10 0.84 Stom Structure: I DI#B3 Total Drainage Area to Storm Structure: 0.10 Acres 4,356 Sq. Ft. Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 025 0.00 0.00 Grass 0.30 0.02 0.06 Gravel 0.55 0.00 0.00 Impervious 0.95 0.08 0.78 TOTAL: - 0.10 0.84 Stom Structure: I DI#B4 Total Drainage Area to Storm Structure: 0.10 Acres 4,356 Sq. Ft. Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.01 0.03 Gravel 0.55 0.00 0.00 Impervious 0.95 0.09 0.81 TOTAL: - 0.10 0.84 Stom Structure: I DI#B5 Total Drainage Area to Storm Structure: 0.16 Acres 6,970 Sq. Ft. Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 025 0.00 0.00 Grass 0.30 0.12 0.37 Gravel 0.55 0.00 0.00 Impervious 0.95 0.04 0.38 TOTAL: - 0.16 0.75 Stom Structure: I CB#B8 Total Drainage Area to Storm Structure: 0.22 Acres 9,583 Sq. Ft. Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 025 0.00 0.00 Grass 0.30 0.04 0.05 Gravel 0.55 0.00 0.00 Impervious 0.95 0.18 0.78 TOTAL: - 0.22 0.83 Stom Structure: I CB#B9 Total Drainage Area to Storm Structure: 0.14 Acres 6,098 Sq. Ft. Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.05 0.11 Gravel 0.55 0.00 0.00 Impervious 0.95 0.09 0.61 TOTAL: - 0.14 0.72 Stom Structure: I CB#B70 Total Drainage Area to Storm Structure: 0.33 Acres 14,375 Sq. Ft. Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 025 0.00 0.00 Grass 0.30 0.05 0.05 Gravel 0.55 0.00 0.00 Impervious 0.95 028 0.81 TOTAL: - 0.33 0.85 Project: The Towns At Aurdrey Parks County/City: Union County Designed By: KK Date: 3/15/2018 State: North Carolina Checked By: MRR Date: 3/15/2018 Stom Structure: I DCB#B11 Total Drainage Area to Storm Structure: 0.48 Acres 20,909 Sq. Ft. Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.07 0.04 Gravel 0.55 0.00 0.00 Imperviousl 0.95 1 0.41 0.81 TOTAL: I - 1 0.48 0.85 Stom Structure: I CB#B7 Total Drainage Area to Storm Structure: 0.10 Acres Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.04 0.12 Gravel 0.55 0.00 0.00 Imperviousl 0.95 1 0.06 0.57 TOTAL: I - 1 0.10 0.69 Stom Structure: I CB#B12 Total Drainage Area to Storm Structure: 0.04 Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.01 0.08 Gravel 0.55 0.00 0.00 Imperviousl 0.95 1 0.03 0.71 TOTAL: - 0.04 0.79 Stom Structure: I DI#B13 Total Drainage Area to Storm Structure: 0.09 Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.05 0.17 Gravel 0.55 0.00 0.00 Imperviousl 0.95 1 0.04 0.42 TOTAL: I - 1 0.09 0.59 Stom Structure: I DI#B14 Total Drainage Area to Storm Structure: 0.16 Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.07 0.13 Gravel 0.55 0.00 0.00 Imperviousl 0.95 1 0.09 0.53 TOTAL: - 0.16 0.67 Acres Acres Acres 4,356 Sq. Ft. 1,742 Sq. Ft. 3,920 Sq. Ft. 6,970 Sq. Ft. Project: The Towns At Aurdrey Parks County/City: Union County Designed By: KK Date: 3/15/2018 State: North Carolina Checked By: MRR Date: 3/15/2018 Stom Structure: I DI#B15 Total Drainage Area to Storm Structure: 0.18 Acres 7,841 Sq. Ft. Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.03 0.05 Gravel 0.55 0.00 0.00 I mpervious 0.95 0.15 0.79 TOTAL: - 0.18 0.84 Stom Structure: I CB#B16 Total Drainage Area to Storm Structure: 0.36 Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.05 0.04 Gravell 0.55 1 0.00 0.00 I mpervious 0.95 0.31 0.82 TOTAL: - 0.36 0.86 Stom Structure: I CB#B17 Total Drainage Area to Storm Structure: 0.34 Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.03 0.03 Gravell 0.55 1 0.00 0.00 I mpervious 0.95 0.31 0.87 TOTAL: - 0.34 0.89 Stom Structure: I CB#B18 Total Drainage Area to Storm Structure: 0.04 Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.03 0.23 Gravell 0.55 1 0.00 0.00 I mpervious 0.95 0.01 0.21 TOTAL: - 0.04 0.44 Acres 15,682 Sq. Ft. Acres 14,810 Sq. Ft. Acres 1,742 Sq. Ft. Project: The Towns At Aurdrey Parks County/City: Union County Designed By: KK Date: 3/15/2018 State: North Carolina Checked By: MRR Date: 3/15/2018 Stom Structure: I DI#B19 Total Drainage Area to Storm Structure: 0.05 Acres 2,178 Sq. Ft. Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.04 0.24 Gravel 0.55 0.00 0.00 I mpervious 0.95 0.01 0.17 TOTAL: - 0.05 0.41 Stom Structure: I DI#B20 Total Drainage Area to Storm Structure: 0.15 Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.07 0.14 Gravel 0.55 0.00 0.00 I mpervious 0.95 0.08 0.51 TOTAL: - 0.15 0.65 Stom Structure: I DI#B21 Total Drainage Area to Storm Structure: 0.10 Area C Value Area (Acres) Composite C Denuded 0.60 0.00 0.00 Woods 0.25 0.00 0.00 Grass 0.30 0.06 0.18 Gravel 0.55 0.00 0.00 I mpervious 0.95 0.04 0.38 TOTAL: - 0.10 0.56 Acres 6,534 Sq. Ft. Acres 4,356 Sq. Ft. Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) 00 (ft) 00 (ft) (ft) 00 I End 9.198 0.10 3.24 0.84 0.08 2.56 0.0 8.2 6.4 16.41 18.06 5.72 24 0.54 582.00 582.05 583.73 583.75 0.00 590.11 132-1311 2 1 99.290 0.18 1.22 0.84 0.15 0.96 5.0 7.8 6.5 6.22 8.07 3.52 18 0.50 582.55 583.05 584.53 584.82 590.11 588.84 1315-132 3 2 102.968 0.36 1.04 0.86 0.31 0.80 5.0 7.2 6.7 5.35 8.08 3.03 18 0.50 583.26 583.78 585.11 585.34 588.84 589.54 1316-1315 4 3 24.340 0.34 0.68 0.89 0.30 0.49 5.0 7.1 6.7 3.30 7.98 3.02 18 0.49 583.96 584.08 585.41 584.77 589.54 589.54 1317-1316 5 4 77.670 0.04 0.34 0.44 0.02 0.19 5.0 6.7 6.8 1.30 4.96 3.31 15 0.50 584.33 584.72 584.77 585.17 589.54 590.09 1318-1317 6 5 102.878 0.05 0.30 0.41 0.02 0.17 5.0 6.2 6.9 1.20 4.93 3.26 15 0.50 586.29 586.80 586.71 587.23 590.09 591.47 1319-1318 7 6 71.874 0.15 0.25 0.65 0.10 0.15 5.0 5.8 7.0 1.08 4.95 3.16 15 0.50 587.00 587.36 587.40 587.77 591.47 590.69 1320-1319 8 7 111.770 0.10 0.10 0.56 0.06 0.06 5.0 5.0 7.2 0.41 4.95 2A0 15 0.50 587.56 588.12 587.80 588.37 590.69 590.85 1321-1320 9 1 38.550 0.10 1.92 0.84 0.08 1.52 5.0 77 6.5 9.94 17.21 3.16 24 0.49 582.05 582.24 584.53 584.59 590.11 589.02 133-132 10 9 69.417 0.10 1.82 0.84 0.08 1.44 5.0 7.3 6.6 9.52 17.40 3.03 24 0.50 582.24 582.59 584.67 584.77 589.02 590.20 134-133 11 10 72.448 0.16 1.72 0.75 0.12 1.35 5.0 6.9 6.7 9.10 17.27 2.90 24 0.50 582.59 582.95 584.84 584.94 590.20 588.82 135-134 12 11 129.714 0.00 1.56 0.00 0.00 1.23 0.0 6.2 6.9 8.53 17.35 2.89 24 0.50 582.95 583.60 585.13 585.26 588.82 589.12 136-135 13 12 21.812 0.10 0.75 0.69 0.07 0.54 5.0 6.1 6.9 3.78 11.43 5.07 18 1.01 585.61 585.83 586.20 586.57 589.12 588.94 137-136 14 13 83729 0.04 0.29 0.79 0.03 0.19 5.0 5.6 7.1 1.35 4.95 3.17 15 0.50 586.08 586.50 586.57 586.96 588.94 589.97 B12-B7 15 14 56.165 0.09 0.25 0.59 0.05 0.16 5.0 5.3 7.1 1.14 4.94 3.21 15 0.50 586.70 586.98 587.11 587.40 589.97 590.19 1313-1312 16 15 60.000 0.16 0.16 0.67 0.11 0.11 5.0 5.0 7.2 0.78 4.95 2.88 15 0.50 587.18 587.48 587.51 587.82 590.19 590.42 1314-1313 17 13 24.333 0.22 0.36 0.83 0.18 0.28 5.0 5.3 7.1 2.03 4.91 3.78 15 0.49 586.08 586.20 586.64 586.77 588.94 588.94 138-137 18 17 50.150 0.14 0.14 0.72 0.10 0.10 5.0 5.0 7.2 0.73 4.94 2.60 15 0.50 586.40 586.65 586.77 586.98 588.94 589.59 139-138 19 12 60.373 0.33 0.81 0.85 0.28 0.69 5.0 5.1 7.2 4.96 8.02 3.90 18 0.50 584.10 584.40 585.41 585.26 589.12 588.94 B10-B6 20 19 24.833 0.48 0.48 0.85 0.41 0.41 5.0 5.0 7.2 2.95 4.87 4.16 15 0.48 584.65 584.77 585.35 585.47 588.94 589.22 1311-1310 Project File: STORM B 8-23-2018.stm Number of lines: 20 Run Date: 8/28/2018 NOTES:Intensity = 88.24 / (Inlet time + 15.50) 1 0.83; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers 02.00 Proj. file: STORM B 8-23-2018.stm Elev. (ft) 603.00 598.00 583.00 m a +r DE DE J Ds .y /1� IMOSCOW ■III- .�I■■1■��I I1�1�■1■�i■��■I■11�■I��1��11 I1 � 1 �■ 1 ■� 1 ���_; i�J�■�I�■� 1■■i�N.l�li���ifiifii■ii`�iili■�� .1 1a 588.00 -IF@0.50% 583.00 578.00 100 150 200 250 300 350 400 450 500 550 EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STORM B 8-23-2018.stm Elev. (ft) 600.00 ra + C* LU W F :.; Z.; OE ma" "i "I 7 WEE OE .5 0 CA loan LU * UJ LU W (4 -E jp; 31; -M �; 3.; W E.E WE 600.00 596.00 596.00 592.00 588.00 —592.00 588.00 584.00 584.00 I 2*859H -- 15" @ 0,48% 580.00 1 580.00 0 25 50 75 100 125 150 175 200 225 — HGL— EGL Reach (ft) Storm Sewers Elev. (ft} 598.00 ap A m m CA Wuiw E' 7 9 C C men m �m� w� +� Wuiui E77 W C C �Co� IotaLa +Q Www ,M E'77 W W C C im �� +Q Ww _M €7 W I C 598.00 595.00 595.00 592.00 592.00 589.00 586.00 589.00 586.00 5 D.15DLf -15r ® 0.50 583.00 583.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Proj. file: STORM B 8-23-2018.stm Elev. (ft) 604.00 599.00 584.00 OE J Q C Q C Q M m e � a J ME C Q E J ci ON I-_-Il��i �I��EI-1-� • 1 1'� ��i]�■iiiii'ii�1■ii`i�'�i'i'�fi������ M 599.00 589.00 cz 0.50% 584.00 579.00 100 150 200 250 300 350 400 450 500 550 600 EGL Reach (ft) Storm Sewers Inlet Capacity Chart / Spread Calculations 10-YR STORM: SPREAD CALCULATIONS / INLET CAPACITY CHART PROJECT: The Towns At Aurdrey Park LOCATION: Union County, NC RAINFALL INTENSITY 4.00 IN/HR DESIGNED BY: KK DATE: 3/26/2018 CHECKED BY: MRR DATE: REFERENCE: MAXIMUM ALLOWABLE SPREAD FOR VALLEY CURB AND GUTTER = 7' STORM SYSTEM B INLET# DRAINAGE AREA INLET'C' INLET TYPE SURFACE'Q' SLOPE INLET BYPASS Q To Inlet# SUB. TOTAL LONG. TRANS. K QCAP SPREAD DEPTH REMARKS CB#B10 0.04 0.79 ON GRADE 0.13 0.13 1.00% 2.08% 21.0 0.23 3.24 0.07 0.00 CB#B4 CB#B5 0.22 0.83 SAG -SINGLE 0.73 0.73 0.00% 2.08% N/A N/A 4.83 0.10 0.00 N/A CB#B4 0.10 0.69 SAG -SINGLE 0.28 0.28 0.00% 2.08% N/A N/A 2.53 0.05 0.00 N/A CB#B6 0.14 0.72 ON GRADE 0.40 0.40 1.00% 2.08% 21.0 0.48 5.00 0.10 0.00 CB#B7 CB#B7 0.33 0.85 SAG -SINGLE 1.12 1.12 0.00% 2.08% N/A N/A 6.44 0.13 1 0.00 N/A DCB#B8 0.48 0.85 SAG -DOUBLE 1.63 1 1.63 1 0.00% 1 2.08% 1 N/A N/A 6.51 1 0.14 0.00 N/A STORM SYSTEM B CB#B18 0.04 0.44 ON GRADE 0.07 0.07 1 1.00% 2.08% 21.0 1 0.16 2.60 0.05 0.00 CB#B17 CB#B17 0.34 0.89 SAG -SINGLE 1.21 1 1.21 1 0.00% 1 2.08% 1 N/A I N/A 6.77 1 0.14 0.00 N/A CB#B16 1 0.36 1 0.86 1 SAG -SINGLE 1 1.24 1 1.24 1 0.00% 1 2.08% 1 N/A I N/A 1 6.87 1 0.14 1 0.00 1 N/A 6. Extended Dry Detention BM P Calculations B. Sand Filter Calculations ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project The Towns at Audrey Parks By KK Location Union County, NC Checked MRR Circle One: Present Developed Pre CN 1. Runoff Curve Number Date Date 6/27/2018 6/27/2018 Soil Hydrologic Group Cover Description (cover type, treatment and hydrologic condition) CN* Area Acres Product of CN x area Tbl. 2-2 Fig. 2-3 Fig. 2-4 D Woods —grass combination (orchard), Fair condition (IrA,MeB2,ChA) 82 3.640 298.48 * Use only one CN source per line CN (weighted) total product = 298.48 = 82.0 total area 3.64 2. Runoff Frequency yr Rainfall , P (24-hour) in Runoff, Q in (Use P and CN with table 3-11, fig. 2-1, and equation 3-14) Totals = 1 3.640 Use CN= 82 Storm #1 Storm #2 2 10 3.12 4.80 1 1.47 1 2.90 1 298.48 Storm #3 100 6.96 1 4.88 Reference: Urban Hydrology for Small Watersheds Rainfall, P, taken from: Technical Release 55, Soil Conservation Service CMSWS Storm Water Design Manual, U.S. Department of Agriculture, June 1986 January 2014 ESP Assocates, PA Pre CN PoBox 7030 The Towns At Audrey Park - Pre & Post-dev CN Calcs Charlotte NC 28241 8/18/2018 ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Runoff Curve Number and Runoff Project The Towns at Audrey Park By KK Date 6/27/2018 Location Union County, NC Checked MRR Date 6/27/2018 Circle One: Present Developed Post-Dev. CN 1. Runoff Curve Number Soil Cover Description CN* Area Product Hydrologic (cover type, treatment of Tbl. Fig. Fig. Group and hydrologic condition) 2-2 2-3 2-4 Acres CN x area D Residential, 1/8 acre or less (town houses) (IrA,MeB2,ChA) 92 3.140 288.88 * Use only one CN source per line Totals = 1 3.140 1 288.88 CN (weighted) total product = 288.88 = 92.0 Use CN= 92 total area 3.14 2. Runoff Storm #1 Storm #2 Storm #3 Frequency yr 2 10 100 Rainfall , P (24-hour) in 3.12 4.80 6.96 Runoff, Q in 1 2.27 1 3.89 1 6.02 (Use P and CN with table 3-11, fig. 2-1, and equation 3-14) Reference: Urban Hydrology for Small Watersheds Rainfall, P, taken from: Technical Release 55, Soil Conservation Service CMSWS Storm Water Design Manual, U.S. Department of Agriculture, June 1986 January 2014 ESP Assocates, PA Post-Dev. CN PoBox 7030 The Towns At Audrey Park - Pre & Post-dev CN Calcs Charlotte NC 28241 8/18/2018 ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project The Towns at Aurdrey Park By KK Date 6/27/2018 Location City of Charlotte, NC Checked MRR Date 612712018 Circle One: Present Developed Extended Dry Detention Pre-Dev 1. SHEET FLOW SEGMENT ID A to B 1. Surface description (table 3-1)................................. Woods -Light 2. Manning's roughness coefficient, n (table 3-1)............... 0.4 3. Flow length, L (total L <_ 300 ft)...............................ft 200 4. Two-year 24-hour rainfall, P...................................in 3.12 5. Land slope, s.....................................................ft/ft 0.0340 6. Tt = 0.007 (nL)^0.8 Compute Tt ................hr 0.51 + 0.51 P210.5 s10.4 SHALLOW CONCENTRATED FLOW SEGMENT ID B to C 7. Surface description (paved or unpaved) ...................... Unpaved 8. Flow length, L.......................................................ft 171 9. Watercourse slope, s..........................................ft/ft 0.0130 10. Average velocity, V (figure 3-1) ............................... 1.840 11. Tt = L Compute Tt .............. hri 0.03 + 0.03 3600 V CHANNEL FLOW SEGMENT ID 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a....................................ft2 14. Wetted perimeter, pw.........................................ft 15. Hydraulic radius r = a/pw Compute r ................ft 16. Channel slope, s..............................................ft/ft 17. Manning's roughness coefficient, n.............................. 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V ..............ft/s 19. Flow length, L...................................................ft 20. Tt = L Compute Tt ...............hr + 0.00 3600 V 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) Hr = 0.54 Min = 32.4 Reference: Urban Hydrology for Small Watersheds Rainfall, P, taken from: Technical Release 55, Soil Conservation Service CMSWS Storm Water Design Manual, U.S. Department of Agriculture, June 1986 January 2014 ESP Associates', PA Po Box 7030 Charlotte NC 28241 ESP Associates, P.A. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project The Towns at Aurdrey Park By KK Date 6/27/2018 Location Unio County, NC Checked MRR Date 612712018 Circle One: Present eveloped Extended Dry Detention Post-Dev 1. SHEET FLOW SEGMENT ID 1. Surface description (table 3-1)................................. 2. Manning's roughness coefficient, n (table 3-1)................ 3. Flow length, L (total L <_ 300 ft)...............................ft 4. Two-year 24-hour rainfall, P...................................in 5. Land slope, s.....................................................ft/ft 6. Tt = 0.007 (nL)^0.8 Compute Tt.................hr P210.5 s10.4 2. SHALLOW CONCENTRATED FLOW SEGMENT ID 7. Surface description (paved or unpaved) ...................... 8. Flow length, L.......................................................f 9. Watercourse slope, s..........................................ft/fi 10. Average velocity, V (figure 3-1) ............................... 11. Tt = L Compute Tt ..............hi 3600 V 3. CHANNEL FLOW SEGMENT ID 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a.....................................ft2 14. Wetted perimeter, pw.........................................ft 15. Hydraulic radius r = a/pw Compute r.................ft 16. Channel slope, s..............................................ft/ft 17. Manning's roughness coefficient, n .............................. 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V ..............ft/s 19. Flow length, L...................................................ft 20. Tt = L Compute Tt ...............hr 3600 V 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) Reference: Urban Hydrology for Small Watersheds Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 ESP Associates', PA Po Box 7030 Charlotte NC 28241 + I 1 0. + I 1 0. + I 1 0. Hr = o.00 Min = 7.9 Rainfall, P, taken from: CMSWS Storm Water Design Manual, January 2014 BMP Sizing Data XX.XX Required user input data XX.XX Calculations Post Developed Basin Data Drainage Area = 3.140 ac Impervious % (1)= 82.803 % Impervious acres = 2.600 ac Curve Number (CN) = 92.000 Tc = 7.900 minutes = 0.132 hours T lag = 4.740 minutes = 0.079 hours Water Quality Volume Calculations Rv = 0.05+0.009(1) = 0.795 WQv = 1.ORvA/12 = 0.208 ac-ft WQv = 1.ORv = 0.795 inches Modified CN = 98.047 Pre -Developed Basin Data Drainage Area = 3.640 ac Impervious % (1)= 0.000 % Impervious acres = 0.000 ac Curve Number (CN) = 82.000 Tc = 32.400 minutes = 0.540 hours T lag = 19.440 minutes = 0.324 hours Basin ID: Project Name Project # : Extended Dry Detention Basin Worksheet Extended Dry Detention Pond The Towns At Aurdrey Park Designer: KK Date: 08/13/18 Rev: 08/13/18 Rev: 11 /22/22 Pond Designed For: Standard Efficiency Minimum Detention Time: 2 Days Min. Pollutant Removal Rates: 30% TSS 30% TP Basin Drainage Area Summary Impervious Area: 2.60 ac Pervious Area: 0.54 ac Future Impervious Area: Total Area: 3.14 ac Percent BUA: 82.80% Required Designer Input= Calculate The Water Quality Volume WQv WQv Design Rainfall: 1.00-in Determine the Runoff Coefficient (Rv) for the 1-in rainfall Rv = 0.05 + 0.9 x (1) 1 = 82.80% Rv = 0.80 Determine the Water Quality Volume (WQv) WQ , = Design Rainfall x Rv x Drainage Area Design Rainfall is 1 Inch Rv is 0.80 Drainage Area is 3.14 Acres WQv = (1 x 0.80 x 3.14)/12 WQ„ = 0.208-ac-ft 9,064.11-cf Calculate the Average Depth and Design Volume of Basin from Proposed Contours Basin Stage/Storage Elev. Forebay Area Main Bay Area Total Area Forebay Incr. Vol. Forebay Accumulated Vol. Main Bay Incr. Vol. Main Bay Accumulated Vol. Total Accumulated Vol. 582.00 3,586.00 sf 495.00 sf 4,081.00 sf 0.00-cf 0.00-cf 0.00-cf 0.00-cf 0.00-cf 583.00 3,733.00 sf 535.00 sf 4,268.00 sf 3,659.50-cf 3,659.50-cf 515.00-cf 515.00-cf 4,174.50-cf 583.01 3,733.00 sf 5,109.00 sf 8,842.00 sf 37.33-cf 3,696.83-cf 28.22-cf 543.22-cf 4,240.05-cf 584.00 3,879.00 sf 5,266.00 sf 9,145.00 sf 3,767.94-cf 7,464.77-cf 5,135.63-cf 5,678.85-cf 13,143.62-cf 585.00 4,027.00 sf 5,424.00 sf 9,451.00 sf 3,953.00-cf 11,417.77-cf 5,345.00-cf 11,023.85-cf 22,441.62-cf 586.00 4,098.00 sf 5,504.00 sf 9,602.00 sf 4,062.50-cf 15,480.27-cf 5,464.00-cf 16,487.85-cf 31,968.12-cf Min. Forebay Volume Req'd (0.2"/Imp AC): 1,887.60-cf Forebay Volume Provided: 15,480.27-cf Riser Rim ELEV. = 585.00 WQv PEAK ELEV.= 583.11 BOTTOM OF DRY POND = 582.00 OUTFLOW PIPE SAND FILTER CALCULATIONS PROJECT NAME: The Towns At Aurdrey Park BMP ID: 1 Dry Pond PROJECT NUMBER: ER22.450 DESIGNER: KK CHECKED BY: MR DATE: 08/13/18 DATE: REV.:. DATE: Drainage Area Characteristics: Total Drainage Area: 3.14 ac 0.00 ac Exist./Prop. Impervious Area: 2.60 ac Future Impervious Area: 0.00 ac WATER QUALITY VOLUME CALCULATION BMP ID Pervious Area Impervious Total Imperv. Runoff Coeff. Rainfall Depth Drainage Area Water Quality Area Fraction IA Rv P (A) Volume (WQv) 1 1 0.54 ac 2.60 ac 3.14 ac 1 0.83 1 0.80 1 1.00 inj 3.14 ac 1 9,064.15 c Simple Method Water Quality Volume: R=0.05+0.9xIA WQ = (P x R x A)/12 Calculate the Water Quality Peak Flow (Qp): Calculate CN,n CN,,, = 1,000/(10 + 5P + 10WQ - 10(WQV2 + 1.25WQ p) o.ej P = Rainfall in inches P: 1.00 in WQ , (Inches) = P *Rv WQv: 0.80 in 0.208 acre-ft CN, : 98.05 QP: 0.57 cfs Taken from Pond Modeling Software- See attached routing for more info. Page 1 SAND FILTER SURFACE AREA BMP ID Water Quality Filter Bed Coeff. of Avg. Ht of Design Drain Req'd Area of Surface Area Volume (WQv) Depth (df) Permeability Water Above Time (tf) BMP (Af) Provided (k) Filter Bed (hf) 1 9,064.15 cf, 1.50-ft 3.50-ft/day 1.00-ft 2.13 days 731.23-sf, 4,953.78-sfl Darcy's Law Surface Area Calculation A f = (WQ j (d r) / [(k) (h f + d f) (t f)] Sediment Forebay Volume Calculation Fv = 0.20 * WQv Fv: 1,812.83 cf Minimum Req'd Volume Forebay Elev.: 582.00 WQv Elev.: 585.50 Forebay Vol. Provided: 12,384.45 cf 0.284 acre-ft ForebayVol.Required: 1,812.83 cf ACCEPTABLE Page 2 ACCEPTABLE WQv Provided: 9,907.56 cf WQVApj Req'd: 9,064.15 cf ACCEPTABL Calculate the Stage -Discharge for the Sand Filter m E E E m > E O V_ a) LO 0) m WQ It =Q. =Af (k)(hf+df)l(df) Af: 4,953.78-sf Ar: 4,953.78-sf (Provided Surface Area of Filter Bed) k: 3.5 ft/day (Coeff. Of Permeability) df: 1.5 ft (Filter Bed Depth) Elevation (ft) sand filter (hf) (ft) Discharge (cfs) 582.00 0 0.000 583.00 1.00 0.334 584.00 2.00 0.468 585.00 3.00 0.602 586.00 4.00 0.736 Calculate the Underdrain Outflow and Minimum Drawdown Calculate Minimum Drawdown (Qmin) Q min = (wQV / to / 86,400 sec/day Qmin 0.05 cfs Size Underdrain System for BMP Calculate Perforation Capacity 2 rows/ft, 10 Pipe Perforations: 10/If holes/row Linear Ft of Pipe 268.00 Total Perforations: 2680 50% Perforations: 1340 Dia. of Perforation: 0.375-in 0.031 ft 0.00307-sf Total Head Above Drain: 2.00-ft Capacity Per Perforation 0.02-cfs ca(2gh)05 c = 0.62 Total Capacity: 28.93-cfs ACCEPTABLE Page 3 THE TOWNS AT AURDREY PARK CONCRETE ANCHOR BUOYANCY CALCULATIONS Unit wt. of concrete (pcf) _ Unit wt. of HZO = TOP OF RISER ELEV. _ INV. OUT OF RISER ELEV. _ INT. WIDTH OF RISER = INT. LENGTH OF RISER = WALL THICK. OF RISER = BASE THICK. OF RISER = VOL. OF RISER = BUOYANTFORCE= VOL. CONC. IN RISER = SINKING FORCE OF RISER = CONC. PAD THICKNESS = CONC. PAD WIDTH/LENGTH = VOL. OF CONC. PAD = SINKING FORCE OF PAD = TOTAL SINKING FORCE = Extended Dry Detention BMP CONCRETE BASE 150 1 b/ft3 62.4 1 b/ft3 585.00 ft 579.50 ft 48 i n 48 i n 6 in 6 in 150.0 ft3 9360.0 Ibs Vol. of Riser x Unit wt. of HZO 62 ft3 5431.2 Ibs Vol. of Conc. x (Unit wt. of Conc. - Unit wt. of HZO) 18 in 8 ft 96.00 ft3 L x W x H/ Pad Thickness 8409.6 Ibs Vol. of Pad x (Unit wt. of Conc. - Unit wt. of HZO) 13840.8 Ibs Factor of safety = SINKING FORCE BUOYANT FORCE F.S. = 1.48 OK I F.S. MUST BE GREATER THAN 1.10 C. 1 INCH — 6 HR Analysis: Water Quality Volume 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 1 PRE -DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 0.321 cfs Storm frequency = 1 yrs Time to peak = 3.60 hrs Time interval = 2 min Hyd. volume = 1,525 cuft Drainage area = 3.640 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 32.40 min Total precip. = 1.00 in Distribution = Custom Storm duration = VAER22.400 - Rea Road Towr$kwgesKE�Atuulations\WateMuality\Extended Dry C * Composite (Area/CN) = [(1.710 x 55) + (1.140 x 70) + (1.720 x 58) + (1.140 x 71)] / 3.640 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 PRE -DEVELOPMENT Hyd. No. 1 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 - Hyd No. 1 Time (hrs) 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 2 POST -DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 2.232 cfs Storm frequency = 1 yrs Time to peak = 3.13 hrs Time interval = 2 min Hyd. volume = 4,587 cuft Drainage area = 3.140 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.90 min Total precip. = 1.00 in Distribution = Custom Storm duration = VAER22.400 - Rea Road Towr$kwgesKE�Atuulations\WateMuality\Extended Dry C * Composite (Area/CN) = [(2.910 x 98) + (0.550 x 55) + (0.670 x 61) + (0.440 x 74) + (0.830 x 70)] / 3.140 Q (cfs) 3.00 rM 1.00 POST -DEVELOPMENT Hyd. No. 2 -- 1 Year 0.00 1 1 1 .01 1 1 1 1 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 2 Q (cfs) 3.00 2.00 1.00 1 0.00 7.0 Time (hrs) Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 3 POST-DEV ROUTED Hydrograph type = Reservoir Peak discharge = 0.265 cfs Storm frequency = 1 yrs Time to peak = 4.07 hrs Time interval = 2 min Hyd. volume = 4,577 cuft Inflow hyd. No. = 2 - POST -DEVELOPMENT Max. Elevation = 582.66 ft Reservoir name = EXTENDED DRY POND Max. Storage = 2,759 cuft Storage Indication method used Q (cfs) 3.00 r M 1.00 POST-DEV ROUTED Hyd. No. 3 -- 1 Year 2.0 4.0 6.0 8.0 Hyd No. 3 — Hyd No. 2 10.0 12.0 14.0 16.0 18.0 Total storage used = 2,759 cuft Q (cfs) 3.00 2.00 1.00 ---� 0.00 20.0 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 4 1 inch WQ PEAK Hydrograph type = SCS Runoff Peak discharge = 4.478 cfs Storm frequency = 1 yrs Time to peak = 3.10 hrs Time interval = 2 min Hyd. volume = 8,451 cuft Drainage area = 3.140 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = Custom Storm duration = V:\ER22.400 - Rea Road Towr$kwgesKE�Atuulations\WateMuality\Extended Dry C Q (cfs) 5.00 4.00 3.00 r 11 1.00 0.00 ' 1 0.0 1.0 — Hyd No. 4 1 inch WQ PEAK Hyd. No. 4 -- 1 Year 2.0 3.0 4.0 5.0 6.0 Q (cfs) 5.00 4.00 3.00 2.00 1.00 1 0.00 7.0 Time (hrs) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 5 WQv Routed Hydrograph type = Reservoir Peak discharge = 0.623 cfs Storm frequency = 1 yrs Time to peak = 3.57 hrs Time interval = 2 min Hyd. volume = 8,441 cuft Inflow hyd. No. = 4 - 1 inch WQ PEAK Max. Elevation = 583.11 ft Reservoir name = EXTENDED DRY POND Max. Storage = 5,151 cuft Storage Indication method used. WQv Routed Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Time (hrs) — Hyd No. 5 Hyd No. 4 Total storage used = 5,151 cult D. 10 Year Storm Analysis: Pre & Post Development 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 1 PRE -DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 7.462 cfs Storm frequency = 10 yrs Time to peak = 204 min Time interval = 2 min Hyd. volume = 26,299 cuft Drainage area = 3.640 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 32.40 min Total precip. = 3.72 in Distribution = Custom Storm duration = VAER22.400 - Rea Road Towr$kwgesKE�Atuulations\WateMuality\Extended Dry C * Composite (Area/CN) = [(1.710 x 55) + (1.140 x 70) + (1.720 x 58) + (1.140 x 71)] / 3.640 Q (cfs) 8.00 .M 4.00 rM 0.00 0 60 — Hyd No. 1 PRE -DEVELOPMENT Hyd. No. 1 -- 10 Year 120 180 240 300 360 Q (cfs) 8.00 m 4.00 2.00 --1 0.00 420 Time (min) 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 2 POST -DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 15.39 cfs Storm frequency = 10 yrs Time to peak = 188 min Time interval = 2 min Hyd. volume = 32,459 cuft Drainage area = 3.140 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.90 min Total precip. = 3.72 in Distribution = Custom Storm duration = VAER22.400 - Rea Road Towr$kwgesKE�Atuulations\WateMuality\Extended Dry C * Composite (Area/CN) = [(2.910 x 98) + (0.550 x 55) + (0.670 x 61) + (0.440 x 74) + (0.830 x 70)] / 3.140 Q (cfs) 18.00 15.00 12.00 •M .M 3.00 0.00 0 60 Hyd No. 2 POST -DEVELOPMENT Hyd. No. 2 -- 10 Year 120 180 240 300 360 Q (cfs) 18.00 15.00 12.00 m m 3.00 1 0.00 420 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 3 POST-DEV ROUTED Hydrograph type = Reservoir Peak discharge = 3.391 cfs Storm frequency = 10 yrs Time to peak = 210 min Time interval = 2 min Hyd. volume = 32,449 cuft Inflow hyd. No. = 2 - POST -DEVELOPMENT Max. Elevation = 584.70 ft Reservoir name = EXTENDED DRY POND Max. Storage = 19,654 cuft Storage Indication method used. POST-DEV ROUTED Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 Time (min) Hyd No. 3 — Hyd No. 2 Total storage used = 19,654 cult Pond Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Pond No. 1 - EXTENDED DRY POND Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 582.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 582.00 1.00 583.00 1.01 583.01 2.00 584.00 3.00 585.00 4.00 586.00 Contour area (sqft) 4,081 4,268 8,842 9,145 9,451 9,602 Incr. Storage (cuft) 0 4,174 64 8,902 9,297 9,525 Total storage (cuft) 0 4,174 4,238 13,140 22,437 31,962 Tuesday, 11 / 22 / 2022 Culvert / Orifice Structures [A] Rise (in) = 18.00 Span (in) = 18.00 No. Barrels = 1 Invert El. (ft) = 579.50 Length (ft) = 20.00 Slope (%) = 0.50 N-Value = .013 Orifice Coeff. = 0.60 Multi -Stage = n/a [B] [C] [PrfRsr] 6.00 Inactive Inactive 48.00 0.00 0.00 2 0 0 584.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 n/a .013 .013 n/a 0.60 0.60 0.60 Yes No No Weir Structures [A] [B] Crest Len (ft) = 16.00 Inactive Crest El. (ft) = 585.00 584.20 Weir Coeff. = 3.33 3.33 Weir Type = 1 Rect Multi -Stage = Yes Yes Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 [C] [D] 20.00 Inactive 586.00 0.00 3.33 3.33 Ciplti --- No No Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 582.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.10 417 582.10 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.040 0.040 0.20 835 582.20 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.080 0.080 0.30 1,252 582.30 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.120 0.120 0.40 1,669 582.40 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.160 0.160 0.50 2,087 582.50 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.200 0.200 0.60 2,504 582.60 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.241 0.241 0.70 2,922 582.70 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.281 0.281 0.80 3,339 582.80 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.321 0.321 0.90 3,756 582.90 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.361 0.361 1.00 4,174 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.401 0.401 1.00 4,180 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.421 0.421 1.00 4,187 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.441 0.441 1.00 4,193 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.461 0.461 1.00 4,199 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.481 0.481 1.00 4,206 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.502 0.502 1.01 4,212 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.522 0.522 1.01 4,219 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.542 0.542 1.01 4,225 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.562 0.562 1.01 4,231 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.582 0.582 1.01 4,238 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.602 0.602 1.11 5,128 583.11 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.622 0.622 1.21 6,018 583.21 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.642 0.642 1.31 6,909 583.31 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.662 0.662 1.41 7,799 583.41 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.682 0.682 1.50 8,689 583.51 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.702 0.702 1.60 9,579 583.60 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.723 0.723 1.70 10,469 583.70 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.743 0.743 1.80 11,360 583.80 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.763 0.763 1.90 12,250 583.90 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.783 0.783 2.00 13,140 584.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.803 0.803 2.10 14,070 584.10 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.823 0.823 2.20 14,999 584.20 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.843 0.843 2.30 15,929 584.30 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.863 0.863 2.40 16,859 584.40 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.883 0.883 2.50 17,788 584.50 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.903 0.903 2.60 18,718 584.60 10.90 oc 0.86 is --- --- 0.00 0.00 0.00 --- --- 0.923 1.782 Continues on next page... 5 EXTENDED DRY POND Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.70 19,648 584.70 10.90 oc 2.43 is --- --- 0.00 0.00 0.00 --- --- 0.943 3.376 2.80 20,577 584.80 10.90 oc 4.47 is --- --- 0.00 0.00 0.00 --- --- 0.963 5.434 2.90 21,507 584.90 10.90 oc 6.88 is --- --- 0.00 0.00 0.00 --- --- 0.983 7.868 3.00 22,437 585.00 10.90 oc 9.63 is --- --- 0.00 0.00 0.00 --- --- 1.003 10.63 3.10 23,389 585.10 13.08 is 11.39 is --- --- 1.68 0.00 0.00 --- --- --- 13.08 3.20 24,342 585.20 17.68 is 12.92 is --- --- 4.76 0.00 0.00 --- --- --- 17.68 3.30 25,294 585.30 18.60 is 9.97 is --- --- 8.63 s 0.00 0.00 --- --- --- 18.60 3.40 26,247 585.40 18.98 is 8.06 is --- --- 10.91 s 0.00 0.00 --- --- --- 18.97 3.50 27,200 585.50 19.26 is 6.76 is --- --- 12.51 s 0.00 0.00 --- --- --- 19.26 3.60 28,152 585.60 19.51 is 5.78 is --- --- 13.73 s 0.00 0.00 --- --- --- 19.51 3.70 29,105 585.70 19.74 is 5.02 is --- --- 14.71 s 0.00 0.00 --- --- --- 19.73 3.80 30,057 585.80 19.95 is 4.42 is --- --- 15.52 s 0.00 0.00 --- --- --- 19.94 3.90 31,010 585.90 20.15 is 3.93 is --- --- 16.21 s 0.00 0.00 --- --- --- 20.13 4.00 31,962 586.00 20.34 is 3.53 is --- --- 16.80 s 0.00 0.00 --- --- --- 20.33 ... End E. 25 Year Storm Analysis: Pre & Post Development Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 1 PRE -DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 9.631 cfs Storm frequency = 25 yrs Time to peak = 204 min Time interval = 2 min Hyd. volume = 33,862 cuft Drainage area = 3.640 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 32.40 min Total precip. = 4.38 in Distribution = Custom Storm duration = VAER22.400 - Rea Road Towr$kwgesKE�Atuulations\WateMuality\Extended Dry C * Composite (Area/CN) = [(1.710 x 55) + (1.140 x 70) + (1.720 x 58) + (1.140 x 71)] / 3.640 Q (cfs) 10.00 4.00 e 60 120 Hyd No. 1 PRE -DEVELOPMENT Hyd. No. 1 -- 25 Year 180 240 300 360 Q (cfs) 10.00 We 4.00 2.00 --1 0.00 420 Time (min) 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 2 POST -DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 18.62 cfs Storm frequency = 25 yrs Time to peak = 188 min Time interval = 2 min Hyd. volume = 39,728 cuft Drainage area = 3.140 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.90 min Total precip. = 4.38 in Distribution = Custom Storm duration = VAER22.400 - Rea Road Towr$kwgesKE�Atuulations\WateMuality\Extended Dry C * Composite (Area/CN) = [(2.910 x 98) + (0.550 x 55) + (0.670 x 61) + (0.440 x 74) + (0.830 x 70)] / 3.140 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 0 60 — Hyd No. 2 POST -DEVELOPMENT Hyd. No. 2 -- 25 Year Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 120 180 240 300 360 420 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 3 POST-DEV ROUTED Hydrograph type = Reservoir Peak discharge = 7.433 cfs Storm frequency = 25 yrs Time to peak = 200 min Time interval = 2 min Hyd. volume = 39,718 cuft Inflow hyd. No. = 2 - POST -DEVELOPMENT Max. Elevation = 584.88 ft Reservoir name = EXTENDED DRY POND Max. Storage = 21,341 cuft Storage Indication method used. Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 120 — Hyd No. 3 POST-DEV ROUTED Hyd. No. 3 -- 25 Year Q (cfs) 240 360 — Hyd No. 2 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 480 600 720 840 960 Time (min) Total storage used = 21,341 cult Pond Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Pond No. 1 - EXTENDED DRY POND Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 582.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 582.00 1.00 583.00 1.01 583.01 2.00 584.00 3.00 585.00 4.00 586.00 Contour area (sqft) 4,081 4,268 8,842 9,145 9,451 9,602 Incr. Storage (cuft) 0 4,174 64 8,902 9,297 9,525 Total storage (cuft) 0 4,174 4,238 13,140 22,437 31,962 Tuesday, 11 / 22 / 2022 Culvert / Orifice Structures [A] Rise (in) = 18.00 Span (in) = 18.00 No. Barrels = 1 Invert El. (ft) = 579.50 Length (ft) = 20.00 Slope (%) = 0.50 N-Value = .013 Orifice Coeff. = 0.60 Multi -Stage = n/a [B] [C] [PrfRsr] 6.00 Inactive Inactive 48.00 0.00 0.00 2 0 0 584.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 n/a .013 .013 n/a 0.60 0.60 0.60 Yes No No Weir Structures [A] [B] Crest Len (ft) = 16.00 Inactive Crest El. (ft) = 585.00 584.20 Weir Coeff. = 3.33 3.33 Weir Type = 1 Rect Multi -Stage = Yes Yes Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 [C] [D] 20.00 Inactive 586.00 0.00 3.33 3.33 Ciplti --- No No Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 582.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.10 417 582.10 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.040 0.040 0.20 835 582.20 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.080 0.080 0.30 1,252 582.30 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.120 0.120 0.40 1,669 582.40 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.160 0.160 0.50 2,087 582.50 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.200 0.200 0.60 2,504 582.60 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.241 0.241 0.70 2,922 582.70 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.281 0.281 0.80 3,339 582.80 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.321 0.321 0.90 3,756 582.90 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.361 0.361 1.00 4,174 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.401 0.401 1.00 4,180 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.421 0.421 1.00 4,187 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.441 0.441 1.00 4,193 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.461 0.461 1.00 4,199 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.481 0.481 1.00 4,206 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.502 0.502 1.01 4,212 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.522 0.522 1.01 4,219 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.542 0.542 1.01 4,225 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.562 0.562 1.01 4,231 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.582 0.582 1.01 4,238 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.602 0.602 1.11 5,128 583.11 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.622 0.622 1.21 6,018 583.21 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.642 0.642 1.31 6,909 583.31 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.662 0.662 1.41 7,799 583.41 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.682 0.682 1.50 8,689 583.51 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.702 0.702 1.60 9,579 583.60 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.723 0.723 1.70 10,469 583.70 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.743 0.743 1.80 11,360 583.80 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.763 0.763 1.90 12,250 583.90 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.783 0.783 2.00 13,140 584.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.803 0.803 2.10 14,070 584.10 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.823 0.823 2.20 14,999 584.20 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.843 0.843 2.30 15,929 584.30 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.863 0.863 2.40 16,859 584.40 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.883 0.883 2.50 17,788 584.50 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.903 0.903 2.60 18,718 584.60 10.90 oc 0.86 is --- --- 0.00 0.00 0.00 --- --- 0.923 1.782 Continues on next page... 5 EXTENDED DRY POND Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.70 19,648 584.70 10.90 oc 2.43 is --- --- 0.00 0.00 0.00 --- --- 0.943 3.376 2.80 20,577 584.80 10.90 oc 4.47 is --- --- 0.00 0.00 0.00 --- --- 0.963 5.434 2.90 21,507 584.90 10.90 oc 6.88 is --- --- 0.00 0.00 0.00 --- --- 0.983 7.868 3.00 22,437 585.00 10.90 oc 9.63 is --- --- 0.00 0.00 0.00 --- --- 1.003 10.63 3.10 23,389 585.10 13.08 is 11.39 is --- --- 1.68 0.00 0.00 --- --- --- 13.08 3.20 24,342 585.20 17.68 is 12.92 is --- --- 4.76 0.00 0.00 --- --- --- 17.68 3.30 25,294 585.30 18.60 is 9.97 is --- --- 8.63 s 0.00 0.00 --- --- --- 18.60 3.40 26,247 585.40 18.98 is 8.06 is --- --- 10.91 s 0.00 0.00 --- --- --- 18.97 3.50 27,200 585.50 19.26 is 6.76 is --- --- 12.51 s 0.00 0.00 --- --- --- 19.26 3.60 28,152 585.60 19.51 is 5.78 is --- --- 13.73 s 0.00 0.00 --- --- --- 19.51 3.70 29,105 585.70 19.74 is 5.02 is --- --- 14.71 s 0.00 0.00 --- --- --- 19.73 3.80 30,057 585.80 19.95 is 4.42 is --- --- 15.52 s 0.00 0.00 --- --- --- 19.94 3.90 31,010 585.90 20.15 is 3.93 is --- --- 16.21 s 0.00 0.00 --- --- --- 20.13 4.00 31,962 586.00 20.34 is 3.53 is --- --- 16.80 s 0.00 0.00 --- --- --- 20.33 ... End R 50 Year Storm Analysis: Pre & Post Development 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 1 PRE -DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 11.44 cfs Storm frequency = 50 yrs Time to peak = 204 min Time interval = 2 min Hyd. volume = 40,237 cuft Drainage area = 3.640 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 32.40 min Total precip. = 4.92 in Distribution = Custom Storm duration = VAER22.400 - Rea Road Towr$kwgesKE�Atuulations\WateMuality\Extended Dry C * Composite (Area/CN) = [(1.710 x 55) + (1.140 x 70) + (1.720 x 58) + (1.140 x 71)] / 3.640 Q (cfs) 12.00 10.00 :1M .M 4.00 rM 0.00 0 60 Hyd No. 1 PRE -DEVELOPMENT Hyd. No. 1 -- 50 Year 120 180 240 300 360 Q (cfs) 12.00 10.00 m m 4.00 2.00 --1 0.00 420 Time (min) 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 2 POST -DEVELOPMENT Hydrograph type = SCS Runoff Peak discharge = 21.26 cfs Storm frequency = 50 yrs Time to peak = 188 min Time interval = 2 min Hyd. volume = 45,720 cuft Drainage area = 3.140 ac Curve number = 92* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.90 min Total precip. = 4.92 in Distribution = Custom Storm duration = VAER22.400 - Rea Road Towr$kwgesKE�Atuulations\WateMuality\Extended Dry C * Composite (Area/CN) = [(2.910 x 98) + (0.550 x 55) + (0.670 x 61) + (0.440 x 74) + (0.830 x 70)] / 3.140 Q (cfs) 24.00 20.00 16.00 12.00 :1M 4.00 0.00 ' �- 0 60 — Hyd No. 2 POST -DEVELOPMENT Hyd. No. 2 -- 50 Year 120 180 240 300 360 Q (cfs) 24.00 20.00 16.00 12.00 m 4.00 1 0.00 420 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Tuesday, 11 / 22 / 2022 Hyd. No. 3 POST-DEV ROUTED Hydrograph type = Reservoir Peak discharge = 11.17 cfs Storm frequency = 50 yrs Time to peak = 196 min Time interval = 2 min Hyd. volume = 45,710 cuft Inflow hyd. No. = 2 - POST -DEVELOPMENT Max. Elevation = 585.02 ft Reservoir name = EXTENDED DRY POND Max. Storage = 22,648 cuft Storage Indication method used. Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 0.00 0 120 — Hyd No. 3 POST-DEV ROUTED Hyd. No. 3 -- 50 Year 240 360 480 600 720 840 Hyd No. 2 Total storage used = 22,648 cuft Q (cfs) 24.00 0 �1 16.00 12.00 M 4.00 0.00 960 Time (min) Pond Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Pond No. 1 - EXTENDED DRY POND Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 582.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 582.00 1.00 583.00 1.01 583.01 2.00 584.00 3.00 585.00 4.00 586.00 Contour area (sqft) 4,081 4,268 8,842 9,145 9,451 9,602 Incr. Storage (cuft) 0 4,174 64 8,902 9,297 9,525 Total storage (cuft) 0 4,174 4,238 13,140 22,437 31,962 Tuesday, 11 / 22 / 2022 Culvert / Orifice Structures [A] Rise (in) = 18.00 Span (in) = 18.00 No. Barrels = 1 Invert El. (ft) = 579.50 Length (ft) = 20.00 Slope (%) = 0.50 N-Value = .013 Orifice Coeff. = 0.60 Multi -Stage = n/a [B] [C] [PrfRsr] 6.00 Inactive Inactive 48.00 0.00 0.00 2 0 0 584.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 n/a .013 .013 n/a 0.60 0.60 0.60 Yes No No Weir Structures [A] [B] Crest Len (ft) = 16.00 Inactive Crest El. (ft) = 585.00 584.20 Weir Coeff. = 3.33 3.33 Weir Type = 1 Rect Multi -Stage = Yes Yes Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 [C] [D] 20.00 Inactive 586.00 0.00 3.33 3.33 Ciplti --- No No Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 582.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.10 417 582.10 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.040 0.040 0.20 835 582.20 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.080 0.080 0.30 1,252 582.30 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.120 0.120 0.40 1,669 582.40 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.160 0.160 0.50 2,087 582.50 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.200 0.200 0.60 2,504 582.60 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.241 0.241 0.70 2,922 582.70 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.281 0.281 0.80 3,339 582.80 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.321 0.321 0.90 3,756 582.90 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.361 0.361 1.00 4,174 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.401 0.401 1.00 4,180 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.421 0.421 1.00 4,187 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.441 0.441 1.00 4,193 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.461 0.461 1.00 4,199 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.481 0.481 1.00 4,206 583.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.502 0.502 1.01 4,212 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.522 0.522 1.01 4,219 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.542 0.542 1.01 4,225 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.562 0.562 1.01 4,231 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.582 0.582 1.01 4,238 583.01 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.602 0.602 1.11 5,128 583.11 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.622 0.622 1.21 6,018 583.21 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.642 0.642 1.31 6,909 583.31 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.662 0.662 1.41 7,799 583.41 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.682 0.682 1.50 8,689 583.51 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.702 0.702 1.60 9,579 583.60 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.723 0.723 1.70 10,469 583.70 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.743 0.743 1.80 11,360 583.80 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.763 0.763 1.90 12,250 583.90 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.783 0.783 2.00 13,140 584.00 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.803 0.803 2.10 14,070 584.10 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.823 0.823 2.20 14,999 584.20 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.843 0.843 2.30 15,929 584.30 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.863 0.863 2.40 16,859 584.40 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.883 0.883 2.50 17,788 584.50 10.90 oc 0.00 --- --- 0.00 0.00 0.00 --- --- 0.903 0.903 2.60 18,718 584.60 10.90 oc 0.86 is --- --- 0.00 0.00 0.00 --- --- 0.923 1.782 Continues on next page... 5 EXTENDED DRY POND Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.70 19,648 584.70 10.90 oc 2.43 is --- --- 0.00 0.00 0.00 --- --- 0.943 3.376 2.80 20,577 584.80 10.90 oc 4.47 is --- --- 0.00 0.00 0.00 --- --- 0.963 5.434 2.90 21,507 584.90 10.90 oc 6.88 is --- --- 0.00 0.00 0.00 --- --- 0.983 7.868 3.00 22,437 585.00 10.90 oc 9.63 is --- --- 0.00 0.00 0.00 --- --- 1.003 10.63 3.10 23,389 585.10 13.08 is 11.39 is --- --- 1.68 0.00 0.00 --- --- --- 13.08 3.20 24,342 585.20 17.68 is 12.92 is --- --- 4.76 0.00 0.00 --- --- --- 17.68 3.30 25,294 585.30 18.60 is 9.97 is --- --- 8.63 s 0.00 0.00 --- --- --- 18.60 3.40 26,247 585.40 18.98 is 8.06 is --- --- 10.91 s 0.00 0.00 --- --- --- 18.97 3.50 27,200 585.50 19.26 is 6.76 is --- --- 12.51 s 0.00 0.00 --- --- --- 19.26 3.60 28,152 585.60 19.51 is 5.78 is --- --- 13.73 s 0.00 0.00 --- --- --- 19.51 3.70 29,105 585.70 19.74 is 5.02 is --- --- 14.71 s 0.00 0.00 --- --- --- 19.73 3.80 30,057 585.80 19.95 is 4.42 is --- --- 15.52 s 0.00 0.00 --- --- --- 19.94 3.90 31,010 585.90 20.15 is 3.93 is --- --- 16.21 s 0.00 0.00 --- --- --- 20.13 4.00 31,962 586.00 20.34 is 3.53 is --- --- 16.80 s 0.00 0.00 --- --- --- 20.33 ... End 7. Sediment Basin Calculations Sediment Basin Skimmer Data Project: The Towns At Aurdrey Park County/City: Union Designed By: KK Date: 3/20/2018 State: North Carolina Checked By: MRR Date: 3/20/2018 Sediment Basin: I SB-1 (Phase 1) Erosion Control Phase Total Drainage Area to Basin: 3.63 Acres Potential Max. Disturbed Area to Basin: 3.63 Acres Area C Value Area (Acres) Composite C Denuded 0.60 3.63 0.60 Woods 0.25 0.00 0.00 Grass 0.30 0.00 0.00 Gravel 0.55 1 0.00 0.00 I mpervious 0.95 0.00 0.00 TOTAL: - 3.63 0.60 Minimum Volume Requirement: Peak Inflows: Minimum Volume = Minimum Volume = Volume Provided = 1800 ft3/disturbed acre 6,534 ft3 9,507 ft3 0 158,123 Sq. Ft. 158,123 Sq. Ft. Time of Concentration = 5.0 min. 2-Year rainfall intensity = 5.88 in/hr 10-Year rainfall intensity = 7.52 in/hr Runoff Coefficient (C) = 0.60 Q2 = 12.81 cfs (Calculated by Rational Method) QUO= 16.38 cfs (Calculated by Rational Method) Minimum Basin Surface Area: Minimum Surface Area = 325 sf/cfs (10-year, 24 hour storm peak inflow) Minimum Surface Area=W5,323 Surface Area Provided = 5,612 sf Elevation (FT) Area (SF) Incremental Volume(CF) Cumulative Volume(CF) 581.00 33908 0 0 582.00 4,747 4,328 4,328 583.00 53612 5,180 9,507 584.00 63502 6,057 15,564 585.00 7,416 6,959 22,523 586.00 83356 7,886 30,409 CA(2gH)o.s = Q Emergency Spillway Design: Spillway length 2 Skimmer Elevation: 00 Q 3 H Spillway elevation Weir Coef. (c): Quo Less Q2 = Spillway stage (H): Maximum slope: Top of berm elevation: Freeboard = 8.00-ft 583.00 584.00 3.33 3.57 0.05 18.00 586.0 1.95 cfs (Calculated by Rational Method) ft (Based on Weir Equation) % (from Table 8.07c) ft The Towns At Aurdrey Park Sediment Basin Skimmer Sizes 3/21/2018 SB-1 (Phase 1) Calculate Skimmer Size Required Basin Volume (CF) 6,534 Cu.Ft Skimmer Size 2.0 Inch Days to Drain 2 Days Orifice Radius 1.0 Inch[es] Orifice Diameter 2.0 Inch[es] Calculate Skimmer Size Provided Basin Volume (CF) 9,507 Cu.Ft Skimmer Size 2.0 Inch Days to Drain 3 Days Orifice Radius 1.0 Inch[es] Orifice Diameter 2.0 Inch[es] Project: The Towns At Aurdrey Park County/City: Union )esigned By: KK Date: 3/20/2018 State: North Carolina Checked By: MRR Date: 3/20/2018 Sediment Basin: r SB-1 (Phase 2) Erosion Control Phase 0 Total Drainage Area to Basin: 3.78 Acres 164,657 Sq. Ft. Potential Max. Disturbed Area to Basin: 3.78 Acres 164,657 Sq. Ft. Area C Value Area (Acres) Composite C Denuded 0.60 3.78 0.60 Woods 0.25 0.00 0.00 Grass 0.30 0.00 0.00 Gravel 0.55 1 0.00 0.00 I mpervious 0.95 0.00 0.00 TOTAL: - 3.78 0.60 Minimum Volume Requirement: Peak Inflows: Minimum Volume = Minimum Volume = Volume Provided = 1800 ft3/disturbed acre 6,804 ft3 9,507 ft3 Time of Concentration = 5.0 min. 2-Year rainfall intensity = 5.80 in/hr 10-Year rainfall intensity = 7.52 in/hr Runoff Coefficient (C) = 0.60 Q2 = 13.15 cfs (Calculated by Rational Method) QUO= 17.06 cfs (Calculated by Rational Method) Minimum Basin Surface Area: Minimum Surface Area = 325 sf/cfs (10-year, 24 hour storm peak inflow) Minimum Surface Area =W5,543 Surface Area Provided = 5,612 sf OK Elevation (FT) Area (SF) Incremental Volume(CF) Cumulative Volume(CF) 581.00 33908 0 0 582.00 4,747 4,328 4,328 583.00 53612 5,180 9,507 584.00 63502 6,057 15,564 585.00 7,416 6,959 22,523 586.00 83356 7,886 30,409 CA(2gH)o.s = Q Emergency Spillway Design: Spillway length 2 Skimmer Elevation: Q3 (CL)- H Spillway elevation Weir Coef. (c): Quo Less Q2 = Spillway stage (H): Maximum slope: Top of berm elevation: Freeboard = 8.00-ft 583.00 584.00 3.33 3.90 cfs (Calculated by Rational Method) 0.06 ft (Based on Weir Equation) 18.00 % (from Table 8.07c) 586.0 1.94 ft The Towns At Aurdrey Park Sediment Basin Skimmer Sizes 3/21/2018 SB-1 (Phase 2) Calculate Skimmer Size Required Basin Volume (CF) 6,804 Cu.Ft Skimmer Size 2.0 Inch Days to Drain 2 Days Orifice Radius 1.0 Inch[es] Orifice Diameter 2.0 Inch[es] Calculate Skimmer Size Provided Basin Volume (CF) 9,507 Cu.Ft Skimmer Size 2.0 Inch Days to Drain 3 Days Orifice Radius 1.0 Inch[es] Orifice Diameter 2.0 Inch[es] 8. Rip Rap Apron Calculations F99- :�.tiirir a5 9. Drainage Map L i \ I 1 -- - 0s� / as as 0s as 0S as as as as as as as as as as as as as as as 0s as as 0 cn REA ROAD EXTENSION (EXIST. PUBLIC R/W WIDTH VARIES) cn — — — — — — — — — — — — — NCDOT PROJECT # 9.8100352 U-2506 PC L FILE 526 — -- — — cn\593 — — — — — — — — — es— e — — — o •-T 594 p N/F — — — = _ — — — , —� — 3I#621 / LONGVIEW SOUTH 596 ----_-- -- — DI#B19 CB#B12 _ DA=0.05 AC — — DA=0.04V --vv— AC " \ C L DI#B20 594' DA=0.10 A- 5" RCP 15 R D 19 DA=0.15 AC-�Z�Az I W \ 15" RCP (CLASS IV) — o DI#B14 15" RCP (CLASS IV) `C �, I DI#B13 �I#B13 DI#B14 DA=0.16 AC/ 4 v p DA=0.09 AC \ 59 21 w I LU> CB#B12 \ 24 v v PLOP. 209 LF RJTAINING 1�VAL (TO BE DESIGNF�D BY OT ERS cr c�: M o so'•5"xsa'-s" T J o0 F- a CB#B7 rn — so _o so _o X 64'-s 1 f \ X CB#B10 -3o'-o, x sa'-s" q-E °° / Z 0 DA=0.10 AC n ° L sa'_s., 30._0.. x sa._s,. 30 q 3U' f �S N\ M a W a I DA=0.33 AC 30 30,_5.. x s4' g E 5 x � so \ \ Y -- CB#BI7 30,_0.. X�, o" x 0' \ N F �� B# 8 15" a._0„ 30._0,. X�, A 30� �- \ �/v 30' CB#B17 �i _ RCP ' 18" RCP (CLASS IV) A 30' L N G E 0 T Id ss CB#B8.22_ q_E su » �U CB#B18 DA-0.34 AC 1 / DA=0AC �M (CLg/ \DA=0.04AC?... TAX #06222,-W.; IV) W JB#B6 18" RCP PR \ PROP. APDX. CATION Of I T . W9L EOGRID (1:1 V ;».. CB#B'715" RCP (CLASS IV) Q — - - — — r ♦ I I \ •a \ _ 00U \ \ � B#B18 CB#B16 CB#B9 is ® CB#B10 \ DA=0.14 AC 15" RCP \� � HEATHBROOK LANE c6#616 -0 36 AC � J (PROP. 40' PRIVATE RAW) EXIST. 1\00-YEAR i ,0£ O..: DCB#B11 a OE 3-tl OE tl „s ,bs x ,.o o� FEMA FLOODPLAIN B#B9 — M DA=0.48AC 0£ 3_tl oEtl „g,bsxs,oE-s.b9x.,o.oE — — DCB#B11 s ,b � —l► . .,9-,b9 X .,0-,0£ „s•,b9xs-.oE 00 EXI T. PROPERTY o „s-,bsx,.o-,oE BO NDARY A s�sx —5g8 — 5�8 1 $ c c c c c c c c 2 DI#B15 1 0 — — — DA=0.18 AC- DI#B4 / DI#B3 DA=0.10 AC \ 6' DA=0.10 AC DA=0.10 AC 24" RCP \ o a � DI#B2 24" RCP DI#B4 DI#B15 \ 06 -<DI#B5 \ r r r \ 4 \V DI#B5 - 2 " RCP DA=0.16 AC 1„ \ \ DI#B3 TLET#B1 — 24" RCP 71 GOB pE��sD PROP. BMP PROP. RIP RAP APRON — — 585- — — r L — L=12', W1=6' / W2=14', T=1/ V \ \ \ EXIST. 100-YEAR / ♦\ \� \ 1�/� FEMA FLOODPLAN V A J r ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ \ � \` \ \ � / r r r r r r r r r r r r r L r r r r r r r r r r r \ \ 610 EXIST. 100-YEAR �� ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ > > r ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ �♦� A -- A \ FEMA FL00DPLAIN \ � / ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ 100 i ♦ ♦ ♦ `♦ =' � � I r r r r r r r r r r r r r r r r r r r r/ — — — - \ ss _ r r r r r / i r r r r r r I r ` 1 — / ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ = ♦ ♦ ♦ ♦ ♦/ / — — --- SS ♦ ♦ ♦ ♦ ♦ ♦ ♦ r r r r r r r r r r r f✓ — ��SS — \ r r r� �r ♦ ♦ ♦ ♦ ♦ —♦ —♦ ♦ ♦ SS �SS�SS �SS�— c�ss- S/ S— — ---- / �ss�sS�SS — — — — — — — — — _ ♦� s_ ♦ ♦ ♦ ♦ ♦ ♦ ♦ SS�Sg��SS r r r r r r � r r—� �— r— r— f _ _ _ _ — — — — — — MCBRIDE CREEK EXIST. PROPERTY — f / — — (EXIST. TOP OF BANK) BOUNDARY (TYP.) I /GS SS EXIST. 20' SANITARY SEWER ESMT. (DB 951 PG 400) m W 0 0 z Q E ti 8 a 8 U co C0r- z� N Co orU ON � U oz EcUn °'N . U u) y fn co� Y _ M N0 f6 Q J LO CO CO CON (L d L rl- 0 (A U M i° � ao III=LM4 Im mr LU U Z F- H Z O U Z O Q z `a} LU cn U J O Z Q LJLJ a. O CW C O 2 W F- a. PROJECT INFORMATION PROJECT MANAGER: MRR DESIGNED BY: KK GRAPHIC SCALE DRAWN BY: KK 40' 0 20' 40' 80' 160' PROJECT NUMBER: ER22.450 ORIGINAL DATE: 04/02/2018 ( IN FEET) Know what's below. SHEET: 1 INCH = 40 FT. Call before you dig. EXHIBIT