HomeMy WebLinkAboutNCC205670_MODIFICATION Supporting Doc (CLOSEOUT)_20221201 (37)rri�rs'
TOWN of
AT E FOREST
Certificate of Completion
Erosion and Sediment Control
Town of Wake Forest Engineering Department
301 S. Brooks St.
Wake Forest, NC 27587
Phone: (919) 435-9443
Permit Number: 2021-00000519
Subdivision / Site Name:
Permit Issue Date:
Date of Final Inspection / walk thru:
/Mason Oaks lots 9, 10, 257, 263
11/2/2022
11/2/2022
Location:
Financial Responsible Party:
Contactor Phone Number:
HOLDEN MASON II LLC
Plan Specifications Met:
Local Ordinance Met:
Temporary Controls Removed:
Permanent Controls Installed and
Operational:
Yes
Yes
Yes
N/A
Additional Comments:
The undersigned (inspector) hereby accepts the installation of permanent and removal of temporary erosion and sediment control devices (per plan and
specification) on behalf of the Town of Wake Forest. The owner is responsible for maintaining these devices, and
in no way holds the Town responsible for
cleanout or repair
Jordan
Whitman
Inspector: W 11112/2022
Contractor:
Owner: