Loading...
HomeMy WebLinkAbout20221671 Ver 1_Individual_20221201Staff Review Form NORTH CAROLINA Ertrlmnmertlrtl Quality Updated September 4, 2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID# * 20221671 Version* 1 Is this project a public transportation project?* Reviewer List:* Select Reviewing Office: * Submittal Type:* Yes No Sue Homewood:eads\slhomewood:Sue.Homewood@ncdenr.gov Winston-Salem Regional Office - (336) 776-9800 Individual Does this project require a request for payment to be sent?* Yes No How much is owed?* $240.00 $570.00 Project Submittal Form Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: 10/27/2022 Project Contact Information Name: Owen Carson Who is submitting the information? Email Address: owen@equinoxenvironmental.com Project Information Project Name: Woodfin Riverside Park & Wave Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County (ies) Buncombe Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document JOINT_PCN_SUBMITTAL_12.01.2022.pdf 63.29MB Only pdf or kmz files are accepted. Describe the attachments or comments: The attached pdf contains the complete submittal package that was provided to the USACE (Amanda Jones) per the Engineering form 4345 for a federal individual permit. The package includes the completed form and supplemental documents, which consist of 90% Construction Plans, 90% Erosion Control Sets, and other impact -related details. Dates on the form reflect its original submission in October, but there were subsequent requests on behalf of the USACE, leading to several iterations of supplemental information in response to the requests. Thus, the final package includes the original form, which did not change over time, and the attachments that were reiterated between October and November and finally accepted in November. Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: 12/1/2022 Is filled in automatically. U.S. ARMY CORPS OF ENGINEERS APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT 33 CFR 325. The proponent agency is CECW-CO-R. OMB APPROVAL R2 EXPIRES: 28 FEBRUARY RY 2013013 Public reporting for this collection of information is estimated to average 11 hours per response, inc uding the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANTS NAME First - Adrienne Middle -D. Last - Isenhower Company - Town of Woodfin, (Ms. Isenhower = Responsible Party) E-mail Address - aisenhower@woodfin-nc.gov 8. AUTHORIZED AGENTS NAME AND TITLE (agent is not required) First - William Middle -"Owen" Last - Carson Company - Equinox Environmental E-mail Address - owen@equinoxenvironmental.com 6. APPLICANT'S ADDRESS: Address- 90 Elk Mountain Rd. City - Woodfin State - NC Zip - 28804 Country - USA 9. AGENT'S ADDRESS: Address- 37 Haywood Street, Suite 100 City - Asheville State - NC Zip - 28801 Country - 7. APPLICANT'S PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax (828) 253-4887 10. AGENTS PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax (828) 553-9091 [cell] (828) 253-6856 x204 STATEMENT OF AUTHORIZATION 11. I hereby authorize, Owen Carson (Equinox) to act in my behalf as my agent in the processing of this application o1 as a - and to furnish, upon request, supplemental information in support of this permit application. SIGNATURE OF APPLICANT DATE NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) Woodfin Riverside Park 13. NAME OF WATERBODY, IF KNOWN (if applicable) French Broad River 14. PROJECT STREET ADDRESS (if applicable) Address 1598 Riverside Drive City Woodfin State NC Zip 28804 15. LOCATION OF PROJECT Latitude: oN 35.630581 Longitude: oW-82.601567 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID BUNC 9730031357 Municipality Woodfin, NC Section - Township - 11 Range - ENG FORM 4345, OCT 2012 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 3 117. DIRECTIONS TO THE SITE From USACE Asheville offices (Federal Building): Head west on Patton Ave toward S French Broad Ave (0.4 mi). Keep right at the fork, follow signs for US-19 N/US-23 N/US-70 W/Wcavcrvillc (0.3 mi). Continue onto I-26 W/US-19 N/US-23 N/US-70 W (1.3 mi). Take exit 25 toward NC-251 (0.3 mi). Turn left onto Broadway St. (0.1 mi). Continue onto Riverside Drive (2.3 mi); the project location is on the left (currently comprising the combined area of WastePro and Woodfin's Riverside Park). Location is at/just downstream of French Broad River Mile #143 (Old Leicester Highway Bridge & Woodfin Riverside Park) 18. Nature of Activity (Description of project, include all features) Project activities include significant modifications to the terrestrial and aquatic environment at Woodfin Riverside Park. The existing park will be expanded southward to include the current WastePro site, a greenway and other recreational amenities/facilities will be built, and a standing whitewater wave will be constructed in a portion of the riverbed. Major modifications to the WastePro site elevation will occur to match grade with the existing park; excavated soils will be hauled offsite. The Park will include river access areas, one at a proposed new boat ramp, and a second at a beach area adjacent to the Wave feature. A portion of an existing unnamed tributary will be culverted under the proposed greenway. The Wave will be built using a combination of excavations and fills (boulder installation) to ensure the feature will work at all flow levels; a bypass channel will allow rivcrgocrs to pass the wave and fish species to migrate up and downstream. Dangerous historical bridge pilings will also be removed incidental to the project. A comprehensive set of park and wave plans & designs and according sediment & erosion control sets is attached; these documents comprehensively depict and describe all proposed project work. 19. Project Purpose (Describe the reason or purpose of the project, see instructions) To celebrate, re -imagine, expand upon, and improve an existing rivcrfront recreational amenity, Woodfin's Riverside Park, with updated features such as a greenway, park space with expanded facilities, improved river access, and creation of a standing whitewater wave in the French Broad River. Land -based activities will create amenities for pedestrians, cyclists, whitewater enthusiasts, tourists, and many others; water -based structures are designed for whitewater paddlers to hone their skills. The wave will have a bypass channel to allow aquatic organisms to pass up and downstream without engaging with the Wave, and to allow human river users to safely avoid the feature. Furthermore, it will remove existing wood and metal pilings from the riverbed that currently pose a danger to human safety. Conceptual design is nearing 90%, and project work is expected to commence in summer 2023; completion date is yet TBD and will hinge upon the 401/404/Section 7 permitting processes, timing of the awarded construction contract, and appropriate meteorological conditions during the construction window. USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 26. Reason(s) for Discharge Various temporary and permanent discharges of fill material below OHWM are required to construct the wave features in the riverbed and to sufficiently tie them into either riverbank; there will also be fill placed along the riverbank related to river access (ramp) and shoreline stabilization (boulder toe protection); one minor discharge is also required to properly span an existing jurisdictional stream on the inland park area. The wave design dictates permanent discharges in the form of concrete and boulder materials will need to be permanently placed in and affixed to the riverbed to adequately form the wave feature and conjoined bypass channel. Specific information regarding the discharges of fill is provided as an Attachment to Block 21b. Some excavation of the riverbed will also be required to construct the wave feature, although it will be limited due to the presence of bedrock within large portions of the footprint of the wave. Temporary discharges will be incurred during the placement and adjustment of various coffer dams as necessary to work in the dry and establish wave features. Construction sequencing is provided in attached Block 20: Supplemental Info as well as in the attached sediment & erosion control plans. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards Sec attached Impact Summary Table 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres or SEE ATTACHMENTS FOR DETAILS Linear Feet 23. Description of Avoidance, Minimization, and Compensation (see instructions) For the on -land park features, avoidance and minimization to impacts to WOTUS will be achieved through work in the dry and implementation proper sediment and erosion control techniques during work in and around WOTUS; construction areas will also be stabilized/replanted with native vegetation to establish a buffer for runoff. For the wave, avoidance and minimization will be primarily through working in the dry via the establishment of coder dams. Due to minimal impacts to WOTUS, no mitigation is being proposed; permanent losses are detailed in Block 23 of the attached sheet as well as in the attached detailed sediment and erosion control plans. - ENG FORM 4345, OCT 2012 Page 2of3 24. Is Any Portion of the Work Already Complete? Yes X No IF YES, DESCRIBE THE COMPLETED WORK Only background studies and limited assessments have been performed to date to understand the feasibility of site designs. A comprehensive topographical survey of both the land and the riverbed has been conducted. A USACE concurrence request has been granted acknowledging the presence of WOTUS including the call -out of OHWM elevations. Conceptual planning and design of the inland and wave features is at approximately 90%, and consultation with the USFWS has begun regarding avoidance/minimization of impacts to both aquatic and terrestrial listed species known to occur in the corridor containing the project area. Preliminary geotechnical borings have been conducted to understand subsurface conditions and to assess structural stability. The CLOMR/LOMR process is underway. A mussel survey conducted in early October detected no endangered mussels; a final endangered species report is expected no later than December 2022. 25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list). a. Address- SEE ATTACHED BLOCK 25 FOR ADJOINING LANDOWNER INFORMATION City - State - Zip - b. Address - City - State - Zip - c. Address - City - State - Zip - d. Address - City - State - Zip - e. Address - City - State - Zip - 26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL` IDENTIFICATION DATE APPLIED DATE APPROVED DATE DENIED NUMBER USACE WOTUS Concurrence AID: 2021-02163 08/01/2022 08/08/2022 Would include but is not restricted to zoning, building, and flood plain permits 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. 04t 12 M. �C� c -ei'Ti 10-25-2022 SIGNATURE OF APPLICANT DATE SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, OCT 2012 Page 3 of 3 Riverside Park Impact Table Impact Type/Reason Permanent/No Loss (If/ acreage) Permanent / Loss of Waters (If/acreage) Temporary (If/acreage) Total Impacts Cut (cy) Fill (cy) P1 Culvert (S2) 17 If / 0.003 ac (158 sf) 20 If /0.001 ac (48 sf) 37 If / 0.004 ac ---- ---- P2 River Access (upstream) 143 If / 0.014 ac (594 sf) ---- 38 If /0.093 ac (4,067 sf) 181 If / 0.107 ac ---- 27 P3 Boat Ramp (downstream) 37 If / 0.008 ac (362 sf) ---- 17 If /0.015 ac (689 sf) 54 If / 0.023 ac ---- 11 Total 180 If / 0.022 ac 17 If / 0.003 ac 75 If / 0.109 ac ---- 38 Wave and Bypass Impact Table Impact Type/Reason Permanent/No Loss (If/acreage) Permanent/Loss of Waters (acreage) Temporary (acreage) Total Cut (cy) Fill (cy) W1 Wave & Bypass Fill 0.760 ac (33,123 sf) 0.027 acre (1,185 sf)* 1.932 ac (84,161 sf)** 2.719 ac 396 4,079 W2 Construction Access 0.262 ac (11,408 sf) 0.262 ac 521*** W3 Boulder Toe River Left 161 If / 0.019 ac (842 sf) 161 If / 0.019 ac 91 Total 161 If / 0.779 ac 0.027 acre 2.194 acre 917 4,170 *0.027 acre of open water will be permanently filled/considered a loss of water due to construction of bypass channel 'island' and elevated tie - ins on bank that will be permanently above Ordinary High Water Mark Elevation of French Broad River (see Impact Summary Map). **Dewatering will occur in phases through construction of 3 cofferdams (see attached plans). ***Once construction is completed, pre-existing piers will be removed/excavated. Equinox Application for Department of Army Permit (ENG Form 4345) Supplemental Information Riverside Park & Wave Block 20 — Supplemental Information Riverside Park & Wave — Reasons for Discharge IN -STREAM COMPONENTS CALCULATION OF NET CUT/FILL BELOW OHWM: CUT/FILL QUANTITIES BELOW OHWM ZONE NET CUT/FILL (CY) PUT -IN AREA 26.89 WAVE/BYPASS 3883.66 RAILROAD PIERS 520.78 OTHER CHANNEL GRADING 90.61 OVERALL CUT/FILL: 3280.38 fill fill cut fill fill A volume surface comparison was completed using Autodesk Civil 3D. In order to trim the surfaces to the correct boundary, the ordinary high water mark (OHWM), had to be determined. Kee Surveying provided a delineation of the OHWM along the river right bank at the project site along Riverside Park. S20 used HEC-RAS 2D modeling to run a series of flows through the existing conditions terrain and matched the Water Surface results to Kee's survey delineation, determining that a flow of 2600cfs represents ordinary high water. Once the appropriate OHW flow was determined, two different 2D models were run. One with the existing conditions surface was run at 2600cfs, and another with the proposed conditions surface was run at 2600cfs. The resulting water surface layers were exported to CAD as shape files to use as clipping boundaries for volume surface cut/fill comparison, and for areal comparison of OHW to determine square footage difference. The table below shows a breakdown of the volume surface comparison completed using the OHWM as a clipping boundary. The top line is the overall net fill total (3280.38cy), the other three lines are the quantity of cut or fill for the three different work zones; the wave/bypass, the railroad pier removal, and the put -in area. R OHWM - COMPOSITE SURFACE C._ 1.000 1.000 Contours 1' a_.[ 252738.58 1039.07 4319.45 328038<Fil._ © OHWM - Wave 1.000 1.000 Contours 1' a... r 49666.84 395.79 4079.45 36A3.66<Fil_ — [ OHWM - Railroad 1.000 1.000 Contours 1' a... 9576.13 520.78 0.00 520.78<Cuts - © OHWM - Put -In 1.000 1.000 Contours 1' a_. v.;, 360.35 0.00 26.89 26,89cFiIl. Equinox Application for Department of Army Permit (ENG Form 4345) Supplemental Information Riverside Park & Wave The graphic below identifies areas within the project site that are a cut (red) or a fill (green): Equinox Application for Department of Army Permit (ENG Form 4345) Supplemental Information Riverside Park & Wave CALCULATION OF NET CUT/FILL BELOW OHWM: WS AREA CHANGE AT OHWM FLOW CORRESPONDING TO SURVEYED OHWM 2600 EXISTING WS AREA AT OHW (2D MODEL) 264009 PROPOSED WS AREA AT OHW (2D MODEL) 263295 WS AREA DIFFERENCE 714 CFS SF SF SF REDUCED Polygons were exported from HEC-RAS to CAD including the existing conditions 2D model water surface at ordinary high water (2600cfs), and the proposed conditions water surface at ordinary high water. These two polygons' areas were compared to determine the change in water surface area at ordinary high water. The result is a loss of 714sf of water surface from existing conditions to proposed conditions. The image below shows the area of each polygon from the HEC-RAS results. ® depth - Layer Properties Visualization and Information Features i Source: C'...'tHEC- HWM Inundation Boundary (16._412022 07 3o D0 Value_D).shp FID Feature Count ► 0 I PofygonXY Length I Area Range Min Range Max Max 14956 2288.41183631 264009.354127 0 ' =oti• D.crert Visualization and information Features i 1 Source: C:', HWM\Inundation Boundary (16JAN2fl22 07 30 00 Val ue_0).shp FID Feature ► C PolygonXY Count 81573 I Length j Area 1 Range Min , Range Max 14357.06045118 1263295.470191 0 Max • Equinox Application for Department of Army Permit (ENG Form 4345) Supplemental Information Riverside Park & Wave Below is the existing conditions water surface layer at 2600cfs from HEC-RAS results: 100.0 63.3 66.7 50.0 33.3 16.7 0.0 Equinox Application for Department of Army Permit (ENG Form 4345) Supplemental Information Riverside Park & Wave Below is the proposed conditions water surface layer at 2600cfs from HEC-RAS results: Selected 'elevation' 16JAN2022 07 30 00 100.0 53.3 66.7 50.0 33.3 16.7 0.0 Equinox Application for Department of Army Permit (ENG Form 4345) Supplemental Information Riverside Park & Wave Below is the existing conditions OHWM (orange) imported to CAD from HEC-RAS and matched with the Kee Surveying OHWM (red) that was surveyed in the field: Equinox Application for Department of Army Permit (ENG Form 4345) Supplemental Information Riverside Park & Wave Below is the proposed conditions OHWM (blue) imported to CAD from HEC-RAS overlaid on the proposed conditions surface: Equinox Application for Department of Army Permit (ENG Form 4345) Supplemental Information Riverside Park & Wave Below are the existing conditions OHWM (orange) and the proposed conditions OHWM (blue) that were imported to CAD from HEC-RAS and overlaid on the proposed conditions surface: Equinox Application for Department of Army Permit (ENG Form 4345) Supplemental Information Riverside Park & Wave Block 25 — Supplemental Information Riverside Park & Wave - Adioining Parcels Map ID - - Buncombe Co. PIN - v Owner Address 1 973005736300000 FRENCH BROAD RIVER ACADEMY INC 1990 RIVERSIDE DR ASHEVILLE,NC 28804 2 973014492500000 RIVER WALK HOMEOWNERS ASSOCIATION PO BOX 1598 FLETCHER,NC 28732 3 973014065800000 RIVER WALK HOMEOWNERS ASSOCIATION PO BOX 1598 FLETCHER,NC 28732 4 973003453000000 TYLER BRITT ANTHONY 1233 HUMDOLDT ST BELLINGHAM,WA 98225 5 973003325800000 MCMANUS-STUART NOREEN 3 W CITY VIEW DR ASHEVILLE,NC 28804 6 973003427200000 JACOBS MATTHEW C 14 RUGBY WAY ASHEVILLE,NC 28804 7 973003403300000 DEEL HAROLD LYNN JR 15 RUGBY WAY ASHEVILLE,NC 28804 8 973003202700000 ROBERTS WOODROW RIVERSIDE DR (UNKNOWN) UNKNOWN,NC 99999 9 973002290600000 WALDROP RICHARD D;WALDROP SHEILA M 7 CEDAR RIDGE DR ASHEVILLE,NC 28806 10 973002199000000 WALDROP BEURA D 7 CEDAR RIDGE DR ASHEVILLE,NC 28806 11 973002386800000 MULLEN DAVID MATTHEW;MULLEN ELIZABETH G 27 BLUE RIDGE AVE ASHEVILLE,NC 28806 12 973002362800000 HOLCOMBE LARRY D 125 ELK MOUNTAIN RD ASHEVILLE,NC 28804 13 973002150100000 17 GROVE ST WEAVERVILLE,NC 28787 CRAGGY RIVER PROPERTIES LLC 14 972092587800000 CLEMMONS JOHN;CLEMMONS BETTY 132 GREEN ACRES DR LEICESTER,NC 28748 15 972093404100000 CRAGGY A 20 OLD LEICESTER HIGHWAY LLC 1900 N BREVARD ST CHARLOTTE,NC 28206 16 972092492600000 BATISTA J ALEXIS 20 OLD LEICESTER HWY ASHEVILLE,NC 28804 17 972093319000000 CRAGGY A 20 OLD LEICESTER HIGHWAY LLC 1900 N BREVARD ST CHARLOTTE,NC 28206 18 972093322700000 TINY RANCH LLC 466 GRANT METCALF RD MARSHALL,NC 28753 19 972093248400000 TINY RANCH LLC 466 GRANT METCALF RD MARSHALL,NC 28753 20 972093262400000 TINY RANCH LLC 466 GRANT METCALF RD MARSHALL,NC 28753 21 972093276800000 14 ROCKY SLOPE RD ASHEVILLE,NC 28804 MCCURRY JOEY;MCCURRY TIFFENY 22 972093469600000 CAHN ELAINE RHONDA 625 BALDWIN AVE CHARLOTTE,NC 28204 23 972093582100000 GRIFFIN RICHARD L;GRIFFIN ALICE C 34 ALPINE WAY ASHEVILLE,NC 28805 24 972094405800000 BARGER GEORGE R 12 INGLE RD ASHEVILLE,NC 28804 25 972094723300000 LUSTER WILLIAM CLARK III 64 MCCLAIN ST ASHEVILLE,NC 28803 26 972094894200000 WARGEL DENNIS J;WARGEL SANDRA 763 COUNTY ROAD 8 STRINGER,MS 39481 27 N/A (Railroad, no PIN) NORFOLK SOUTHERN RAILWAY CO FKA SOUTHERN RAILWAY 3 COMMERCIAL PL # 209 NORFOLK, VA 23510 C/O BRIAN TAYLOR (LOCAL CONTACT) NORFOLK SOUTHERN CORPORATION 650 WEST PEACHTREE STREET NW BOX 45 ATLANTA, GA 30308 Woodfin Riverside Park - Adjoining Parcels Map u a Project_a rea o Adjoining Parcels 0 0 1 ngle R 6911 1 Q�t '' pane R`Ve< Oi a Revora -Ida Dr F� �u`nt'a n Rd -o Reed Sf �_ 0 225 450 900 1,350 1,800 US Feet RIVERSIDE PARK CONSTRUCTION DOCUVENTS ISSUED FOR PERVITTING, NOT FOR CONSTRUCTION PREPARED FOR: Wei °FIN PARO CLIENT/OWNER: Town of Woodfin 90 Elk Mountain RD. Woodfin, NC 28804 (828) 253-4887 PREPARED BY: swisirr4i *.-11414444litt4OP EQUINOX balance through proper planning LANDSCAPE ARCHITECT: Equinox 37 Haywood Street, Suite 100 Asheville, NC 28801 (828) 253-6856 (x202) david@equinoxenvironmental.com Z 0 Q W 0 Z ADDRESS: 1598 Riverside Dr. Asheville, NC 28804 Latitude: 35.627678° N Longitude: - 82.600733° W PROJECT SIZE: Approximately 9.15 Ac Total Disturbance area is 8.31 Ac FIZENCy BROAD RAVER All aspects of work shall be performed in accordance with all applicable local, state, and federal regulations pertaining to worker safety. SHEETS INCLUDED IN THIS SET: LANDSCAPE ARCHITECTURE LO- PROJECT INFORVATION L1- SITE PLAN L2- SITE PREPERATION L3- LAYOUT PLAN L4- VATERIAL PLAN - SIGNAGE & WAYFINDING L5- GRADING & DRAINAGE L6-STORVWATER PLAN L7- PLANTING PLAN L8- DETAILS EC- EROSION CONTROL PLAN STRUCTURAL ENGINEERING S- STRUCTURAL PLAN CIVIL ENGINEERING C- WATER & SEWER LAYOUT PLAN ELECTRICAL ENGINEERING E- ELECTRICAL LAYOUT PLAN PLUMBING P- PLUMBING PLAN AND DETAILS ARCHITECTURE Al- PLANS A2- ELEVATIONS A3- SECTIONS A5- DETAILS A6- FINISH SCHEDULE PE- STRUCTURE PLUMBING & ELECTRICAL p OU rn SA w N v�1 cWcoD V) W O 2DrG)C w^ COrC)DWm- DW C�� > ODD * z Dm Zm\� c m r m�0� \I CZmD vc z m n D r r v1�i$m -0� v W13C)pr o2Eem m�-<NV)<Im c_z O m D c0 N o c0 N cn OO w o OO w0 cn 1 OO o OO a cn OO o 0 OO 01 cn OO 0 o (fl 0, cn (fl J 0 OO N o OO N cn OO w o c0- w cn o - cn - 01 o - c0 cn vis 111 OZODm�DDI*I� - D� --,DOZE V)rtD/1 rn r cn Z�v�� ry* vcn c0 - C O G) N m 0O o end m D O�1 *m00�0 u> OD�ZZO �c)�:LID NDOOvv� 00)=<-z 10m2OV) :C) Z ZZ m()m `�D cn OOO Dri �m�zDr�)C)�co{���NO •' _ rnxicA mimNN �O Zm j�jm 00zm ��zu123 cziim0_E�� zO 0 m ccn mcO0+00 00 gym, zn G) z n ZxZpcn w v��0zp0 zm �z� sm0 0+00 ocr��n�zDoe�C N ONO w m o z �� 1' 1 C) Jox�mcnNm z I rnnZ��� cn ;I-I:7 N�' A_ cn r D DWG C) 07 0 p z D �'I m N o to C_= m Z 0 G)N O 7C c� DOwN nD o cnm- D�� V)m m vv > m;v r�. m 1- m 0+25 0+25 n �nmWoO s �- c� a cz CA IT vw" N-. z D - Do C DymmD n�� p m m V) DDmZc)c)c W ZD� m0 zv\� �r�m� o v m�� ON �n v�N zzz Cr/\y vp� �z N�� �pc�m p m n�m om><O�zo oO ym r= O D 0+50 C 0+50 z �Dr�V)W D •Dv o > �DDt�, DW �ODz nA �2N���� p�vv)cn� �ND�CC `. �N �zc-Om co-.2 1 s". D LA �o7 xi 0zm0l*tooz mz *�m D pZM v c I V) m _1 z r G 0+75 0+7`j DN rn D - ZE-D- �mo� �� �� Z �XI I pOymmxO m m �O co< v w o��mc) o m�� �D n� v Zrm- Dptn� C!L° cDvu) f1l 1+00 1+Op D np < H �ID�m\ D V)D I z m M zm � N w W I X. m O�z tnxi 'oc Zp� W N O = pZ m 20 mZNVI>>�Z TID O� zz �o�N� TI Zm zz�r550 c)DNmcncn� OV) z0 v NC V)ov zG)�� WWODO-vOmD 22Dt� n Dmm O Z\� NmcZv ®v C��� D1TI� ZND C� ,„,. 1+25 .(l O 1+25 _ 2io mD�DDOZ a N coD v�D�z�GD`Z __ zr.. �OOp D rZZZ nm0 OOi o0 On vm I z W =DO rDDc) z-< mA v xi nD vi ��v�DN D�z p�Zpvp WW m xiz i DO 8 n U) 1+50 cn w 1+50 W *17 m ZO CO Or D ��O�vD� Z D z � vtn�fm*1mDCDop171 m�D0�0�00� rZ� C) rn V)A7C �- CDm Nvzv ?mc'V) NI zx1 N- n �m W 2Cm t-D M O V D ccmc3;0 o m DDD Wv mm� z-ID p cn m O W Vl (� v m- n m Z 2 V) v'� %am Z m 1+75 n + 1 75 O `r DaO, 7�23 C �1 n rn O� N >O m-1 m O zV)o�-• w�D r n `nz �� N D WZCZO ?1 OHO nc)c�nyD C tjD �O vD z 2 m1�Oz !T1 D pry CmV) V) RIB v_ m� �m H 2+00 O m 2+00 m _<Z 00� �v ^D-IDm Dye N O m Z cncn N� z m c^' D u) pm - ID _._ m= g O D ODem/► 5 �O� zcoifDOa�o�3; m�z z z �m zm \D rn Wz y Dm O �m� �c)D v zmN D ZG) mz c,, Drz (n Z 2+25 1V m 2+25 n N D� > v) �� z zxmtnpm�tntnmv)c)c� np-1 1mcn t v V00 mp rDD23zmm O o� "� m0 2+50 0 2+50 ���mZo�oDOaoo1��-IZ�n� O vzm�Wr m z� W zr mm ,� ry* zV)�oz �� V)c �mzG�n Z I D nN m�zz>�-sm'ml- m p�p�N�o ova Nz :: m�DO 2+75 2+75 1"87irri� _ m D�Zn�m 1'12 v �D� zp �aDo z :•:1:: <,),_-,. z\) 111'- n �p=nOt=*1�vmc V)`_ o ND x m G)2 1•'•10< 0 p O 1m''1 v O 1T1 �1No A cri -A ,D, 3+00 3+00 / v r 23 m �NZNZVWWrttnnD��cNO 1 p ; 3+25Fri 3+25 p m c� - n z v� �cDit„No��v=m�o��;O m NCGS MONI "X179" Z: 1947.80' oom 0 0 D 3+50 m m m m m m m m m m m 3 50 Znrnm -1 r Omrnm m>r D �� z 1- > 0 g m .1 / H m N o N cn co o co al A o A al On o On al On o On cn J 3+75 o o O D M n TI N m o v 5 G G N 4+00 a ozn n m m v a� m 4+25 a - f z � A ,,<< 0 € € COW zz ..411/ �Arn H�C� W H o ›rn-�n 4+50 No Nc coo coc Ao Ac (o (ca (no -as?'c. /J •• �vHus - vl-usr S? °= VHS m e pN � �� 0�� 4G .iA— ,,, %ce\ .M� _ i ir .•' �� W mo -1 N r J CONTROL POINT 5/8" RBC (503) GROUND COORDINATES N: 703730.41' E: 929635.77' ELEV: 1956.26' )GRAPHIC DATA SHOWN WI JSION AREA WAS COLLECT 7-3/31/17 AND SHOWN ON A ;20 DESIGN "WOODFIN WAV PPING AND SURVEYING, Di D7 ,, "5., - - " - �rr�.G_f:. ��1 �- ' /ji �i > nl Cnm " m m Z O cn m ° O mc Pi ,o po�COz oJ� 0 OC ����°` A�mmH <oo�w �7Z H G I' G-IIf arnrn(� n O n o 'fir o �I _ !`. A r • O m D �° roy Z / co rn 0 , U c/ C �` \ ��.►\ ^ �_`\ n m m z G� C� C ._ z a D73 z C O Z 23_ r- D k�,c\ )NTROL POINT " RBC (300) 'OUND COORDINATES 704231.71' ;29929.93' EV: 1943.36' (ZONE AE) 4P NO. 3700973000 D O D Z 7 ZG� fp�1Gn�W„ L C� b mom � Hys� orn �,G 0 7 D_ D O L �l03 `o� rn <<� 2. �prby v of\-;:::7` c.. -0 0m, / ��� �mn •a o<� Irky 0 �C S �' (� c�� V / VI -Os o� _ ���m� O CO Z 0 Dpm00po� _ ' ` (nZ�O(nODD m T 2 HDH CZ1rH 1 1 D m 13 n O -, n , m 46 G) < 0 O A m v - Gj� by I Zcn Z O m Z (� p mN' < Z a ( o pi?,b NyS� "'City 'o(1\1 0 r ni DOrIa cn !`%,/\�---�' WmO_oDzD ��DC��2 ���^^ V J Om _ �j b.- O m z7 2 ti.B � _ a 0 •P lit 1 y �m0�� --{ i� A4O�F m 0 D= m n_ BOO*Z7)OC V O / bHyS zwD� A_f F 1�% y �% --______/ C�)oZ0 m< Z mWz48 �ss �l±` � mmzG) nn z�cnmc��cnm O �m�� sS n y �__ `° z y - 0 ' T � mO<^ I SS ° mCO�O'=0 < 0 O 0 �owC� Z W H bHys \ n-mom>O� b O Z D m r0 - HyS Z Z O ' cmm ss s tic ..- -`,vi/ )">y'� ° SS - '-.`- ` A - • ° ;c. `-� :t I Jaz oC ---1 o (� o O m m z G) cn n m w o O O Q°rmom \ bHyS WD mC-<m O� ��� bHy /`VHdS m .(1 Z=1Y S nx im)' ' / m ISS \� r,_.., hui:i SSl''JI``1_` �'_Ci, /� �� �� J r p 33 O < o A C 0 Z N o Z W ��w�(7��� wA \/ VHHS ` 0 O 07cn bHdS �-- bHdS-�� b O�mm 0 In' n D0= cn m (7 \ L0����® HyS �� C Ln2III•m .cL _ �r5 0�� Y. m02m020-�mmzG� cnc.. p 0 mmz0 n 0�1 �0 W D�rZI/�s 0 Zen>n O :"� <-.— m yS 4 C �. dN�S iltr� . i m I:`s .a /!—, ..,8) _� ` O `- H-,.. �co<� N �_ 2 Z D mcoz�° O A N O W Z mwoO�O rn z=0 z co n DrD mZ m r O - BUILDING �/ _..,_� _ __ {K tII9 {t � - \• a mi ° A No C n 73 A N n W O z V _ - \ \ ,..` 4 ill `` Q� Fl. .. FO `�'•.ci p8j N Nm 0 .) O y o D 'gt)ILDINr 9 1\. =— - Ma•li ry{� \ 31/4\ T ---' l O- �.� •••••.} ;.. 'c� r ,,,. 4. , -,cam_ _s ?) �� S S >G �L, J Lr z7 O M < o N 0 0 ,03H 0 CO A ® - • �i"k . .. _ - • - - °" • ��"�r��"=�-ice �* s• ram/ yw _ ;•,� : .I �1T�: ���� �, h'•:• �-. \' • f `� :. ` / / q �/ /� O 2 Q ,`0 >g .__' S '\•'. z z z 1 1 O C7 cn cn w 0 A O O N N 0 8 r m :70 r Z Z i rn cn < < K Cn z m m z G� (7 m CO J �J D O \l /// ZJ-a zzz rn Cr) � .. �.., � �,.. r 0 `� v C- O ,� t, 00 ".P ,=1 Z �'•.z \;y. a 0 p O m ��oz W IH RCP) ELEV: 1948.8, IN: 1927.3' OUT: 1927.2' 8OoG� iHU O O- O � Oz H13-13 « () 0 z CO ACD co a) J CO rn o n -DTI 2 •• CzcD •:>.< � \ CO :• ::•. s SMH (66" RCP) RIM ELEV: 19 INV IN: 1925. INV OUT: 192 O 0 O ., W A CO N �� f. \ i. �1�\I,• (T V of D H D H A A (n I� W ��41 rn m Z G7 (7 IZ O �^ A � � ��i,k-� rn •.• < < < w �1�c � * ? h .: �. •o-r •41 a I.kx �� 7> �$ z p 0zm02 �,m� zzrn(n v. �1� `R x -. .• \ A n(�j� 0 �mzG� n< < < - 0m< Z OS co 2 wH - m- N W COS� cn ., e 1Ib ,...� O S� �_ V :;: .�. ,7 ` ys S . °'"~.':'" ? 1HdS % bHdS .. :•>r - '` •'rP"'^' '�S�Af�,�7, b �4 •_SS \ d- _ y �l%� SS � � 1 �,, 4i r�- �..G w• T 0 . G7 C �.` �" •m ��,' __ - - i zzrn(n o O - z m a7 2 ��mm < c'o cNi, cnN-OormO�I;0 O-w O" �77t_ I O_ Z Z D (�mmZG�en<a0w m o O o� w CO OJ o A a O n .Z�1 0cip n pH- wocower c��o o O (�A OOiv W�0a orn�0 nrn o 0w No y • Z W 2 IQ dN� ','� �. bHdS bHd\ \ `�t� - .<,SS ` k� f, . ` m G C G = m m bHdS 'O� `�` ��� cn w o A cn o O- A- rD cri O0732n _1:Y WW Dn \ ea mZ���� ZZ�rn (n CD GZ_ ZZ •�_�`��e, Sys \ — ���.,�a. rn�O D O_" ZZ� o Oo o -0 << _ «ern =a<< �_ 0 �0 O O SSj e @\ \�I/I{' locjmo �z n z Z (7 0zm� K�l umiZ11 l/ X m D o w W CO _o 0O� 'N<_" p N v z�� = Oyr S$-rnD\1�z N z CO C cn m D 2 D n lv co A o CO W -W 00 N ° i'1��A^�A_ >� g mmzG��� <oAo G� �: �yl LCJ� 1`�=my S O6 50'45" yy (ON�_a �LOL 5 �� n m m D r� - m r 0 o D — m I I I I I Z m < o o n W N callo0Wo N y 3318. — 11 3 "8£.LZ. m 97' ,L£ co b ., ��' aim • II%%JJff,, M 1'ul' YC" N N II o mOvv ��mmv DDO z-0Tlz � O v 75 •• vM DD Kv pm n m v z ?I L7 (Cl/3 Z O O y cn<n��cnDz�— n m DW 2-0-0-0 nav0 I I o — 1 * mco �, O D cn p * x -_ II ® ^ �x� • ❑ , �Ti© ® rn EA* C rnN(OAr o mo D O sFNP sFNP vH4s\ CA Pr C r•)� Z m mnm* vD�m �� -� ,� 'D J� r>< 0 c — I m l l i mcn VHS dN�S O T W CA C) _ O II m O \Cam) xi G) W D D a D N N v < Z = 1598 RIVERSIDE DRIVE, WOOD ;HIP, BUNCOMBE COUNTY, N )WNER LISTED AS: TOWN OF W ION NUMBERS: 9730-04-5547 SO-03-2884 & 9730-03-135 n C rnJ T� ,Z0) L m D V) 5 0 0 0 N z z W m O O O-1 0 0 m W D W W W 23 y m m r 1'1 -1 O xi O C C z z v_ v v C C z z v v 1T1 C) N -o Vl D Z I*1 O -1 < m z N N m O O D N 1 m p v co G) n s D U '7 V) o 0 ** rn 0 V) V) v m G) C D v v Z K VI Z r m m m W O D N m m O D\ v W D v D z C) uDi cDn D D COm v m m O 1' 1 r m D c� G) O O Z m SF�P / .r �� a a� y �\ 2 �„� Gd Z rnn 0��� ^� v2AQ y m F RD o P A HOLLIFIELD RENT Z n m m m m W C) O m O '� W z 2 1' 1 coxl r D m z n v p u) C7 2 D r W W W_ DZ m m O D G) O O G) 1T1 r 0 0 n N N m r Z O D Z C; 7C V) m M< A 0 0 13 O p y p D D o •r;;� v m zT. 0 0 0 0 T1 v z O 0 v Orri C D t7 m r z �m c r m Dmm G) mD� D rrn\2p2 z I / 5 Q mmzo n r w- n w O < o 2 0 z . O y B ROAD Ri RIVE E_ VE RSID R R znr�*r� CCCCr moozz r W = r v v 'l Z = Z Z Z Z O rNi7 G) G) m r D C < r () 2 y Z n O r m N C to 0 W Z D DW m m m r 4 i/ _, o N z n '1 l�1 o-DC cDimC)c)v p v v v v 0 0 D m O D m G) Z= �0DD m D 7C D r m z m m r O O Z z () C) `z m G) v D D c O m m\� C) O m Ir'') mm m a\ Ti 0 = x x v < m CO C N Z CO m D m m s wA�0A0 .i,, o m m C1 ��� z �0m n jV c7 Q (0 c cm) V) N C� c� N m Z 7C m v_ r*i D n z .Z1 Z O C C m W 2 m m m m m y r 0 o D N� �\�\dy��0 O 0 r m _ u a oO �W o 7 Y FOR: NTAL, INC ET, ASHEVILLE, NC 28801 N �� r n D r+1 r+7 y O o x z m -< -< z m o z Dw co m D D >> M x z K m D D D 0 - m '� O cc co - W 1S 3NIh ysy OOD Fj t p\>S�0 m i 6D��,6 m 1�I pn V C) D> -1' 126E Know what's below. CaII before you dig. ---.....i..... EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL C111071;`O �J O4S cO DESIGN BY: DRAWN BY: CHECKED BY: REVISIONS DATE I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright© 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME S 4c1E4441111t • 2 FRENCH BROAD RIVER 'o CRAGGY MOU __L Know what's below. CaII before you dig. STORMWATER ASPHALT PARKING (70 SPACES) TAN RAILROAD r I 1 GREENWAY EX. RAIL LINE GREENWAY CROSSING (TO TIE INTO FUTURE PHASE OF GREENWAY) PARK SIGN EXISTING ENTRANCE DRIVE RIVERSIDE DRIVE (H WY 251) 0 0 w /101 I 1 I I I T 0 I 1 I / I I 1 I i 1 i T FRENCH BROAD RIVER EX. BRIDGE (OVERHEAD) STORMWATER DROP OFF RIVERSIDE DRIVE (HWY 251) PAVILION UPPER PLAZA GRAND STAIR PLAY AREA GATHERING SPACE RESTROOMS & FACILITIES �' . / yM° / AO , BANK STABILIZATION (BY OTHERS) WAVE FEATURE (BY OTHERS) LOWER PLAZA BEACH (BY OTHERS) BANK STABILIZATION (BY OTHERS) OLD PILE REMNANTS TO BE REMOVED (BY OTHERS) OPEN SPACE EX. PILE TO REMAIN CREEK PLAY °1G(2Y NATURAL SURFACE TRAIL EX. WETLAND EXISTING LEGEND O E —FOC. 0 PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT FIBER OPTIC CABLE WATER METER GAS PEDESTAL STREAM GAUGE EXISTING WETLAND -oW- ss SFHA FOC OHW TB MINOR CONTOUR — — MAJOR CONTOUR FENCE LINE OVERHEAD WIRE SANITARY SEWER SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30' STREAM BUFFER PROPOSED LEGEND ASPHALT CONCRETE GRAVEL PERMEABLE PAVERS WATERLINE NOTE: ALL WORK IN THE RIVER OR ALONG THE BANKS TO BE PROVIDED BY OTHERS, UNLESS OTHERWISE NOTED. cy R/k eR FR O,i BOULDER TOE / STEP RIVER ACCESS EX. ASPHALT PATH (RESURFACED) UPDATED PICNIC AREA SFHA g EXPANDED PARKING (39 SPACES) NEW ENTRANCE DRIVE "HA PAVILION ACCESSIBLE PATH STAGING AREA RIVER ACCESS D 257 RIVE FRFNOH a RI�FR °AD SS SS ® \ �° �® O6 _r • ONE-WAY LOOP — SFHA TRAILER PARKING EX. RESTROOM HA 0 30' 60' 120' SCALE: 60'-0" SI ...„,, ih,,,E..._,•.._..0.7.0 EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL , 0,1161A„A,,, ss‘k • `z `C '���RRRRRR .� * N 5' -: *_ ,/1111111111�7. �````` NOTE: Drawings are invalid without signed stamp by professional DESIGN BY: DRAWN BY: CHECKED BY: w Q 0 REVISIONS I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright© 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME OVERALL SITE PLAN • 0 dN�s SFHA dHOs tr- ----- IN . SS Ss ■ ■ I CONCRETE ISLAND W/ MOUNTABLE CURB GREENWAY CROSSING EX. RAIL LINE VHdS - 4/HAS EXPANDED ENTRANCE DRIVE . . -ss teetetea FRENCH BROAD RIVER firatatorgra • • SIGNAGE, TYP. BOULDER, TYP. BOULDER WALL PLANTING AREA, TYP. alisiftwor PARK SIGN • • BOULDER WALL AS HEADWALL TREES TO REMAIN, TYP. (6t: • . . \� • Ss Ss EXISTING LEGEND 0 0 0 . . - O 0 E D —FOC- 0 PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT FIBER OPTIC CABLE WATER METER GAS PEDESTAL STREAM GAUGE EXISTING WETLAND -X OW ss SFHA FOC 0HW - TB - CML BUFFER -: MINOR CONTOUR MAJOR CONTOUR FENCE LINE OVERHEAD WIRE SANITARY SEWER SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30' STREAM BUFFER PROPOSED LEGEND v ASPHALT CONCRETE GRAVEL PERMEABLE PAVERS WATERLINE RIVER ACCESS (BY OTHERS) CONCRETE STAIRS BANK STABILIZATION (BY OTHERS) CONCRETE WHEEL STOP, TYP. • 60° PARKING, TYP. ONE WAY DRIVE AISLE iftrfr /4"Timp__ "Ate_ ASPHALT PARKING (70 SPACES) PEDESTRIAN CROSSING WEIR, TYP. STORMWATER CHECK DAM, TYP. _ VV 1111111111\111111 in in VEHICULAR GUARDRAIL \.SFHA GUARDRAIL \ PLANTING AREA, TYP. EX. UTILITY POLE AND NON -DISTURBANCE BUFFER, TYP. ACCESSIBLE PARKING & PATH • RIVERSIDE DRIVE (HWY 251) - • 0 I 0 I 0 I O III Hi ACCESSIBLE PARKING W/ CURB RAMP III EX. BRIDGE PIER S • REPRESENTATIONAL 'RIVER' PAVING STORMWATER OVERLOOK & EDUCATIONAL SIGNAGE SIDEWALK TRAFFIC CONTROL BUMP VEHICULAR GUARDRAIL THROUGH TRAFFIC DROP OFF AREA — a333no 1 MOUNTABLE CURB BOLLARD, TYP. BOULDER PLANTING AREA, TYP. SEAT WALL • • • • UPPER PLAZA - • PERFORATED METAL CROSSING DRY 'RIVER BED' FLAGSTONE EDGE INTERPRETIVE SIGNAGE •�� • CHANGING ROOMS PLANTING AREA BIKE RACK (5) sa Know what's below. CaII before you dig. 0 10' 20' 40' SCALE: 20'-0" am oprg „ompicitImiur EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL O NOTE: Drawings are invalid without signed stamp by professional DESIGN BY: DRAWN BY: CHECKED BY: w Q 0 REVISIONS I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright© 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME SITE PLAN • 'ARKING W/ CURB RAMP ER 1 MOUNTABLE CURB BOLLARD, TYP. BOULDER THROUGH TRAFFIC DROP OFF AREA - / / la ��a \ 0 1111111.8 PLANTING AREA, TYP. SEAT WALL • • 11111111.mlf • • • I I I I I • • • • PERFORATED METAL CROSSING I. DRY 'RIVER BED' r.� FLAGSTONE EDGE INTERPRETIVE SIGNAGE EXISTING LEGEND • • 0 CHANGING ROOMS PLANTING AREA BIKE RACK (5) PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT FIBER OPTIC CABLE WATER METER GAS PEDESTAL STREAM GAUGE EXISTING WETLAND TRASH/RECYCLING, TYP. PAVILION PLANTING AREA CONCRETE RETAINING WALL BOULDER RETAINING, TYP. BOULDER, TYP. ' DRINKING FOUNTAIN EX. RAIL LINE 1111111111ftimi an OW SS SFHA FOC oHw TB CIVIL BUFFER BOULDER & GRASS VIEWING/ SEATING TERRACES SFHA an 1111111.11 RIVERSIDE DRIVE MINOR CONTOUR MAJOR CONTOUR FENCE LINE OVERHEAD WIRE SANITARY SEWER SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30' STREAM BUFFER WHITEWATER WAVE & BANK TREATMENT (BY OTHERS) / FOOT WASH BOULDER SCRAMBLE SLIDE SEATING AREA GREENWAY ACCESS PROPOSED LEGEND • BENCH, TYP. BOULDER SEAT WALL, TYP. oe.......„......„ GIANT PLAY BOULDER TRASH/RECYCLING, TYP. - DOG WASTE STATION, TYP. ASPHALT CONCRETE GRAVEL PERMEABLE PAVERS WATERLINE TIGHTROPE CONCRETE RIBBON WALL CONCRETE FLUSH CONTINUATION OF WALL iINTERPRETIVE SIGNAGE BOULDER SEATING _ Foc ASPHALT GREENWAY 100 rvo BOULDER RETAINING WALL uaddrin BEACH (BY OTHERS) BOULDER RETAINING WALL 1111110 BENCH CONCRETE PATH LS4110"" Mir ACCESS PATH BOULDERS HEADWALL ,a\°'; NATURAL SURFACE TRAIL BOULDER SEATING SFHA SFHA • • • • • • • Know what's below. Call before you dig. 1 EX. PILE TO REMAIN WITH NEW SIGNAGE 0 10' 20' Si Cll CC NATU STEP 40' If4.0 ...._..„,...„„tkioa... EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL 11011°. (11$74§) +'"s' ab14 ' DESIGN BY: DRAWN BY: CHECKED BY: w o REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright @ 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME SITE PLAN 1 • 2 • • SFHA SFHA Sip SFHA sFyq SFHA Ss ML INING WALL ss, a333na Ss Ss Ss ss ACCESS PATH BOULDERS HEADWALL BEACH (BY OTHERS) BOULDER RETAINING WALL CONCRETE PATH BENCH ss AA FOC Po Fuc Mo MC Know what's below. CaII before you dig. s SFHA NATURAL SURFACE TRAIL BOULDER SEATING c'kL srHA�S�i-\ SFHA \\ SF/iA cM sfih q \ t EX. PILE TO REMAIN WITH NEW SIGNAGE O0 MUD PLAY AREA —1 I I 1 I 1 EXISTING LEGEND •• ar • E • O BOULDER RETAINING WALL SAFETY RAIL CULVERT CONCRETE PATH WETLAND NATU - SURFACE TRAIL STEPPING STO PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT FIBER OPTIC CABLE WATER METER GAS PEDESTAL STREAM GAUGE EXISTING WETLAND a33na X X —OW— ss SFHA FOC OHW TB — BUFFO TRANSITION FROM NEW TO EXISTING ASPHALT PAVING; SMOOTH & FLUSH Ss INTERPRETIVE SIGN SITE BOULDERS, TYP. - p CONS WETLAND MINOR CONTOUR MAJOR CONTOUR FENCE LINE OVERHEAD WIRE SANITARY SEWER SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30' STREAM BUFFER PROPOSED LEGEND v w ASPHALT CONCRETE GRAVEL PERMEABLE PAVERS WATERLINE BOULDER TOE BANK STABILIZATION TO DOUBLE AS RIVER ACCESS BENCH EX. ASPHALT PATH (RESURFACED) BENCH SWING, TYP. — \ PICNIC TABLE, TYP. GRILL, TYP. DOG WASTE STATION, TYP. TRASH AND RECYCLING, TYP. PLANTED DEPRESSION EX. WETLAND ASPHALT GREENWAY rywy �S,J OJ 1' v TRANSITION FROM NEW TO EXISTING ASPHALT PAVING; TIE IN SMOOTH & FLUSH SUR TRANSITION FROM NEW TO EXISTING ASPHALT PAVING; SMOOTH & FLUSH ASPHALT PATH STORMWATER SWALE BOULDER RETAINING WALL TIMBER STAIR AT C CE TRAIL EX. WETLAND • • • • • • • `44i0 FOc 1940 / `—Ow •*. CONSTRUCTED WETLAND •v_ ow Ow ow Ow EXPANDED PARKING 0 10' 20' 40' SCALE: 20'-0" s EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL O `CQ� ";'�� DESIGN BY: DRAWN BY: CHECKED BY: REVISIONS DATE u Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME SITE PLAN • 3 00 FOC SS. UPDATED PICNIC AREA SS y�S SS ASPHALT PATH 'ITION FROM NEW TO STORMWATER SWALE JG ASPHALT PAVING 44'.v IN SMOOTH & FLU° BOULDER RETAINING WALL TIMBER STAIR SUR Know what's below. CaII before you dig. EX. WETLAND CE TRAIL NEW ENTRANCE DRIVE vwas VHAS SFHA • CONSTRUCTED WETLAND ow 90° PARKING, TYP. NEW PARK SIGN SFHA \ ` , SFjii \ o \ SFHA • 0 ow ow SS PAVILION GRILL. DRINKING FOUNTAIN ow 0 EXPANDED PARKING (39 SPACES) 1�\ SFHA • alftliftor SFHA —� - • ' s PLANTING AREA, TYP. TRANSITION FROM NEW TO GEXISTING ASPHALT PAVING EX. ASPHALT PATH (RESURFACED) p Qo� L,AJ- ACCESSIBLE PATH ACCESSIBLE PARKING BOLLARD • CII� s i _ CM SFHA CML Eas EXISTING LEGEND MI 1 — E PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT FIBER OPTIC CABLE WATER METER GAS PEDESTAL STREAM GAUGE EXISTING WETLAND X X OW SS — SFHA — FOC OHW — MINOR CONTOUR MAJOR CONTOUR FENCE LINE OVERHEAD WIRE SANITARY SEWER SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30' STREAM BUFFER PROPOSED LEGEND w ASPHALT CONCRETE GRAVEL PERMEABLE PAVERS WATERLINE ▪ 11111111 ar ▪ 4111 BOULDER TOE INTERPRETIVE SIGNAGE RIVER ACCESS SAFETY STRIPING STAGING AREA 4 SITE BOULDER, TYP. FLUSH 9" CURB ASPHALT GREENWAY DIRECTIONAL SIGNAGE EX. RESTROOM, TO REMAIN, WITH EXTERIOR ENHANCEMENTS air 111111 Mir el RIVERS (H 251) AIIIN—••111111111111„ MR VE TRAILER PARKING PAVING EXTENSION FOR TRAILER BACKUP CONSTRUCTED WETLAND 0 b�yynA Ss ss - FOC !m REMOVABLE BOLLARDS 0a FRE NcH BROAD R/ VER s b�yyne ss s FOC FoO oo FOC 1 \ �OW bsyyne \ ss ss ss SS 0w— BENCH SWING TERMINATE GREENWAY INTO EXISTING PATH EXISTING ASPHALT PATH (FUTURE GREENWAY PHASE) FOO�FO Cam^ ss \ss_ SS OPEN SPACE w Foe —0w SS \ SS Po C \ F r— oC Ow ` OC 0 10' 20' Crot Cr4E CMi 40' SCALE: 20'-0" EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL ow �2 O�Pr1pSii[-���V O DESIGN BY: DRAWN BY: CHECKED BY: REVISIONS DATE u Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME SITE PLAN • 4 0 I 0 0 I 0 I 0 0 I CMS SITE PREPARATION ALL PROJECT ACTIVITY SHALL BE CONFINED TO THE AREA WITHIN THE LIMITS OF DISTURBANCE (21.20 ACRES). ow DEMOLITION/CLEARING/GRUBBING SHALL OCCUR IN ACCORDANCE WITH CONSTRUCTION SEQUENCING NOTED ON EROSION CONTROL. SEE EC SHEETS FOR CONSTRUCTION SEQUENCING. ONLY CLEAR WHAT IS NECESSARY FOR THE INSTALLATION OF PERIMETER EC MEASURES AND CONSTRUCTION ENTRANCE FIRST. WORK TASKS: • ESTABLISH CONSTRUCTION ACCESS, STAGING AREAS, & BORROW/WASTE DISPOSAL AREAS • TREE PROTECTION TO BE INSTALLED PRIOR TO ANY CONSTRUCTION IN GENERAL VICINITY OF 'EXISTING TREES TO REMAIN' • INSTALL TEMPORARY EROSION CONTROL MEASURES, INCLUDING SILT FENCING AS NOTED ON PLAN • DEMOLISH EXISTING FEATURES INDICATED ON THIS PLAN; CLEAR & GRUB SITE • DURING INITIAL SITE DISTURBING ACTIVITIES ABOVE, CLEAR ALL INVASIVE TREES, SHRUBS, AND VINES. ALL REMOVED INVASIVE VEGETATION SHALL BE DISPOSED OF IN SUCH A WAY TO PREVENT GROWTH AT A DISPOSAL LOCATION OFF SITE. • REMOVE ALL DOWNED TREES. • OTHER AREAS USED BY GEOTECHNICAL ENGINEER TO ACCESS BORINGS SHALL BE REVIEWED FURTHER FOR APPROPRIATE VEGETATION FOR RE-ESTABLISHMENT. CONSULT W/ LANDSCAPE ARCHITECT. • CLEAR ALL EXCESS AND OVERGROWN VEGETATION WITHIN LIMITS OF DISTURBANCE • LIMB UP ALL TREES 10-15 FROM THE GROUND AROUND ALL PICNIC AREAS • CENTERLINE STAKE THE GREENWAY AND CORNERS OF BUILT STRUCTURES PRIOR TO CONSTRUCTION FOR REVIEW AND APPROVAL BY LANDSCAPE ARCHITECT • CLEAN UP LITTER ALONG RIVER'S EDGE • ROUGH GRADING • BANK STABILIZATION • TIMELY APPLICATION OF TEMPORARY/PERMANENT SEEDING AS NECESSARY TO STABILIZE DISTURBED SOILS (SEE SHEET EC SERIES) Know what's below. CaII before you dig. SFHA sw hq .Fy �sF�\ EXISTING LEGEND A MN 0 E 0 PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT FIBER OPTIC CABLE WATER METER GAS PEDESTAL STREAM GAUGE —X -oW ss SFHA - FOC OHW CML BUFFET spHA OLD BRIDGE PYLON REMNANTS MINOR CONTOUR MAJOR CONTOUR X— FENCE LINE OVERHEAD WIRE SANITARY SEWER SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30' STREAM BUFFER min •-••,,,.._ / / CtQ 0 10' 20' Ss c FCC\ dt 40' SCALE: 20'-0" EQUINOX Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 Asheville, 37 SEAL • `z `C '���RRRRRR •� Ciiii III III111AAAAAA.•s DESIGN BY: DRAWN BY: CHECKED BY: REVISIONS DATE u I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME THREE LINE TITLE L2.O KEY PLAN SFI-IA ---_._ 100 t FENCE AND ASSOCIATED FOOTINGS TO BE REMOVED TO PROPERTY LINE. TREE, FENCE ON NEIGHBORING PROPERTY TO BE PROTECTED. POLES AND WIRES TO BE REMOVED BY DUKE ENERGY 100 CML CML CML CML 100 / / / I / STORAGE TANK TO BE REMOVED FENCE AND ASSOCIATED FOOTINGS TO BE REMOVED TO PROPERTY LINE. FENCE ON NEIGHBORING PROPERTY TO BE PROTECTED. CML 103 CML CML CML CML MI MI a3ddne EXISTING LEGEND E 0 0- PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT FIBER OPTIC CABLE WATER METER GAS PEDESTAL STREAM GAUGE — — - — — —X OW ss OLD BRIDGE PYLON REMNANTS MINOR CONTOUR MAJOR CONTOUR X— FENCE LINE OVERHEAD WIRE SANITARY SEWER SFHA FOC OHW TB — CML BUFFER CML SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30' STREAM BUFFER Know what's below. CaII before you dig. STRUCTURES TO BE DEMOLISHED. a' • �Y ss . ASSOCIATED UTILITIES TO BE REMOVED AS a �.- •• • . a .•4 '` ' . . 0.4.A. ss 7":".7.4". ' &. APPROPRIATE; SEE ENGINEERING DRAWINGS. .. •• •' �,�•.d s. a , e d •• .a. ' Q: e • a y.. r 1 0 i 6`e I a. a»dne jj /jjj/�_ jjj/' _ I1 FRENCH BROAD RIVER CML CML CML CML INVASIVE PLANT SPECIES TO BE REMOVED FROM EDGE OF CONSTRUCTION DISTURBANCE TO WATER. CUT ALL CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. if --B BM- DEBRISTO BE REMOVED CRAGGY MOUNTAIN RAILR CONCRETE AND BASE COURSE TO BE REMOVED ASPHALT TO BE REMOVED. BASE COURSE TO REMAIN AND BE REUSED AS ABLE. DECK AND STAIR TO BE REMOVED FENCE AND ASSOCIATED FOOTINGS TO BE REMOVED DECK TO BE REMOVED ASPHALT AND BASE COURSE TO BE REMOVED Ne7888"fila Ira •� UTILITY POLE TO BE PROTECTED, REMAIN IN PLACE. AREA DRAIN AND ASSOCIATED PIPE TO BE REMOVED, SEE ENGINEERING DRAWINGS. FOR SITE PREPARATION DETAILS OF ITEMS WITHIN THE FRENCH BROAD RIVER, SEE S20 SHEETS. TREES BELOW TOP OF BANK TO BE CUT NEAR THE BASE AND STUMP LEFT INTACT UNLESS REQUIRED TO BE REMOVED. TREE TO REMAIN, TYP. TREE TO BE REMOVED CML -CML -CML STRUCTURE TO BE DEMOLISHED. ASSOCIATED UTILITIES TO BE REMOVED AS APPROPRIATE; SEE ENGINEERING DRAWINGS. SFHA UTILITY POLE TO BE PROTECTED, REMAIN IN PLACE. i' STRUCTURE TO BE DEMOLISHED. ASSOCIATED UTILITIES TO BE REMOVED AS APPROPRIATE; SEE ENGINEERING DRAWINGS. CONCRETE TO BE DEMOLISHED. OPTION FOR CONCRETE TO HAVE METAL REMOVED AND BE CRUSHED OR PROCESSED TO A GRADATION SIMILAR TO NCDOT ABC AND REMAIN ON -SITE AS BASE COURSE FOR FUTURE PARKING. CHOICE SLABS (18" - 30") TO BE REUSED FOR PAVING; SEE SHEET L4.2 (MP2) AND DETAIL 9/L8.0. RIVERSIDE DRIVE (HWY 251) CML I 1 0 n I 0 I INVASIVE PLANT SPECIES TO BE REMOVED FROM EDGE OF CONSTRUCTION DISTURBANCE TO WATER. CUT ALL CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. DEBRIS TO BE REMOVED . CML CML I CML F : a . G a.:e . ea SFHA 4• • -•d a e a e . a . a a: e d e • • ' a a 'a •'a •a a e • •d • . a • SS d • • e •.4: tea •. .d d • • •a dd • • • • • • • • • d' . • a . • A a.d •• a •• • • .•O 'a• '.. .. • • '• _ FOCI. •, . a °• 'a a ad..C-•• • • .e: CML _CML _CML _CML • ' 4 . a CML CML 0 10' 20' CML . CML iniesiam 40' SCALE: 20'-0" ,`.,'l 4*"iiill EQUINOX Asheville, - 37 Haywood t 828.253.6856 f 828.253.8256 s St. Suite 100 NC 28801 SEAL \ \ 1111111„RI.' sss,, .0 A p, ,,,, .`'Q- NP1ps' '� � O o. ^• pa ., , ' CIO DESIGN BY: DRAWN BY: CHECKED BY: REVISIONS DATE 1 Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME SITE PREP L2.1 • • A 4 a • •• . • , 4 . A . 4 • A O. • O • . • A 4 A • 4 42 Ai 4. • • • • • ••••••• SFHA --"*.••• SPH, 1.3J Joe • • t4 • "•• -:-. • A "•I• . . . . . • . • .• A• e • • 4 ' 7".......• .. . A • 0 . • 4 ••----•.". ' : ....,,,. -*IA . _A 4. • • .. • ••• • • • • • • • 0 INVASIVE PLANT SPECIES TO BE REMOVED FROM EDGE OF CONSTRUCTION DISTURBANCE TO WATER. CUT ALL CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. ' • 0 •• .0 -61f.±Atl DEBRIS TO BE REMOVED . : A...• • • 4. • • • !d. • A• -- Ss • SS. ' • o • • . • . a • ----1:- ss 1 . .•:.• .•4 444 s.,, .•. 4• . - .• • . . 4 4• ' • a• • : ”• -13 4 . ........ . . • . ; 4 • .• A 4 4. • • . :* . 4. ' ' O• • A' 4 c • 4 A • •.• A • A44' • • • '• • . • • • • • • 4 • . . • 3* . • • • .. 41. • • ' . . . • .. 44 • • • . . • .44 A • . • . • • .. • . . • • A • A • . • • . 4. • • • ' • • • 4: A • 4 • . • • 4 • • Dc • . • • . • • 4 . • • : • 41 • CA& -""•••"'"- cmL • • ' • • . • • 0 • CmL CA,IL CALL l/*aIuumuuuul ix Know what's below. Call before you dig. CA& co. • 4 A • SFHA VHS N3d331£1 A• 4 , A • a 4'. • • • • • • • • 4 • • A • • • • • 1. sFHA SlHA • . . • ' • 4 • .. • • . • • - • 4 • 4 • •• . . • ' 4 • • A • • A. • 4 ' • • . • • • . 44 . . .• . . .. . ' 4 4 • • : 4 • . - . . • . • . . . . .•' . . 4. . . . . . . . . . .. . . . . : 1 • • ' . 4 . • . ' 4. 4 • , -,4 . • ° .• • . . • • . . . • SFHA a]dane .• • • e • . • • . . • • • 4 - ,:_ ..i.• • . ••. , . • .. . ss . . •40 . . . •• • • • ' 4 .• --..----- Ss . . 4 . . . 4 . • A . „ -.---.-- ss* • . . • . • • 4."..4 • • - . . 4 a . a .•S.9I . W . . . . ... ........:„ . A 14 '! 4444 . . .• . . A . . . .... g• . • . . A • S•. " • 0 .71.---7..-• t, • • • A A •' • . • • • . '. •• • • • 4 .... • . A• A ••••-'••• • • • . • • • • • 4- 7".4"•-• SS • • 4' • • 4 •A . .4 4 . . • • "•'---. • . .. . • 44 • ....... A • 4 ' . . . . A • • • . . . .t 4 • . . • • • •• • . • -'....*• ' •SS• • 4 g ' ,...., • 4 ' ' .--- • . •• 4 4°•.. A .. . A.. '.---.---..... .• • .. . • A • . A ,• • . .,i•41 - • < 4 • ••• -.--• ... •• A • SS . . • • # 4 4•. A ' A . --... 4 • .S3 A ' 4 . • . ---4-.--- ss•4 • • • . . - . . • • . . • . . . . • . . . . ,.....____ • • • • A • • 4 A . 4. • • • . . • • • . • ."."••' : ' LA. •••'• " . i . • 0 ; . • • • • SS • I. ••••. • •• ° : •-r-- , 4. . • --__ .. • . : . . : . . . ... . .• SFHA EXISTING LEGEND INVASIVE PLANT SPECIES TO BE REMOVED FROM EDGE OF CONSTRUCTION DISTURBANCE TO WATER. CUT ALL CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. • TREES BELOW TOP OF BANK TO BE CUT NEAR THE BASE AND STUMP LEFT INTACT UNLESS REQUIRED TO BE REMOVED. TREE TO BE REMOVED, TYP. SFHA SFHA - SPI-bq ' • -.• . • • • • • • a • . . . • • . • • • • . 4. . • • • .. . . . • . • • • . • . • 004 • • 4. • • •• 4 ' • . . . .• . • .000 • • 4 A • g • 4 POC iCmL .................cmi_ • . • . • -"PO • ' .4 • : • 4 p• • 4... e. • A • 4 • •• ' •• .4 4°1 • 4. • 1-1--u.millft _ OM. • . .•• •• • • • 1 • 0 - . . " .•• • • • • • . .. ... •: . • • • • 0' • ' .. .. • . . 4 A 1 . • 4 .. • A. • . . 4• A • 8 • • • 4 •A :• • • • ' . ..•4 •A.4.e 44 • 44 44*. ..4i • • . •. A : '- . . .. 4. • . . 4 . --:_.• .. • • .• : a. • 4 • 4 • 4 • 4 ••• •• . . . . • . .•a .41• 41 . • A . .' 0 • . Al • • . • 4 • • A 4 4 .44 44 . ••• • 4. • .. .. .•• 4. • • • . . .. . . . . . OH, SS SFHA SS • • • • • .• . • • • • . . • 4 01 A • • 41. . • A • '0 : . . . . . 4' . . . 4. . 4' • • • . • . •• ' •4 .„ 4i .•• A.• 414 - .4 . • • • . •Foe • • • 4 • • • 4 • . • • • A •• a . 4 A CA4L SA& eariamin ge SA& CML • 0 • s . • • . A 4 4 ' • 4 • • . • . . . • • • • • • Foca • • • . ' . OC • • 4 • 4 ' • F.00. CA/L 11111.11 SA& CML as CUL CML FOC :•4 • 4 A • 0 • 4 FOC SA& SA& as FOC SA& SA& 4 4 • • FOC CONCRETE TO BE DEMOLISHED. OPTION FOR CONCRETE TO HAVE METAL REMOVED AND -- Foc BE CRUSHED OR PROCESSED TO A F 0 UC F GRADATION SIMILAR TO NCDOT ABC AND REMAIN ON -SITE AS BASE COURSE FOR FUTURE PARKING. CHOICE SLABS (18" - 30") TO BE REUSED FOR PAVING; SEE SHEET L4.2 (MP2) AND DETAIL 9/L8.0. • SS Ss Ss '4 • " 4 • A OHW •••••••••„ SFHA VHS -•••••-• elaj,,E1 • A . ••4 S•x• A/1 SS PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT FIBER OPTIC CABLE WATER METER GAS PEDESTAL STREAM GAUGE SS SS spt./4 &pi/xi SS SS SS SA& as CML TREE TO BE REMOVED, TYP. CML SA& SA& los 111111 SA& • CML CML ea Foc -X - OW SS SFHA FOC OHW TB OLD BRIDGE PYLON REMNANTS MINOR CONTOUR MAJOR CONTOUR X- FENCE LINE OVERHEAD WIRE SANITARY SEWER Foc ./ SM. ccoo (5,o NI/ 1111111"6111 / altilat aliftsmor SS SS SS CJVIL CML CM SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30STREAM BUFFER FOC -- • n ."4444,1114p ,„ y, OHyy SS CML Pos • Sp6.1 Ss SS POC SS Pos snit SS Cmi„ Sm. Ss c)c FOR SITE PREPARATION DETAILS OF ITEMS WITHIN THE FRENCH BROAD RIVER, SEE S20 SHEETS. INVASIVE PLANT SPECIES TO BE REMOVED FROM TOP OF BANK TO WATER. CUT ALL CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. TREE BELOW TOP OF BANK TO BE CUT NEAR THE BASE AND STUMP LEFT INTACT UNLESS REQUIRED TO BE REMOVED. Cp6,1 SFry Ne' SS TREE TO BE REMOVED, TYP. SS 6, ' • A‘4, 21..d09 SS • 'I SS Ss ASPHALT AND BASE COURSE TO BE REMOVED ••••••••••••„... Ck. Poo P•Oc poc poc CmL SFHA t'P SFHA ck --e.gd6Mt SFHA .....„...... &Prim CAA ....„ ......„...... ,..... .....„..... `..,• C1114 s.„ vi-HS ,AA • •••••• '9'4•Yx.,/ Ss 114 11111111111%.* Spima, 0 ftftiliate 0 ar • a ck PILE TO BE PROTECTED AN IN PLACE. Poo a ••••••••• • • as. SpH4 "sa /11•• TF Oc DISTURBANCE BOUNDARY 22,000 SF) FOR REMOVAL ( PLANT SPECIES AND MID UNDERSTORY CLEARING F SEE NOTE THIS SHEET 0 10' 20' 40' SCALE: 201-0" - EQUINOX Asheville, Apprit -,01,17 37 Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 SEAL „,„, C A RI.,„ elk+ „ss', x' ......... . %., :'.qt-- ••••,;,‘." •Itt -p, - = , ...... . . iiim.wko. (hi DESIGN BY: DRAWN BY: CHECKED BY: REVISIONS DATE 1 Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright @ 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September 30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME THREE LINE TITLE 2•2 Hq Ss :,Oc .CML Ss Ss FCC cm( --CM[ \ oM[ Mo MO NOTES: CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. TREE BELOW TOP OF BANK TO BE CUT NEAR THE BASE AND STUMP LEFT INTACT UNLESS REQUIRED TO BE REMOVED. Mo Ss TREE TO BE REMOVED, TYP. SS SS Ss ti9 Ss SS ASPHALT AND BASE COURSE TO BE REMOVED Foe DEBRIS TO BE REMOVED FCC �0M< \ cM< 0M< Mo FCC FCC CM< SERA •—,--- M" —'•••• :;.,,. "--..... sfi[iq cy4 \ \ \ cMt \ ........ \ cM< F'CC A SS oc c cM� \ cM< PIPE TO REMAIN IN PLACE • \\ sFti • ow ` SFyq\ \ • • AREA FOR REMOVAL OF INVASIVE SPECIES AND MID -STORY CLEARING FOR VISIBILITY TO ADHERE TO THE FOLLOWING STEPS: 1. REMOVE INVASIVE PLANTS AND RE-VEGETATE/SEED WITHIN SHOWN BOUNDARY . DO NOT CLEAR AND GRUB. CLEAR MID -STORY (2' TO 10' IN HEIGHT) OF ALL VEGETATION, EXCLUDING TREES AND GROUNDCOVER. BE SURE TO LEAVE GROUND COVER FOR SLOPE STABILITY.CUT ALL CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. 2. REMOVE INVASIVE PLANTS AROUND THE BASE OF TREE MASSES. IF USING MECHANICAL EQUIPMENT FOR REMOVAL, RETAIN A 10-20' BUFFER FROM THE BASE OF ALL TREES THAT WILL REMAIN AFTER CONSTRUCTION TO AVOID ROOT COMPACTION AND OTHER DETRIMENTAL IMPACTS TO TREE HEALTH. INVASIVES WITHIN THIS BUFFER SHOULD BE CONTROLLED BY INTEGRATED PEST MANAGEMENT TECHNIQUES. IF USING HERBICIDE USE AQUATIC SAFE HERBICIDE. 3. SEE SPECIFICATIONS FOR ALL SEEDING, PLANTING , SOIL PREPARATION SPECIFICATIONS AND WATERING INSTRUCTIONS. CONTRACTOR TO WALK THE AREA WITH THE PROJECT LANDSCAPE ARCHITECT PRIOR TO REMOVING ANY TREES. IF TREES CUT DOWN PRIOR TO WALK THROUGH, TREES WILL BE REPLACED BY CONTRACTOR AT A RATIO OF 3:1 AT A SIZE OF 2 1/2" CALIPER. Know what's below. CaII before you dig. sFk PILE TO BE PROTECTED AND REMAIN IN PLACE. CM< CM4 SF/{\ TREE TO REMAIN, TYP. TREE PROTECTION FENCE, TYP. TREE TO BE REMOVED, TYP. EXISTING WETLAND TO BE PROTECTED Sp,q 'ben DISTURBANCE BOUNDARY (APPROX. 22,000 SF) FOR REMOVAL OF INVASIVE PLANT SPECIES AND MID LEVEL UNDERSTORY CLEARING FOR VISIBILITY; SEE NOTE THIS SHEET I 1 I 1 I 1 INVASIVE PLANT SPECIES TO BE REMOVED FROM TOP OF BANK TO WATER. CUT ALL CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. ASPHALT AND BASE COURSE TO BE REMOVED. WHERE ADJOINING ASPHALT TO REMAIN, EDGE IS TO BE SAW CUT. TYP. FENCE AND ASSOCIATED FOOTINGS TO BE REMOVED TREE PROTECTION FENCE, TYP. sFN \®� SFirq cM CM< cM INVASIVE PLANT SPECIES TO BE REMOVED FROM TOP OF BANK TO WATER. CUT ALL CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. ¶REE PROTECTION FENCE, TYP. TREE TO REMAIN7.1Z'P. —'On TREE TO BE REMOVED, TYP. ASPHALT AND BASE COURSE TO BE REMOVED. WHERE ADJOINING ASPHALT TO REMAIN, EDGE IS TO BE SAW CUT. TYP. cM c. • ASPHALT AND BASE COURSE TO BE REMOVED. WHERE ADJOINING ASPHALT TO REMAIN, EDGE IS TO BE SAW CUT. TYP. EXISTING WETLAND TO BE PROTECTED c. N ING LEGEND E • 0 PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT FIBER OPTIC CABLE WATER METER GAS PEDESTAL STREAM GAUGE AmevANN -X OW ss SFHA TB OLD BRIDGE PYLON REMNANTS MINOR CONTOUR MAJOR CONTOUR X— FENCE LINE OVERHEAD WIRE SANITARY SEWER SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30' STREAM BUFFER 0 10' 20' 40' SCALE: 20'-0" iiml,, ---..,„...-ik,...i•#' EQUINOX Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 Asheville, 37 SEAL ,,V\ U A„A,,, -t:*;N 5' -c *_ 7. CPO DESIGN BY: DRAWN BY: CHECKED BY: REVISIONS DATE u I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME THREE LINE TITLE 2 • 3 FENCE, TYP. 1VED, TYP. E COURSE TO RE ADJOINING IN, EDGE IS TO T. TYP. ow ST� ���tlli�S VHAS SFHA NOTES: SFHA • DISTURBANCE BOUNDARY (APPROX. 22,000 SF) FOR REMOVAL OF INVASIVE PLANT SPECIES AND MID LEVEL UNDERSTORY CLEARING FOR VISIBILITY; SEE NOTE THIS SHEET SFHA SFHA SFHA TREES BELOW TOP OF BANK TO BE CUT NEAR THE BASE AND STUMP LEFT INTACT UNLESS REQUIRED TO BE REMOVED. TREE TC7B REMOVED, TYP. STAIR TO BE REMOVED SFHA —/ AREA FOR REMOVAL OF INVASIVE SPECIES AND MID -STORY CLEARING FOR VISIBILITY TO ADHERE TO THE FOLLOWING STEPS: INVASIVE PLANT SPECIES TO BE REMOVED FROM TOP OF BANK TO WATER. CUT ALL CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. TREE PROTECTION FENCE, TYP. TREE TO BE REMAIN, TYP. UTILITY POLE TO BE PROTECTED, REMAIN IN PLACE. l S'ch111111 \\ CML CML SFHA CML . CML se SFHA CML SFHA CML . SFHA 1. REMOVE INVASIVE PLANTS AND RE-VEGETATE/SEED WITHIN SHOWN BOUNDARY . DO NOT CLEAR AND GRUB. CLEAR MID -STORY (2' TO 10' IN HEIGHT) OF ALL VEGETATION, EXCLUDING TREES AND GROUNDCOVER. BE SURE TO LEAVE GROUND COVER FOR SLOPE STABILITY.CUT ALL CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. 2. REMOVE INVASIVE PLANTS AROUND THE BASE OF TREE MASSES. IF USING MECHANICAL EQUIPMENT FOR REMOVAL, RETAIN A 10-20' BUFFER FROM THE BASE OF ALL TREES THAT WILL REMAIN AFTER CONSTRUCTION TO AVOID ROOT COMPACTION AND OTHER DETRIMENTAL IMPACTS TO TREE HEALTH. INVASIVES WITHIN THIS BUFFER SHOULD BE CONTROLLED INVASIVES WITHIN THIS BUFFER SHOULD BE CONTROLLED BY INTEGRATED PEST MANAGEMENT TECHNIQUES. IF USING HERBICIDE USE AQUATIC SAFE HERBICIDE. 3. SEE SPECIFICATIONS FOR ALL SEEDING, PLANTING , SOIL PREPARATION SPECIFICATIONS AND WATERING INSTRUCTIONS. CONTRACTOR TO WALK THE AREA WITH THE PROJECT LANDSCAPE ARCHITECT PRIOR TO REMOVING ANY TREES. IF TREES CUT DOWN PRIOR TO WALK THROUGH, TREES WILL BE REPLACED BY CONTRACTOR AT A RATIO OF 3:1 AT A SIZE OF 2 1/2" CALIPER. TREE BELOW TOP OF BANK TO BE CUT NEAR THE BASE AND STUMP LEFT INTACT UNLESS REQUIRED TO BE REMOVED. TREE TO BE REMOVED, TYP. CML Know what's below. CaII before you dig. 111111 SFHA CML . SFHA CML INVASIVE PLANT SPECIES TO BE REMOVED FROM TOP OF BANK TO WATER. CUT ALL CLIMBING VINES AT 8' OFF THE GROUND AND REMOVE LOWER PORTION, LEAVING THE PORTION IN THE TREE CANOPY TO DIE, OR CAREFULLY REMOVE BY HAND WITHOUT DAMAGING TREE LIMBS. STRUCTURE TO BE DEMOLISHED. ASSOCIATED UTILITIES TO BE REMOVED AS APPROPRIATE; SEE ENGINEERING DRAWINGS. pw ow EXISTING BUILDING TO REMAIN. PROTECT DURING CONSTRUCTION AS NECESSARY. . SFHA SFHA CML CML ML ow CML ML. IIIMMIlminit_attaw_ammummft CML CML CML RIVERS' (HW�E DRIVE 251) CML ow ow CML CML CML SFHq SFHq CML EXISTING LEGEND ar E • PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT FIBER OPTIC CABLE WATER METER GAS PEDESTAL STREAM GAUGE ASPHALT AND BASE COURSE TO BE REMOVED. WHERE ADJOINING ASPHALT TO REMAIN, EDGE IS TO BE SAW CUT. TYP. FpC \ . OW_ FpC Ow O CML � . CML_ . ML SFHA * CML SFHA CML - — � - ® \ Fi _°W--T-----..—__ _ \1 1 *� pW \\ �/ _Ow \�__— _oW CM� SFHA CML SFHA CML Clint SFHA CML SFHA CML CML SFHA . . CML CML SFHA CML -- --- X X OW ss SFHA — FOC — OHW TB CML BUFr EE OLD BRIDGE PYLON REMNANTS MINOR CONTOUR MAJOR CONTOUR FENCE LINE OVERHEAD WIRE SANITARY SEWER SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30' STREAM BUFFER \ss\ ss \ ss \ ss C \ Fp � C \ co \ FOC FOC .\ FO owC\ Ow FO SFHA Ow FpC Ow \ F O °W =F O°C CML CML CML CML CML _ CML CML SFHA SF ammmeimmi CML CML SFHA � SFHA CML ammeimmor CML CML 0 10' 20' AL CMI CML 40' SCALE: 20'-0" EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL \<z-• o5N6s•�, _* ;N 5'-c *_ i, L L L CPOPG ���.``,, DESIGN BY: DRAWN BY: CHECKED BY: REVISIONS DATE u I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME THREE LINE TITLE L2.4 FRENCH BROAD RIVER CRAGGY MOUNTAIN RAILROAD SFHA / _1_ STORMWATER I ASPHALT PARKING (70 SPACES) GREENWA`' EX. RAIL LIR GREENWAY CROSSING (TO TIE INTO FUTURE PHASE OF GREENWAY) PARK SIGN - EXISTING ENTRANCE DRIVE l RIVERSIDE DRIVE (HWY 251) 0 0 IMPACTS LEGEND LOSS OF WATERS AT THE ORDINARY HIGH WATER MARK GAIN OF WATERS AT THE ORDINARY HIGH WATER MARK FILL BELOW THE ORDINARY HIGH WATER MARK QUANTITIES 101 SF IN LOSS OF WATERS 28 SF IN GAIN OF WATERS 73 SF NET LOSS OF WATERS 0 CY CUT IN WATERS 11 CY FILL IN WATERS 11 CY NET FILL IN WATERS Know what's below. CaII before you dig. I 1 I 1 i 1 1 / I I I ‘c • 2 I 0 ° I 0 T ° I � —a FRENCH BROAD /l RIV€R / EX. BRpDGE .(OVERHEAD) STORMWATER DROP OFF • RIVERSIDE DRIVE 1 (HWY 251) 7% PAVILION C UPPER PLAZA / GRAND STAIR PLAY AREA GATHERING SPACE — Hp `/ems \ 1 / \1_J 1 7\. 1, lam'\ _ 11 ___ - ( (----- ( C7 \ ( ; t1� \}, j �� 1 f c 1_ --'\ trt"-----L1 J i $ 1-\ )1 ./\...)_-,:i ) '------- '' I 0 ( 7 \ \ ) ___ BANK STABILIZATION (BY OTHERS) WAVE FEATURE (BY OTHERS) LOWER PLAZA BEACH (BY OTHERS) BANK STABILIZATION (BY OTHERS) RESTROOMS & FACILITIES ITIES 1 1 1 I / I / L, / J �MO MO MO BASE MAP LEGEND EXISTING M. E -0C 0 PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT FIBER OPTIC CABLE WATER METER GAS PEDESTAL STREAM GAUGE EXISTING WETLAND NOTE: ALL WORK IN THE RIVER OR ALONG THE BANKS TO BE PROVIDED BY OTHERS, UNLESS OTHERWISE NOTED. cy OLD PILE REMNANTS TO BE REMOVED (BY OTHERS) OPEN SPACE `EX prE TO REMAIN LAY 79 SF LOSS ®'1 0 — —.•.--- OW SS SFHA FOC OHVV TB CIVIL BUFFER MINOR CONTOUR MAJOR CONTOUR FENCE LINE OVERHEAD WIRE SANITARY SEWER SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30' STREAM BUFFER BOULDER TOE / STEP RIVER ACCESS EX. ASPHALT PATH (RESURFACED) +n � UPDATED PICNIC AREA — EXPANDED PARKING (39 SPACES) NEW ENTRANCE DRIVE SFHA SFHA PROPOSED PAVILION ACCESSIBLE PATH STAGING AREA RIVER ACCESS 251 ASPHALT CONCRETE GRAVEL PERMEABLE PAVERS WATERLINE 22 SF LOSS 28 SF GAIN 11 CY FILL DRIvE 1) 4444.18 ss Ss ow ONE-WAY LOOP zz- TRAILER PARKIN( EX. RESTROOM 0 30' 60' SFHA 120' SI Ailw--.4 ..,,,w EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL CP NOTE: Drawings are invalid without signed stamp by professional DESIGN BY: DRAWN BY: CHECKED BY: tit 1— o REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright @ 2022, Equinox Environmental Consultation & Design, Inc. PHASE 900/0 DATE October 6, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME WATERS OF THE US IMPACTS EXHIBIT DRAINAGE TO SEDIMENT TRAPS DRAINAGE TO SILT FENCE DRAINAGE TO ROCK CHECKS OR SEDIMENT SOCKS C] LIMITS OF DISTURBANCE (8.31 ACRES) PREPARED FOR: CLIENT/OWNER: Town of Woodfin 90 Elk Mountain RD. Woodfin, NC 28804 (828) 253-4887 PREPARED BY: SEE SHEETS BY S20 (HYDRAULIC ENGINEER) FOR EROSION CONTROL IN THESE LOCATIONS LANDSCAPE ARCHITECT: Equinox 37 Haywood Street, Suite 100 Asheville, NC 28801 (828) 253-6856 (x202) david@equinoxenvironmental.com CML MO Z 0 W 0 � 0 Z FOC FOO I - ADDRESS: 1598 Riverside Dr. Asheville, NC 28804 Latitude: 35.627678° N Longitude: - 82.600733° W PROJECT SIZE: Approximately 9.15 Ac Total Disturbance area isAc All aspects of work shall be performed in accordance with all applicable local, state, and federal regulations pertaining to worker safety. r EROSION CONTROL MEASURE NOTES: 1. THOROUGHLY REVIEW THE SEDIMENT AND EROSION CONTROL PLAN, ADDING EXTRA PROTECTION ALONG THE RIVER AND NEAR STREAMS (I.E. DOUBLE ROW SILT FENCE). 2. CONTRACTOR TO FINE GRADE AND ADD EROSION CONTROL MATTING AND NATURAL SITE DEBRIS AT ACCESS AREAS USED BYGEOTECHNICAL ENGINEERS FOR BORING SITES. 3. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN SEVEN (7) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW. 4. WHERE STABILIZATION BY THE 7TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE. 5. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH -DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 7 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE. 6. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. IF THIS OCCURS, NOTIFY LANDSCAPE ARCHITECT. 7. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELYAFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 8. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAYBE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 9. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 10. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT -LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. THESE TEMPORARY BERMS AND DITCHES SHALL BE PROTECTED WITH A ROLLED EROSION AND SEDIMENT CONTROL PRODUCT UNTIL VEGETATION CAN BE ESTABLISHED. 11. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS. 12. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 13. A COPY OF THE INSPECTION RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. 14. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND -DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS. 15. MINIMIZE SOIL COMPACTION AND, UNLESS UNFEASIBLE, PRESERVE TOPSOIL. 16. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE. 17. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMP'S (SEDIMENT BASIN, FILTER BAG, ETC). 18. MAINTAIN ALL BUFFER REQUIREMENTS AS INDICATED ON THE PLAN. 19. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: 19.1. WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; 19.2. WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS; 19.3. FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND 19.4. SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 20. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS ARE EXPECTED TO BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. Sediment Trap Schedule Trap DrainageAr ea (AC) Min. L/W Ratio Designed L/W Ratio Required Surface Area Required volume Minimum Storage Depth (with 1.5' min. excavation) Bottom Surface Elev Surface Area Volume Weir Width weir Elevation ST1 0.93 2 to 1 2 to 1 1352 SF 3348 CF 2.0' 1935 1745 SF 3873 CF 4' 1938.00 ST2 0.22 2 to 1 2 to 1 492 SF 792 CF 2.0' 1933 574 SF 893 CF 4' 1935.00 Skimmer Sizing Trap Drainage Area (AC) Time to Drain Required volume Skimmer Size Orifice Radius Orifice Diameter ST1 0.93 48 hrs 3348 CF 1.5 in 0.6 in 1.3 in ST2 0.22 48 hrs 792 CF 1.5 in 0.3 in 0.6 in Know what's below. Call before you dig. ,..........4#1" EQUINOX Asheville, 37 Haywood t 828.253.6856 f 828.253.8256 s St. Suite 100 NC 28801 SEAL �01‘uuu,,,,, ` s, `N C A q'''-/,//,, Q- •O�,P6S�q�,' .Qi, . DESIGN BY: DRAWN BY: CHECKED BY: w H- 0 REVISIONS I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME EC COVER C 1 • 0 AVAO - SS _ - CML SS _ Know what's below. CaII before you dig. SS STAGING AREA SS SS - SS S CONSTRUCTION ENTRANCE, TYP. 0 0 g I 11, CML CML -7' 0. 0 0 0 0 I 0 I 0 I` y a JI ss \\ FOC FOC lj FCC x STAGING \.)- AREA FOC r / / / / / / / / / / / FOCI F/C EROSION CONTROL SEQUENCE PHASE 1 PROCEED AS FOLLOWS: 1. HOLD PRE -CONSTRUCTION MEETING TO IDENTIFY SITE CONSTRAINTS, CONSTRUCTION ROUTING, AND STAGING. 2. INSTALL CONSTRUCTION ENTRANCE AND CONSTRUCTION ACCESS. 3. INSTALL PERIMETER EC MEASURES AROUND AREAS TO BE DEMO-ED, INCLUDING SILT FENCE. 2. BREAK AND REMOVE HARD SURFACE AS NEEDED TO INSTALL ACCESS TO RIVER. 3. CUT ACCESS ROAD TO BUILD WAVE AND HAUL OFF MATERIAL. 4. CLEAR AND GRUB ONLY AREAS ADJACENT TO WAVE CONSTRUCTION ACCESS. 5. INSTALL WAVE STRUCTURE IN FRENCH BROAD RIVER. REFER TO S20 EROSION CONTROL PLANS FOR SEQUENCE. 6. ENSURE A STABLE AND VEGETATED SURFACE BEFORE MOVING TO THE NEXT PHASE OF PARK CONSTRUCTION. 7. LEAVE EROSION CONTROL MEASURES IN PLACE UNTIL FINISHED SURFACE TREATMENT IS APPLIED. 8. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC DETAILS. 9. INSTALL ADDITIONAL MEASURES AS NEEDED TO KEEP SEDIMENT ON SITE. FOC \ GRADE CONSTRUCTION ENTRANCE TO ACCESS RIVER FOR WAVE CONSTRUCTION , ss oc COVER EXPOSED AREAS OF CONSTRUCTION ROUTE IN STONE PROTECTIVE CONSTRUCTION MATS OVER EXISTING SEWER LINE FOC PHASE 1 LIMITS OF WORK 1.07 ACRES PROJECT LIMITS OF DISTURBANCE f ! 1 _J ss =ss_ FOO\ F / oo /�1 P; {ASS (.6 — SSA - 44, \ F o� \�Ll • Ss ss y S, F"`_ ss '§\ LEGEND SYMBOL DESCRIPTION DETAIL EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 1:4' 57. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 REINFORCED SILT FENCE 2/ EC2.3 TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD TDD obbb ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 .,-/t5-, cts SEDIMENT TRAP WITH ROCK SEDIMENT DYKE 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 NNE ,,,,,_ r/_,,,____. ' '9, -,,,,,,:s j61;---------/----::711----=------__, -:%%'• OW A CAR CitriL cur 0 30' 60' SFHA 120' SCALE: 601-0" ---..........._ EQUINOX Haywood t 828.253.6856 f 828.253.8256 ,,, St. Suite 100 NC 28801 Asheville, 37 SEAL CI DESIGN BY: DRAWN BY: CHECKED BY: w 1— o REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright @ 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 1 SS SFHA Moe - CML SS Know what's below. CaII before you dig. aa+Ano ‘ , --___\__, \\___ \ ___\ :iv, AT SS _____ s Jj. IV AL CML 0 0 s I /a 0 MATTING ON SLOPE + + + + 0 + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +' + + + + +=�y- + + + + + + + + + + + -F + + + ++-I //� / / / / / / / / / / 00 + + + + + + + + + + + + + • + + + + + + + + + + + i- + + + + -+ + + + + + + + + + + + + + + + + + + + + TOO + + + + + + + + + ' ~-F + + + + + + + + + + + + + + + + + kiL COVER CONSTRUCTION ROUTE IN STONE ONCE EXPOSED BREAK AND REMOVE CONCRETE NORTH OF THIS LINE FOR PHASE 2 _ O\\ SFgA,CtijC \ + + + + - + + + + + + -- + + + + + + + + + + + + + + + + + + + + + + + + + + + + +. + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + d. + + -J \ \ \ \ PROJECT LIMITS OF DISTURBANCE PHASE 2 LIMITS OF WORK 2.02 ACRES �rt8y 4, FCC PROTECTIVE CONSTRUCTION MATS OVER TEMPORARY SWALE AND SEWER LINE TEMPORARY SLOPE DRAIN EROSION CONTROL SEQUENCE PHASE2 PROCEED AS FOLLOWS: 1. USE CONSTRUCTION ACCESS FROM PHASE 1. 2. INSTALL PERIMETER EC MEASURES AROUND AREAS TO BE DEMO-ED, INCLUDING SILT FENCE. 3. DEMO EXISTING STRUCTURES AND DUKE POWER POLE. 4. BREAK AND REMOVE HARD SURFACE AS SHOWN ON PLAN. 5. CUT SLOPE AND HAUL OFF MATERIAL. 6. INSTAL MUD MATS OVER SEWER LINES 7. INSTALL SEDIMENT TRAP 1. WHEN CONSTRUCTING, IF GROUNDWATER IS ENCOUNTERED WITH EXCAVATION, NOTIFY LANDSCAPE ARCHITECT. 8. SCM OUTFALL STRUCTURES TO BE SET 3-6" ABOVE GRADE DURING CONSTRUCTION AND SURROUNDED BY SEDIMENT CONTROL MEASURES TO PREVENT PONDING. 9. SEDIMENT TRAP 1 DISCHARGES THROUGH SKIMMER TO OUTLET AND INTO STREAM. 10. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS 10.1. DIVERSION DITCHES 10.2. SWALES 10.3. SLOPE DRAINS 10.4. INSTALL EC MATTING, INLET & OUTLET PROTECTION PER SCHEDULES AND MANUFACTURER'S INSTRUCTIONS 11. BUILD WALL ALONG GREENWAY/ CONSTRUCTION ACCESS ROAD. 12. INSTALL CULVERT CROSSING AT STREAM. 12.1 INSTALL PUMP AROUND ACORDING TO DETAIL 12.2 ONCE WORK AREA IS IN THE DRY, BEGIN EXCAVATION FOR CULVERT AND FOOTERS. 13. ENSURE A STABLE AND VEGETATED SURFACE BEFORE MOVING TO THE NEXT PHASE OF PARK CONSTRUCTION. 14. LEAVE EROSION CONTROL MEASURES IN PLACE UNTIL FINISHED SURFACE TREATMENT IS APPLIED. 15. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC DETAILS, INCLUDING SEDIMENT TRAP 1. 16. ADD ADDITIONAL EC MEASURES AS NEEDED. Ss/a4n pfr _ ss s \ rsz yy�9\\ -____ - - yam,. s„,\N \ FCd FCC • • CML CML CML SFHA LEGEND SYMBOL DESCRIPTION DETAIL %... .4.4 DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 1:4' 57. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 REINFORCED SILT FENCE 2/ EC2.3 TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD TDD C5693 ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 worm PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 CML CMSLFHA cML S▪ FHA cut cML 0 30' 60' 120' SCALE: 601-0" ,........, EQUINOX Haywood t 828.253.6856 f 828.253.8256 ,,, St. Suite 100 NC 28801 Asheville, 37 SEAL • CO DESIGN BY: DRAWN BY: CHECKED BY: w 1- o REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright @ 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 2 C 1 • 2 i SS SFHA ss _ — CML �NL Know what's below. CaII before you dig. aaane CMI_ — 0 0 HA FHA--; CML ti CML CML CML I - Cl.1L cc _ yr CQ LT11 , c V QO a O ,+ +.+ -F.+ i ++++++ 0 + + + + + + + E2+ + + + + + + + + + + + + + a I+ + +.+ t + + . + + + + + + -' + + + + + + + + +- + a + + + + + + + + , .,,.. ,-, + + + + + + + + + pp\ I + + + + + + + + + + + + + + + + + + + + + + +- + + + + + + oyl.. + + + + +---F + + + + + + + + + 0- + + + + + a + + + + + + + + + + + + + + + + + + + + + + +_+ �- + + + + + + + + + + + ± -+ + + + + + + + + + + -1_, c + + + + + + \ r X srrce�� + +++ram, + + + + + + + + + + + + + + + ��♦:♦\ `+ + + + + + F♦®< 0*7� + + + + i ♦♦��"p + + + + ♦o♦sto 1♦o♦8♦w ` + + + e♦♦!'o �♦i4�a�i toaA��oo°r'�SOO o♦.. Tpp + + + + + + j9i°o♦�1�♦�♦�♦�♦�♦�♦♦ + + ♦�i0♦i♦ii♦ii♦ii♦Oi♦i♦ ko�+ + + + + + + + + + + + + + + + + + 8 + ± + ± + ± + ± + ± + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +/ + + + + + + + + + ♦Qi♦i♦i♦i ♦♦Oi ♦♦i.i. � �i ♦i4i♦i♦i♦i♦i♦♦♦i♦i♦i♦i♦i♦: ' + + .47 r r ":;;;:k.;.% PHASE 3 LIMITS OF WORK 1.36 ACRES EROSION CONTROL SEQUENCE PHASE3 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE PRIMARY CONSTRUCTION ENTRANCES & STAGING AREA FROM PHASE 1. 2. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES, PIPES, ETC.) FOR CONSTRUCTION OF SLOPE, AND LOWER PLAZA. 3. INSTALL SLOPE STRUCTURES (GRAND STAIRCASE) 4. FINE GRADE AND STABILIZE SLOPE AND ALL EXPOSED SOIL WITH TEMPORARY SEED. 5. INSTALL LOWER PLAZA. 6. STABILIZE SURFACES WITH ROCK AND SEED & STABILIZE ALL OTHER EXPOSED SOIL AS INDICATED. 7. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC DETAILS, INCLUDING SEDIMENT TRAP 1. 8. ONCE SITE IS STABLE MOVE TO PHASE 4 AND THE INSTALLATION OF THE UPPER PLAZA. 9. ADD ADDITIONAL EC MEASURES AS NEEDED J PROTECTIVE CONSTRUCTION MATS OVER TEMPORARY SWALE AND SEWER LINE, TYP SFHA / cy R/1/ eR FR O,1 0 /�/ Ss SS din __5� S - { � � Pocr fer,) Poe -'� — o\fe,.%0,4 K.roe, V b eY N Foe \� • y9 SF J\` \ CML ` CML — 4�; 9 Poo L Soo LEGEND SYMBOL DESCRIPTION DETAIL DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 ‘()) DITCH OUTLET PROTECTION 4/ EC2.2 ��• OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 Too— Too— ROCK CHECK DAM 2/ EC2.1 did) TEMPORARY SEED 1/ EC2.3 TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 c O L ��t �fML/ // CML CML SFHA \ s4HA \ CML CMLSFF7A_� A,ILy\ CML SFH CIVIL snit SFHA cmt, SFHA CML CIA CML ss Ovy mum SF SFHA CML Nu. CML CML 0 30' 60' CML 120' SCALE: 601-0" ,......., EQUINOX Haywood t 828.253.6856 f 828.253.8256 ,,, St. Suite 100 NC 28801 Asheville, 37 SEAL • CI DESIGN BY: DRAWN BY: CHECKED BY: 1— o REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright @ 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME C 1 • 3 STAGING AREA 0 J 0 BREAK AND REMOVE REMAINING CONCRETE FOR PHASE 5 £ML �.— CML COVER CONSTRUCTION ROUTE IN STONE 1 ° PHASE 4 LIMITS OF DISTURBANCE 1.77 ACRES 0 ` • CML CML CML 7ML — \0 INSTALL PERMANENT STORM PIPE C • FOC FOC FOC �d SZ HA Cn,1L O\ SFH��CMC EROSInN CONTROL SEQUENCE PHASE 4 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE PRIMARY CONSTRUCTION ENTRANCES & STAGING AREA FROM PHASE 1. 2. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES, PIPES, ETC.) FOR CONSTRUCTION OF UPPER PLAZA. 3. INSTALL UTILITIES INCLUDING ELECTRICAL AND WATER LINES. 4. INSTALL PERMANENT STORM PIPES IN PLAZA. 5. INSTALL STRUCTURES IN UPPER PLAZA (PAVILION AND RESTROOM/ CHANGING ROOM) 6. INSTALL HARDSCAPE IN UPPER PLAZA. 6.2. EXCAVATE FOR INFILTRATION TRENCH AND DIVERT RUNOFF TO ST1. 6.3. INSTALL PLAZA HARDSCAPE TO INFILTRATION TRENCH EDGE, AND INSTALL STRUCTURAL SLABS. 6.4. INSTALL SILT SOCKS AROUND INFILTRATION TRENCH 6.5. INSTALL INFILTRATION EGRP PRODUCT (INSTALLED BY OTHERS) 6.6. INSTALL WALLS OF TRENCH 6.7. INFILTRATION TRENCH MATERIALS MUST BE INSTALLED ONLY AFTER CONTRIBUTING AREA IS STABILIZED. CONTACT LANDSCAPE ARCHITECT PRIOR TO INSTALLING SAND/GRAVEL. 7. INSTALL PLAY SLOPE 8. STABILIZE SURFACES WITH ROCK AND SEED & STABILIZE ALL OTHER EXPOSED SOIL AS INDICATED. 9. MAINTAIN EROSION CONTROL MEASURES. 10. ADD ADDITIONAL EC MEASURES AS NEEDED. 11. ONCE SITE IS STABLE MOVE TO PHASE 5 AND THE INSTALLATION OF THE PARKING AREA. Know what's below. Call before you dig. R/ eR FR oq O 00 ss 147 `o Pc Foe \\fad CM "�-� \�.. O\\ \.` 1 / �:$g _ ' S-- ` �,yy\� ' aJd4n s ss SS • O /41 \"\ oc ow SFHA LEGEND SYMBOL DESCRIPTION DETAIL EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 1:4' 57. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 REINFORCED SILT FENCE 2/ EC2.3 TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD TDD C5693 ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 cm CML. SFHA CIVIL cmL SF HA onnt CAIL SFHA CML CML 0 30' 60' 120' SCALE: 601-0" ,........._ EQUINOX Haywood t 828.253.6856 f 828.253.8256 ,,, St. Suite 100 NC 28801 Asheville, 37 SEAL • DESIGN BY: DRAWN BY: CHECKED BY: w 1— o REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright @ 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME C 1 • 4 AGING AREA vAo SFHA CML �x=L. — \___ CML 1 Ch W5I CML ---- f• SFHA - if -HA i- CML \p- CMA 0 LL! c �L=_ PHASE 4 LIMITS OF WORK 1.36 ACRES c CML -CML CML EROSION CONTROL SEQUENCE PHASE., AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE PRIMARY CONSTRUCTION ENTRANCE. 2. ENSURE EROSION CONTROL MEASURES REMAIN IN PLACE TO PROTECT STORM PIPES AND INFILTRATION TRENCH. 3. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES) FOR CONSTRUCTION OF THE UPPER PARKING AREA. 4. INSTALL UPSTREAM RIVER ACCESS. 5. STABILIZE SURFACES WITH ROCK AND SEED &STABILIZE ALL OTHER EXPOSED SOIL AS INDICATED. 6. MAINTAIN EROSION CONTROL MEASURES. 7. ONCE SITE IS STABLE MOVE TO PHASE 6 AND THE INSTALLATION OF THE PARKING AREA. 8. ADD ADDITIONAL EC MEASURES AS NECESSARY. Know what's below. CaII before you dig. FO° 11. FOC / �ytC MO�\ MO- .1� CMC. ON, MO MO ow �F NIA tiB 1Y o R �p Ss — SS 1------- J�@ — .`8 -/SS'-<-°'� "S yst"5.`=q yr SS e,\J Ss \ CMC FHA _ 8m, — . \\ FOC \ - N \Poc 044 LEGEND SYMBOL DESCRIPTION DETAIL %... .'"' DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 1 ' 57. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 i{ INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD TDD— dab ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 DW1 / OW Obi MC. o� l CA„,/ \�'_\ -.4,„,„_.„/...... 1' MC ... r CML `_� \ ` `\ ��%`� i - CML_ i. CML Cm, --`_ - l l l V�ill _ civic °ML 4.` `ems�• / f CMC CMLSFHA- CML ► _--v4--f --- --L _ tlH�\ SFHA _ - SFHA —/ v - CML SFHA .� � •e'' - CMLML SF— ` — .... HA SFHA CML -_- _ -CP.1L FHA-_ Cat. SF- ; SFk; CML CML CML 0 30' 60' 120' SCALE: 60'-0" ,......., EQUINOX Haywood t 828.253.6856 f 828.253.8256 ,,, St. Suite 100 NC 28801 Asheville, 37 SEAL ,,,,rrrrrrr,,,,,,, \`‘‘ \\ k • - , A P ',/,, f IS sss‘' ..... .. ,-!,/ \NI., .•o =z P- a-*:� 5aS -: *_ DESIGN BY: DRAWN BY: CHECKED BY: w Q 0 REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 5 C 1 • 5 / SS CML — SFHA —\ PHASE 6 LIMITS OF DISTURBANCE 1.29 ACRES d 11 ■ cc 0 CML ML CML -4—, -- CML _ — — 7- — MO _�\ 11� =il 9 oa ue, 4 s'ed-'na ` � 'I= 1. f/1/ F CCU EROSION CONTROL SEQUENCE PHASE 6 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE PRIMARY CONSTRUCTION ENTRANCE FROM PHASE & STAGING AREA FROM PHASE 5. 2. CONSTRUCT OBSERVATION WALL AROUND WETLAND. 3. ROUGH GRADE PARKING AREA. 4. FINE GRADE PARKING AREA AND INSTALL BASE COURSE. 5. APPLY TEMPORARY SEED. 6. STABILIZE SURFACES WITH ROCK AND SEED & STABILIZE ALL OTHER EXPOSED SOIL AS INDICATED. 7. MAINTAIN EROSION CONTROL MEASURES. 8. REMOVE TEMPORARY SEDIMENT TRAP ONLY AFTER THE ENTIRE AREA DRAINING TO IT IS PERMANENTLY STABILIZED. 8.1. ONCE CONTRIBUTING AREA TO CENTER OF PARKING IS STABILIZED, MOVE TO NEXT STEP. 8.2. REMOVE EXCESS SEDIMENT IN LOCATION FOR BIOSWALE AND CONSTRUCTED WETLAND AND CONVERT TO SCMS AND FINE GRADE AS SHOWN IN PLANS. 8.3. INSTALL BIORETENTION MEDIA INTO BIOSWALE. 8.4. INSTALL PERMANENT OUTFALL STRUCTURES TO PLANNED ELEVATIONS. 8.5. PLANT SCMS AND BIOSWALE ACCORDING TO PLANTING PLAN. 9. DECOMMISSION ACCESS ROAD TO LOWER PLAZA AND TOP GREENWAY WITH FINER GRAVEL BASE. 10. ALL TEMPORARY DIVERSIONS, SWALES AND CHANNELS TO BE TEMPORARILY STABILIZED WITH A ROLLED EROSION AND SEDIMENT CONTROL PRODUCT UNTIL VEGETATION IS ESTABLISHED. 7. MAINTAIN CONSTRUCTION ENTRANCE AT THIS SIDE OF PARK. 8. ONCE SITE IS STABLE MOVE TO PHASE 7 AND THE IMPROVEMENTS TO RIVERSIDE PARK. Know what's below. CaII before you dig. /17 ss ; c ML SFHA 0c � O, �\ _�,� `FpC '\ 'F., \ Fo vv fir -ow _ erg'-\\ \_-,-.:—c-4— -i--. --dGv _ < FCc �Ow/ n� ow CML Huac SFHA CMl LEGEND SYMBOL DESCRIPTION DETAIL *s._ /*** DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 �� OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 Too— Too— ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 Jr / ow/ I / 1 l L / \ _ CML _ CML '9 cut. MC L SFHA —�—� SFHA \ 4. CML SFHA SFHA CML ---- CML erg / cML __ CML . CML _ 5 \\ CML SS Ow 0 30' 60' CML 120' SCALE: 601-0" ,........._ EQUINOX Haywood t 828.253.6856 f 828.253.8256 ,,, St. Suite 100 NC 28801 Asheville, 37 SEAL CI DESIGN BY: DRAWN BY: CHECKED BY: w 1— o REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright @ 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 6 C 1 • 6 / SS s CML — SFHA CML 0 J 0 LIJ o 0 i 11 00 i g) sx r L CML 0 - CML — CML CML ' \ kit I/ civil. cCtS Oc EROSION CONTROL SEQUENCE PHASE 7 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. ESTABLISH CONSTRUCTION ENTRANCE AND STAGING AREA FOR THIS PHASE. 2. INSTALL PERIMETER EROSION CONTROL MEASURES. 3. INSTALL TREE PROTECTION FENCING. 4. CONDUCT SITE PREP. 6. DEMO EXISTING PAVILION. 7. BEGIN CLEARING, GRUBBING, AND ROUGH GRADING FOR PHASE 7. 8. CREATE ACCESS ROUTE FROM PROPOSED BOAT RAMP TO EXISTING CULVERT CROSSING. MAINTAIN SENSITIVITY TO THE TREES AND ROOT COMPACTION AROUND THE TREES TO BE SAVED, ESPECIALLY IN THE AREAS WHERE NEW TRAILS ARE TO BE INSTALLED. 9. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES, PIPES, ETC.) 10. INSTALL EC MATTING, INLET & OUTLET PROTECTION PER SCHEDULES AND MANUFACTURER'S INSTRUCTIONS. 11. GRADE IN GREENWAY ALIGNMENT AND TRAILS. 12. ESTABLISH WETLAND UNDERDRAIN SYSTEM. 13. APPLY TEMPORARY SEED. 14. FINE GRADE GREENWAY AND TRAILS. 15. STABILIZE GREENWAY SURFACE WITH ROCK AND SEED & STABILIZE ALL OTHER EXPOSED SOIL AS INDICATED. Know what's below. Call before you dig. ss ss DOUBLE ROW OF SILT FENCE AROUND EXISTING WETLANDS LEGEND SYMBOL DESCRIPTION DETAIL •-.4.— /fts DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 ie OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 REINFORCED SILT FENCE 2/ EC2.3 TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD TDD obbb ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 worm PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 PHASE 7 LIMITS OF WORK 1.84 ACRES • STAGING AREA 0 30' 60' 120' SCALE: 601-0" ,........._ EQUINOX Haywood t 828.253.6856 f 828.253.8256 ,,, St. Suite 100 NC 28801 Asheville, 37 SEAL CI DESIGN BY: DRAWN BY: CHECKED BY: 1— o REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright @ 2022, Equinox Environmental Consultation & Design, Inc. PHASE 900/0 DATE DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 7 C 1 • 7 / -- �r.e.. / SS — s STAG I� AR CML _ SFHA i g) o� L 0 0 ML CML __ CML EROSION CONTROL SEQUENCE PHASE 8 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE CONSTRUCTION ENTRANCE & STAGING AREA FROM PHASE 7. 2. INSTALL SILT FENCE FOR CONSTRUCTION OF BOAT RAMP AND PARKING LOOP. 5. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES, PIPES, ETC.) FOR CONSTRUCTION OF BOAT RAMP AND PAVILION. 6. INSTALL BOAT RAMP 6.1. INSTALL TURBIDITY CURTAIN 6.2. UTILIZE LAY IN PLACE CONSTRUCTION OF PRECAST UNITS. 6.3. INSTALL SILT SOCKS AT TOP OF RAMP 7. INSTALL SLAB FOR PAVILION 8. INSTALL PAVILION STRUCTURE. 9. FINE GRADE AND STABILIZE ALL NEW PATHWAYS. 7. MAINTAIN EROSION CONTROL MEASURES. 8. ADD ADDITIONAL EC MEASURES IF NECESSARY. 9. ONCE SITE IS STABLE MOVE TO PHASE 9 AND THE INSTALLATION OF THE PARKING AREA. Know what's below. CaII before you dig. CML A _ CML MO L — MO 0 O0 �roiL N �• • LEGEND SYMBOL DESCRIPTION DETAIL *".._ /*** DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 1 ' 57. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD TDD— ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 F ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 PHASE 8 LIMITS OF WORK 2.56 ACRES /))( _ STAGING AREA ML CM< '� - e X CML — DOUBLE ROW OF SILT FENCE AROUND EXISTING WETLANDS TO REMAIN THROUGH THIS PHASE CMLSFRA-� _ _ SFHA X� CML --- CMLFH� CML TURBIDITY CURTAIN SF CML CML CML Ow(_- 0 30' 60' ML CML _ dflp _ CML 120' SCALE: 60'-0" --.......--... EQUINOX iirr.4 ,.,„7., Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 Asheville, 37 SEAL �O�PNOS • ••8• ; =z � = * :N 5' CI DESIGN BY: DRAWN BY: CHECKED BY: w 0 REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 8 C 1 • 8 0 SS s _.-WO - CML L — cr W / 0 O T AAA 0 0 0 ML - CML __ CML A4L CML. SF, ceiS SC4,1, 0 OO EROSION CONTROL SEQUENCE PHASE 9 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE CONSTRUCTION ENTRANCE & STAGING AREA FROM PHASE 7. 2. INSTALL ADDITIONAL SILT FENCE AND WATTLES FOR CONSTRUCTION OF PARKING LOOP. 5. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES, PIPES, ETC.) FOR CONSTRUCTION OF BOAT RAMP AND PAVILION. 6. REMOVE ACCESS ROAD AND GRADE IN TRAILER PARKING. 7. INSTALL LOOP ROAD. 9. INSTALL PARKING LOT INCLUDING WALLS AND STAIRS. 10. FINAL GRADE AND APPLY FINAL TOP COAT SURFACE APPLICATION ON PARKING LOT. 11. REMOVE TEMPORARY SEDIMENT TRAPS ONLY AFTER THE ENTIRE AREA DRAINING TO THEM IS PERMANENTLY STABILZED. 11.1. REMOVE EXCESS SEDIMENT IN CENTER OF LOOP TO CONVERT TO SCM AND FINE GRADE AS SHOWN IN PLANS. 11.2. INSTALL PERMANENT OUTFALL STRUCTURE TO PLANNED ELEVATIONS. 12. PLANT SCMS ACCORDING TO PLANTING PLAN. 13. REMOVE TREE PROTECTION FENCING ONCE ALL HEAVY EQUIPMENT IS CLEARED FROM THE SITE. 14. ONCE NORTHERN PARK AREA IS FINISHED, RETURN TO UPPER PARKING AREA TO PREPARE FINAL GRADE FOR MAIN ENTRANCE DRIVE AND INSTALL WALL. 15. REMOVE STAGING AREA AND APPLY FINAL TOP COAT SURFACE APPLICATION TO PARKING AREA. 16. REMILLAND PAVE DRIVEWAY AT UPPER PARKING AREA. 17. SUBMIT NOTICE OF TERMINATION ONCE SITE IMPROVEMENTS ARE COMPLETED AND ALL EROSION CONTROL MEASURES ARE REMOVED. Know what's below. CaII before you dig. DOUBLE ROW OF SILT FENCE AROUND EXISTING WETLANDS TO REMAIN THROUGH THIS PHASE LEGEND SYMBOL DESCRIPTION DETAIL •••,.. ft's DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 �. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD TDD— ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 F ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 PHASE 9 LIMITS OF WORK .„....„..z 1.63 ACRES c . 'AX _ STAGING X� \REA s -X� sAo 0 30' 60' 120' SCALE: 60'-0" --.......--... EQUINOX iirr.4 ,,,,,,, Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 Asheville, 37 SEAL =z � = * ;N 5' CP DESIGN BY: DRAWN BY: CHECKED BY: w Q 0 REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 9 C 1 • 9 WRAP WATTLE ONTO ITSELF AND CONTINUE BUILDING UP, IF NECESSARY "TRENCH" WATTLE INTO GROUND %4 OF WATTLE THICKNESS FLOW METAL POSTS DRIVEN INTO EXISTING GRADE AT 45° ANGLE OVER WATTLE ATTACH T-POST OR TREATED 2X4 HORIZONTALLY TO POSTS TO FORM A CONTINUOUS TOP BAND STRAW WATTLE, INSTALLED ACCORDING TO MANUFACTURERS SPECIFICATIONS ADDITIONAL STAKES THROUGH WATTLE AROUND PERIMETER TO STABILIZE NOTE: ILLUSTRATION DEPICTS A LOW POINT CATCH BASIN. IF INLET PROTECTION IS APPLIED AT HEADWALL OR SINGLE -SIDED INLET STRUCTURE, METAL POSTS MAY NOT BE REQUIRED, HOWEVER, WATTLE IS TO BE KEYED INTO BANK ON BOTH SIDES OF INLET. INSPECTION AND MAINTENANCE: REMOVE SEDIMENT ONCE IT HAS REACHED 3 THE HEIGHT OF THE STRAW WATTLE. r I\LET PROTECTION 9 PLAN SYMBOL NOT TO SCALE BURY THE TOP END OF THE MAT IN A TRENCH 4" OR MORE IN DEPTH. TAMP THE TRENCH FULL OF SOIL. SECURE WITH ROW OF STAPLES, 10" SPACING, 4" DOWN FROM THE TRENCH. OVERLAP END OF TOP STRIP 6" AND STAPLE. TEMPORARY/ PERMANENT SEEDING ON BANKS PERMANENT SEED MIX C / NOT TO SCALE 10" ALLOW 3" OVERLAP BETWEEN PARALLEL STRIPS DITCH APPLICATION .OEROSION CONTROL NATTI\G WOOD/BIODEGRADABLE STAPLES .091" DIA. OR LARGER: U SHAPED 6" LEGS OR APPROVED EQUAL (STAPLES PER EROSION CONTROL MATTING SPECIFICATIONS) MATTING TUCKED AT EDGE AND STAPLED THROUGH FOLD TO SECURE STONE CLASS B EROSION CONTROL 6" MIN. 1.5' MIN. I FILTER FABRIC 24" MAX. AT CENTER FILTER FABRIC .::.�, %� ��� �!;��O !i• !•• i _i_ SECTION A —A STONE SHOULD BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER FROM CUTTING AROUND THE DAM. INSPECTION AND MAINTENANCE: REMOVE SEDIMENT ONCE IT HAS REACHED 1/3 THE HEIGHT OF THE CHECK DAM. ROC C CHECK DA NOT TO SCALE NOTE: THE MOST UPSLOPE EDGE OF EROSION CONTROL BLANKETS IS TO BE STAPLED 2' O.C. 6" MIN. OVERLAP V PLAN SYMBOL O°O°00 DOUBLE SIDED BIODEGRADABLE STRAW BLANKET (NORTH AMERICAN GREEN BIONET BLANKET), BIODEGRADABLE JUTE MATTING OR EQUIVALENT DIRECTION OF WATER FLOW STAPLES IN ALTERNATING PATTERN +/-5' APART 4 STAPLES IN ROW ALONG END AND ALONG EDGE OF SWALE CHANNEL BOTH SIDES HILLSIDE APPLICATION PLAN SYMBOL MINIMUM 24" X 24" SIGN WITH 5' HIGH LETTERS CONCRETE WASHOUT SIGN LAN VIEW /L1\ /4 REBAR, 36" LONG (TYP.) INSTALLATION: 1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD. 2. LOCATE CONCRETE WASHOUT AT LEAST 50' FROM ANY STORMWATER INLET. 3. INSTALL CONCRETE WASHOUT SIGN WITHIN 30' OF FACIUTY. 4. STAKE EACH BALE WITH TWO (2) #4 REBAR, 36" LONG. 5. INSTALL CONCRETE WASHOUT PRIOR TO ANY CONCRETE PLACEMENT ON SITE. IMPERMEABLE PLASTIC LINER (EXTEND 6" MIN. UNDER HAYBALES) SECTION A -A INSPECTION AND MAINTENANCE: 1. THE CONCRETE WASHOUT AREA SHALL MAINTAINED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. 2. CLEAN OUT CONCRETE WASHOUT AREA WHEN 50% FULL 3. UPON COMPLETION OF CONCRETE WORK, ALL CONCRETE SHALL BE REMOVED FROM THE WASHOUT AND DISPOSED OF AT AN APPROVED WASTE SITE. 4. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED, OR OTHERWISE STABILIZED. nCONCRETE WASHOUT 3xD D 4 RBR— 6OG (Y. — 0MN) ECOE CNRT AHURA VT TKD HY BLS • D P La •..•1♦:••••• • 40asN ••••••••••••l• •40*Ai ior• �•Te•Y '•�• i re Wt•.i•.�•.i•.i•.i•.i.. •. • A ME ••••••0••••••0%044 �l�I�_1���_t�1�_t�1�1�1�1�1�1�1•�1�1i_tt��• • • • •"•,(04•440::::: ei .•• •• vr:•w•j•.:;' ••p..op• •• •• •• •• ••t•• 1•-•••••••,••••••••••••••• vo•r c•TItl. it;•:• r•imer•,•T•:•1••:•mipi eery•., a.••••••••••••••••••••,0 D = PIPE DIA. IN INCHES Dmax = MAXIMUM STONE SIZE (1.5 x d50) OUTLET POTECTIO\ W= D + La 1.5 x Dmax FILTER FABRIC PIPE OUTF CLASS RIP RAP La PIPE 1 CLASS A 8' PIPE 3 CLASS A 8' PIPE 5 CLASS A 8' PIPE 6 CLASS A 8' PIPE 7 CLASS A 8' PIPE 8 CLASS A 8' PLAN SYMBOL NOT TO SCALE 15" 0 Cor. Plastic Pipe COVER OVER PIPE AS NECESSARY II I�� Rip Rap Apron III %0%% • 00 ••,f TEMPORARY SLOPE DRAIN PIPE NOT TO SCALE Dike NOT TO SCALE COMPACTED SOIL TE 2' i //\//\//\//\//\//\ i V� V /VA/VA/VA/VA/VA/VA/VA/VA/VA AAA/VA/' 6' TYP. VIPORAY DIVERSIO\ 18" DITCH FLON PLAN SYMBOL NOT TO SCALE 3 Inlet 12' Min. Dike PLAN SYMBOL -41 AltIF ,...........1#1" EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL _* :,_, 5' -: *_ O Cif DESIGN BY: DRAWN BY: CHECKED BY: w 0 REVISIONS I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME EC DETAILS (:::: :2 4111 0 EXISTING CHANNEL VI PERVIOUS DIKE PUN P SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP -AROUND TEMPORARY FLEXIBLE HOSE PROPOSED CULVERT fPROPOSED DRIVEWAY PU \A P ENERGY DISSAPATOR (SAND BAGS) PUMP IMPERVIOUS DIKE ENERGY DISSPATOR (SAND BAGS) 1. INSTALL SAND BAG ENERGY DISSIPATERS. 2. INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE. 3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS. DE -WATER ENTRAPPED AREA. 5. PERFORM CULVERT INSTALLATION WORK IN ACCORDANCE WITH THE PLANS. 6. EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERIOUS DIKES. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE. (DOWNSTREAM DIKE FIRST). 7. ALL GRADING AND STABILIZATION MUST BE COMPLETED WITHIN THE PUMP -AROUND AREA BETWEEN THE IMPERVIOUS DIKES. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATION OF THE IMPERVIOUS DIKES. 8. REMOVE ENERGY DISSIPATERS AND BACKFILL. STABILIZED DISTURBED AREA WITH SEED AND MULCH. AROUND OPERATION NOTES: 1. ALL EXCAVATION SHALL BE PERFORMED IN ONLY DRY OR ISOLATED SECTIONS OF THE CHANNEL. 2. IMPERVIOUS DIKES ARE TO BE USED TO ISOLATE WORK FROM STREAM FLOW WHEN NECESSARY. 3. ALL GRADED AREAS SHALL BE STABILIZED WITHIN 24 HOURS. 4. MAINTENANCE OF STREAM FLOW OPERATION SHALL BE INCIDENTAL TO THE WORK. THIS INCLUDES SHEETING, DIVERSIONS PIPES, PUMPS AND HOSES. 5. PUMPS AND HOSES SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. NOT TO SCALE TOP OF EMBANKMENT 5' MINIMUM BASIN LENGTH EMERGENCY SPILLWAY RIP -RAP APRON 411=11=II:-1=-#11 II: 11- -,tir1-11 ;AI'1 EARTHEN DAM ' I 1: 1I. 1. 1-1 %11.I ANTI -SEEP COLLAR 1.�1- 41i: i �I II11. I? we -I-I-I-I. GENERAL NOTES BARREL WATER SURFACE ELEVATION / \ RISER CREST SKIMMER - PRINCIPLE SPILLWAY ORIFICE ROCK BERM BAFFLE CLEANOUT MARK ST RRUNO F TER 11P11= 1-1- 1.1 .I 41:a 4= RIP -RAP STABILIZATION .1151u.-ii fir-Ga-��-u-a-a-u. II II �=�1.=II=IL=IL=II. Ir-.II=11=11.- 'II=11=I1.=I�=I1=11.=IL=11P11 _ _-- JL�1_L�1_L�II 11• x;',t';,.•4...,11-11=11. =11=11=1-11=11= - =1-11-11=11= -1=1- 111:-111-11-11-11-11- -11. -1-11_ 71=11=111= .11=II=11= RISER ANTI -FLOATATION -II BASIN BOTTOM SLOPE (0.5% MIN.) -II-�- POROUS BAFFLES 1. Sediment traps should not be placed in Waters of the State or USGS blue -line streams (unless approved by Federal Authorities). 2. Both outlet berm and the stone apron shall have an underlying layer of non -woven geotextile filter fabric. 3. AU internal side slopes of the sediment trap should be 2.5:1 or flatter. 5. A sediment cleanout stake should be installed and marked to remove sediment at 50% of the sediment storage volume. 7. After construction of each sediment trap, the area disturbed to construct the trap should be promptly stabilized, including all side slopes. 8. The following sediment trap requirements shall be maintained: - Maximum embankment height shall be 5-feet. - Maximum riprap outlet height shall be 3.5-feet. - Minimum flow length at top of riprap outlet shall be 5-feet. SEDINE\T TRAP WITH S NOT TO SCALE <VNER (DO NOT USE SILT FENCE) CLEANOUT STAKE INSPECTION AND MAINTENANCE 1. The key to a functional sediment trap is weekly inspections, routine maintenance and regular sediment removal. 2. Attention to sediment accumulations within the trap is extremely important. Accumulated sediment deposition should be continually monitored in the trap and removed when necessary. 3. Remove accumulated sediment when it reaches 50% of the designed sediment storage volume as marked by the cleanout stake. 4. Removed sediment from the trap shall be placed in stockpile storage areas or spread thinly across the disturbed area. Stabilize the removed sediment after it is relocated. 5. Regular inspections of sediment traps should be conducted once every calendar week and, as recommended and within 24-hours after each rainfall event that produces 1/2-inch or more of precipitation. 6. Disturbed areas resulting from the removal of the sediment trap should be permanently stabilized and additional BMPs, such as silt fence, should be utilized to handle stormwater runoff from this disturbed area until final stabilization is reached. PLAN SYMBOL �O \ EDGES SHALL BE TAPERED OUT TOWARD ROAD TO PREVENT TRACKING OF MUD ON THE EDGES STONE DIAMETER 2" TO 3" AVERAGE, 6-INCH MINIMUM DEPTH 7 UNDERLYING NON -WOVEN GEOTEXTILE FABRIC INSTALLATION: 1. STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED AT ALL POINTS WHERE TRAFFIC WILL EGRESS/INGRESS A CONSTRUCTION SITE ONTO A PUBLIC ROAD OR ANY IMPERVIOUS SURFACE, SUCH AS A PARKING LOT. 2. INSTALL A NON -WOVEN GEOTEXTILE FABRIC PRIOR TO PLACING ANY STONE. 3. INSTALL CULVERT PIPE ACROSS THE ENTRANCE WHERE NEEDED TO PROVIDE POSITIVE DRAINAGE. 4. LIMESTONE MAY NOT BE USED FOR THE STONE PAD. INSPECTION AND MAINTENANCE: 1. INSPECT THE CONSTRUCTION ENTRANCE AT LEAST ONCE PER CALENDAR WEEK. CHECK FOR MUD AND SEDIMENT BUILDUP AND PAD INTEGRITY. INSPECTIONS MAY BE NEEDED TO BE MORE FREQUENT DURING LONG PERIODS OF WET WEATHER. 2. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEAN OUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY, 5. IMMEDIATELY REMOVE ANY MUD OR SEDIMENT TRACKED ONTO ADJACENT IMPERVIOUS SURFACES BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED WHEN THE WATER IS DIRECTED TOA SEDIMENT TRAP OR BASIN. 6. REMOVE CONSTRUCTION ENTRANCE ONLY AFTER THE SITE HAS REACHED FINAL STABILIZATION. PERMANENT VEGETATION SHOULD REPLACE AREAS WHERE THE CONSTRUCTION ENTRANCE HAS BEEN REMOVED UNLESS THE AREA WILL BE CONVERTED TO AN IMPERVIOUS SURFACE TO SERVE POST -CONSTRUCTION. 4 CO\S-RUCTIO\ ENTRA\CE LENGTH (MIN.) WIDTH (MIN.) PROJECT F 00 EET 24 FEET INDIVIDUA L LOT 20 FEET 15 FEET NOT TO SCALE STRAW WATTLE ANCHOR TO GRADE DITCH OUTFALL PLAN VIEW EXTEND TENAX MULTI -MAT OR EQUAL 10' BEYOND OUTLET PROTECTION OR WHERE DITCH MEETS ANOTHER LINER MATERIAL 1" WASHED STONE FILTER DITCH OUTFALL TENAX MULTI -MAT OR EQUAL NOTCHED WEIR 4040•"4�••�• • CROSS SECTION RIP RAP 5 FT. MAX. -III- 1 1- STRAW WATTLE INSPECTION AND MAINTENANCE: REMOVE SEDIMENT ONCE IT HAS REACHED 1/3 THE HEIGHT OF THE NOTCHED WEIR. PLAN SYMBOL DITCH OUTLET PROTECTION NOT TO SCALE ,.........i....#' EQUINOX Asheville, 37 Haywood t 828.253.6856 f 828.253.8256 s „, St. Suite 100 NC 28801 SEAL * H 5 -: CPO DESIGN BY: DRAWN BY: CHECKED BY: w 1- REVISIONS I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME EC DETAILS NOTES: 1. SEE PLANTING & REVEGETATION SPECIFICATIONS FOR MORE INFORMATION ON SEED APPLICATION AND ESTABLISHMENT. 2. CONTRACTOR TO KEEP RECORD OF SEED PURCHASE AND APPLICATION RATES FOR FINAL INSPECTION (BAGS & RECEIPTS). 3. GROUND STABILIZATION REQUIRED IN (7) SEVEN DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1, AND GROUND STABILIZATION IN (14) DAYS ON OTHER AREAS TEMPORARY SEEDING SCHEDULE TEMPORARY SEEDING MUST OCCUR WHEN DENUDED AREAS WILL NOT BE BROUGHT TO FINAL GRADE WITHIN 7 CALENDAR DAYS (SEE NOTE 3 ABOVE). PERMANENT SEEDING SCHEDULE PERMANENT SEEDING MUST OCCUR WITHIN 14 CALENDAR DAYS OF FINAL GRADING. COVER CROPS (TEMPORARY SEEDING) TO BE ADDED TO PERMANENT SEEDING MIXES IF NO TEMPORARY SEEDING HAS BEEN PLACED PREVIOUSLY. SUMMER SEEDING MIXTURE: SPECIES RATE (LB/ACRE) PERMANENT SEEDING MIXES: RATE (LB/ACRE) GERMAN MILLET 40 PARTRIDGE PEA 10 A small -stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: May 15-Aug 15 REFERENCE PLANTING PLAN SHEETS 7.1-7.5 FOR PERMANENT SEED MIXES • The seed mixes above are listed in the specifications and available at ERNST CONSERVATION SEEDS (800.873.3321). Local sources of similar seed mix may be used (to be approved by Landscape Architect in writing). WINTER & EARLY SPRING SEEDING MIXTURE SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 A small -stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: Feb 1-May 15 SOIL AMENDMENTS: Physically or chemically treat all exotic invasive plants before amending soil. Apply FALL SEEDING MIXTURE: SPECIES RATE (LB/ACRE) lime and fertilizer according to soil tests or apply 4,000 lb/acre ground agricultural limestone and 1,000 lb/acre 5-10-10 fertilizer. SOIL PREPARATION: Soil impacted by construction must be loosened prior to seeding by means of disking ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 A small -stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: Aug 15-Dec 30 or raking. Seedbed shall be well-pulvarized, loose, and uniform. All stones larger than three (3) inches, sticks, roots, and other extraneous materials shall be removed. Apply seed uniformly with a cyclon seeder, drop -type spreader, drill or hydro -seeder. Cover broadcast seed by lightly raking, then firm surface with roller or cultipacker. Cut or disc temporary seeding cover crop prior to seeding. SEED PREPARATION: GENERAL SOIL AMENDMENTS: Follow recommendation of soil tests. Use only amendments safe for riparian areas. MULCH: If banks exceed 4:1, apply seed, lime, and apply mulch. MULCH: Apply 4,000 lb/acre straw. Anchor straw by tacking. MAINTENANCE: Apply 4,000-5,000 lb/acre grain straw or equivalent cover of another suitable, weed -free mulching material. Use a spray -on growth (mulch) matrix (FlexterrSGM or equal) for slope embankments that exceed 3:1 slopes. MAINTENANCE: Refertilize if growth is not fully adequate. Topdress with 50 lb/acre of nitrogen in March (if applicable). If it is necessary to extend temporary cover beyond June 15th overseed with mixes provided. Reseed, re -fertilize and mulch immediately following erosion or other damage. Mow or cut back no more than once a year. Refertilize in the second year unless growth is fully adequate. Reseed, fertilize, and mulch damaged areas immediately. Weed during first 2 years of establishment. 0 SEEDING SCHEDULE PLAN SYMBOL NOT TO SCALE DOZER TREADS CREATE CLEAT IMPRINTS PARALLEL TO THE SLOPE CONTOUR AREA SHOULD BE SEEDED AND STABILIZED IMMEDIATELY. .iirIWIrio, ,* • _,,,..--1,00-1,_.„1,,... 1 k. 0 ,,*,k _ . , . i Vevez:•, 1,,. '4"'41r-.1t: INSTALLATION: 1. TO SLOW EROSION, PERFORM SURFACE ROUGHENING (TRACKING) AS SOON AS POSSIBLE AFTER VEGETATION HAS BEEN REMOVED FROM SLOPE. 2. CLEAT IMPRINTS SHOULD BE PARALLEL TO THE SLOPE, 3. USE TRACKING WITH TEMPORARY SEEDING AND MULCHING TO STABILIZE AN AREA. 4. PERFORM TRACKING IMMEDIATELY AFTER GRADING ACTIVITIES HAVE CEASED (TEMPORARILY OR PERMANENTLY) IN AN AREA. 5. AVOID EXCESSIVE COMPACTING OF THE SOIL SURFACE WHEN TRACKING SINCE SOIL COMPACTION INHIBITS VEGETATION GROWTH AND CAUSES HIGHER RUNOFF RATES. AS FEW PASSES AS POSSIBLE SHOULD BE MADE WITH THE MACHINERY TO MINIMIZE COMPACTION. INSPECTION AND MAINTENANCE: 1. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. 2. IF RILLS (SMALL WATERCOURSES THAT HAVE STEEP SIDES AND USUALLY ARE ONLYA FEW INCHES DEEP) APPEAR, RE -GRADE , RE -ROUGHEN AND RE -SEED IMMEDIATELY. SURFACE ROUGHENING NOT TO SCALE PLAN SYMBOL 10' ROCK CHECK EVERY 50-100' ALONG SILT FENCE AS SHOWN ON PLAN AND IN AREAS OF CONCENTRATED FLOW. USE CLASS B RIP RAP LINED WITH #57 STONE ON FLOW SIDE WIRE -BACKED MIRAFI 100X SILT FENCE FABRIC (OR ENGINEERING APPROVED EQUAL - SEE NOTE #3) y\\ vA \ j\\\ \\i BACKFILL TRENCH WITH COMPACTED EARTH ISOMETRIC VIEW HEAVY DUTY PLASTIC TIES (EVENLY SPACED, RESTRICTED TO TOP 8 INCHES OF FABRIC) NOTE: TYPE S (SENSITVE) FENCE REQUIRES WOVEN WIRE FENCE OR ALTERNATE BACKING FILTER FABRIC COMPACTED EARTH RUNOFF BURYAT LEAST 12 INCHES OF FILTER FABRIC TRENCH DETAIL S Agc14/G 1.25 LB./LF STEEL POST REI\FOCED SILT FE\CE SILT FENCE RUNOFF END OF ROW: TURN UP SILT FENCE AT ENDS TO ENSURE APPROPRIATE TRAPPING OF SEDIMENT r 3 FT. MINIMUM SPACING 5 FT. MAXIMUM SPACING DOUBLE ROW OF SILT FENCE INSTALLATION: 1. SILT FENCES SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. 2. INSTALL MINIMUM 10' (OR GREATER AS SPECIFIED ON PLANS) CHECKS (TIE -BACKS) AT END TO PREVENT FLOWS FROM BY-PASSING SILT FENCE, AND EVERY 50'-100' WHERE SILT FENCE IS INSTALLED WITH SLOPE AND CONCENTRATED FLOWS ARE EXPECTED ALONG FENCE. 3. SILT FENCE SLURRY FLOW RATE TO BE 0.3 GPM/FT2, LESS THAN THE CLEAR WATER FLOW RATE OF 10 GPM/FT2. INSPECTION AND MAINTENANCE: 1. INSPECT AND REPAIR SILT FENCE AT LEAST ONCE EVERY CALENDAR WEEK.. 2. SEDIMENT SHALL BE REMOVED WHEN IT IS 1/3 THE HEIGHT OF THE SILT FENCE. 3. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF -SITE AND CAN BE PERMANENTLY STABILIZED. 4. UPON PROJECT COMPLETION, THE SILT FENCE SHALL BE REMOVED AND HAULED OFF -SITE. ANY DEPOSITED SEDIMENT SHALL BE PROPERLY GRADED AND SEEDED. PLAN SYMBOL NOT TO SCALE ---....... EQUINOX Asheville, -.or 37 Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 SEAL ,,A �rAr,A''', ', O * Nam 5:� c *a DESIGN BY: DRAWN BY: CHECKED BY: w 1— REVISIONS I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME EC DETAILS EC2.3 V:WC\Genf v 1\032 120-04 W000l n Rivers c1 Park\5tructure5\5TR000I \Plans\32 120-04 STRUCT.dwg 9/23/2022 6:20 PM 10 0 5 SS GRAPHIC SCALE 10 20 SS SS 40 0' 0 z ELLIPTICAL PIPE INLET INVERT EL.1934.05' TOP OF FOOTING EL. 1934.05' ( IN FEET ) 1" = 10' 8" 0 iso CURTAI WALL (TYP.) 1 1 -- WALL 1 PLAN VIEW SCALE: 1"=10' GRID NORTH NAD 63/NSRS 2011 17'-9" 64" X 43" ELLIPTICAL METAL PIPE ARCH h TOP OF WALL 2 EL. 1941.03' ELEVATION 1940.12' (HIGH POINT) NATIVE STREAM BED MATERIAL 143/8" THICK #57 STONE UNDER CULVERT. WALL 2 \ (3 'SECTION ALONG OF ELLIPTICAL PIPE S1.0 NON —WOVEN GEOTEXTILE FILTER FABRIC NOT TO SCALE NOT TO SCALE ff ELLIPTICAL PIPE OUTLET INVERT EL. 1933.53' TOP OF FOOTING EL. 1933.53' 0 0 8" CURTAIN WALL (TYP.) z_ HEADWALLS WITH 64"x43" ELLIPTICAL METAL PIPE ARCH NOT TO SCALE TOP E LIMITS OF FOUNDATION UNDERCUT AND SUBGRADE REMDIATION 0 LIMITS OF FOUNDATION UNDERCUT AND SUBGRADE REMDIATION NON —WOVEN GEOTEXTILE FILTER FABRIC SAFETY RAILING(TYP.) SEE SAFETY RAIL DETAIL SHEET L8.3 17'-6" 17'-6" / TOP OF WALL 1 EL. 1940.97' q OF ELLIPTICAL PIPE 1 CO NATIVE STREAM BED MATERIAL 64" X 43" ELLIPTICAL METAL PIPE — 143/8" THICK )F FOOTING L. 1934.05' CONSTRUCTION INLET INVERT JOINT EL. 1934.05' 0 0 0 (TYP. EA. END) 0 0000000000000• • 0000000000000 0 0 0 0 0 0 aaaaaaa I — 5 o00000000000; A 00000000000000 0 0 0 0 aaaaaaa 000e 0000 i�J 0000000 0000( I� �0000 000� 0 30000 000e 0000 0000 0000 0001 000oe 0 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00000 1-0-00 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 00000 0 0 0 0 0000 0oQa a a a a a a a a a a a a a aaaaaaaaaaaaaaaaaaaaaaaaaaaaaa I o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a o 0°0°0°0°0°0°0°0°0°0°°°0°°o°o°o°o°o°o°°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o° o�oao giaa o o *1°0 a s ��oaorg a oio gV g a o o o�airgioaa oio oaoelq e a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c a o 0 o a o 0 °°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°o°oo°o°o°o°o°o°o°°o°o°o°. ,aa giNfg a oio elolf o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00o 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a i oaa,a�igaa o�o rlrgi o o °4? loaa a a a oioa,ao c a a a a a a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 oio oloaor0.a.a. 3'-0" - s - o IC 0z 1 N OF ELLIPTICAL PIPE k I /-1 k I 11 /P1 t /rk 1 /\I- P1 Tr-1/Ti 1 1— LIMITS OF FOUNDATION UNDERCUT AND SUBGRADE REMDIATION FILTER FABRIC C4ELEVATION (WALL 1 SHOWN, WALL 2 SIMILAR) PRELIMINARY; NOT TO SCALE NOT FOR CONSTRUCTION EQUINOX t 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 /MI Vaughn & Mellen Firm License # F- 1088 13 18-F Patton Ave. Asheville, NC 28806 828-253-2796 SEAL \\01U1iNll/lll�/'/fii 1111�'0CAR0 .;2 40� Ssi� �y�;�% Q = SEAL 046056 = %,,i4, FA'CIN� s Q,���, '''', rYt ER 5\11� 1 NOTE: Drawings are invalid without signed stamp by professional DESIGN BY: DRAWN BY: CHECKED BY: JEB AW RTS REVISIONS DATE ":::::C E L_ O �IIIz o O �c t j 1 I 1 Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 100% DATE SEPTEMBER 26, 2022 DRAWING SCALE AS SHOWN NOTE: if this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME STRUCTURAL PLAN s'o CN �i g +9_c mCC a) C+' 0 C CC y c I5p{ rl O - 3 fo c - ua .c C° E a E +. 1J C _ +, ` O o s= ++ ra ;�► di }` 0 o �' �, fa +' A.AO- 2= Ili .,� ` r At fi 1 II>' e 1111! M �Rls Nig 11 "I� M1 lil C 4... 03 0 Y o '^ N *' O 0) '} v) > a) 0) u 3 3°aEi °'E°'a) ° +' yco30 O L N UJ .0 ++ C 7 C T O E O c0 +. C `� +, "p y E L O cu ?1011 tz — i y 3 4- Ill) L p L sz-oi a) a) -cO O "a ,n u a�Ei .E coax 3 `°co 0 c cca 13 T c o ro v' a°, u J Q v +L, Q N 0 fo ) co v 0, >� co O) 3 -o m 3 C 0 L +� �1D N o o,CU 0 3 0$ m a No_ `c° a o f I) c a.., t L O) + fO a v 3 fo 0 C E vs 0o >, C +O+ a0 N 0 co -f3 E a) C m v m a; a).(� vL > o o� 3'n aEi C-a oL E in accordance with label ginal containers with the aid steps in case of Imes where flooding is nwater drains, ground water ly. site. )ndary containment. :erials directly on the ground. TIVE: 04/01/1 fU U E N 00 +, 'p O a) t CO L 7 C C "� 3 (11 -ao°a, L N ++ N 0) U C Z 0) 0) a, 0,0 C L fo w O E }, �, C �, iH s p 3 +� .a C a 0 *= a)LE ' > j m ° m c� v W 3 E L. s I� coTv� To +C G p N � .� E E E O) a °�' o }' CCco IL C u O ra a) C W fa h 0 O „i +' °� O) a) v H }'� Z ra a) 0 a) E a0 +J O cowry) and Other Requirement; .ctronic notification. srt that contains a description of address the cause of the deposil quirement for a written report a NC 303(d) list as impaired for sed may be required to perform addi ly more stringent practices if sta sirements are needed to assure c red -waters conditions. .ctronic notification. The notifica t the date, time, nature, volume we the date of the bypass, iif pas iluation of the anticipated quality ,ctronic notification. srt that includes an evaluation of s. ,ctronic notification. srt that contains a description of ; the period of noncompliance, s, and if the noncompliance has i d time noncompliance is expecte lanned to reduce, eliminate, and incompliance. [40 CFR 122.41(l)( quireiment for a written report a NORTH CARO1 � 1 Ehvironmente FFECTIVE: 04 Tq� da'b2� +w 0 co +_, E > — C +W fo + >• +� a0 c •4 _ E 7 m c 3 a0 a) t L V) "O ? N fo fo �n C +' r0 a, V) L O,_ _ ; U ro C V a ,� -o fa +� -p U N 0) a) O W N O L t6 N O c �e _ ar O e� -- o f� G. to fU a CI. o a) 0 O ai w .. as > ., a� w - 4 +. _ as w of 5 CL C L ®) C ° _ V ee 1 1] _ ++ N O O +� .` p a) C E ,_ .c 0 C 't fo +S+ .X E >` C s N p A t . fll t .O •— u '7 a) C O v ,_ 4= +., la p E W -_ vJ C W a) 3 _o fo ` to C. C_ O E ]C U MO }' w N >' L'� fa a) fs .. L c C ..' al co "i �'' L e tip fa tit al c L. 0 VI I- Cadi L 0 O 0D a) 'C tic 44 III Ul N O c V3i C +� > +� O) — C i> ++ C o y O O N "O O V) C C L 4. , N w G w H c m O fU ++ S. C fu FA , -, o 03 c �+ O o ff1 40 Co O MI fa 0 47 y�7 H u O yr ++ a) ffs °C G O N v c B 0 0 3 a CO eu o c _ as a. c 6b 8 E +� ° cco To ° a 3 .c ° c `a n Q 0 a) Q 'p •L c0 O c > c rca E O a°JO O 00 �1 oc 1 4., -c a E c 3 x E u c cn N U E® C3 O �)i) F / .. w v v\ c 0 0) L 4-1 C fa 0) 0)•V) 0 U -O p' U CO O +a)) !O 0 En t Q) 0) 0cs3 0 0 C u U U > ++ U a) » ffs ++ L O +, 00 c of E 0. ip C u fo O -0. O a) c ,- m O +3 *' v r0 U fo fo E L 0) V) u fo 1 +0.+ c ++ "- f0 Q s-c L 0) fl- *' -".4-'_ a) O c - r II T�11 ra co L 0) .1 ++CO a� c� u a, 0 a, c fa 0 = 0 3 W U L �, ++ O - lY Q w �7 C a) 3 E re O N rn i N U r-I 'u c0 is (a u u C 'a 00 fo 3 = c0) N :F., 0 a) U O Z V) cc ° O '> Reporting Timeframes C f® ;_ c 3 E a, 13 fa•>, . ra ar 4 rJ '� +iw • O. 0 co E f^ 01 C c 4) • Within 24 hours, an shall include informa location of the spill c • A report at least ten The report shall inch effect of the bypass. • Within 24 hours, an • Within 7 calendar dt quality and effect of • Within 24 hours, an • Within 7 calendar do noncompliance, and including exact date! been corrected, the continue; and steps i prevent reoccurrenc• • Division staff may via case -by -case basis. NSITE CONCRETE ' STRUCTURE WITH 1 lasue�s W1 >E:1w.O 21 FO.. EX VAUNT 21.12111111111 .1.L II WIN MD NOM CB =NUMMI ElMThi 1.1CCUE112121 MICE. IESIGlin. via', u1 �.., O•N O) V) a) v) t c f0 U i ++ N a) ut +0+ C "p ++ ° > ++ fo C i O c L a) a) E 0 E }, c �, o +� x o o o c y o v y o L • c a) . 0 0 o 0� c v LL a) C E V) H I +f0+ fa t0 In ,� 0) +a, U N oc C +fa 3 i 0)) > +. 0 O L ro ra w 3 o j a) .CT) fa1 L C }' L ++ !., �, 4-' C -O 4- ra L 3 ++ COfv` N 7 ° °' `° ai ° a o' L > O aJ ate) ai 3 +L' a0o a=., o •v QJ + 0 o co +., -O O L s u 'O O, L E .ro a-, L L a) 0) c u u -0 4-' Ea0 ES, PESTICIDES AND RODENTICIDES re and apply herbicides, pesticides a :rictions. re herbicides, pesticides and rodents which lists directions for use, ingr idental poisoning. not store herbicides, pesticides and sible or where they may spill or leak ,urface water. If a spill occurs, clean not stockpile these materials onsite. IUS AND TOXIC WASTE ate designated hazardous waste ca e hazardous waste containers under sot store hazardous chemicals, drum O 0. Z (U V) c M O rC+ •C c a) V -? •- L c U m co ` O C o p c o° ° H r' C s co fa 3 w ° E `a°O h �� "' cu O r3a ° —a°, + N 0 Lf1 C '} N +, V' CO c -8 V) ate, C C_ C Q O H i "a +,, O Q O O L O s co E c a) E ~ 0) ° fa �' 41 H + w +' t 0 ate-+ C '3 O O fa CU U Vs .V) CO co �' .•i, c0 = ai E rn ".2 ++ .0 fo fa v) A a raw aj t 4 *0' u CO c c 4- 0 w o.c v, 132 E +f•' .� y ��y f� 0i .0 a) ftl k, ' f3 `- E E '-i 3 a) Nc 0o0 C•iEE �o`o °'o -��io3 U N N 'X C fl. 3 a`J O aJ ++ fca C a) C 00 O C L a, O V) +� tO E C. o O 7.1 L O io 0J -w v, 2 +, c 4a 9A 0,OraOg N z H 0_ C as N N 4, C m E �•> �aC, N C N 4J a) '3 .c M - c +j ,I- ar . aci p _ Vf C fY -a fa C y 0)0) aJ "O •N - Occurrence c (b) ail spills and release of hazardous substances per Item 1(b)-(c) above (c) Anticipated bypasses [40 CFR 122.41(m)(3)j (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] In c0 f/) >• co a) V > L N cfo+'p L a0 c E c fo Q) U ++ L , O co L 3 N l0 rn ra C N 4- L C to V, a) O > O i1 Id 4J 0) ° fa LL 0) ++ E t O) N fLa U f`o N O 0 �.., C_ E E co N ++ EL 01 +—�., c Q © o-. _co 4-, '9' '� 'd' N. 4 D�L-:a°aF aocE �0 oo�_ °.aocc3ov-0E LO o'''c • �o u N"� oo fsc� ' a, O = +O O o c U `t o "a 0 V) Vf 0) Vf ,TD a) N O u) U co 0) co 0 U ra +' a- E "O -O "O o L C.0 6i q) Q 0) N a) N m N U U L Out N O is a0 w aJ +' ++ •C > 'aPP+ C_ C_ N N l0 'Ap c 6? Ci E O c 1U ni el MI L E N ray' fn 3 N aJ N v) O +' > of C aJ '}if a) C `� V) ?! p O E C ++ V) 0) 0) ro p Ia a0 - O a) E >, L C Occ' N ja =o ° °; c E a) a.., co a- 0 Vi an CL 3 V) L L 3 fv,, C •w rs a) 3 C +-- 0 0. a) Z 0 av+ H H H H ` ++ 0, C O C i C_ +' m O O fY O ..- < Z a) 0 co a, 0 E . •. •. •. ) u r . u� I° e O. c O C r+Y a) = l - fo +' ra O C L u 'p +•' w +., 00 O 'L _ +•' ra E 0) a) O a) c > > 0 O ro L 0. +, a t C �' a) .O z t +� ro 'a) f� l��l, o �� co Q+�a,3°' ocoUa °�+�co �, ��O ° o sz�+, cFA4 ) W in v a, �t+,v�n C O f1 ro v 'O a= OC Q +� O 00 a)L `bS *'��a)i� E v O E ai �.3 Ir Mi_iM ' W O H ra +, v! + > C O v �„ a) u c-• u C C_ E 0) > O OL +' fa fa C a) >• N O co Q O 0 O in O U w v) U O 0 L 0 0 U as �-- LU N 0 II�-�il re p C C C C 0 fo G f0 CO L ++ u) "O J V u1 J 0) fo = O U O_ Q V V ++ O ++ N L fn l0 fo D 0. 0 0 a L p U a Q in rl z m 6 cc a Plml -- c-I N M L7 lD i< 00 Ol W c-i N M 4Q N V);G.—_.l c-_O = c-I N M � o°a)_ o s, a, OinTo c3`1 4- c - - - 3 a) O sn Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensionsand relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon th initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. N p a) N i N 'fj O i^ C a) E +v u u v) O a) 0) Lrl"I; ++ C" 0, c 4- co +C, ++ _c 0�O `� ri -° N U u OL a) _ CU -CD u 3 0) O 'O a) E fa c ca O S2 C SZ +, +, fa N u V 1 '" a) +�.+ m ° v) E >, _ 'n +' a) E H fa li C > =+' o `t p +' 4,,a) E O L O Q U c c ut fa L L +' L > 0) 'Cr) a)v) OO c U '� L f0 ra O ` _ L �) vi O L fa C O L p a) C,� C a) Ni — t0 '(3 +� O O N L-NNfo> ++ fU fo "° > L '0 �•', 0) �i t c Fs C +, a) N 0) aJ +, O O "� +'' C U fO H O N , 0J 0J 0- o s E v *' ;_, a) E L L c r"'o 0 3 !c)" C c 'fa !co + L 'faC C C _. c C O +., O a) - a+4 `� a, L -p v c 3 . O a) "mac -� m fco 0, C E+ v fo u L v) u f0 c c E 0 'c � a) v° "° 5 L f0 E f0 +.' f° coco --11 �jz C o c n 0) c0 i= (I) to U _ c ��� O) '> Efl — °rn o 3 E n c - C. a) �° ++ C +., v) � v o m E a)v v, t c &a ° ous 0J +., _C ° +� 3 r , C o yt C 0 a, f0 � E o 3 E u ++ )n O co E u t O) o a) 'p a •°' O 7 Vs O .- v c c a) - '- u; — N v L +� N t �� 0 t" +' V; E v C C L p CT r L O u 3 > C. c o — V +`' v v a) ,n +� E v E a) a0 . 4-, E a`n, +,, '= a0 ,e +, vv)) f0 - fo a) o. V) s- C -0 v N ,n L „, o a) +, O • u - L H C_ a-+ v a) C Irevent discharge of fluids. luipment. asible, or remove leaking eq ite containers and properly )le). :tion equipment from servic hydraulic fluids and other p lanrilac thaca matarialc iquid waste into storm drains, strea 50 feet away from storm drain inle itives are reasonably available. :rolled area. sized and placed appropriately for i, solvents, detergents and other liq collets on level ground, at least 50 feet away from Inds unless there is no alternative reasonably avai inable, provide relocation of portable toilet behin end surround with sand bags. it anchoring of portable toilets during periods of I toilets for leaking and properly dispose of any le sanitary waste hauler to remove leaking portable lerating unit. :ate earthen -material stock! sediment basins, perimeter own no other alternatives al ed along toe of slope with a n feasible. les provided on this sheet al onal requirements. Soil stal rerage techniques that will r iry or permanent control ne PART III PECTION, RECORDKEEPING AND REF well as any approved deviation shall e kept up-to-date throughout the coy ing to the E&SC plan shall be kept on g normal business hours. nentation to be Kept on Site E&SC plan documents above, the following iten for inspectors at all times during normal busine a site -specific exemption based on unique site c not practical: Permit as well as the Certificate of Coverage, afi spections made during the previous twelve mor ,quired observations on the Inspection Record F; similar inspection form that includes all the reqi y-available records in lieu of the required paper wide equal access and utility as the hard -copy re o be Retained for Three Years omplete the e-NOI and all inspection records sh; er project completion and made available upon 1 ICE OR CLOSE OUT t withdraw water from the surface when these c from the surface shall be rare (for example, tim; is time periods or conditions in which it will occu tem (2)(c) and (d) of this permit, :moved from the sediment basin. Examples of 't of the dewatering treatment devices describe( s of all dewatering devices, and ier that does not cause deposition of sediment i M C a) E TERIAL AND LAND CLEARING WASTE rn waste. Place litter and debris in app ,nt number and size of waste container te to contain construction and domestic stainers at least 50 feet away from store other alternatives are reasonably avail stainers on areas that do not receive su ss and does not drain directly to a storn tainers at the end of each workday and Ty containment. Repair or replace dam eight items in waste containers during tainers as needed to prevent overflow. ow. f-site at an approved disposal facility. i, clean up and dispose of waste in desii FION AND MI a JORTHi CAi= 'n vironrell RD ] ON_ RECOR 0) a) +' O c a, N O ru L c a) E ai L. AND VEI• c C ++ L co c u o 0. 0) fo Y ER, BUILDING MA C C a� If) a) N o a, c CO 3 c o >• c 0 L p 'O +� O v NT AND OTHER LIC Do not dump pa Locate paint was waters unless nc Contain liquid w Containment mL Prevent the disc construction site +J ro O V) 0_ a, ++ 'O m a) 0 0) ;THEN STOCKPILE 1' - o +, a) a H > C 0) ,a fO O +, Q a) ,G a ECTION B: RECORI . E&SC Plan Docur The approved E8 approved E&SC The following ite inspection at all 1 C w a) O) v) +� c a)) o +�0+U' _ f1 C O `� t "O U L Pa Z L ++ a) ++ C < O U •0 •o CO LE u) to > C. _� v3i 10 0 4— C —U�)B v V) u c U 0 O 0 'a a) 0 0 +W 0 v+') 7V)y RS u� a) 3C I- a/ V) ro 3 +, 03 0. fo t' a) L ai Y(0 a) u O fa O 0.> u 3 ++ raN a) }, 0) 0) � +�,O .E O c 'o QiiCD C ifl _0) L v) > +� +, 0) .'-n WE c O0_E Z C 3 Oa) �aifa0) tL u0) 3 L C y •y _ _ C +.'+.+ '> O �raOi+° 0 roLU -E• L0 ++ a0 'O_ ++ N 0_ r0 a) +' N '> 3W aJ N -O _ ++ a,o O 3 w a ca a) Li" )n O U O iS U > O 0) -0 c O N t 0) O L t` CD fo ++ U L Nu a 0J ,0 w C -O 0) "C N +- ra 0 O _ N O co N (o 'i > > O) fa +, fa E > U C_ C C_ O u U TOP U O O 'n C J +Ca a) a.) ro ++ C _ +t-, vs L 0 0 0fo C ' `~ O 'm O aJ 0 fa +' > O t O C> L> L (0 L. - 'd ''_n 7 co •O N r- cc L N 'n u s '> ++ fa =•M _ N a l7 = 3 fU a C U t f0) s m° — 0J p C E O O L E O za`L�3��c�QQwut70 m a C ++ L p +, 'nooa���3 +, cn�facaaafn3faa) al aJ ++ -+ac+� s o—� a— �^ : Da O -C -C -p a) O +' 3 as E •,,) 'n Z LL v ra fa L r0 a) ° '� O Q 4 c-I N M Lll W c I N M 6f1 lD fi 00 01 Qa r-i N M Ln re O. r 9 N M W r-I N M f/1 a i nl M _O N = 'w f6 0- vi 4_ 4 Z O ++ =p v -' c C0 a) c — U VI I— z 3 0) c +� C a) > o 00 V V) V 1 L N O 6. u) ' 'R N 4) I +, CC W V) O co c o s OL ML ° I 'n , . }° �. .. f3 S ra cr a 9 ++ 4- ++ +' +' C- Q S n' c - . OUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WIT ization Timeframes Timeframe variations If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 - 7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones - 10 days for Falls Lake Watershed - 7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zone - 10 days for Falls Lake Watershed unless there is zero slope te: After the permanent cessation of construction activities, any areas with temporary )und stabilization shall be converted to permanent ground stabilization as soon as icticable but in no case longer than 90 calendar days after the last land disturbing :ivity. Temporary ground stabilization shall be maintained in a manner to render the -face stable against accelerated erosion until permanent ground stabilization is achieve( will not dislodge the soil. Use one of the Permanent Stabilization • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed ILYACRYLAMIDES (PAMS) AND FLOCCULANTS . Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. . Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. Provide ponding area for containment of treated Stormwater before discharging offsite. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. NC GO 1 GROUND PART III )N, RECORDKEEPING AND REPORTING ig normal business hours in accordance with the tat site conditions would cause the safety of the inspec ispection may be delayed until the next business da )ection. In addition, when a storm event of equal tc le of normal business hours, the self -inspection sha ent of the next business day. Any time when inspec Inspection Record. Inspection records must include: Daily rainfall amounts. If no daily rain gauge observations are made during weekend holiday periods, and no individual -day rainfall information available, record the cumulative rain measurement for those L attended days (ant this will determine if a site inspection needed). Days on which no rainfall occurred shall be recorded "zero." The permittee may use another rain -monitoring devi approved by the Division. 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has le the site limits, 2. Description, evidence, and date of corrective actions taken, ao 3. An explanation as to the actions taken to control future releases. If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, ar 2. Records of the required reports to the appropriate Division Regional office per Part III, Section C, Item ( () of this perms 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requiremen P, DRAW DOWN OF SEDIII ediment basins and traps that receive runoff from drainage areas of one acre or mon )r maintenance or close out unless this is infeasible. The circumstances in which it is on -surface withdrawals from sediment basins shall be allowed only when all of the fc (a) The E&SC plan authority has been provided with documentation of the non-su shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in acco (c) Dewatering discharges are treated with controls to minimize discharges of pollu properly sited, designed and maintained dewatering tanks, weir tanks, and filtra (d) Vegetated, upland areas of the sites or a properly designed stone pad is used tc (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are (f) Sediment removed from the dewatering treatment devices described in Item (c (1) C a) C 0 Z 0 Z NCGO1 Stabilize within this many calendar days after ceasing land disturbance E NCGO1 CONSTRUCTION GENERAL PERMI1 plementing the details and specifications on :ivity being considered compliant with the G :tions of the NCGO1 Construction General Pc rmittee shall comply with the Erosion and Sc legated authority having jurisdiction. All dett iy not apply depending on site conditions an N N N mr Temporary Stabilization Temporary grass seed covered with straw or other mulches and tackifiers Hydroseeding Rolled erosion control products with or without temporary grass seed Appropriately applied straw or other mulch Plastic sheeting CTION E: GROUND STABILIZATIO Frequency (during normal business hours) At least once per 7 calendar days and within 24 hours of a rain event ? 1.0 inch in 24 hours At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours w co .c c. .ICOa Site Area Description a) Perimeter dikes, swales, ditches, and perimeter slopes )) High Quality Water (HQW) Zones ;) Slopes steeper than 3:1 I) Slopes 3:1 to 4:1 ,) Areas with slopes flatter than 4:1 A. �p z i 37 is N CIO 0 te 0 LS lU .••. Ts c) -0'O E ao o (2) E&SC Measures (3) Stormwater discharge outfalls (SDCs) (4) Perimeter of site (5) Streams or wetlands onsite or offsite (where accessible) fa Nil co a' t0 E Ix X E ti 0 `_ 11 v. v °1-2 i U j • • • • • 0 r-I N M Q ul N N Z 5 CO 2 > to z 1- _ a vQ 75 E N Z 00 Z N VI 0 vt -I-, c.Ix ---......-- EQUINOX Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 Asheville, 37 SEAL , A �'A'rA,,, CO DESIGN BY: DRAWN BY: CHECKED BY: w 1- REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright© 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90%0 DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME EC DETAILS EC2.4 N\DESIGN\ACTIVE DRAWINGS\20220929 EROSION CONTROL SEQUENCE PHASE 2 PROCEED AS FOLLOWS: 1. INSTALL LOW WATER ACCESS TO CENTRAL WORK ZONE IN THE WET FROM RIVER RIGHT BANK UTILIZING CULVERTS BETWEEN ABANDONED RAILROAD BRIDGE PIERS TO BUILD TEMPORARY ROAD. 2. INSTALL COFFERDAM FOR WATER CONTROL IN CENTRAL WORK ZONE USING SUPER SACK CONSTRUCTION DETAIL PROVIDED IN WHITEWATER PLAN SET. SUPER SACKS TO BE FILLED WITH GRAVEL OR SMALL COBBLE BASED ON CONTRACTOR PREFERENCE. 3. ALLOW WATER WITHIN ENCLOSED WORK AREA TO SETTLE PRIOR TO PRELIMINARY PUMP DOWN OF WORK AREA.. 4. INSTALL SUMP IN LOW CORNER OF CLOSED OFF WORK ZONE AND INSTALL INLET PROTECTION MEASURES SHOWN IN WHITEWATER PLAN SET DETAILS. INSTALL ADDITIONAL MEASURES SUCH AS SILT FENCE OR SETTLING PONDS AS NEEDED TO MINIMIZE TURBIDITY OF WATER PUMPED BACK INTO THE RIVER FROM THE SUMP. 5. ONCE WATER CONTROL AND EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING PROPERLY, COMPLETE CONSTRUCTION OF NOTE: THESE PLANS ILLUSTRATE THE SUGGESTED WATER CONTROL AND CONSTRUCTION PHASING TO COMPLETE THE IN -STREAM WORK SCOPE. ANY DEVIATION FROM THESE PLANS REQUESTED BY THE CONTRACTOR MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL BY PERMITTING AGENCIES. CONCRETE WASHOUT TO BE LOCATED NEAR STAGING AREA (SEE TYP. DETAIL ON SHEET WWEC.7) 1 1 1 CONSTRUCTION ENTRANCE, SEE EQUINOX DETAILS THE CENTRAL PORTION OF THE WAVE STRUCTURE IN THE DRY FROM THE RIVER RIGHT MEDIUM FLOW PLATE TO THE EDGE OF THE BYPASS CHANNEL INCLUDING THE ISLAND. 6. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS THE WATERWAY DURING GROUTING OPERATIONS. 7. UPON COMPLETION OF THE CENTRAL PORTION OF THE WAVE STRUCTURE INSTALLATION AND MIN. 3—DAY GROUT CURE TIME PER PROJECT SPECIFICATIONS, COMPLETE FINAL GRADING AND REMOVE ALL EQUIPMENT AND FINALLY THE SUMP FROM THE WORK ZONE ALLOWING IT TO BACKWATER. 8. REMOVE 3 OF THE 4 WALLS OF THE SUPER SACK COFFER DAM AND ALL MATERIALS FROM THE RIVER. THE SUPER SACK WALL CLOSEST TO THE RIVER RIGHT BANK WILL REMAIN AND BE SHIFTED OVER AS PART OF THE NEXT PHASE OF CONSTRUCTION. 9. REMOVE THE TEMPORARY ROAD, CULVERTS AND ABANDONED BRIDGE PILINGS TO FINAL GRADE MOVING FROM THE CENTRAL WORK ZONE TOWARDS THE RIVER RIGHT ACCESS POINT. 10. PREPARE TO BEGIN THE NEXT PHASE OF WAVE CONSTRUCTION ALONG THE RIVER RIGHT BANK. Nv SUPER SACK COFFERDAM (SEE TYP. DETAIL ON SHEET WWEC.6) �/ IIU11//�111��I� ,r 1=1:.+,-=,f-mow; 1� y�t1�r �1 Ii � 1/ 1 / 111 ��� P.,Isl1� 1� �/ �/{�11/1��1� 1� �� �/ �1 �1 :4,I,A 1�� 1� 1i..f 111 1� 4.. .. t.1,�1i 1�Ii �i 1� � 1; �`�171�Ii 1� �� CI\Ir _ 1 C,,0 1j/1141i,P CI .. 1V. 1�1.1� 411�114111 /.$ %"PJ,1' J i 0'6 iA o: ��=�J1a woesbc/ib .. ��1111i,1. INLET PROTECTION (SEE TYP. DETAIL ON SHEET WWEC.6) PROTECTIVE CONSTRUCTION MATS OVER EXISTING SEWER LINE PHASE 2 LIMITS OF WORK x ACRES TEMPORARY LOW-WATER STREAM CROSSING CONSTRUCTED OVER EXISTING RAILROAD PIERS. SEE DETAIL ON SHEET WWEC.7 FROM NORTH CAROLINA DEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (CHAPTER 6). i !S2O REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 1 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 2 Revisions: 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Sheet: WWEC.2 0 O z O 0 O w 0 z O N\DESIGN\ACTIVE DRAWINGS\20220929 LL 0 0 O (9 w 0 LL 0 z w J J w w 0 0 Lu z 2 0 0 0 >- J w 0 0 w w z_ (9 w z z 0 0 0 >- J 0 EROSION CONTROL SEQUENCE PHASE 3 PROCEED AS FOLLOWS: 1. INSTALL COFFERDAM FOR WATER CONTROL SURROUNDING RIVER RIGHT WORK ZONE USING SUPER SACK CONSTRUCTION DETAIL PROVIDED IN WHITEWATER PLAN SET. SHIFT THE EXISTING SUPER SACK WALL AT THE MEDIUM FLOW PLATE OVER TO THE LOW FLOW SLOT SO THAT THE REMAINDER OF THE WAVE STRUCTURE CAN BE COMPLETED. SUPER SACKS TO BE FILLED WITH GRAVEL OR SMALL COBBLE BASED ON CONTRACTOR PREFERENCE. 2. ALLOW WATER WITHIN ENCLOSED WORK AREA TO SETTLE PRIOR TO PRELIMINARY PUMP DOWN OF WORK AREA. 3. INSTALL SUMP IN LOW CORNER OF CLOSED OFF WORK ZONE AND INSTALL INLET PROTECTION MEASURES SHOWN IN WHITEWATER PLAN SET DETAILS. INSTALL ADDITIONAL MEASURES SUCH AS SILT FENCE OR SETTLING PONDS AS NEEDED TO MINIMIZE TURBIDITY OF WATER PUMPED BACK INTO THE RIVER FROM THE SUMP. 4. ONCE WATER CONTROL AND EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING PROPERLY, COMPLETE CONSTRUCTION OF THE RIVER RIGHT PORTION OF THE WAVE STRUCTURE IN THE DRY FROM THE RIVER RIGHT MEDIUM FLOW PLATE TO THE TOP OF BANK INCLUDING BOULDER TERRACING, BEACH AND TAKEOUT AREA. 5. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS THE WATERWAY DURING GROUTING OPERATIONS FOR THE WAVE STRUCTURE. 6. UPON COMPLETION OF THE CENTRAL PORTION OF THE WAVE STRUCTURE INSTALLATION AND MIN. 3—DAY GROUT CURE TIME PER PROJECT SPECIFICATIONS, COMPLETE FINAL CHANNEL GRADING. REMOVE ALL EQUIPMENT AND FINALLY THE SUMP FROM THE WORK ZONE ALLOWING IT TO BACKWATER. 7. REMOVE SUPER SACK COFFER DAM AND ALL MATERIALS FROM THE RIVER. 0 NOTE: THESE PLANS ILLUSTRATE THE SUGGEST D WATER CONTROL AND CONSTRUCTION PHASING TO COMPLETE T IN -STREAM WORK SCOPE. ANY DEVIATION FROM THESE PLANS REQUESTED BY THE CONTRACTOR MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL BY PERMITTING AGENCIES. SILT FENCE (SEE EQUINOX DETAILS) CONCRETE WASHOUT TO BE LOCATED NEAR STAGING AREA (SEE TYP. DETAIL ON SHEET WWEC.7) 1 • CONSTRUCTION ENTRANCE, SEE EQUINOX DETAILS • .rTu' -n 0 0 0 0 0 -n 0 0 -n O 0 0 SUPER SACK COFFERDAM (SEE TYP. DETAIL ON SHEET WWEC.6) FOC FOC - /. INLET PROTECTION (SEE TYP. DETAIL ON SHEET WWEC.6) 11111.:/1 i00. O.7:040 .f1/i,1: 0..1/110..1Uk0t.4,P20 0.40 5r41-54 1: / ../ / FOC FOC — i PHASE 3 LIMITS OF WORK x ACRES PROTECTIVE CONSTRUCTION MATS OVER EXISTING SEWER LINE FOC I can MO I O/ MO OC ow t O'v"v SS FOC to t 14.4.41 FOC U VV cp SS E!S20 REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 3 Revisions: 0 cOC Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1=40' Sheet: WWEC.3 EROSION CONTROL SEQUENCE PHASE 4 PROCEED AS FOLLOWS: 1. INSTALL EC MEASURES AROUND AREAS TO BE DEMO—ED, INCLUDING SILT FENCE ADJACENT TO PUT —IN WORK AREA. 2. BREAK AND REMOVE HARD SURFACE AS NEEDED TO INSTALL ACCESS TO RIVER. 3. CUT ACCESS ROAD TO BUILD RIVER PUT —IN AREA. 4. CLEAR AND GRUB ONLY AREAS ADJACENT TO WAVE CONSTRUCTION ACCESS. 5. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC AND WHITEWATER PACKAGE DETAILS. 6. INSTALL ADDITIONAL MEASURES AS NEEDED TO KEEP SEDIMENT ON SITE. 7. INSTALL PUT —IN AREA BANK PROTECTION AND BEACH AREA IN THE WET. 8. REMOVE ALL EQUIPMENT AND MATERIALS FROM THE RIVER. REMOVE THE TEMPORARY ACCESS ROAD. 9. ENSURE A STABLE AND VEGETATED SURFACE BEFORE MOVING TO THE NEXT PHASE OF WORK. LEAVE EROSION CONTROL MEASURES IN PLACE UNTIL FINAL ACCESS PATH IS INSTALLED TO PUT —IN AREA. w >- a_ 2' 0 z w z_ (9 w z z (9 0 0>- w J U NOTE: THESE PLANS ILLUSTRATE THE SUGGESTED WATER CONTROL AND CONSTRUCTION PHASING TO COMPLETE TIE IN -STREAM WORK SCOPE. ANY DEVIATION FROM THESE PLANS RECUESTED BY THE CONTRACTOR MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL BY PERMITTING AGENCIES. N� SILT FENCE (SEE EQUINOX DETAILS) v PHASE 4 LIMITS OF WORK x ACRES P sS PROTECTIVE CONSTRUCTION MATS OVER EXISTING SEWER LINE CONSTRUCTION ENTRANCE, SEE EQUINOX DETAILS COVER EXPOSED AREAS OF CONSTRUCTION ROUTE IN STONE INS NO Oil Oil -n 0 0 0 -n 0 0 0 0 -n 0 -n 0 0 O 0 0 1]M19�'L SS O 1( Cyr FOC FOC SS SS FOC SS — FOC i can MO I o/ FOC OC FOC cp SS o 0 �!S2O REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 1 SS — Mo SS FOC )WU — Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 4 Revisions: 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1=40' Sheet: WWEC.4 NOTE: THESE PLANS ILLUSTRATE THE SUGGESTED WATER CONTROL AND CONSTRUCTION PHASING TO COMPLETE THE IN -STREAM WORK SCOPE. ANY DEVIATION FROM THESE PLANS REQUESTED BY THE CONTRACTOR MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL BY PERMITTING AGENCIES. w w ss 0 0 z w w Lu C9 z Q 0 0 0 >- Lu (1) ss -- • • • .10 • ■ 4 0 ■ ■ -n 0 0 -n 0 0 -n 0 -n 0 0 0 O -n 0 -n 0 -n 0 0 0 0 0 CONCRETE WASHOUT TO BE LOCATED NEAR STAGING AREA (SEE TYP. DETAIL ON SHEET WWEC.7) 0 ss FOC — CONSTRUCTION ENTRANCE, _ SEE EQUINOX DETAILS SUPER SACK COFFERDAM (SEE TYP. DETAIL ON SHEET WWEC.6) ss Fnc' COVER EXPOSED AREAS OF CONSTRUCTION ROUTE IN STONE EROSION CONTROL SEQUENCE PHASE 5 PROCEED AS FOLLOWS: 1. HOLD PRE —CONSTRUCTION MEETING WITH NF SOUTHERN TO IDENTIFY RIVER LEFT SITE CONSTRAINTS, PROTOCOLS, CONSTRUCTION ROUTING, AND STAGING. 2. INSTALL CONSTRUCTION ENTRANCE AND CONSTRUCTION ACCESS FROM EXISTING NF SOUTHERN ACCESS ROAD. 3. INSTALL PERIMETER EC MEASURES AROUND CONSTRUCTION AREAS, INCLUDING SILT FENCE. 4. CUT ACCESS ROAD TO BUILD BYPASS CHANNEL AND HAUL OFF MATERIAL. 5. CLEAR AND GRUB ONLY AREAS ADJACENT TO WAVE CONSTRUCTION ACCESS. 6. ENSURE A STABLE AND VEGETATED SURFACE BEFORE MOVING TO THE NEXT PHASE OF WORK. LEAVE EROSION CONTROL MEASURES IN PLACE UNTIL FINISHED SURFACE TREATMENT IS APPLIED. 8. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC AND WHITEWATER PACKAGE DETAILS. 9. INSTALL ADDITIONAL MEASURES AS NEEDED TO KEEP SEDIMENT ON SITE. 10. INSTALL COFFERDAM FOR WATER CONTROL SURROUNDING RIVER LEFT WORK ZONE USING SUPER SACK CONSTRUCTION DETAIL PROVIDED IN WHITEWATER PLAN SET. SUPER SACKS TO BE FILLED WITH GRAVEL OR SMALL COBBLE BASED ON CONTRACTOR PREFERENCE. PHASE 5 LIMITS OF WORK x ACRES PUMP PLATFORM & DISCHARGE HOSE SUMP (SEE TYP. DETAIL ON SHEET WWEC.7) INLET PROTECTION (SEE TYP. DETAIL ON SHEET WWEC.6) t , 00 oo 11. ALLOW WATER WITHIN ENCLOSED WORK AREA TO SETTLE PRIOR TO PRELIMINARY PUMP DOWN OF WORK AREA. 12. INSTALL SUMP IN LOW CORNER OF CLOSED OFF WORK ZONE AND INSTALL INLET PROTECTION MEASURES SHOWN IN WHITEWATER PLAN SET DETAILS. INSTALL ADDITIONAL MEASURES SUCH AS SILT FENCE OR SETTLING PONDS AS NEEDED TO MINIMIZE TURBIDITY OF WATER PUMPED BACK INTO THE RIVER FROM THE SUMP. 13. ONCE WATER CONTROL AND EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING PROPERLY, COMPLETE CONSTRUCTION OF THE BYPASS CHANNEL IN THE DRY FROM THE ISLAND TO THE TOP OF RIVER LEFT BANK INCLUDING BOULDER TERRACING, BANK STABILIZATION DOWNSTREAM OF BYPASS. 14. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS THE WATERWAY DURING GROUTING OPERATIONS FOR THE BYPASS STRUCTURE. 15. UPON COMPLETION OF THE CENTRAL PORTION OF THE WAVE STRUCTURE INSTALLATION AND MIN. 3—DAY GROUT CURE TIME PER PROJECT SPECIFICATIONS, COMPLETE FINAL CHANNEL GRADING. REMOVE ALL EQUIPMENT AND FINALLY THE SUMP FROM THE WORK ZONE ALLOWING IT TO BACKWATER. 16. REMOVE SUPER SACK COFFER DAM AND ALL MATERIALS FROM THE RIVER. REMOVE THE TEMPORARY ACCESS ROAD AND RESTORE TO PRE —CONSTRUCTION CONDITION. SEED AND STAKE EROSION CONTROL BLANKETS ON DISTURBED SLOPES PER DETAILS IN WHITEWATER PLAN SET. REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 1 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 5 Revisions: 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1=40' Sheet: WWEC.5 I WOODFINNC EROSION CONTROL.DWG C:\USERS\RILEY\S2O DESIGN AND ENGINEERING\SCOTT SHIPLEY - DOCUMENTS\DOCUMENTS\ASHEVILLE, NC\FINAL DESIGN WOODFIN\DESIGN\ACTIVE DRAWINGS\20220929 A' 3 DIAMETER "SUPER SACKS" IMPERVIOUS LINER 1.., alliAlrAlliftallik& -ft,iiiw loh 1,140a01it1itl0.4a004tM "TAfrWitfiA--IrANti.--14M'P44-T14i4lk:l4r1,114lIIr*": M T4 74rr fIN k, *Alt rw 40, wv,464116,44friefireaptit0 temfott ..4 1 --A40 yp ..fit 44:1 ‘4,40:4x 11111 111I—I�* `riPii Adivpo*v_illi �II-II-�I IIEHIEHIEHIEHIE IIIIA IIillEHIEHIEHIEll -II-II-II-II-III—II—I—I—I_ I_ I_� EIHEIHEIHEIHElli —I—I-- —I—I—I—II—II ll- i I-I-I-1II-II-I II—II—III—I—I—I—I—I—II—II—II—II�III I I I11I III II II I II 1 —I_IIII II I I IIIIIII IIIIIIIIII IIIIIIIIIIIWORK AREA IIIIIIIIIIIIIII —111E111—III 11-111E111-111E11 111E111E111E 1E111E111E111E111E11 —111—III-1 111E111—III-1 1 1-1 1 1 111E111-111 11-111E111-111E111E1 —111-111E1 1E111E111E111E111E111 1E1 111E111E111E111-111- 111 11E111E111E111E111E11 1-111E111E111E111E111 111E111E111E111E111 11E111E111E111E111E11 1E111E111E111E111E111 COFFERDAM NOTES: (I) WRAP "SUPER SACKS" WITH IMPERVIOUS PLASTIC LINER TO PREVENT SEEPAGE. (2) BACKFILL THE DOWNSTREAM SIDE OF THE COFFERDAM WITH NATIVE ADJACENT ALLUVIUM. (3) USE "SUPER SACKS" AS A BUTTRESS AS REQUIRED. 0"SUPER SACK" COFFERDAM TYPICAL DETAILS PLAN SCALE: NTS GENERAL EROSION & SEDIMENT CONTROL NOTES: (I) THE IMPLEMENTATION OF EROSION AND SEDIMENT CONTROL MEASURES AND BEST MANAGEMENT PRACTICES INCLUDING CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING ARE THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED. (2) THE DETAILS SHOWN ON THIS SHEET ARE AN EXAMPLE OF ACCEPTABLE METHODS TO USE DURING CONSTRUCTION OF THIS PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AND SUBMITTING A COFFERDAM PLAN TO INCLUDE SUFFICIENT DETAIL OF MEANS AND METHODS SATISFACTORILY MEETING THE PROJECT SPECIFICATIONS AND PERMIT REQUIREMENTS. COFFERDAMS MAY CONSIST OF OTHER METHODS INCLUDING (BUT NOT LIMITED TO) SECLUSION FENCING, SAND BAGS, BULK BAGS, SUPER SACKS, SHEET PILE AND INFLATABLE BLADDERS. COFFERDAMS SHALL INCLUDE PLASTING LINER OR FINE MESH SILT FENCE TO REDUCE TURBIDITY AND FINES FROM ENTERING THE FREE FLOWING PORTION OF LIVE WATER. (5) ALL PUMP INTAKES SHALL BE SCREENED FOR FISH PROTECTION AS REQUIRED BY REGULATORY AGENCIES. (4) DEWATERING PUMP DISCHARGE FROM WITHIN COFFERDAM WORK AREAS SHALL BE RELEASED ONTO FLOODPLAIN AREAS AWAY FROM WETLANDS AND CONSTRUCTION ACTIVITIES. DISCHARGE SHALL NOT CAUSE EROSION OF TOPSOIL AND SHALL SHEET FLOW OVER THE FLOODPLAIN BEFORE RETURNING TO LIVE WATER DOWNSTREAM OF THE WORK AREA. ALL RETURN FLOWS MUST MEET PERMIT REQUIREMENTS FOR TURBIDITY. (5) ALL EARTHWORK AND WOOD STRUCTURES CONSTRUCTION WITHIN THE ORDINARY HIGH CHANNEL SHALL CONFORM TO WATER QUALITY STANDARDS ESTABLISHED BY THE REGULATORY AGENCY PERMITS FOR THIS PROJECT. SANDBAGS WATER SURFACE (ELEV. VARIES) EXTEND LINER MIN. 4' BEYOND BARRIER 8, BURY IN NATIVE ALLUVIUM 1' MIN. I c )O U1 )) Ooco�o. ,0 QuoC�O�� ALTERNATE COFFER DAM TYP. (SANDBAGS) SECTION 3' DIAMETER SUPER SACKS WORK AREA BACKFILL WITH GRAVEL 8, COBBLES WATER SURFACE (ELEV. VARIES) RIVER CHANNEL WRAP SUPER SACKS WITH IMPERVIOUS LINER AND BACKFILL LINER 0"SUPER SACK" COFFERDAM DOUBLE STACK SECTION SCALE: NTS BACKFILL WITH GRAVEL 8, COBBLES WORK AREA 3' DIAMETER SUPER SACKS WATER SURFACE (ELEV. VARIES) RIVER CHANNEL WRAP SUPER SACKS WITH IMPERVIOUS LINER AND BACKFILL LINER 0"SUPER SACK" COFFERDAM SINGLE STACK SECTION SCALE: NTS POLYETHYLENE LINER MIN. THICKNESS 8 MIL. MAX SLOPE IH:2V OR FLATTER DRY WORK AREA EXISTING COMPACTED RIVERBED NTS EXISTING RIVERBED WATER SURFACE (ELEV. VARIES) ,� o w�.= o 0 0 0 0 =04.4.E"cia- 1 4it'cl40 6 cc; cl?::%%31Wiacc° cR> cc> cR> c> '11\• INSTALL WATER FILLED COFFER DAM ACCORDING TO MANUFACTURER SPECIFICATIONS ON A SMOOTH WORK SURFACE SUCH THAT MINIMUM LEAKAGE IS OBSERVED THROUGH DAM. DRY WORK AREA ALTERNATE COFFER DAM TYP. WATER -FILLED BLADDER SECTION c; c7Ti• .c5;40cD 0000 NTS CONSTRUCTION AREA LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL EXISTING RIVER BANK sr MIN. 6" OVERLAP COFFER DAM HAY BALES (PURE HAY) LLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLL LLLLLLLLLLLLLLLLL L LLLLLLLLLLLLLLL LLLLLLLLLLLLL LLLLLLLLLLLL LLLLLLLLLLL LLLLLLLLLLL. LLLLLLLLLL LLLLLLLLL LLLLLLLLLL LLLLLLLLL LLLLLLLLL LLLLLLLLL LLLLLLLLL LLLLLLLL LLLLLLL LLLLLLL LLLLLLL. DRY WORK LLLLLLL LLLLLLLL LLLLLLL AREA LLLLLLL. LLLLLLL LLLLLLL LLLLLLL LLLLLL LLLLLLL. LLLLLL LLLLLL. LLLLLL LLLLLL LLLLLL LLLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLL LLLLLL LLLLLL. LLLLLL LLLLLL LLLLL LLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLL LLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLLL LLLLLLL LLLLLLL LLLLLLLLL LLLLLLLLLL LLLLLLLLLLLL LLLLLLLLLLL L LLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLL LLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLL / LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLL ea DRY WORK AREA WEIGHTED FIBER ROLL OR FIBER ROLL WITH GRAVEL BAGS AS WEIGHTS PUMP PLATFORM LLLLLLLL LLLLLLLLLLL LLLLLL_LLLLLL _LLLLLLLLL.LLLLLL LLLLLLLLLL LLLLLL -._LLLLLLLLLLLL L LLLLL 1 LLLLLLLLL LLLLLL LLLLL LL L LLLLLLLLLL PUMP DISCHARGE LLLLLLLLLLL L L L L L LL _LL LL L LL. L L. LI L FLOW SETTLING POND SETTLING POND COFFER DAM SETTLING POND HAY BALES (PURE HAY) DISCHARGE BY GRAVITY, OR PUMP IF NECESSARY TYPICAL COFFER DAM WATER CONTROL PLAN RIVER FLOW DIMENSIONS OF CHANNEL TO ALLOW FOR A MINIMUM FLOW COFFER DAM RIVER BANK NTS REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 11 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park r Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Erosion Control Details 1 Revisions: 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1=40' Sheet: WWEC.6 I WOODFINNC EROSION CONTROL.DWG C:\USERS\RILEY\S2O DESIGN AND ENGINEERING\SCOTT SHIPLEY - DOCUMENTS\DOCUMENTS\ASHEVILLE. NC\FINAL DESIGN WOODFIN\DESIGN\ACTIVE DRAWINGS\20220929 PUMP SUCTION LINE OR SUBMERSIBLE PUMP CENTERED IN BUCKET PUMP SUCTION LINE OR SUBMERSIBLE PUMP CENTERED IN BUCKET LID WITH HOLE CUT FOR SUCTION LINE www-y!=„,, , 100 Col III=11 I-IIILH I- - IIIEIIIIII�, 1���� -I 11 III=I I I- er00• Olt 0] PLASTIC 5—GALLON BUCKET WITH MANY $" HOLES DRILLED IN SIDES BUCKET FILLED WITH AASHTO #3 GRAVEL (CDOT SECT. 703. #3) ODEWATERING POND ALREADY FILLED WITH WATER SECTION NTS LOWEST SUBGRADE fELEVATION TO BE DEWATERED 12" MIN. AROUND ON ALL SIDES OF BUCKET 12" MIN. BELOW BUCKET LID WITH HOLE CUT FOR SUCTION LINE V PLASTIC 5—GALLON BUCKET WITH MANY $" HOLES DRILLED IN SIDES AND BOTTOM AASHTO #3 GRAVEL (CDOT SECT. 703. #3) ODEWATERING SUMP FOR SUBMERSED PUMP SECTION NTS Flow NC DOT #5 or #57 washed stone Stream Channel NCDOT #5 or #57 washed stone ALN z diameter of pipe or 12" whichever is greater TEMPORARY STREAM CROSSING/ACCESS ROAD DETAIL Class B Erosion Stone Capacity of pipe culverts together = bankf ull flow Filter Cloth NTS Class B Erosion Store GROUND SURFACE SIGN TO INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA I III III I= � I=III=fe_11 I � Imo' III=11 T-f 2�r�rr-r - 3H:1V SIDE SLOPES PLASTIC SHEETING OR GEOMEMBRANE, MIN. 10-MIL THICKNESS GROUND SURFACE H f ORANGE CONSTRUCTION FENCE ORANGE CONSTRUCTION FENCE AROUND WASHOUT STRUCTURE BERM AROUND PERIMETER COMPACTED EMBANKMENT .4R -111 1f- -IIf i-Iff,= — 8'X8' MIN. OR AS REQUIRED TO CONTAIN CONCRETE WASTE SECTION H—H' ��� 1J�ll�ll1�J1"'-' ll1=- 11�111�11�11= �-III-III-III-I I I I I� I I -III -III -III -II -III -III -III -I I I � I� I I� _ .I1= I1=1 I -III- - = = " 1 F7rrrrr--r--_r�r--r--_r-�rrlr--_r�r--_ri-�rr�mom--_rirrlrrr_fir-n II... II-III-III-J7s'-J, `',I'��' >�il'�-'):'�%J'y'/7�-'jfS/J' III 11E 11=1 I I -I I I�////i�///�///�/i/i///i///ii//i///i///i/ I TI LIIi/��i//�i///ii�/i/%%ii//ii//ii�/ii//i/� �I 1I I -IT ITI ii!!!!!!!!!!!!:771Mit �i/�//iii/ii�iii/iii/ii�iii�iii�ii�iii�// / ,/ // // /// / / , , // f// %/ %/ / // // j/ ;/', % j%jIII�I /j%�/j%�jj%�jj%/j%�jjf�j%%/j% /%IIIII= % % /% j j%% j j %i/f /�i% j%//% I/ I�II� ��iii�i$ ,-,M�!�ii�ii�/ �iiiii =1=111-///// fI��I `li(� li�i///i// / loll iTi1LJllll%��%�/;1L�1J1ill�i;�iiii� i�/i�i ll // / I � � I-III-III-I� r�, / /// //,/////==ITi=1Ti�12 ..111E1 T�fl // /// /1Tii�=1TfTfI� jj,/ja,j==I ==:i jj; j%tII--II I511::!!!!!! jj;;jII IITIITI;� ,/; '/II ////I�// M II-III=III//;j/I-III=11�//;;�/; 11 1./////// j///////////�1L��j/�j j�j��jj jj� jj��,j j�, ///�///�///�//�i//�i//�i/�ii/IIII /;;//;�//;j//;///�///j//////'11111=1�111�%//ii�/ii��i� i711/1/:////�i/�i��/�i//i/�i�i/i�//11=I 11=1/�/�i; /�i; /ii/�i;�ii�//--I ITi' I I T 11�ITiT=1I I IE 11��II 1�11�1 I� 1 I���I 1II ICIiI 1�11�11 1111 EEEE �ITIIIIIII�I�II�IITITIIII�I�ITII�II�IITIII�III�III�II�1II -11 II III II III II II II III IIF TI�TI-u 1=1 IT1111 1 �I I_IITImI III 1 I 1 1 Ifll PLAN VIEW MATERIAL, TYP. = 111EIIEIII_ 1-11 El 1 E1 11-I BERM AROUND PERIMETER. COMPACTED EMBANKMENT MATERIAL, TYP. 1 E111M11E1 Inn H' } NOTES: 1. CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE; PLACED A MINIMUM 50' FROM STATE WATERS. 2. VEHICLE TRACKING CONTROL IS REQUIRED AT CONCRETE WASHOUT ENTRANCE IF ACCESS TO CONCRETE WASHOUT AREA IS OFF PAVEMENT. 3. A PLASTIC SHEETING OR GEOMEMBRANE LINER SHALL BE PLACED. MINIMUM 10-MIL THICKNESS.. 4. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND/OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY FOR WASTE CONCRETE. 5. WASTE MATERIAL FROM CONCRETE WASHOUT OPERATIONS MUST BE REMOVED AND LEGALLY DISPOSED OF WHEN IT HAS ACCUMULATED TWO-THIRDS OF THE WET STORAGE CAPACITY OF THE STRUCTURE AND AT THE END OF CONSTRUCTION. 6. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CLIENT. 7. NO STORMWATER RUN-OFF SHALL DRAIN INTO CONCRETE WASHOUT AREA. CONCRETE WASHOUT AREA DETAIL NTS !S2O REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 1 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Erosion Control Details 2 Revisions: 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1=40' Sheet: WWEC.7 WOTUS Impacts Narrative The Riverside Park and Wave project is a 12.01ac park improvement project that will have impacts to waters of the United States. There will be both land based and water based impacts including tributary crossing, the addition and improvements of river access, and the implementation of an in -stream white water feature (the wave and bypass channel). Water based impacts will be first in the construction sequencing. Impacts will be both temporary and permanent. Temporary impacts are necessary to construct the wave and bypass feature as well as bank tie-ins. These impacts will include a temporary low -flow road, coffer dams and dewatering zones to allow construction of the wave feature in the dry. The construction of the wave and bypass will be done in three sections. The project will commence with the lowering of the east bank to gain access for the wave and bypass construction. Once a temporary construction access is installed down to the east bank and where the abandoned railroad piles meet the east bank, a temporary low -flow road will be constructed along the existing remnants of the old railroad crossing. The low -flow road will be constructed by placing culverts between the abandoned railroad piles and filling over the culverts and between the piles with cobble. This road will be used to carry construction equipment and material to the first section of construction, the center of the wave, including the island separating the wave from the bypass. Once the road is complete, a coffer dam will be constructed surrounding this section on all sides and it will be dewatered. Once the construction of the first (center) section is complete, the coffer dam on the upstream side of this section will be relocated to the downstream side of the temporary low -flow road as well as portions of the upstream side of the road that may not have coffer dam. At this point, the road should have coffer dam on either side of it. The road will then be removed. While removing the road, the contractor will also pull out the abandoned bridge pilings. These pilings are to be removed for the safety of river users. Note, this area of road and piling removal will not be dewatered, however cofferdams will limit siltation and turbidity migrating downstream. The coffer dams will be removed as the road gets removed, backing back to the east bank. The second section of the wave to be constructed will be the east side. This includes from the center of the wave feature to the east bank tie in and the east bank boulder toe. This section will be surrounded with coffer dam and dewatered. The portion of coffer dam furthest from the bank will be shifted coffer dam from the previous section of work, while the portions of coffer dam closer to the bank will be set from the bank and a built-up peninsula in the footprint of the wave. Once this portion of the wave is complete, all construction material temporary measures will be removed wrapping up with the coffer dams. The third section (fish bypass) will be built from the west bank. Coffer dams will be installed to surround the limits of work which will be from the island to the west bank tie-in, including boulder toe and bank stabilization. This section will be dewatered, and construction of the bypass will be done in the dry. Once construction is complete, all construction equipment and temporary measures will be removed finishing with the coffer dam. As part of other water -based impacts, the park improvements include two river access points. The south access will be constructed first and includes boulder toe/bank stabilization. This section will be surrounded by a coffer dam and dewatered. The north access will be a precast boat ramp that will be placed. This will not be done in the dry, however a turbidity curtain will be used to protect the river from construction activities on the bank. Land based impacts include a tributary crossing. This crossing will be complete as part of other land - based activities and will be constructed in the dry using a pump around with dykes. The crossing will be an elliptical metal culvert that will be partially buried. Once the culvert is installed, the pump around and temporary dykes will be removed. FRENCH BROAD RIVER - STORMWATER ASPHALT PARKING CRAGGY MOUNTAIN RAILROAD `r 1 1 GREENWA`` EX. RAIL LIR • 0 J 4661 SF TEMPORARY P2 Impact Location 27 CY FILL SPACES) - - GREENWAY CROSSING (TO TIE INTO FUTURE PHASE OF GREENWAY) PARK SIGN - EXISTING ENTRANCE DRIVE RIVERSIDE DRIVE (HWY 251) IMPACTS LEGEND TEMPORARY IMPACTS LOSS OF WATERS AT THE ORDINARY HIGH WATER MARK GAIN OF WATERS AT THE ORDINARY HIGH WATER MARK FILL BELOW THE ORDINARY HIGH WATER MARK CUT BELOW THE ORDINARY HIGH WATER MARK QUANTITIES 1,286 SF IN LOSS OF WATERS 499 SF IN GAIN OF WATERS 787 SF NET LOSS OF WATERS 917 CY CUT IN WATERS 4,208 CY FILL IN WATERS 3,291 CY NET FILL IN WATERS Know what's below. CaII before you dig. I I 1 1 / I i / I 1 I / I 0 I ---u---+ u-----Si I a WAVE AND BYPASS 396 CY CUT [wi Impact Location 106,921 SF TEMPORARY FRENCH BROAD RIVER 1 1 EX. BRIDGE (OVERHEAD) STORMWATER / DROP OFF / PAVILION UPPER PL RAND CRAGGY MOUNTAIN RAILROAD -...ft.- RIVERSIDE DRIVE (HWY 251) PLAY AREA GATHERING SPACE RESTROOMS & FACILITIES !'� I J �MO MO M BA`N K WAVE LOV)/E BEA BAN S BASE MAP LEGEND hlO EXISTING - - r W3 Impact Location OTHER CHANNEL GRADING (EDGES) 91 CY FILL WAVE AND BYPASS 4,079 CY FILL _W1 Impact Location - RAILROAD PIER 521 CY CUT I W2 Impact Location TION (b`r E (BY OTHL Y OTH'ERS) OPEN` EX. P 674 SF LOSS W1 Impact Location 284 SF LOSS 471 SF GAIN W1 Impact Location 227 SF LOSS 79 SF LOSS P1 Impact Location E PROJECT BOUNDARY DECIDUOUS TREE DEAD TREE AREA LIGHT UTILITY POLE GUY ANCHOR ELECTRIC/CABLE PEDESTAL DROP INLET SEWER MANHOLE (SMH) SEWER CLEAN OUT -oc- FIBER OPTIC CABLE 0 WATER METER GAS PEDESTAL STREAM GAUGE EXISTING WETLAND NOTE: ALL WORK IN THE RIVER OR ALONG THE BANKS TO BE PROVIDED BY OTHERS, UNLESS OTHERWISE NOTED. 206 SF TEMPORARY cy / FR BR 0,q O NATURAL SURFACE TRAIL EX. WETLAND tiq -- --- -X -ow- ss SFHA FOC OHW Ts X— MINOR CONTOUR MAJOR CONTOUR FENCE LINE OVERHEAD WIRE SANITARY SEWER SPECIAL FLOOD HAZARD AREA UNDERGROUND FIBER OPTIC CABLE ORDINARY HIGHWATER MARK TOP BANK TREE LINE RAILROAD TRACKS CRAGGY MOUNTAIN LINE EASEMENT 30' STREAM BUFFER BOULDER TOE / STEP RIVER ACCESS EX. ASPHALT PATH (RESURFACED) UPDATED PICNIC AREA �h9 vHds SFHA EXPANDED PARKING (39 SPACES) NEW ENTRANCE DRIVE SFIiA SFHA SFHA FHAy PROPOSED PAVILION ACCESSIBLE STAG II /RIV RIV • w ASPHALT CONCRETE GRAVEL PERMEABLE PAVERS WATERLINE IP3 Impact Location 'ATH 689 SF TEMPORARY 22 SF LOSS 28 SF GAIN 11 CY FILL Y I MOUNTAIN RAILROAD DRIVE oe f oe"e — FOC O W It. OW ow Pc FRENCH RIVER OAD Sys ONE-WAY LOOP TRAILER PARKINC EX. RESTROOM 0 30' 60' SFHA SFHA 120' SCALE: 60'-0" EQUINOX 40" Asheville, ii*.it,,,,„7, 37 Haywood t 828.253.6856 f 828.253.8256 4 St. Suite 100 NC 28801 SEAL o„,,Igi p ..P�1DSc'' , / ' go ./...Z eO Q /.. � Vic; -Pa 11. O'„/,111111111\\\\\�� NOTE: Drawings are invalid without signed s amp by professional DESIGN BY: DRAWN BY: CHECKED BY: REVISIONS DATE Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE November 15, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME I M PACTS SUMMARY MAP Up- CML i DRAINAGE TO SEDIMENT TRAPS DRAINAGE TO SILT FENCE DRAINAGE TO ROCK CHECKS OR SEDIMENT SOCKS C] LIMITS OF DISTURBANCE (8.31 ACRES) PREPARED FOR: 1101111, 4 _ �o0F'N PARKS CLIENT/OWNER: Town of Woodfin 90 Elk Mountain RD. Woodfin, NC 28804 (828) 253-4887 CML PREPARED BY: qML SEE SHEETS BY S20 (HYDRAULIC ENGINEER) FOR EROSION CONTROL IN THESE LOCATIONS 3 0 FOC flan FOC FOC LANDSCAPE ARCHITECT: Equinox 37 Haywood Street, Suite 100 Asheville, NC 28801 (828) 253-6856 (x202) david@equinoxenvironmental.com FOC FOC Z 0 W 0 ce 0 LL Z l FOC \FOC� N NN ADDRESS: 1598 Riverside Dr. Asheville, NC 28804 Latitude: 35.627678° N Longitude: - 82.600733° W PROJECT SIZE: Approximately 9.15 Ac Total Disturbance area is 8.31 Ac All aspects of work shall be performed in accordance with all applicable local, state, and federal regulations pertaining to worker safety. r EROSION CONTROL MEASURE NOTES: 1. THOROUGHLY REVIEW THE SEDIMENT AND EROSION CONTROL PLAN, ADDING EXTRA PROTECTION ALONG THE RIVER AND NEAR STREAMS (I.E. DOUBLE ROW SILT FENCE). 2. CONTRACTOR TO FINE GRADE AND ADD EROSION CONTROL MATTING AND NATURAL SITE DEBRIS AT ACCESS AREAS USED BYGEOTECHNICAL ENGINEERS FOR BORING SITES. 3. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN SEVEN (7) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW. 4. WHERE STABILIZATION BY THE 7TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE. 5. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH -DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 7 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE. 6. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. IF THIS OCCURS, NOTIFY LANDSCAPE ARCHITECT. 7. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELYAFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 8. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAYBE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 9. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 10. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT -LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. THESE TEMPORARY BERMS AND DITCHES SHALL BE PROTECTED WITH A ROLLED EROSION AND SEDIMENT CONTROL PRODUCT UNTIL VEGETATION CAN BE ESTABLISHED. 11. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS. 12. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 13. A COPY OF THE INSPECTION RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. 14. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND -DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS. 15. MINIMIZE SOIL COMPACTION AND, UNLESS UNFEASIBLE, PRESERVE TOPSOIL. 16. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE. 17. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMP'S (SEDIMENT BASIN, FILTER BAG, ETC). 18. MAINTAIN ALL BUFFER REQUIREMENTS AS INDICATED ON THE PLAN. 19. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: 19.1. WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; 19.2. WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS; 19.3. FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND 19.4. SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 20. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS ARE EXPECTED TO BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. Sediment Trap Schedule Trap DrainageAr ea (AC) Min. L/W Ratio Designed L/W Ratio Required Surface Area Required volume Minimum Storage Depth (with 1.5' min. excavation) Bottom Surface Elev Surface Area Volume Weir Width weir Elevation ST1 0.93 2 to 1 2 to 1 1352 SF 3348 CF 2.0' 1935 1745 SF 3873 CF 4' 1938.00 ST2 0.22 2 to 1 2 to 1 492 SF 792 CF 2.0' 1933 574 SF 893 CF 4' 1935.00 Skimmer Sizing Trap Drainage Area (AC) Time to Drain Required volume Skimmer Size Orifice Radius Orifice Diameter ST1 0.93 48 hrs 3348 CF 1.5 in 0.6 in 1.3 in ST2 0.22 48 hrs 792 CF 1.5 in 0.3 in 0.6 in Know what's below. Call before you dig. .........,,,,,......_ EQUINOX „to.% Asheville, 37 _ Haywood t 828.253.6856 f 828.253.8256 44/1 St. Suite 100 NC 28801 SEAL w 11Pl S1,,,,,. _* cc 5' is *_ DESIGN BY: DRAWN BY: CHECKED BY: REVISIONS DATE u Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME EC COVER C 1 • 0 - CML SFHA SS _ Know what's below. CaII before you dig. 1• —r— aadano CONSTRUCTION ENTRANCE, TYP. i 0 - .IFHA /5 CML i FOC 0 0 0 I 0 I 0 L� UClfl h� �Ll Tu. • ss -- • — ss ss _ FOC r I I I I I I I FOC x STAGING \J> AREA FOC oUNT,4fNc ML FOCI F/C EROSION CONTROL SEQUENCE PHASE 1 PROCEED AS FOLLOWS: 1. HOLD PRE -CONSTRUCTION MEETING TO IDENTIFY SITE CONSTRAINTS, CONSTRUCTION ROUTING, AND STAGING. 2. INSTALL CONSTRUCTION ENTRANCE AND CONSTRUCTION ACCESS. 3. INSTALL PERIMETER EC MEASURES AROUND AREAS TO BE DEMO-ED, INCLUDING SILT FENCE. 2. BREAK AND REMOVE HARD SURFACE AS NEEDED TO INSTALL ACCESS TO RIVER. 3. CUT ACCESS ROAD TO BUILD WAVE AND HAUL OFF MATERIAL. 4. CLEAR AND GRUB ONLY AREAS ADJACENT TO WAVE CONSTRUCTION ACCESS. 5. INSTALL WAVE STRUCTURE IN FRENCH BROAD RIVER. REFER TO S20 EROSION CONTROL PLANS FOR SEQUENCE. 6. ENSURE A STABLE AND VEGETATED SURFACE BEFORE MOVING TO THE NEXT PHASE OF PARK CONSTRUCTION. 7. LEAVE EROSION CONTROL MEASURES IN PLACE UNTIL FINISHED SURFACE TREATMENT IS APPLIED. 8. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC DETAILS. 9. INSTALL ADDITIONAL MEASURES AS NEEDED TO KEEP SEDIMENT ON SITE. i FOC COVER EXPOSED AREAS OF CONSTRUCTION ROUTE IN STONE PROTECTIVE CONSTRUCTION MATS OVER EXISTING SEWER LINE \ GRADE CONSTRUCTION ENTRANCE TO ACCESS RIVER FOR WAVE CONSTRUCTION PHASE 1 LIMITS OF WORK 1.07 ACRES PROJECT LIMITS OF DISTURBANCE ss Dina • ss O FOC FOG, FO / `` cML�-55 — tan , &is SS -.� 555 yy 6,1 • CML T c LEGEND SYMBOL DESCRIPTION DETAIL �_ /ft** DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 1IV ' OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD— TDD— obbb ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 t SEDIMENT TRAP WITH ROCK SEDIMENT DYKE 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 E :% _D ow � '� ow/ /276- C L /— 5-55 =\� %lML Cm/ CML -� CML CML 55 -5 '�i. CML Mc �y�y b SFHA —��� 9� CM SFH SF,1q \ �� O.� = CM CML SFHA S � CML. L H 5555-CML �Haft.� _- CML 5 On SFHA OML CML CML __ 0 30' 60' CML-. 120' SCALE: 60'-0" ...........,,,,,....._ EQUINOX Asheville, ibir 37 .446-414,7 _ Haywood t 828.253.6856 f 828.253.8256 s St. Suite 100 NC 28801 SEAL 51. S�' -•*,z, / ' _* co;_ 5' is *_ ,..- • , • Off, CO DESIGN BY: DRAWN BY: CHECKED BY: w Q 0 REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright© 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 1 C 1 • SFHA • SS - CML - Emit / 7- aadano 4 } �NL -CML Know what's below. CaII before you dig. rR qo, -.'.;._., r;,:;)--,,,....." :cam byy ins II" LL! co o LLI r V co /Is ■ s f W ' J J L'" I al 11-1 I � a ILL-L11`t'LUCr 1 L7 a�9 /f r 0 0 " MATTING ON SLOPE I I I I I I I I I I I I I + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + *+ -F + + + + +*++ + + + + + + + + + + + + + + + + + '���\�♦♦♦♦ + + + + + + + ♦♦ .♦: ♦ ♦ .♦♦�♦��♦ + .+ + + + + + RAuitoxom, COVER CONSTRUCTION ROUTE IN STONE ONCE EXPOSED BREAK AND REMOVE CONCRETE NORTH OF THIS LINE FOR PHASE 2 + + + + + + + .• I+ + + + + +, + + + + + + + �- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + f + + + + + + + + -F \ \ Foe FOc r, \ \ \ PROTECTIVE CONSTRUCTION MATS OVER TEMPORARY SWALE AND SEWER LINE TEMPORARY SLOPE DRAIN -J PROJECT LIMITS OF DISTURBANCE PHASE 2 LIMITS OF WORK 2.02 ACRES • EROSION CONTROL SEQUENCE PHASE2 PROCEED AS FOLLOWS: 1. USE CONSTRUCTION ACCESS FROM PHASE 1. 2. INSTALL PERIMETER EC MEASURES AROUND AREAS TO BE DEMO-ED, INCLUDING SILT FENCE. 3. DEMO EXISTING STRUCTURES AND DUKE POWER POLE. 4. BREAK AND REMOVE HARD SURFACE AS SHOWN ON PLAN. 5. CUT SLOPE AND HAUL OFF MATERIAL. 6. INSTAL MUD MATS OVER SEWER LINES 7. INSTALL SEDIMENT TRAP 1. WHEN CONSTRUCTING, IF GROUNDWATER IS ENCOUNTERED WITH EXCAVATION, NOTIFY LANDSCAPE ARCHITECT. 8. SCM OUTFALL STRUCTURES TO BE SET 3-6" ABOVE GRADE DURING CONSTRUCTION AND SURROUNDED BY SEDIMENT CONTROL MEASURES TO PREVENT PONDING. 9. SEDIMENT TRAP 1 DISCHARGES THROUGH SKIMMER TO OUTLET AND INTO STREAM. 10. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS 10.1. DIVERSION DITCHES 10.2. SWALES 10.3. SLOPE DRAINS 10.4. INSTALL EC MATTING, INLET & OUTLET PROTECTION PER SCHEDULES AND MANUFACTURER'S INSTRUCTIONS 11. BUILD WALL ALONG GREENWAY/ CONSTRUCTION ACCESS ROAD. 12. INSTALL CULVERT CROSSING AT STREAM. 12.1 INSTALL PUMP AROUND ACORDING TO DETAIL 12.2 ONCE WORK AREA IS IN THE DRY, BEGIN EXCAVATION FOR CULVERT AND FOOTERS. 13. ENSURE A STABLE AND VEGETATED SURFACE BEFORE MOVING TO THE NEXT PHASE OF PARK CONSTRUCTION. 14. LEAVE EROSION CONTROL MEASURES IN PLACE UNTIL FINISHED SURFACE TREATMENT IS APPLIED. 15. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC DETAILS, INCLUDING SEDIMENT TRAP 1. 16. ADD ADDITIONAL EC MEASURES AS NEEDED. SS /EY/ V � Q V � /Y O rrA SS• s •_ SS SS FCC, X i oW\ 6 \S \ S \'a' y�6 SS Poo, \\roc LEGEND SYMBOL DESCRIPTION DETAIL "ft.- /*** DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 1 ' 57. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 Too- Too- ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 Fo „j FOC \ _ FOC FO 1_7-4 CA/k CAlLs OWL eS' CIVIL _ CIVIL CML CML CArIL OM( 0 30' 60' 120' SCALE: 601-0" EQUINOX Asheville, ib, 37 Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 SEAL CP DESIGN BY: DRAWN BY: CHECKED BY: w 1- o REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright@ 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 2 C 1 • 2 - SS SFHA -CML ss _ - CML C 0 I I ° 0 I --si='���it� CML CML [i• J If • VOW 41: �ii°e°oo°o .1.� soo•�o♦♦o♦♦e♦♦ + + .+ . + �D ♦♦♦ ,.es♦♦♦♦♦♦♦ ♦♦s�i�oo♦♦♦♦♦Oio o 0°Oi°i°Oio°°Di° + + + + + + + oo ♦O ••• •i°o°°e or 'fie �o + + + + + + + + + + + + + + + . + t + + o°O°.fir\` + + + + + + + + + °O°°r°oho°t'a°.*♦4`n°i°i` `a + + + + + + + + + + + + + + + + + + +� 9rr��omO♦r ee .♦�° + + + + + + + + + + + + + + + + + + ��°fir°.`1°♦°P�`1s�rr�Qi�°:'Os TO + + + + + + + + +IF +++++++++++++++++++ oo\*`�1°yi°�i°°°ii°i°i°• s°i++++++++++++++++ + + + + + + + + + + + + + + + + + + + ++ii°ii°°° ko`\ + + + + + + �'++++++++++++=�+++++++++ d°• 41.14.°°i°ii°ii°i°i°i++++++++++++ + + + + + + + + + + + _ +♦�♦�♦o♦♦♦♦e�♦�♦oo�°�♦�o�♦♦en�♦�o�♦•�♦ + + + + + • o°®�♦�O�♦ee°®�♦�Oo�♦�OoO♦0♦♦e000♦soOp + ;+: 1++ +♦�°°°°i°s0°i i°OOOOoO°o°OODOOODO�°ivl �!�°+�i!%%irk%%%e�±�s�e%%•:%%%%%%%%o++f ' ♦ 1.`.♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦°°!%iii°iO"i��°: i•♦�?°�°i°i + + - ♦w r rr°♦♦e e° • ♦♦e♦♦1♦♦e Li I PHASE 3 LIMITS OF WORK 1.36 ACRES r 11 EROSION CONTROL SEQUENCE PHASE3 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE PRIMARY CONSTRUCTION ENTRANCES & STAGING AREA FROM PHASE 1. 2. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES, PIPES, ETC.) FOR CONSTRUCTION OF SLOPE, AND LOWER PLAZA. 3. INSTALL SLOPE STRUCTURES (GRAND STAIRCASE) 4. FINE GRADE AND STABILIZE SLOPE AND ALL EXPOSED SOIL WITH TEMPORARY SEED. 5. INSTALL LOWER PLAZA. 6. STABILIZE SURFACES WITH ROCK AND SEED & STABILIZE ALL OTHER EXPOSED SOIL AS INDICATED. 7. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC DETAILS, INCLUDING SEDIMENT TRAP 1. 8. ONCE SITE IS STABLE MOVE TO PHASE 4 AND THE INSTALLATION OF THE UPPER PLAZA. 9. ADD ADDITIONAL EC MEASURES AS NEEDED Know what's below. CaII before you dig. + + -I- + + + - PROTECTIVE CONSTRUCTION MATS OVER TEMPORARY SWALE AND SEWER LINE, TYP FOC FOC ).m Cy O ss� ,SSF_ SS '•. ,� FOc' ow _p_ocr Poc Poe 444. • \�_=- CM` LEGEND SYMBOL DESCRIPTION DETAIL DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 QDITCH OUTLET PROTECTION 4/ EC2.2 r OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD— TDD— ROCK CHECK DAM 2/ EC2.1 did) TEMPORARY SEED 1/ EC2.3 TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 • 'I- - `---„'„ Ce,,ZJ'''° >,-7. ?I', --'''''''':'—' ';'''4 .,_____1/7/_. Hir,17,-_----. ',., . _,,..4......, r rf6A-pw / e'...... -\_oW' / / �Mr ; -- ` ow / 7 M/ 1 i ��` J / / cmL CML CML CML CML ▪ ='tea �.i CML W-I�S SF\ SFHA CM sFH HA L Fl ▪ ▪ - sFHA Z CML CML ,,:9*N3L \ 9 � CML = CML SS �\ . • °c ss awn® — 'S Ow ML CML SFHA HA "FH�r� _- CML _ CML ` SFHA SFH CML CML A -� SFI CML __ CML __ 0 30' 60' 120' SCALE: 60'-0" EQUINOX Asheville, ib, 37 Haywood t 828.253.6856 f 828.253.8256 s St. Suite 100 NC 28801 SEAL 0%1%11111111/4," �P}�DS�' .• l ''.- .0 IA '?�••�_ (10 DESIGN BY: DRAWN BY: CHECKED BY: w Q 0 REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 3 C 1 • 3 i`♦sc♦ c c.. OE + STAGING AREA i SS —7-- 0 BREAK AND REMOVE REMAINING CONCRETE FOR PHASE 5 &!/ \CML i / l• COVER CONSTRUCTION ROUTE IN STONE T LU „J?LU 1/ l'codz Lt LU 1 a /I/ ° ° CML I PHASE 4 LIMITS OF DISTURBANCE 1.77 ACRES CML _ CML CML — - — MO INSTALL PERMANENT STORM PIPE TDD CML 'c'&q FHAA CAA `a3 p • 00 Hssssina Nc R tie V� 0 R '� O ss\rdD c, "a ? 6.0 SS �\ �na� SS '�\ --''\= 9 SS 14a° EROSInN CONTROL SEQUENCE PHASE4 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE PRIMARY CONSTRUCTION ENTRANCES & STAGING AREA FROM PHASE 1. 2. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES, PIPES, ETC.) FOR CONSTRUCTION OF UPPER PLAZA. 3. INSTALL UTILITIES INCLUDING ELECTRICAL AND WATER LINES. 4. INSTALL PERMANENT STORM PIPES IN PLAZA. 5. INSTALL STRUCTURES IN UPPER PLAZA (PAVILION AND RESTROOM/ CHANGING ROOM) 6. INSTALL HARDSCAPE IN UPPER PLAZA. 6.2. EXCAVATE FOR INFILTRATION TRENCH AND DIVERT RUNOFF TO ST1. 6.3. INSTALL PLAZA HARDSCAPE TO INFILTRATION TRENCH EDGE, AND INSTALL STRUCTURAL SLABS. 6.4. INSTALL SILT SOCKS AROUND INFILTRATION TRENCH 6.5. INSTALL INFILTRATION EGRP PRODUCT (INSTALLED BY OTHERS) 6.6. INSTALL WALLS OF TRENCH 6.7. INFILTRATION TRENCH MATERIALS MUST BE INSTALLED ONLY AFTER CONTRIBUTING AREA IS STABILIZED. CONTACT LANDSCAPE ARCHITECT PRIOR TO INSTALLING SAND/GRAVEL. 7. INSTALL PLAY SLOPE 8. STABILIZE SURFACES WITH ROCK AND SEED & STABILIZE ALL OTHER EXPOSED SOIL AS INDICATED. 9. MAINTAIN EROSION CONTROL MEASURES. 10. ADD ADDITIONAL EC MEASURES AS NEEDED. 11. ONCE SITE IS STABLE MOVE TO PHASE 5 AND THE INSTALLATION OF THE PARKING AREA. Know what's below. CaII before you dig. \P°\ O i Foe hoc_ \ �\ Fo Poo _--c��— LEGEND SYMBOL DESCRIPTION DETAIL •._ /*** DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 1 ' 57. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD TDD— ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 ow y� J l / I CM\l CML 44S SFHA W ow/ CIVIL � vZ CMLSFHA— ',y SFHA _ C&IL —' CML CML CML SFHA — CML SFHA SFHA CML CML CML. 0 s_ NSF HA CML SFSFHA CML CML CML 0 30' 60' Ss _ 120' SCALE: 60'-0" EQUINOX lib, Asheville, 37 146-414,7 Haywood t 828.253.6856 f 828.253.8256 s St. Suite 100 NC 28801 SEAL 01‘I IIII I,,,,,,, :�P}dDS7•'*,z, / ' _* co;_ 5' is *_ ,- • , Off, Cio0 DESIGN BY: DRAWN BY: CHECKED BY: w Q 0 REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 4 C 1 • 4 - ss_ AGING AREA CMI SFHA CML 1 i 1 a 0 0i l CML PHASE 4 LIMITS OF WORK 1.36 ACRES E�'1 [,yML Irtrft // CML Nalla - CML EROSION CONTROL SEQUENCE PHASE., AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE PRIMARY CONSTRUCTION ENTRANCE. 2. ENSURE EROSION CONTROL MEASURES REMAIN IN PLACE TO PROTECT STORM PIPES AND INFILTRATION TRENCH. 3. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES) FOR CONSTRUCTION OF THE UPPER PARKING AREA. 4. INSTALL UPSTREAM RIVER ACCESS. 5. STABILIZE SURFACES WITH ROCK AND SEED &STABILIZE ALL OTHER EXPOSED SOIL AS INDICATED. 6. MAINTAIN EROSION CONTROL MEASURES. 7. ONCE SITE IS STABLE MOVE TO PHASE 6 AND THE INSTALLATION OF THE PARKING AREA. 8. ADD ADDITIONAL EC MEASURES AS NECESSARY. Know what's below. CaII before you dig. MO CML _\ . CML 4 it �� ` �CtLTG- 'ti MO a3� a MO O� FhA - -:.•.,_ SF // L_ MO CM/ •u COS OQ a' Y \� - SSbya y� FOC 04V FOC cM< • 4s<oU �'Oiy 414 ft Nc f '7e p ss ft ss 5� s� % \ "mot -at\\\ � 1 \ $� \ _ 4 ,FOC r, A\\ - FOC CML '- 74 soh cn • ti p `tea 1 Ss ss ow / / _fttl,\:;1/ L CML V1-14.9 SFHA CM LEGEND SYMBOL DESCRIPTION DETAIL *".... e''' DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 1 ' 57. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 Too— Too— dab ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 \ ftftft -7 CML -� Iv�7L CMLalma` CML SFHA —/ '= SFHA CML CM( - omt -Poo o 94( SFHq CML SFHA CML _ —_ CPA. _ FHa� SFI-le CML - 0 30' 60' o ft 120' SCALE: 601-0" .......,,...,,,....._ EQUINOX Asheville, ib, 37 _ Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 SEAL :., -..,.: DESIGN BY: DRAWN BY: CHECKED BY: 1— o REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright@ 2022, Equinox Environmental Consultation & Design, Inc. PHASE 900/0 DATE DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME C 1 • 5 / -_ CML �x �L — SFHA —� 474 PHASE 6 LIMITS OF DISTURBANCE 1.29 ACRES ML pIj O 11 o o o r ,J I o o yq S \ c RAILROADm, CML - CML CML — C 7 — _�\ MO • ,or ` - \ 4 b&is ra n ,5. 13 ss = C s SF,y7 EROSION CONTROL SEQUENCE PHASE 6 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE PRIMARY CONSTRUCTION ENTRANCE FROM PHASE & STAGING AREA FROM PHASE 5. 2. CONSTRUCT OBSERVATION WALL AROUND WETLAND. 3. ROUGH GRADE PARKING AREA. 4. FINE GRADE PARKING AREA AND INSTALL BASE COURSE. 5. APPLY TEMPORARY SEED. 6. STABILIZE SURFACES WITH ROCK AND SEED & STABILIZE ALL OTHER EXPOSED SOIL AS INDICATED. 7. MAINTAIN EROSION CONTROL MEASURES. 8. REMOVE TEMPORARY SEDIMENT TRAP ONLY AFTER THE ENTIRE AREA DRAINING TO IT IS PERMANENTLY STABILIZED. 8.1. ONCE CONTRIBUTING AREA TO CENTER OF PARKING IS STABILIZED, MOVE TO NEXT STEP. 8.2. REMOVE EXCESS SEDIMENT IN LOCATION FOR BIOSWALE AND CONSTRUCTED WETLAND AND CONVERT TO SCMS AND FINE GRADE AS SHOWN IN PLANS. 8.3. INSTALL BIORETENTION MEDIA INTO BIOSWALE. 8.4. INSTALL PERMANENT OUTFALL STRUCTURES TO PLANNED ELEVATIONS. 8.5. PLANT SCMS AND BIOSWALE ACCORDING TO PLANTING PLAN. 9. DECOMMISSION ACCESS ROAD TO LOWER PLAZA AND TOP GREENWAY WITH FINER GRAVEL BASE. 10. ALL TEMPORARY DIVERSIONS, SWALES AND CHANNELS TO BE TEMPORARILY STABILIZED WITH A ROLLED EROSION AND SEDIMENT CONTROL PRODUCT UNTIL VEGETATION IS ESTABLISHED. 7. MAINTAIN CONSTRUCTION ENTRANCE AT THIS SIDE OF PARK. 8. ONCE SITE IS STABLE MOVE TO PHASE 7 AND THE IMPROVEMENTS TO RIVERSIDE PARK. Know what's below. CaII before you dig. ss 4,0 SS • OC_ �°e — \ FO Foe rl� ` .7::::::\� FOC OVv -_� \��L °_W..\� 4s SFHA `\ SFHA sFHA LEGEND SYMBOL DESCRIPTION DETAIL "'..._ /ft's DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 10:.?.?.. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD TDD— ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 \ ow_ s\ / �ML 7-7( ° cS, / SFHA / CML 4. CML SFHA SFHA CML / w = CML CM CML. SF 4L SFHA SFHA ss \ s aa,Idns l OC. ML — / — Ow Cq CML _ SFI CML __ 0 30' 60' 120' SCALE: 601-0" EQUINOX Asheville, ib, 37 Haywood t 828.253.6856 f 828.253.8256 s St. Suite 100 NC 28801 SEAL 011111111111,,2v, :51.ln��'•, /', _*c2' 5, is*_ ,.' Off, r11111111111‘•-` ` CO DESIGN BY: DRAWN BY: CHECKED BY: w Q 0 REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 6 C 1 • 6 CML x= iL _ \ C.MI SFHA -/ CML X rr i II i (C OCM CML _ CML - CML i RA IL ML CML __ 0404 CML CML PA L 7 CML = _�\ MO 44. FOC 1203 0 00 FOL cr�,L N\_ FOr, i • EROSION CONTROL SEQUENCE PHASE 7 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. ESTABLISH CONSTRUCTION ENTRANCE AND STAGING AREA FOR THIS PHASE. 2. INSTALL PERIMETER EROSION CONTROL MEASURES. 3. INSTALL TREE PROTECTION FENCING. 4. CONDUCT SITE PREP. 5. INSTALL ST2. 6. DEMO EXISTING PAVILION. 7. BEGIN CLEARING, GRUBBING, AND ROUGH GRADING FOR PHASE 7. 8. CREATE ACCESS ROUTE FROM PROPOSED BOAT RAMP TO EXISTING CULVERT CROSSING. MAINTAIN SENSITIVITY TO THE TREES AND ROOT COMPACTION AROUND THE TREES TO BE SAVED, ESPECIALLY IN THE AREAS WHERE NEW TRAILS ARE TO BE INSTALLED. 9. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES, PIPES, ETC.) 10. INSTALL EC MATTING, INLET & OUTLET PROTECTION PER SCHEDULES AND MANUFACTURER'S INSTRUCTIONS. 11. GRADE IN GREENWAY ALIGNMENT AND TRAILS. 12. ESTABLISH WETLAND UNDERDRAIN SYSTEM. 13. APPLY TEMPORARY SEED. 14. FINE GRADE GREENWAY AND TRAILS. 15. STABILIZE GREENWAY SURFACE WITH ROCK AND SEED & STABILIZE ALL OTHER EXPOSED SOIL AS INDICATED. Know what's below. CaII before you dig. Off/ SS a (�9y SS � tl -2 DOUBLE ROW OF SILT FENCE AROUND EXISTING WETLANDS LEGEND SYMBOL DESCRIPTION DETAIL •._ /*** DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 �. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD TDD- dab ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 PHASE 7 LIMITS OF WORK 1.84 ACRES STAGING AREA • .° / 0 30' 60' 120' SCALE: 60'-0" .......,,...,,,,,....._ EQUINOX Asheville, ib, 37 _ Haywood t 828.253.6856 f 828.253.8256 s St. Suite 100 NC 28801 SEAL _* ;2_ 5' is *_ ,.4 Off, CPO DESIGN BY: DRAWN BY: CHECKED BY: w Q 0 REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright© 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 7 C 1 • 7 / 1 / SS 1 STAGI AR CML SFHA —/ i I/f r LLI E Q 0 i„ mJ�?� LJww .Tcmoo a O° 0 , 0 h 0 0 I 0 0 0 0 °CR RAILROADA„ CML - CML EROSION CONTROL SEQUENCE PHASE 8 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE CONSTRUCTION ENTRANCE & STAGING AREA FROM PHASE 7. 2. INSTALL SILT FENCE FOR CONSTRUCTION OF BOAT RAMP AND PARKING LOOP. 5. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES, PIPES, ETC.) FOR CONSTRUCTION OF BOAT RAMP AND PAVILION. 6. INSTALL BOAT RAMP 6.1. INSTALL TURBIDITY CURTAIN 6.2. UTILIZE LAY IN PLACE CONSTRUCTION OF PRECAST UNITS. 6.3. INSTALL SILT SOCKS AT TOP OF RAMP 7. INSTALL SLAB FOR PAVILION 8. INSTALL PAVILION STRUCTURE. 9. FINE GRADE AND STABILIZE ALL NEW PATHWAYS. 7. MAINTAIN EROSION CONTROL MEASURES. 8. ADD ADDITIONAL EC MEASURES IF NECESSARY. 9. ONCE SITE IS STABLE MOVE TO PHASE 9 AND THE INSTALLATION OF THE PARKING AREA. Know what's below. CaII before you dig. CML._ A L M° L___— MO CML N �• O0 \cam,-C•�rF DOUBLE ROW OF SILT FENCE AROUND EXISTING WETLANDS TO REMAIN THROUGH THIS PHASE LEGEND SYMBOL DESCRIPTION DETAIL •._ /*** DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 1:4 7. OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD- TDD- dab ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 F ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 PHASE 8 LIMITS OF WORK 2.56 ACRES xxx_ STAGING AREA x_ CML A -- CML �Al CML TURBIDITY CURTAIN ama CML CML CML 0 30' 60' ML CML 6a- lR -°, 120' SCALE: 60'-0" EQUINOX j 0 Asheville, 0 37 0 Haywood t 828.253.6856 f 828.253.8256 %.,,- St. Suite 100 NC 28801 SEAL 01 ‘611 r r r,,,,, _* cco 5' is *_ ,4 , Off, L DESIGN BY: DRAWN BY: CHECKED BY: w 0 REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 8 C 1 • 8 —CMLL — J — r L - 0 0 h 0 0 i r, I.� • Cc RAC ' ,LYML Crot CML i.�\`�'*� SF! clot OO CML �_ CML CML _/' ML co �f\ MO _ SFAA_CMt ON/ EROSION CONTROL SEQUENCE PHASE 9 AFTER FOLLOWING THE EROSION CONTROL SEQUENCE OUTLINED FOR THE PREVIOUS PHASE. THEN PROCEED AS FOLLOWS: 1. UTILIZE THE CONSTRUCTION ENTRANCE & STAGING AREA FROM PHASE 7. 2. INSTALL ADDITIONAL SILT FENCE AND WATTLES FOR CONSTRUCTION OF PARKING LOOP. 5. INSTALL TEMPORARY RUNOFF CONVEYANCE SYSTEMS (SWALES, DIVERSION DITCHES, PIPES, ETC.) FOR CONSTRUCTION OF BOAT RAMP AND PAVILION. 6. REMOVE ACCESS ROAD AND GRADE IN TRAILER PARKING. 7. INSTALL LOOP ROAD. 9. INSTALL PARKING LOT INCLUDING WALLS AND STAIRS. 10. FINAL GRADE AND APPLY FINAL TOP COAT SURFACE APPLICATION ON PARKING LOT. 11. REMOVE TEMPORARY SEDIMENT TRAPS ONLY AFTER THE ENTIRE AREA DRAINING TO THEM IS PERMANENTLY STABILZED. 11.1. REMOVE EXCESS SEDIMENT IN CENTER OF LOOP TO CONVERT TO SCM AND FINE GRADE AS SHOWN IN PLANS. 11.2. INSTALL PERMANENT OUTFALL STRUCTURE TO PLANNED ELEVATIONS. 12. PLANT SCMS ACCORDING TO PLANTING PLAN. 13. REMOVE TREE PROTECTION FENCING ONCE ALL HEAVY EQUIPMENT IS CLEARED FROM THE SITE. 14. ONCE NORTHERN PARK AREA IS FINISHED, RETURN TO UPPER PARKING AREA TO PREPARE FINAL GRADE FOR MAIN ENTRANCE DRIVE AND INSTALL WALL. 15. REMOVE STAGING AREA AND APPLY FINAL TOP COAT SURFACE APPLICATION TO PARKING AREA. 16. REMILLAND PAVE DRIVEWAY AT UPPER PARKING AREA. 17. SUBMIT NOTICE OF TERMINATION ONCE SITE IMPROVEMENTS ARE COMPLETED AND ALL EROSION CONTROL MEASURES ARE REMOVED. Know what's below. CaII before you dig. DOUBLE ROW OF SILT FENCE AROUND EXISTING WETLANDS TO REMAIN THROUGH THIS PHASE LEGEND SYMBOL DESCRIPTION DETAIL •••,.. � DISTURBANCE BOUNDARY EROSION CONTROL MATTING 4/ EC2.1 DITCH OUTLET PROTECTION 4/ EC2.2 1;_-<. e OUTLET PROTECTION (ENERGY DISSIPATER) 6/ EC2.1 INLET PROTECTION 1/ EC2.1 TREE PROTECTION FENCE 4/ EC2.4 o o o REINFORCED SILT FENCE 2/ EC2.3 o o o TEMPORARY DIVERSION DITCH 5/ EC2.1 TDD— TDD— dab ROCK CHECK DAM 2/ EC2.1 TEMPORARY SEED 1/ EC2.3 F ■ - - - - - ■ TEMPORARY SLOPE DRAIN 7/ EC2.1 o SEDIMENT TRAP WITH SKIMMER 3/ EC2.2 PERMANENT PIPE SURFACE ROUGHENING 3/ EC2.3 SEDIMENT SOCK 5/ EC2.4 PHASE 9 LIMITS OF WORK „......„..,,z 1.63 ACRES STAGING AREA x X� x 0 30' 60' 120' SCALE: 60'-0" EQUINOX „., 4 Asheville, 37 " Haywood t 828.253.6856 f 828.253.8256 . St. Suite 100 NC 28801 SEAL :�P}dDS��' / _* cw 5' is *_ ,� Off, L DESIGN BY: DRAWN BY: CHECKED BY: w 0 REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME E&SC PH 9 C 1 • 9 WRAP WATTLE ONTO ITSELF AND CONTINUE BUILDING UP, IF NECESSARY "TRENCH" WATTLE INTO WATTLE THICKNESS FLOW 7 GROUND %4 OF NOTE: ILLUSTRATION DEPICTS A LOW POINT CATCH BASIN. IF INLET PROTECTION IS APPLIED AT HEADWALL OR SINGLE -SIDED INLET STRUCTURE, METAL POSTS MAY NOT BE REQUIRED, HOWEVER, WATTLE IS TO BE KEYED INTO BANK ON BOTH SIDES OF INLET. METAL POSTS DRIVEN INTO EXISTING GRADE AT 45° ANGLE OVER WATTLE ATTACH T-POST OR TREATED 2X4 HORIZONTALLY TO POSTS TO FORM A CONTINUOUS TOP BAND STRAW WATTLE, INSTALLED ACCORDING TO MANUFACTURERS SPECIFICATIONS ADDITIONAL STAKES THROUGH WATTLE AROUND PERIMETER TO STABILIZE INSPECTION AND MAINTENANCE: REMOVE SEDIMENT ONCE IT HAS REACHED 3 THE HEIGHT OF THE STRAW WATTLE. 9 I\LET PROTECTION PLAN SYMBOL NOT TO SCALE BURY THE TOP END OF THE MAT IN A TRENCH 4" OR MORE IN DEPTH. TAMP THE TRENCH FULL OF SOIL. SECURE WITH ROW OF STAPLES, 10" SPACING, 4" DOWN FROM THE TRENCH. OVERLAP END OF TOP STRIP 6" AND STAPLE. TEMPORARY/ PERMANENT SEEDING ON BANKS PERMANENT SEED MIX C / NOT TO SCALE 10" I--1-1/2" ALLOW 3" OVERLAP BETWEEN PARALLEL STRIPS DITCH APPLICATION EROSION CONTROL NATTI\G WOOD/BIODEGRADABLE STAPLES .091" DIA. OR LARGER: U SHAPED 6" LEGS OR APPROVED EQUAL (STAPLES PER EROSION CONTROL MATTING SPECIFICATIONS) MATTING TUCKED AT EDGE AND STAPLED THROUGH FOLD TO SECURE STONE CLASS B EROSION CONTROL FILTER FABRIC 1.5' MIN. I FILTER FABRIC 24" MAX. ATFENTER SECTION A —A STONE SHOULD BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER FROM CUTTING AROUND THE DAM. INSPECTION AND MAINTENANCE: REMOVE SEDIMENT ONCE IT HAS REACHED 1/3 THE HEIGHT OF THE CHECK DAM. ROC C CHECK DA NOT TO SCALE NOTE: THE MOST UPSLOPE EDGE OF EROSION CONTROL BLANKETS IS TO BE STAPLED 2' O.C. 6" MIN. OVERLAP V PLAN SYMBOL O°OTO DOUBLE SIDED BIODEGRADABLE STRAW BLANKET (NORTH AMERICAN GREEN BIONET BLANKET), BIODEGRADABLE JUTE MATTING OR EQUIVALENT DIRECTION OF WATER FLOW STAPLES IN ALTERNATING PATTERN +/-5' APART 4 STAPLES IN ROW ALONG END AND ALONG EDGE OF SWALE CHANNEL BOTH SIDES HILLSIDE APPLICATION PLAN SYMBOL MINIMUM 24" X 24" SIGN WITH 5' HIGH LETTERS CONCRETE WASHOUT SIGN — — #4 REBAR, 36"LONG (TYP.) 10' (MIN.) • ENCLOSE CONCRETE WASHOUT AREA VNTH STAKED HAY BALES • PLAN VIEW 41( /4 REBAR, 36" LONG (TYP.) IMPERMEABLE PLASTIC LINER (EXTEND 6" MIN. UNDER HAYBALES) INSTALLATION: 1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD. 2. LOCATE CONCRETE WASHOUT AT LEAST 50' FROM ANY STORMWATER INLET. 3. INSTALL CONCRETE WASHOUT SIGN WITHIN 30' OF FACIUTY. 4. STAKE EACH BALE WITH TWO (2) #4 REBAR, 36" LONG. 5. INSTALL CONCRETE WASHOUT PRIOR TO ANY CONCRETE PLACEMENT ON SITE. SECTION A -A INSPECTION AND MAINTENANCE: 1. THE CONCRETE WASHOUT AREA SHALL MAINTAINED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. 2. CLEAN OUT CONCRETE WASHOUT AREA WHEN 50% FULL 3. UPON COMPLETION OF CONCRETE WORK, ALL CONCRETE SHALL BE REMOVED FROM THE WASHOUT AND DISPOSED OF AT AN APPROVED WASTE SITE. 4. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED, OR OTHERWISE STABILIZED. n 1 WASHOUT 3xD La D • ••••••-•v>te•• • •••••••••••••••••l• MEwalammania ••••••••••••••••••.• .•�a•tm•j#i j�i��i•�i•�i•I•• •1•1•.•• ;;;; •••;••••••••i• 4 • ••l•,•%t' •••• D ei •.••• • Ilt••••••• vapraw•j•.:;' ••,•p• •• •• •• •• ••,.• 1•-•••••••,•••••••••••••••• AT••••T•E r•.mer•I•wirs:emipi erj•:••, !•••••.••••••••••••••WOrittrittr• MAW ••' D = PIPE DIA. IN INCHES Dmax = MAXIMUM STONE SIZE (1.5 x d50) OUTLET POTECTIO\ W= D + La 1.5 x Dmax FILTER FABRIC PIPE OUTF CLASS RIP RAP La PIPE 1 CLASS A 8' PIPE 3 CLASS A 8' PIPE 5 CLASS A 8' PIPE 6 CLASS A 8' PIPE 7 CLASS A 8' PIPE 8 CLASS A 8' PLAN SYMBOL NOT TO SCALE 15" 0 Cor. Plastic Pipe COVER OVER PIPE AS NECESSARY II I�� Rip Rap Apron III % 0eta • TEMPORARY SLOPE DRAIN PIPE NOT TO SCALE Dike NOT TO SCALE COMPACTED SOIL TE 2' i //\//\//\//\//\//\ i V� V /VA/VA/VA/VA/VA/VA/VA/VA/VA AAA/VA/' 6' TYP. VIPORAY DIVERSIO\ 18" DITCH FLON PLAN SYMBOL NOT TO SCALE 3 /14 Inlet 12' Min. Dike PLAN SYMBOL EQUINOX Asheville, 37 Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 SEAL 0111I111111 '1 `ss\ 1 [) ...'.- Sr l , ' 7C •N y: DESIGN BY: DRAWN BY: CHECKED BY: w Q 0 REVISIONS I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME EC DETAILS EC2.1 EXISTING CHANNEL VI PERVIOUS DIKE PROPOSED CULVERT PU \A P ENERGY DISSAPATOR (SAND BAGS) PUMP -71 0 PUN P TEMPORARY FLEXIBLE HOSE PROPOSED f DRIVEWAY wor IMPERVIOUS DIKE ENERGY DISSPATOR (SAND BAGS) SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP -AROUND 1. INSTALL SAND BAG ENERGY DISSIPATERS. 2. INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE. 3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS. DE -WATER ENTRAPPED AREA. 5. PERFORM CULVERT INSTALLATION WORK IN ACCORDANCE WITH THE PLANS. 6. EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERIOUS DIKES. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE. (DOWNSTREAM DIKE FIRST). 7. ALL GRADING AND STABILIZATION MUST BE COMPLETED WITHIN THE PUMP -AROUND AREA BETWEEN THE IMPERVIOUS DIKES. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATION OF THE IMPERVIOUS DIKES. 8. REMOVE ENERGY DISSIPATERS AND BACKFILL. STABILIZED DISTURBED AREA WITH SEED AND MULCH. AROUND OPERATION NOTES: 1. ALL EXCAVATION SHALL BE PERFORMED IN ONLY DRY OR ISOLATED SECTIONS OF THE CHANNEL. 2. IMPERVIOUS DIKES ARE TO BE USED TO ISOLATE WORK FROM STREAM FLOW WHEN NECESSARY. 3. ALL GRADED AREAS SHALL BE STABILIZED WITHIN 24 HOURS. 4. MAINTENANCE OF STREAM FLOW OPERATION SHALL BE INCIDENTAL TO THE WORK. THIS INCLUDES SHEETING, DIVERSIONS PIPES, PUMPS AND HOSES. 5. PUMPS AND HOSES SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. NOT TO SCALE TOP OF EMBANKMENT EMERGENCY SPILLWAY RIP -RAP APRON GENERAL NOTES 5' MINIMUM EARTHEN DAM [ANTI -SEEP COLLAR BARREL RISER CREST SKIMMER WATER SURFACE ELEVATION ROCK BERM BASIN LENGTH BAFFLE Do, BASIN BOTTOM "G" 111:��:I_1:=71:=J1:��:11:=:IC�� I u--=:11:�:11:=:11=11:=11: :11=11=11= -11- .11-11- .11- .11= 11=II=11 ==11=11= RISER ANTI-FLOATATION-11 BASIN BOTTOM SLOPE (0.5% MIN.) 1. Sediment traps should not be placed in Waters of the State or USGS blue -line streams (unless approved by Federal Authorities). 2. Both outlet berm and the stone apron shall have an underlying layer of non -woven geotextile filter fabric. 3. AU internal side slopes of the sediment trap should be 2.5:1 or flatter. 5. A sediment cleanout stake should be installed and marked to remove sediment at 50% of the sediment storage volume. 7. After construction of each sediment trap, the area disturbed to construct the trap should be promptly stabilized, including all side slopes. 8. The following sediment trap requirements shall be maintained: - Maximum embankment height shall be 5-feet. - Maximum riprap outlet height shall be 3.5-feet. - Minimum flow length at top of riprap outlet shall be 5-feet. SEDINE\T TRAP WITH S NOT TO SCALE <VNER CLEANOUT MARK 'il�� 1- - I==1M11=11=11=11.=1r==1r11=u=n.=u. 1 1=1- 1=11=11=11=11=11= =11. POROUS BAFFLES (DO NOT USE SILT FENCE) CLEANOUT STAKE INSPECTION AND MAINTENANCE ST RRUNO F TER RIP -RAP STABILIZATION 1. The key to a functional sediment trap is weekly inspections, routine maintenance and regular sediment removal. 2. Attention to sediment accumulations within the trap is extremely important. Accumulated sediment deposition should be continually monitored in the trap and removed when necessary. 3. Remove accumulated sediment when it reaches 50% of the designed sediment storage volume as marked by the cleanout stake. 4. Removed sediment from the trap shall be placed in stockpile storage areas or spread thinly across the disturbed area. Stabilize the removed sediment after it is relocated. 5. Regular inspections of sediment traps should be conducted once every calendar week and, as recommended and within 24-hours after each rainfall event that produces 1/2-inch or more of precipitation. 6. Disturbed areas resulting from the removal of the sediment trap should be permanently stabilized and additional BMPs, such as silt fence, should be utilized to handle stormwater runoff from this disturbed area until final stabilization is reached. PLAN SYMBOL �O \ EDGES SHALL BE TAPERED OUT TOWARD ROAD TO PREVENT TRACKING OF MUD ON THE EDGES STONE DIAMETER 2" TO 3" AVERAGE, 6-INCH MINIMUM DEPTH 7 UNDERLYING NON -WOVEN GEOTEXTILE FABRIC INSTALLATION: 1. STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED AT ALL POINTS WHERE TRAFFIC WILL EGRESS/INGRESS A CONSTRUCTION SITE ONTO A PUBLIC ROAD OR ANY IMPERVIOUS SURFACE, SUCH AS A PARKING LOT. 2. INSTALL A NON -WOVEN GEOTEXTILE FABRIC PRIOR TO PLACING ANY STONE. 3. INSTALL CULVERT PIPE ACROSS THE ENTRANCE WHERE NEEDED TO PROVIDE POSITIVE DRAINAGE. 4. LIMESTONE MAY NOT BE USED FOR THE STONE PAD. INSPECTION AND MAINTENANCE: 1. INSPECT THE CONSTRUCTION ENTRANCE AT LEAST ONCE PER CALENDAR WEEK. CHECK FOR MUD AND SEDIMENT BUILDUP AND PAD INTEGRITY. INSPECTIONS MAY BE NEEDED TO BE MORE FREQUENT DURING LONG PERIODS OF WET WEATHER. 2. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEAN OUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY, 5. IMMEDIATELY REMOVE ANY MUD OR SEDIMENT TRACKED ONTO ADJACENT IMPERVIOUS SURFACES BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED WHEN THE WATER IS DIRECTED TOA SEDIMENT TRAP OR BASIN. 6. REMOVE CONSTRUCTION ENTRANCE ONLY AFTER THE SITE HAS REACHED FINAL STABILIZATION. PERMANENT VEGETATION SHOULD REPLACE AREAS WHERE THE CONSTRUCTION ENTRANCE HAS BEEN REMOVED UNLESS THE AREA WILL BE CONVERTED TO AN IMPERVIOUS SURFACE TO SERVE POST -CONSTRUCTION. 4 CO\S-RUCTIO\ ENTRA\CE LENGTH (MIN.) WIDTH (MIN.) PROJECT F 00 EET 24 FEET INDIVIDUA L LOT 20 FEET 15 FEET NOT TO SCALE STRAW WATTLE ANCHOR TO GRADE DITCH OUTFALL PLAN VIEW EXTEND TENAX MULTI -MAT OR EQUAL 10' BEYOND OUTLET PROTECTION OR WHERE DITCH MEETS ANOTHER LINER MATERIAL 1" WASHED STONE FILTER NOTCHED WEIR III III_- III= DITCH OUTFALL TENAX MULTI -MAT OR EQUAL 111111 I =11 111j1 RIP RAP CROSS SECTION 5 FT. MAX. 111 STRAW WATTLE INSPECTION AND MAINTENANCE: REMOVE SEDIMENT ONCE IT HAS REACHED 1/3 THE HEIGHT OF THE NOTCHED WEIR. PLAN SYMBOL DITCH OUTLET PROTECTION NOT TO SCALE --...._...._N. EQUINOX Asheville, 37 ii. Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 SEAL �'°CA sAA,), 4 • CIO DESIGN BY: DRAWN BY: CHECKED BY: w 1- REVISIONS I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME EC DETAILS NOTES: 1. SEE PLANTING & REVEGETATION SPECIFICATIONS FOR MORE INFORMATION ON SEED APPLICATION AND ESTABLISHMENT. 2. CONTRACTOR TO KEEP RECORD OF SEED PURCHASE AND APPLICATION RATES FOR FINAL INSPECTION (BAGS & RECEIPTS). 3. GROUND STABILIZATION REQUIRED IN (7) SEVEN DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1, AND GROUND STABILIZATION IN (14) DAYS ON OTHER AREAS TEMPORARY SEEDING SCHEDULE TEMPORARY SEEDING MUST OCCUR WHEN DENUDED AREAS WILL NOT BE BROUGHT TO FINAL GRADE WITHIN 7 CALENDAR DAYS (SEE NOTE 3 ABOVE). PERMANENT SEEDING SCHEDULE PERMANENT SEEDING MUST OCCUR WITHIN 14 CALENDAR DAYS OF FINAL GRADING. COVER CROPS (TEMPORARY SEEDING) TO BE ADDED TO PERMANENT SEEDING MIXES IF NO TEMPORARY SEEDING HAS BEEN PLACED PREVIOUSLY. SUMMER SEEDING MIXTURE: SPECIES RATE (LB/ACRE) PERMANENT SEEDING MIXES: RATE (LB/ACRE) GERMAN MILLET 40 PARTRIDGE PEA 10 A small -stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: May 15-Aug 15 REFERENCE PLANTING PLAN SHEETS 7.1-7.5 FOR PERMANENT SEED MIXES • The seed mixes above are listed in the specifications and available at ERNST CONSERVATION SEEDS (800.873.3321). Local sources of similar seed mix may be used (to be approved by Landscape Architect in writing). WINTER & EARLY SPRING SEEDING MIXTURE SPECIES RATE (LB/ACRE) ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 A small -stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: Feb 1-May 15 SOIL AMENDMENTS: Physically or chemically treat all exotic invasive plants before amending soil. Apply FALL SEEDING MIXTURE: SPECIES RATE (LB/ACRE) lime and fertilizer according to soil tests or apply 4,000 lb/acre ground agricultural limestone and 1,000 lb/acre 5-10-10 fertilizer. SOIL PREPARATION: Soil impacted by construction must be loosened prior to seeding by means of disking ANNUAL (WINTER) RYE GRASS 60 PARTRIDGE PEA 10 A small -stemmed sudangrass may be substituted for Partridge Pea at a rate of 50 lb/acre. SEEDING DATES: Aug 15-Dec 30 or raking. Seedbed shall be well-pulvarized, loose, and uniform. All stones larger than three (3) inches, sticks, roots, and other extraneous materials shall be removed. Apply seed uniformly with a cyclon seeder, drop -type spreader, drill or hydro -seeder. Cover broadcast seed by lightly raking, then firm surface with roller or cultipacker. Cut or disc temporary seeding cover crop prior to seeding. SEED PREPARATION: GENERAL SOIL AMENDMENTS: Follow recommendation of soil tests. Use only amendments safe for riparian areas. MULCH: If banks exceed 4:1, apply seed, lime, and apply mulch. MULCH: Apply 4,000 lb/acre straw. Anchor straw by tacking. MAINTENANCE: Apply 4,000-5,000 lb/acre grain straw or equivalent cover of another suitable, weed -free mulching material. Use a spray -on growth (mulch) matrix (FlexterrSGM or equal) for slope embankments that exceed 3:1 slopes. MAINTENANCE: Refertilize if growth is not fully adequate. Topdress with 50 lb/acre of nitrogen in March (if applicable). If it is necessary to extend temporary cover beyond June 15th overseed with mixes provided. Reseed, re -fertilize and mulch immediately following erosion or other damage. Mow or cut back no more than once a year. Refertilize in the second year unless growth is fully adequate. Reseed, fertilize, and mulch damaged areas immediately. Weed during first 2 years of establishment. 0 SEEDING SCHEDULE PLAN SYMBOL NOT TO SCALE DOZER TREADS CREATE CLEAT IMPRINTS PARALLEL TO THE SLOPE CONTOUR AREA SHOULD BE SEEDED AND STABILIZED IMMEDIATELY. -011W,A1., 4111 INSTALLATION: 1. TO SLOW EROSION, PERFORM SURFACE ROUGHENING (TRACKING) AS SOON AS POSSIBLE AFTER VEGETATION HAS BEEN REMOVED FROM SLOPE. 2. CLEAT IMPRINTS SHOULD BE PARALLEL TO THE SLOPE, 3. USE TRACKING WITH TEMPORARY SEEDING AND MULCHING TO STABILIZE AN AREA. 4. PERFORM TRACKING IMMEDIATELY AFTER GRADING ACTIVITIES HAVE CEASED (TEMPORARILY OR PERMANENTLY) IN AN AREA. 5. AVOID EXCESSIVE COMPACTING OF THE SOIL SURFACE WHEN TRACKING SINCE SOIL COMPACTION INHIBITS VEGETATION GROWTH AND CAUSES HIGHER RUNOFF RATES. AS FEW PASSES AS POSSIBLE SHOULD BE MADE WITH THE MACHINERY TO MINIMIZE COMPACTION. INSPECTION AND MAINTENANCE: 1. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. 2. IF RILLS (SMALL WATERCOURSES THAT HAVE STEEP SIDES AND USUALLY ARE ONLYA FEW INCHES DEEP) APPEAR, RE -GRADE , RE -ROUGHEN AND RE -SEED IMMEDIATELY. SURFACE ROUGHENING NOT TO SCALE PLAN SYMBOL 10' ROCK CHECK EVERY 50-100' ALONG SILT FENCE AS SHOWN ON PLAN AND IN AREAS OF CONCENTRATED FLOW. USE CLASS B RIP RAP LINED WITH #57 STONE ON FLOW SIDE WIRE -BACKED MIRAFI 100X SILT FENCE FABRIC (OR ENGINEERING APPROVED EQUAL - SEE NOTE #3) BACKFILL TRENCH WITH COMPACTED EARTH ISOMETRIC VIEW HEAVY DUTY PLASTIC TIES (EVENLY SPACED, RESTRICTED TO TOP 8 INCHES OF FABRIC) NOTE: TYPE S (SENSITVE) FENCE REQUIRES WOVEN WIRE FENCE OR ALTERNATE BACKING FILTER FABRIC COMPACTED EARTH RUNOFF BURYAT LEAST 12 INCHES OF FILTER FABRIC TRENCH DETAIL 1.25 LB./LF STEEL POST REI\FOCED SILT FE\CE SILT FENCE RUNOFF END OF ROW: TURN UP SILT FENCE AT ENDS TO ENSURE APPROPRIATE TRAPPING OF SEDIMENT r 3 FT. MINIMUM SPACING 5 FT. MAXIMUM SPACING DOUBLE ROW OF SILT FENCE INSTALLATION: 1. SILT FENCES SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. 2. INSTALL MINIMUM 10' (OR GREATER AS SPECIFIED ON PLANS) CHECKS (TIE -BACKS) AT END TO PREVENT FLOWS FROM BY-PASSING SILT FENCE, AND EVERY 50'-100' WHERE SILT FENCE IS INSTALLED WITH SLOPE AND CONCENTRATED FLOWS ARE EXPECTED ALONG FENCE. 3. SILT FENCE SLURRY FLOW RATE TO BE 0.3 GPM/FT2, LESS THAN THE CLEAR WATER FLOW RATE OF 10 GPM/FT2. INSPECTION AND MAINTENANCE: 1. INSPECT AND REPAIR SILT FENCE AT LEAST ONCE EVERY CALENDAR WEEK.. 2. SEDIMENT SHALL BE REMOVED WHEN IT IS 1/3 THE HEIGHT OF THE SILT FENCE. 3. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF -SITE AND CAN BE PERMANENTLY STABILIZED. 4. UPON PROJECT COMPLETION, THE SILT FENCE SHALL BE REMOVED AND HAULED OFF -SITE. ANY DEPOSITED SEDIMENT SHALL BE PROPERLY GRADED AND SEEDED. PLAN SYMBOL NOT TO SCALE .--........A...._Ni-libr_ EQU Asheville, I 37 it* NOX Haywood t 828.253.6856 f 828.253.8256 St. Suite 100 NC 28801 SEAL 0‘%uuu„uq ,,,,, I,* * N 5, is *_ CI DESIGN BY: DRAWN BY: CHECKED BY: w 1— REVISIONS I Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright © 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90% DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME EC DETAILS EC2.3 Y 5 -1 _ ra - Cl/ U CC 0 +, ° u c { •�y eel •+_+ - L U 4- sel+�+ co N C E C 0 O C 'O 0 (a Y1 G1 4..'c O _ '6 l0 C Z �. ' ig F '^^ _ ' �„ i �4111! YJ B bii R ill O L Y cU ra 0,C 70 Y 4-0 CU o3o (11 • ra >- v, 0 C�ut -O 0 Oa 7 u O O Q a CU .E co v t } O N 0 L Q O 0 C Ca ra r6 7 C +•• Y - C a_+ CO L a Cr 4-, _C Y U L co >` 0 ra v to 0 u 0 J c0) Q v c L ++ VI 0 oA u cv �_ O 0- u° 0 7 0 Y ra T a coLco CO - O a Y v) ra 7 > 0 Y Ls) C 0 T O > SZ v0- >• '� Oco L U VI co I\ SZ 41 rp aj 0 u L o- aCi ro ro -0 E 0 r>a O N co O 0 cil L > U O V) �••• C in accordance with label ginal containers with the aid steps in case of areas where flooding is nwater drains, ground water ly. site. tndary containment. :erials directly on the ground. ±TIVE: 04/01 / 1 O +-� N o C o CU Oa N H C O +� Li) v • O N CU O .�a O L VI Q CU C. 0 0 S f'n 0 ra L CC Q 0 0 c-I C z '° > 0 ra ro p (a_)) 0 4- i LJ_ L >` a -° C ° p U +' fD aJ Z ro O N v 0 •C h00 U In C L covery) and Other Requirement; ictronic notification. )rt that contains a description of address the cause of the deposil iquirement for a written report o NC 303(d) list as impaired for sed -nay be required to perform addi ily more stringent practices if sta iirements are needed to assure c red -waters conditions. ctronic notification. The notifica t the date, time, nature, volume »-e the date of the bypass, if pos iluation of the anticipated qua lit} ictronic notification. )rt that includes an evaluation of s. ictronic notification. )rt that contains a description of ; the period of noncompliance, s, and if the noncompliance has 1 d time noncompliance is expecte fanned to reduce, eliminate, and incompliance. [40 CFR 122.41(I)( iquirement for a written report a ‘ti, NORTH CARO Environmenta FFECTIVE: 0� ���.�.� - O O O- 1 •�•�/0� Y (� Y N oa +,' V) >` L a0' oA E_ ra C la ++ _ L r6 N -'a `� 7 4- 4A 0-c LIn Y c ra 03 3 p �,, •s=, Y Y (a L V) •i 0 L a.-, a) O L. O _ -' V i C U ra �/ V G. .. Y L 4- U 0 0 — W v) 0 L C ro 0 O v� S= N O _ _ _ ° Q N• .._ a) v !Z e flCC- 0 N v ° �n `+ > > N ( Q COSZ N _ 0 �••� C a) rn a) N a _ T 1 �I �� O .� +, p i 41 C p CC N _ >� p 7 C la 0 Y >, C 0 0 0 0 .0 rC L - Y 'u O 4J N _ v� t O 0 ra Q U N 0 Y W Y to ` ra ++ L �J N a) N C Yra -c +' +' Cr6 `oco C al CT Q �J in 0 a) O 7 •�+ fl i L F.L� il$ I I 11 L j U° 7 +, C C Y > X +, 0 ° in 0 O 0 0 v) -a c l�'ry L Y I- C 4J �n m cn C cn O O Y O L c 0 O ,c +, 0 v rn 0 ry O ry o c +� .� 1 I /-' C n O 0° ^ (a oa C O 0 _u +� O p CC 0 _ O OL ra v) ,, co 0 Y L C vi ra 0 0 f� O a) a) CC v v ra 0 O u +' +' r- _ co vi r9 0 0 u c a c v O O N N a) u u rli 4- ro c' N N cn ° �.101 0000 L> ra 0 Y L -a C Y C f0 VI 0 !? L 0 U C Y r0 a- •;_ C o > ro __ a"' U ni - L oA - P3 MO C X c-I +' Y C a C C U u Q ::. c') r.' O C.2 c-, z L Is-0 o >. t n o a Y r9 C > n m 0 0 _ c ro 0° > ° Y Q C ._ L L o- L a) To O 0 -_O oa 0. -a L N 0 p O D ra 0 O Q > C pU Y u u=> .0 ++, U a) v0) r0 .+' i O +, to L v) E Q O C U `° 0 +° O c 0 +� L O 0 -a }' +, ra cc C 0 co L u ra ca 0 Q aO+ s- u p ra a +0' 4- C O 4- -6 r' 03 Q C -6 0 0 0 -a _• 1 r�TT � l� a O (o CO 0 ci to °) 42 0 U U a) u a) 0 00 ro O L O L 0C W U L 1• Y U O O_ v) 7 C '-' C CC 0 a ra 4- N `i '-1 'C) C cr as U U c op a) U N a..' ° a) 4- 0 0 Z C O m C '�' CC O p O Reporting Timeframes a a u .s C C S -�' 'o `n co L O vi 4) u- „. a .0 rro 'v) c a ro ° C CO n _^ VI ^ ea "O N al • Within 24 hours, an shall include informa location of the spill c • A report at least ten The report shall inclu effect of the bypass. • Within 24 hours, a n • Within 7 calendar ch quality and effect of • Within 24 hours, an • Within 7 calendar do noncompliance, and including exact dates been corrected, the continue; and steps prevent reoccurrenc. • Division staff may w2 case -by -case basis. NSITE CONCRETE ' STRUCTURE WITH 1 mw GT101 MEMEM= RI FIELD IETE losing 11RUCTUFE3 SHILL D WEN RE LIMO MOM El 75X E TK AXDWIRS ✓KIOIT STRUM E NEEDS TO E 'Z7 MIX XI NM ICTiN UM= ,TRUCTURE N't3 of .0 U N 0 0 0 fZ 7 O of 0 i, N L c co O L Y v a) f6 o v o a VI c +a 3 V) co 3 0 a ro X u 7 6 o L 0 +' C C n O Ou 3 3 v C 0 -IL- rn O O O C N ++ n L ._ 0 t O p L - +, 0 cm^ L +- co co T O Y 0 a u^ QC) ra C N 0 U O L in ti > v) cn a) u ra N N Y L o g�--� is ro - Y -� v- f6 ra ro '+.' ra fa L 0 V a_, U — 3��°) o�'�aoL� >0 v3 3CWD o'ut v +Y, ° O rr3 -, - O N c U 'a >p c E n as `_ 0 0 aCo U U ^ E O p u v) U N +, u 0 `* -o Y O ra :S, PESTICIDES AND RODENTICIDES e and apply herbicides, pesticides a •ictions. e herbicides, pesticides and rodent) I, which lists directions for use, ingr iental poisoning. ot store herbicides, pesticides and ible or where they may spill or leak irface water. If a spill occurs, clean ot stockpile these materials onsite. JS AND TOXIC WASTE to designated hazardous waste coll hazardous waste containers under at store hazardous chemicals, drurr 0 U W d Z J U W a1 N 0 N ++ C a) C U d'ro no "✓3 L > _o C °° co ° v o t 3 w y- O ra 7 v cc to -a U ++ i O O _u) O+ L oA N a O co0 Y `~• N 0 n Y O 0 O CU 0 N a v) U L co +�, -10 N a) .0 L N O O M Q O V1 C 0 -a *' a) o c °L � � oCZ o°Y' 3 L 'O = N •c +dJ rn a) U - N as O +-+ co to N co v_i O Y t co 0 o- O 0 t S= vl +' -O "t o :° u m ao °_) fi N C T v`i• O O t O �' +' Z Z .N ' 0 +� ` w w O "a •> vVi C a) t 333,03 �E�3 • • • ci) ai +-. _ 0 L L 0 •L L C ra ra E O O 0 '*' To U .X U U 0- 0 L L 0 ra }, cC C 0 Y V) 9 C 0 0 O C C Lu O O i- 0 0 n +' CIA 0 E O O C 4- 0 O O N O 0a 0 Y ++ - C ,� co C T 'vl O 0 C ru p 0> L +, co v) -a Y C O Y O L oC SZ - N Z H C oA 0_ N v) N O 0 > N 0 0 LSI N +' ra �j M >' U fC Y 0 ++ i CC 0 C +� O O C Oc fa - C N - to C �' N C 0 0 0 s a `~ "a - a) )ccurrence a) c b) Oil spills and elease of iazardous ubstances per Item (b)-(c) above :) Anticipated ypasses [40 CFR 22.41(m)(3)] d) Unanticipated Aypasses [40 CFR 22.41(m)(3)] a) v c co N u Y p ra 0 a) C (a L a) oA 4- C E 0 VI ro U Y -a O co L a) ra '- - 2i C° cn O -a +' i O L0- L0 O a 0 0 0 ro u_ a) �, TO 4_ O 0 Y Y S a ' _c 0 L L ro L -v U }' O ra ut rn v) ra ra 0 CO .L 0 f9 "6 t O co ' + N 'O 4 - U +, Y Y 0 0 +, O 0 C oa t 3 O oU.0 L) �_ °A ° v c 0 0 W cc U O co C H L O a O N 0 > A A > n N C 0 -- N a) +' _ C fta C _ u o N o v 0 o C° o v N _o O t6 la fZ a +,el cr, L 0 0-C ra co to Y ra > Y O -en > L E -0 ° U r, O O +, 0 a 0 0 a) a) CO 0 u u L a_o a) O a• o0 0 �_ v, L t L L 0 aL 4- +, c Q L 0 lD > °- ^ c 3° O` O c a) r O u '0 H� N Q U ,�= ut 0 a) N TS 'n p +' > `n Q 0 cn 0 C `c- N 3 52 a1 C Y vl 0 0 ra O ra oa 0 o L a 0 0 0 Q L L O 0 C Y O_ O v) O Q 0 Y 0 C +, ra 4- 7 n bA n Q L - u. O 0., C Y V rZ Z Z L +' -_ f- 1- 1- I- _ 0 ++ L a) L L L i O cc O < z 0 L Y c) • • • • C 0 ra 0 O ''n O ro V N Q 0 N s CV O +, v' O L O +' a0+ +-•cn CO oA O 'i CO O +' C E 0 0- O 0 C> > O O U ro O u _O V L Y 0 L CL v O. v Z +-' > 3 '> O_ W 0 p n to •a' 0 i N O O L 7 Y ra n }' 0 22 ro •Y O. tZ 3 c oil 0 a) 4- Y 0 O Q v �' 4- N C Ll N -_' ra I' _.-._ Iii +`n, Q C S? 0 C !� CO — CO L C C V) �..' f? V V V C Y— 0 Y Q Y C 0 C Y 03 O 0 n E Wr1 i' .u" L N N C O O Q O ra U W as V a) ♦Y. Y O L CO V O ut L ,--I c-I ,--I 3 O L aJ Li O i _ i. W C a O C +' N> 0 O p ca Q O C Q O> O +' C ca -U U O O L 0 L) ro p to e1 N CC 0. ro G 03 _ _ co L Y 0 of _0 J u ._ vI J 0 ra _= cC 0 u Q Q ._ 0 U r% L r% (0. 0 a 0 0 U Q L,—•� 2 O� CO • — 0 c-I N M 4 Ln l° l- a0 Ol W, -i N M N vi U = Q c-I Ni M Z 0 ro 0 o 3 0 ro o L Y Y -° ra ra N ~ 0 s O ra ro -a cu +_ - N 5- C 0 Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon th initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. +' 0 Y a) 0 O O O N "0° N C a) E +n, 0 0 Uto U v3 O 0 0 _O Y 0 N c ra Y O c I O U U 0 0 0 V +' _a = 4- 0 c -a ,} 0 sr; +' 0 co S co +, O C 0) �' Y ut O Y 0 c ' ra L 0 U Lc L v)•_O 0 Y ro O + Y v) c -a 0 - 0 u rZ N a-' 0 • co L.L_ ~ > 0 4- c 0 -C4 O 'a L O +, E-a 0 0 Q L L u c f6 L L Lro _ L Y O ut 0 O L 0 N OL 0} ra ra '- 0 LV) . L co • 0 C 4- ° O L a O Y 4- C 0 a) C> } +' ° O - 0 �lJ t L= *' 0 ra "a > C 0 L C U 0 > -a 0 Y C 0 0 a) 0 +ra' O O- 'a_ Y N _ O C u co a) 0 v tz 4- N a) Y ra . 0 _ = 0 a) E O +' t L 0 C 0 V) = 4- 0 v) 0 • +' ._ rTs ra cn 0 c cn ra ra +' Y n L 0 CO a 0 C C 0 > Y .0 0 O 0 C ° ,� Ln •Y L V) 0 3 +O' i n 0 VI L -a 0 fa 0 c • - O 0 V) 0 C L co ra - 0 C 4- Y a) +' § 4) ra U L v3 U ra - U c C 0 0° 7 u 0 L la ,�, .a la - ra 1�1 C /� ra Y Z 0 0 oA U —_ C v) _ N C v 0> - L p t O �; co a }, Q N cn v) 0 c 0 +_, -a -O 0 a'' C Y U 0 X �� c 0 Cr) ra 0 0 S? 4-, 1- 0L0 Q C 0 °' rn co U O 7 O C u Y rn O ra E u L 0 c VI ra 0 -a L O v) O O on `1 0 c C N 0 L .- +' rn — - ut - (a 0 L +, 0 .� 7 cn L cn Q L 0 L 0 �_ L O ° U H > S? c '- Y 0 0 a) N +-, Y Q 0 0 ._ _ +' U „, fa -a +' (6 0-a Q N 0 E O LJ N > V3 ut (n L 0) E N p a u ra ,- N Q Y a 0 L fa "a a pevent discharge of fluids. iuipment. asible, or remove leaking ec le containers and properly )le). tion equipment from servic hydraulic fluids and other p candles these materials. .� — _ - - iquid waste into storm drains, strea 50 feet away from storm drain inle Itives are reasonably available. rolled area. sized and placed appropriately for ;, solvents, detergents and other liq oilets on level ground, at least 50 feet away from [nds unless there is no alternative reasonably avai inable, provide relocation of portable toilet behin Ind surround with sand bags. )r anchoring of portable toilets during periods of I toilets for leaking and properly dispose of any le sanitary waste hauler to remove leaking portable lerating unit. :ate earthen -material stock! sediment basins, perimeter awn no other alternatives a ed along toe of slope with a n feasible. les provided on this sheet al onal requirements. Soil star rerage techniques that will r Iry or permanent control ne PART III PECTION, RECORDKEEPING AND REF well as any approved deviation shall e kept up-to-date throughout the coy ing to the E&SC plan shall be kept on g normal business hours. nentation to be Kept on Site E&SC plan documents above, the following iten for inspectors at all times during normal busine a site -specific exemption based on unique site c not practical: Permit as well as the Certificate of Coverage, afl spections made during the previous twelve mor ,quired observations on the Inspection Record Fi similar inspection form that includes all the regt Ij-available records in lieu of the required paper wide equal access and utility as the hard -copy rE o be Retained for Three Years amplete the e-NOI and all inspection records shi. er project completion and made available upon ICE OR CLOSE OUT t withdraw water from the surface when these c from the surface shall be rare (for example, tiff)! • is time periods or conditions in which it will occu tem (2)(c) and (d) of this permit, e. moved from the sediment basin. Examples of 't of the dewatering treatment devices describe s of all dewatering devices, and ter that does not cause deposition of sediment i . NORTH CAROLINA :5 • F' Environmental Quality TERIAL AND LAND CLEARING WASTE rn waste. Place litter and debris in app nt number and size of waste container :e to contain construction and domesti( tainers at least 50 feet away from stori other alternatives are reasonably avail itainers on areas that do not receive su Is and does not drain directly to a storn tainers at the end of each workday and -y containment. Repair or replace dam eight items in waste containers during tainers as needed to prevent overflow. ow. f-site at an approved disposal facility. ;, clean up and dispose of waste in desii [ON AND AV ON_ RECORDKI 0 C �' O C 0 O v L EQUIPMENT AND VEF aO+ oA U N L u CO ra CCi vs c L) a O TTER, BUILDING MA1 4'}- vi 7 0 •+' C O C C ra 3 _0 .5 `n O c O O -a Y p L O> AND OTHER LIC 1. Do not dump pa 2. Locate paint was waters unless nt 3. Contain liquid w 4. Containment mt 5. Prevent the disc construction sit( rUa vi 0 4..; _ ra !_. +; ra 0 ARTHEN STOCKPILE P O Y N > 0 __co •Q +- a O Q- +, 0 SECTION B: RECORI . E&SC Plan Docur The approved E8 approved E&SC The following ite inspection at all t p 0 VI Y C — ++ +, 3 t 0 c - L ca Q c u `~ -0. LO O Z L }; — L a) +�-, C . c 0 0 U N +' C c U ra LE Q Y Q 3 Y L oC.O ra rn ra O _ _ > 0 - u U .� 0 , O 0 0 `n u L C ra u C U> +0' 0 a O v 'a 0 a0 ,4; O N v) _ O L N a) ti ut C N 0 -_ n CO n a ra ) roc a ca ra CO cn ra r6 0 3cu C 3 3 2i to I- W J :coO O ra ra C L Y C 3 ro L. i ro +' Q Y 0 Y L O CD u 0 0 0 ° v' O T - E - U L a) N u _ Q ra a) O O Q .> 3 L, O L ra Y Y C ra i 0 `n +' `^ 0 0 +, ° NO O Y 0 0 L .0 D N OC Q +-, -> c) N Y C Y ++ -a L ra O a) C C 0 cci3>, p ra Q '� '� YO Z +, Q a0 O N C Q E W v) ra v 3 0 0 t 0 0 co dA Z 3 0 L u Y L C Z. }; Y -a `•� u cY.) > 0 a aJ L O L C •> a •0 0 oA •d_ 0 ro ?� 0 L C 0 Y V) _ _ L fl_ �0+ L L 'a O ate' '� O a O ~ cn c>a O- - L 0 m L L O E+' to Y Y 0 Q ra 0 N ut Y Y 0 0 N 0 C U 0 0 _ Y oA O La 0 �_ 0 ` 0.cra �� p i C ._ O N O U Y -a O p ai O a- •t U> _0 N 0 ' Y c ra Y - W U L 0 Y 0 Q 7 .a a) N 4 ro L `� ° O 0 O O ra 0 ro •c no a 0 ai > > 0 ro +, co E>> u 0_ C Q -0 O u u u p O C n a J ra ra > Y C_ 4-' -' L O O O VI C +' 4- O O ro > O O 6 ra 05 N t 0 C> L > L ut L ro •� H 0 0 N U -a to L c _ cc, U N +�, ra — 0 cn -a Q U c c m Y O L 0 0 O L O L O zo L�3�4_UQaL�,uoo m a_ I- C Y `~ L p n000_4-��3 Y cnLnracaoo cn�raa �� ago ro oa o — .� _ z� ' f° a a) o pLn o 3co 0 Q c-I N M In lit c-I Ni M LI'I l° 00 c- cC O r-I N M ,--I N M 4 a l N M I- Z O 0 t Y h W J a a W ate-+ Y N�-� a ��'� O T /'1 C C a) C C +c C O > O I- Z u CA 1 l l/ 1 L U) O O O `L' Y ro ra .0 ra O _ C N ri O O C _- rp u 7 -O 4% +- Q S n C i 4 OUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WIT N ization Timeframes Timeframe variations If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed - 7 days for slopes greater than 50' in length and with slopes steeper than 4:1 - 7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones - 10 days for Falls Lake Watershed - 7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zone - 10 days for Falls Lake Watershed unless there is zero slope te: After the permanent cessation of construction activities, any areas with temporary )und stabilization shall be converted to permanent ground stabilization as soon as icticable but in no case longer than 90 calendar days after the last land disturbing :ivity. Temporary ground stabilization shall be maintained in a manner to render the -face stable against accelerated erosion until permanent ground stabilization is achieve( will not dislodge the soil. Use one of the Permanent Stabilization • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed NCGO1 GROUND PART III )N, RECORDKEEPING AND REPORTING ig normal business hours in accordance with the tak site conditions would cause the safety of the inspec Ispection may be delayed until the next business da )ection. In addition, when a storm event of equal tc :le of normal business hours, the self -inspection sha ent of the next business day. Any time when inspec Inspection Record. Inspection records must include: Daily rainfall amounts. If no daily rain gauge observations are made during weekend holiday periods, and no individual -day rainfall information available, record the cumulative rain measurement for those L attended days (anc this will determine if a site inspection needed). Days on which no rainfall occurred shall be recorded "zero." The permittee may use another rain -monitoring devi approved by the Division. 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has le the site limits, 2. Description, evidence, and date of corrective actions taken, ai 3. An explanation as to the actions taken to control future releases. If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, ar 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permi 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requiremen P, DRAW DOWN OF SEDIP ediment basins and traps that receive runoff from drainage areas of one acre or mon )r maintenance or close out unless this is infeasible. The circumstances in which it is on -surface withdrawals from sediment basins shall be allowed only when all of the fc (a) The E&SC plan authority has been provided with documentation of the non-su shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in acco (c) Dewatering discharges are treated with controls to minimize discharges of pollu properly sited, designed and maintained dewatering tanks, weir tanks, and filtra (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are (f) Sediment removed from the dewatering treatment devices described in Item (c Ir 1TI c 0 C Cipa) 0 z 0 z V 4 Stabilize within this many calendar days after ceasing land disturbance ILYACRYLAMIDES (PAMS) AND FLOCCULANT1 . Select flocculants that are appropriate for construction, selecting from the NC DWR Apply flocculants at or before the inlets tc . Apply flocculants at the concentrations sp PAMS/Flocculants and in accordance with Provide ponding area for containment of t offsite. Store flocculants in leak -proof containers or surrounded by secondary containment E NCGO1 CONSTRUCTION GENERAL PERMI1 plementing the details and specifications on :ivity being considered compliant with the G tons of the NCGO1 Construction General PE rmittee shall comply with the Erosion and SE legated authority having jurisdiction. All det, iy not apply depending on site conditions an N N N d- d- Temporary Stabilization Temporary grass seed covered with straw or other mulches and tackifiers Hydroseeding Rolled erosion control products with or without temporary grass seed Appropriately applied straw or other mulch Plastic sheeting CTION E: GROUND STABILIZATIO Required Gr 1 Frequency (during normal business hours) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours O m a L tx) u C Site Area Description 3) Perimeter dikes, swales, ditches, and perimeter slopes )) High Quality Water (HQW) Zones :) Slopes steeper than 3:1 I) Slopes 3:1 to 4:1 ,) Areas with slopes flatter than 4:1 T 0 'cid'O d I' 0.0 < O Inspect a, C en 0�0 N C O Y 3 c 7,. c_ fp -E to (2) E&SC Measures (3) Stormwater discharge outfalls (SDCs) (4) Perimeter of site (5) Streams or wetlands onsite or offsite (where accessible) C C .7, .n O ro L 0 ." 3 N L 1 al Y N `D E Ix = ff V 0 0 ra W `-' +� v 0 �� 0 i it-' U a ��/� rW y • • • • • 0 1-1 (-NI co L)D V) Cn 0- 5 oA Q> N z H CO rn O_ -a = N z oo 0_ CO v) r./1 Y d 44 „40000* ........44........._ _ EQUINOX 37 Haywood St. Suite 100 Asheville, NC 28801 t 828.253.6856 f 828.253.8256 SEAL %� pi,,,„ sss'.� • , Il'. , cPDSr OO'''1' PE r,,)rrLllll,,,,,aaa DESIGN BY: DRAWN BY: CHECKED BY: w 1- 0 REVISIONS Town of Woodfin RIVERSIDE PARK Woodfin, NC Copyright© 2022, Equinox Environmental Consultation & Design, Inc. PHASE 90%0 DATE September30, 2022 DRAWING SCALE AS SHOWN NOTE: If this drawing is not 24x36" it has been revised from its original size and the scales noted on drawings/details are no longer applicable. DRAWING NAME EC DETAILS EC2.4 N\DESIGN\ACTIVE DRAWINGS\20220929 EROSION CONTROL SEQUENCE PHASE 2 PROCEED AS FOLLOWS: 1. INSTALL LOW WATER ACCESS TO CENTRAL WORK ZONE IN THE WET FROM RIVER RIGHT BANK UTILIZING CULVERTS BETWEEN ABANDONED RAILROAD BRIDGE PIERS TO BUILD TEMPORARY ROAD. 2. INSTALL COFFERDAM FOR WATER CONTROL IN CENTRAL WORK ZONE USING SUPER SACK CONSTRUCTION DETAIL PROVIDED IN WHITEWATER PLAN SET. SUPER SACKS TO BE FILLED WITH GRAVEL OR SMALL COBBLE BASED ON CONTRACTOR PREFERENCE. 3. ALLOW WATER WITHIN ENCLOSED WORK AREA TO SETTLE PRIOR TO PRELIMINARY PUMP DOWN OF WORK AREA.. 4. INSTALL SUMP IN LOW CORNER OF CLOSED OFF WORK ZONE AND INSTALL INLET PROTECTION MEASURES SHOWN IN WHITEWATER PLAN SET DETAILS. INSTALL ADDITIONAL MEASURES SUCH AS SILT FENCE OR SETTLING PONDS AS NEEDED TO MINIMIZE TURBIDITY OF WATER PUMPED BACK INTO THE RIVER FROM THE SUMP. 5. ONCE WATER CONTROL AND EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING PROPERLY, COMPLETE CONSTRUCTION OF NOTE: THESE PLANS ILLUSTRATE THE SUGGESTED WATER CONTROL AND CONSTRUCTION PHASING TO COMPLETE THE IN -STREAM WORK SCOPE. ANY DEVIATION FROM THESE PLANS REQUESTED BY THE CONTRACTOR MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL BY PERMITTING AGENCIES. CONCRETE WASHOUT TO BE LOCATED NEAR STAGING AREA (SEE TYP. DETAIL ON SHEET WWEC.7) 1 1 1 CONSTRUCTION ENTRANCE, SEE EQUINOX DETAILS THE CENTRAL PORTION OF THE WAVE STRUCTURE IN THE DRY FROM THE RIVER RIGHT MEDIUM FLOW PLATE TO THE EDGE OF THE BYPASS CHANNEL INCLUDING THE ISLAND. 6. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS THE WATERWAY DURING GROUTING OPERATIONS. 7. UPON COMPLETION OF THE CENTRAL PORTION OF THE WAVE STRUCTURE INSTALLATION AND MIN. 3—DAY GROUT CURE TIME PER PROJECT SPECIFICATIONS, COMPLETE FINAL GRADING AND REMOVE ALL EQUIPMENT AND FINALLY THE SUMP FROM THE WORK ZONE ALLOWING IT TO BACKWATER. 8. REMOVE 3 OF THE 4 WALLS OF THE SUPER SACK COFFER DAM AND ALL MATERIALS FROM THE RIVER. THE SUPER SACK WALL CLOSEST TO THE RIVER RIGHT BANK WILL REMAIN AND BE SHIFTED OVER AS PART OF THE NEXT PHASE OF CONSTRUCTION. 9. REMOVE THE TEMPORARY ROAD, CULVERTS AND ABANDONED BRIDGE PILINGS TO FINAL GRADE MOVING FROM THE CENTRAL WORK ZONE TOWARDS THE RIVER RIGHT ACCESS POINT. 10. PREPARE TO BEGIN THE NEXT PHASE OF WAVE CONSTRUCTION ALONG THE RIVER RIGHT BANK. Nv SUPER SACK COFFERDAM (SEE TYP. DETAIL ON SHEET WWEC.6) �/ 1�p111�111��I� ,r 1=1:.+,-=,f-mow; �tw� �I Ii � 1/ 1 / 111 ��� P.,>m 1� 1� M �If�1111��1� 1� �� �1 �1 �1 :4,I,i 1�� 1� Iili1 y i/1 Ii 4.. .. t.1,�1i 1�Ii �i 1� � 1; �`�171�Ii 1� �� III it C,,0 1j/1141i,P CIO .. 1V. 1�1.1� 411�114111 /.$ %"PJ,1' J i 0'6 iA o: ��=�J1a woesbc/ib .. ��1111i,1. INLET PROTECTION (SEE TYP. DETAIL ON SHEET WWEC.6) PROTECTIVE CONSTRUCTION MATS OVER EXISTING SEWER LINE PHASE 2 LIMITS OF WORK x ACRES TEMPORARY LOW-WATER STREAM CROSSING CONSTRUCTED OVER EXISTING RAILROAD PIERS. SEE DETAIL ON SHEET WWEC.7 FROM NORTH CAROLINA DEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (CHAPTER 6). i !S2O REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 1 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 2 Revisions: 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Sheet: WWEC.2 J >- IZ 2 0 0 w z_ (9 w z z (9 0 0>- w J U EROSION CONTROL SEQUENCE PHASE 3 PROCEED AS FOLLOWS: 1. INSTALL COFFERDAM FOR WATER CONTROL SURROUNDING RIVER RIGHT WORK ZONE USING SUPER SACK CONSTRUCTION DETAIL PROVIDED IN WHITEWATER PLAN SET. SHIFT THE EXISTING SUPER SACK WALL AT THE MEDIUM FLOW PLATE OVER TO THE LOW FLOW SLOT SO THAT THE REMAINDER OF THE WAVE STRUCTURE CAN BE COMPLETED. SUPER SACKS TO BE FILLED WITH GRAVEL OR SMALL COBBLE BASED ON CONTRACTOR PREFERENCE. 2. ALLOW WATER WITHIN ENCLOSED WORK AREA TO SETTLE PRIOR TO PRELIMINARY PUMP DOWN OF WORK AREA. 3. INSTALL SUMP IN LOW CORNER OF CLOSED OFF WORK ZONE AND INSTALL INLET PROTECTION MEASURES SHOWN IN WHITEWATER PLAN SET DETAILS. INSTALL ADDITIONAL MEASURES SUCH AS SILT FENCE OR SETTLING PONDS AS NEEDED TO MINIMIZE TURBIDITY OF WATER PUMPED BACK INTO THE RIVER FROM THE SUMP. 4. ONCE WATER CONTROL AND EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING PROPERLY, COMPLETE CONSTRUCTION OF THE RIVER RIGHT PORTION OF THE WAVE STRUCTURE IN THE DRY FROM THE RIVER RIGHT MEDIUM FLOW PLATE TO THE TOP OF BANK INCLUDING BOULDER TERRACING, BEACH AND TAKEOUT AREA. 5. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS THE WATERWAY DURING GROUTING OPERATIONS FOR THE WAVE STRUCTURE. 6. UPON COMPLETION OF THE CENTRAL PORTION OF THE WAVE STRUCTURE INSTALLATION AND MIN. 3—DAY GROUT CURE TIME PER PROJECT SPECIFICATIONS, COMPLETE FINAL CHANNEL GRADING. REMOVE ALL EQUIPMENT AND FINALLY THE SUMP FROM THE WORK ZONE ALLOWING IT TO BACKWATER. 7. REMOVE SUPER SACK COFFER DAM AND ALL MATERIALS FROM THE RIVER. NOTE: THESE PLANS ILLUSTRATE THE SUGGESTED WATER CONTROL AND CONSTRUCTION PHASING TO COMPLETE THE IN -STREAM WORK SCOPE. ANY DEVIATION FROM THESE PLANS REQUESTED BY THE CONTRACTOR MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL BY PERMITTING AGENCIES. v i,a♦ icy f SILT FENCE (SEE EQUINOX DETAILS) CONCRETE WASHOUT TO BE LOCATED NEAR STAGING AREA (SEE TYP. DETAIL ON SHEET WWEC.7) O 1 CONSTRUCTION ENTRANCE, SEE EQUINOX DETAILS -n 0 0 0 0 0 0 0 i 0 0 0 1]L SUPER SACK COFFERDAM (SEE TYP. DETAIL ON SHEET WWEC.6) FOC FOC ----------------- /. PROTECTIVE CONSTRUCTION MATS OVER EXISTING SEWER LINE FOU- Foc INLET PROTECTION (SEE TYP. DETAIL ON SHEET WWEC.6) I can MO I O/ o FOC cp SS o 0 PHASE 3 LIMITS OF WORK x ACRES Mo Oc ow ss FOC tet U VV — REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 3 Revisions: 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Sheet: WWEC.3 0 0 0 O 0 z 0 0 w 0 z 0 0 O rn N rn O N N O N 0 Z_ 0 0 5 0 w 0 z 0 0 O C9 w 0 0 z W J J w w 0 0 v / w 2 0 0 0 1 w J w_ 2' 0 0 w z_ w z z 0 0 0 N >- J 0 EROSION CONTROL SEQUENCE PHASE 4 PROCEED AS FOLLOWS: 1. INSTALL EC MEASURES AROUND AREAS TO BE DEMO—ED, INCLUDING SILT FENCE ADJACENT TO PUT —IN WORK AREA. 2. BREAK AND REMOVE HARD SURFACE AS NEEDED TO INSTALL ACCESS TO RIVER. 3. CUT ACCESS ROAD TO BUILD RIVER PUT —IN AREA. 4. CLEAR AND GRUB ONLY AREAS ADJACENT TO WAVE CONSTRUCTION ACCESS. 5. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC AND WHITEWATER PACKAGE DETAILS. 6. INSTALL ADDITIONAL MEASURES AS NEEDED TO KEEP SEDIMENT ON SITE. 7. INSTALL PUT —IN AREA BANK PROTECTION AND BEACH AREA IN THE WET. 8. REMOVE ALL EQUIPMENT AND MATERIALS FROM THE RIVER. REMOVE THE TEMPORARY ACCESS ROAD. 9. ENSURE A STABLE AND VEGETATED SURFACE BEFORE MOVING TO THE NEXT PHASE OF WORK. LEAVE EROSION CONTROL MEASURES IN PLACE UNTIL FINAL ACCESS PATH IS INSTALLED TO PUT —IN AREA. NOTE: THESE PLANS ILLUSTRATE THE SUGGESTED WATER CONTROL AND CONSTRUCTION PHASING TO COMPLETE THE IN -STREAM WORK SCOPE. ANY DEVIATION FROM THESE PLANS REQUESTED BY THE CONTRACTOR MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL BY PERMITTING AGENCIES. r v • COVER EXPOSED AREAS OF CONSTRUCTION ROUTE IN STONE -n 0 0 i -n 0 -n 0 0 0 -n 0 -n 0 0 0 SS 0 — SSA/ FOC FOC — SS FOC SS FoC FOC I can MO I o/ SS FOC FOC L--//1\, FOC 'cOC f \� cp SS o 0 SS — Mo OC UVV SS FOC tet UWU — PHASE 4 LIMITS OF WORK x ACRES P sS PROTECTIVE CONSTRUCTION MATS OVER EXISTING SEWER LINE CONSTRUCTION ENTRANCE, SEE EQUINOX DETAILS REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 1 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 4 Revisions: 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1=40' Sheet: WWEC.4 NOTE: THESE PLANS ILLUSTRATE THE SUGGESTED WATER CONTROL AND CONSTRUCTION PHASING TO COMPLETE THE IN -STREAM WORK SCOPE. ANY DEVIATION FROM THESE PLANS REQUESTED BY THE CONTRACTOR MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL BY PERMITTING AGENCIES. w w ss 0 U z w w >- (1) C9 z Q C9 0 O w U ss -- ;v • • • 103 ■ ■ Ir ./ • -n 0 0 o ■ 0 0 -n 0 -n 0 0 0 -n 0 0 0 0 0 i 0 0 0 1]49��L cw�wr w �7w CONCRETE WASHOUT TO BE LOCATED NEAR STAGING AREA (SEE TYP. DETAIL ON SHEET WWEC.7) 0 ss NEM FOC — CONSTRUCTION ENTRANCE, _ SEE EQUINOX DETAILS SUPER SACK COFFERDAM (SEE TYP. DETAIL ON SHEET WWEC.6) ss Fnr' COVER EXPOSED AREAS OF CONSTRUCTION ROUTE IN STONE EROSION CONTROL SEQUENCE PHASE 5 PROCEED AS FOLLOWS: 1. HOLD PRE —CONSTRUCTION MEETING WITH NF SOUTHERN TO IDENTIFY RIVER LEFT SITE CONSTRAINTS, PROTOCOLS, CONSTRUCTION ROUTING, AND STAGING. 2. INSTALL CONSTRUCTION ENTRANCE AND CONSTRUCTION ACCESS FROM EXISTING NF SOUTHERN ACCESS ROAD. 3. INSTALL PERIMETER EC MEASURES AROUND CONSTRUCTION AREAS, INCLUDING SILT FENCE. 4. CUT ACCESS ROAD TO BUILD BYPASS CHANNEL AND HAUL OFF MATERIAL. 5. CLEAR AND GRUB ONLY AREAS ADJACENT TO WAVE CONSTRUCTION ACCESS. 6. ENSURE A STABLE AND VEGETATED SURFACE BEFORE MOVING TO THE NEXT PHASE OF WORK. LEAVE EROSION CONTROL MEASURES IN PLACE UNTIL FINISHED SURFACE TREATMENT IS APPLIED. 8. MAINTAIN EROSION CONTROL DEVICES AS NOTED IN EC AND WHITEWATER PACKAGE DETAILS. 9. INSTALL ADDITIONAL MEASURES AS NEEDED TO KEEP SEDIMENT ON SITE. 10. INSTALL COFFERDAM FOR WATER CONTROL SURROUNDING RIVER LEFT WORK ZONE USING SUPER SACK CONSTRUCTION DETAIL PROVIDED IN WHITEWATER PLAN SET. SUPER SACKS TO BE FILLED WITH GRAVEL OR SMALL COBBLE BASED ON CONTRACTOR PREFERENCE. PHASE 5 LIMITS OF WORK x ACRES PUMP PLATFORM & DISCHARGE HOSE SUMP (SEE TYP. DETAIL ON SHEET WWEC.7) INLET PROTECTION (SEE TYP. DETAIL ON SHEET WWEC.6) t , 00 oo 11. ALLOW WATER WITHIN ENCLOSED WORK AREA TO SETTLE PRIOR TO PRELIMINARY PUMP DOWN OF WORK AREA. 12. INSTALL SUMP IN LOW CORNER OF CLOSED OFF WORK ZONE AND INSTALL INLET PROTECTION MEASURES SHOWN IN WHITEWATER PLAN SET DETAILS. INSTALL ADDITIONAL MEASURES SUCH AS SILT FENCE OR SETTLING PONDS AS NEEDED TO MINIMIZE TURBIDITY OF WATER PUMPED BACK INTO THE RIVER FROM THE SUMP. 13. ONCE WATER CONTROL AND EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING PROPERLY, COMPLETE CONSTRUCTION OF THE BYPASS CHANNEL IN THE DRY FROM THE ISLAND TO THE TOP OF RIVER LEFT BANK INCLUDING BOULDER TERRACING, BANK STABILIZATION DOWNSTREAM OF BYPASS. 14. ENSURE THAT NO CEMENTITIOUS MATERIAL ENTERS THE WATERWAY DURING GROUTING OPERATIONS FOR THE BYPASS STRUCTURE. 15. UPON COMPLETION OF THE CENTRAL PORTION OF THE WAVE STRUCTURE INSTALLATION AND MIN. 3—DAY GROUT CURE TIME PER PROJECT SPECIFICATIONS, COMPLETE FINAL CHANNEL GRADING. REMOVE ALL EQUIPMENT AND FINALLY THE SUMP FROM THE WORK ZONE ALLOWING IT TO BACKWATER. 16. REMOVE SUPER SACK COFFER DAM AND ALL MATERIALS FROM THE RIVER. REMOVE THE TEMPORARY ACCESS ROAD AND RESTORE TO PRE —CONSTRUCTION CONDITION. SEED AND STAKE EROSION CONTROL BLANKETS ON DISTURBED SLOPES PER DETAILS IN WHITEWATER PLAN SET. REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 1 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Wave Construction Sequence 5 Revisions: 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1=40' Sheet: WWEC.5 I WOODFINNC EROSION CONTROL.DWG C:\USERS\RILEY\S2O DESIGN AND ENGINEERING\SCOTT SHIPLEY - DOCUMENTS\DOCUMENTS\ASHEVILLE, NC\FINAL DESIGN WOODFIN\DESIGN\ACTIVE DRAWINGS\20220929 V A' 3 DIAMETER "SUPER SACKS" IMPERVIOUS LINER _1,11 lifiittf, -�-III III-1 � 1-11 C I-� I -I I 111,1 II-1 1-111 1 41,4f-1 1 I11, 1-1 1 1-1 1 1 1111111111111111 11 11111111111111 111=111=111=1 1,111=11.11 -111-111-I I I 11-111-111 111111111111111 III-111 1 1=1_.11 A WORK AREA COFFERDAM NOTES: (I) WRAP "SUPER SACKS" WITH IMPERVIOUS PLASTIC LINER TO PREVENT SEEPAGE. (2) BACKFILL THE DOWNSTREAM SIDE OF THE COFFERDAM WITH NATIVE ADJACENT ALLUVIUM. (3) USE "SUPER SACKS" AS A BUTTRESS AS REQUIRED. 0"SUPER SACK" COFFERDAM TYPICAL DETAILS PLAN SCALE: NTS GENERAL EROSION & SEDIMENT CONTROL NOTES: (I) THE IMPLEMENTATION OF EROSION AND SEDIMENT CONTROL MEASURES AND BEST MANAGEMENT PRACTICES INCLUDING CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING ARE THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED. (2) THE DETAILS SHOWN ON THIS SHEET ARE AN EXAMPLE OF ACCEPTABLE METHODS TO USE DURING CONSTRUCTION OF THIS PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AND SUBMITTING A COFFERDAM PLAN TO INCLUDE SUFFICIENT DETAIL OF MEANS AND METHODS SATISFACTORILY MEETING THE PROJECT SPECIFICATIONS AND PERMIT REQUIREMENTS. COFFERDAMS MAY CONSIST OF OTHER METHODS INCLUDING (BUT NOT LIMITED TO) SECLUSION FENCING, SAND BAGS, BULK BAGS, SUPER SACKS, SHEET PILE AND INFLATABLE BLADDERS. COFFERDAMS SHALL INCLUDE PLASTING LINER OR FINE MESH SILT FENCE TO REDUCE TURBIDITY AND FINES FROM ENTERING THE FREE FLOWING PORTION OF LIVE WATER. (5) ALL PUMP INTAKES SHALL BE SCREENED FOR FISH PROTECTION AS REQUIRED BY REGULATORY AGENCIES. (4) DEWATERING PUMP DISCHARGE FROM WITHIN COFFERDAM WORK AREAS SHALL BE RELEASED ONTO FLOODPLAIN AREAS AWAY FROM WETLANDS AND CONSTRUCTION ACTIVITIES. DISCHARGE SHALL NOT CAUSE EROSION OF TOPSOIL AND SHALL SHEET FLOW OVER THE FLOODPLAIN BEFORE RETURNING TO LIVE WATER DOWNSTREAM OF THE WORK AREA. ALL RETURN FLOWS MUST MEET PERMIT REQUIREMENTS FOR TURBIDITY. (5) ALL EARTHWORK AND WOOD STRUCTURES CONSTRUCTION WITHIN THE ORDINARY HIGH CHANNEL SHALL CONFORM TO WATER QUALITY STANDARDS ESTABLISHED BY THE REGULATORY AGENCY PERMITS FOR THIS PROJECT. SANDBAGS WATER SURFACE (ELEV. VARIES) EXTEND LINER MIN. 4' BEYOND BARRIER 8, BURY IN NATIVE ALLUVIUM 1' MIN. I c )O U1 )) Ooocao°00 Q�o<4) ALTERNATE COFFER DAM TYP. (SANDBAGS) SECTION EXISTING RIVERBED WATER SURFACE (ELEV. VARIES) 3' DIAMETER SUPER SACKS WORK AREA BACKFILL WITH GRAVEL 8, COBBLES WATER SURFACE (ELEV. VARIES) RIVER CHANNEL WRAP SUPER SACKS WITH IMPERVIOUS LINER AND BACKFILL LINER 0"SUPER SACK" COFFERDAM DOUBLE STACK SECTION SCALE: NTS BACKFILL WITH GRAVEL 8, COBBLES WORK AREA 3' DIAMETER SUPER SACKS WATER SURFACE (ELEV. VARIES) RIVER CHANNEL WRAP SUPER SACKS WITH IMPERVIOUS LINER AND BACKFILL LINER 0"SUPER SACK" COFFERDAM SINGLE STACK SECTION SCALE: NTS POLYETHYLENE LINER MIN. THICKNESS 8 MIL. MAX SLOPE IH:2V OR FLATTER DRY WORK AREA EXISTING COMPACTED RIVERBED NTS IWI— �'O.PCVQ- °C?-c °Q- °Q-,c°Q-c °Q- °Q-c °Q- °Q- °C?-c DC?-c °Q- cl?::%%31Wiac cl?› c> INSTALL WATER FILLED COFFER DAM ACCORDING TO MANUFACTURER SPECIFICATIONS ON A SMOOTH WORK SURFACE SUCH THAT MINIMUM LEAKAGE IS OBSERVED THROUGH DAM. DRY WORK AREA ALTERNATE COFFER DAM TYP. WATER -FILLED BLADDER SECTION c; c7Ti• .c5;40cD 0000 NTS CONSTRUCTION AREA LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL EXISTING RIVER BANK sr MIN. 6" OVERLAP COFFER DAM HAY BALES (PURE HAY) LLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLL LLLLLLLLLLLLLLLLL L LLLLLLLLLLLLLLL LLLLLLLLLLLLL LLLLLLLLLLLL LLLLLLLLLLL LLLLLLLLLLL. LLLLLLLLLL LLLLLLLLL LLLLLLLLLL LLLLLLLLL LLLLLLLLL LLLLLLLLL LLLLLLLLL LLLLLLLL LLLLLLL LLLLLLL LLLLLLL. DRY WORK LLLLLLL LLLLLLLL LLLLLLL AREA LLLLLLL. LLLLLLL LLLLLLL LLLLLLL LLLLLL LLLLLLL. LLLLLL LLLLLL. LLLLLL LLLLLL LLLLLL LLLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLL LLLLLL LLLLLL. LLLLLL LLLLLL LLLLL LLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLL LLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLL LLLLL LLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLL LLLLLLL LLLLLLL LLLLLLL LLLLLLLLL LLLLLLLLLL LLLLLLLLLLLL LLLLLLLLLLL L LLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLL LLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLL / LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLLLLLLLLL LLLLLLLLLLLLLLLLLLLLLL ea DRY WORK AREA WEIGHTED FIBER ROLL OR FIBER ROLL WITH GRAVEL BAGS AS WEIGHTS PUMP PLATFORM LLLLLLLL LLLLLLLLLLL LLLLLL_LLLLLL _LLLLLLLLL .LLLLLL _LLLLLLLLLL LLLLLL -_LLLLLLLLLLLL L LLLL 1 LLLLLLLLLL LLLLLL LLLLL I_. LLL LLLLLLLLLL PUMP DISCHARGE LLLLLLLLLLL L L L L L LL _LL LL L LL. L L. LI L FLOW SETTLING POND SETTLING POND COFFER DAM SETTLING POND HAY BALES (PURE HAY) DISCHARGE BY GRAVITY, OR PUMP IF NECESSARY TYPICAL COFFER DAM WATER CONTROL PLAN RIVER FLOW DIMENSIONS OF CHANNEL TO ALLOW FOR A MINIMUM FLOW COFFER DAM RIVER BANK NTS REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 11 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park r Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Erosion Control Details 1 Revisions: 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1=40' Sheet: WWEC.6 I WOODFINNC EROSION CONTROL.DWG C:\USERS\RILEY\S2O DESIGN AND ENGINEERING\SCOTT SHIPLEY - DOCUMENTS\DOCUMENTS\ASHEVILLE. NC\FINAL DESIGN WOODFIN\DESIGN\ACTIVE DRAWINGS\20220929 LID WITH HOLE CUT FOR SUCTION LINE PUMP SUCTION LINE OR SUBMERSIBLE PUMP CENTERED IN BUCKET PLASTIC 5—GALLON BUCKET WITH MANY $" HOLES DRILLED IN SIDES BUCKET FILLED WITH AASHTO #3 GRAVEL (CDOT SECT. 703. #3) ODEWATERING POND ALREADY FILLED WITH WATER SECTION NTS LOWEST SUBGRADE fELEVATION TO BE DEWATERED PUMP SUCTION LINE OR SUBMERSIBLE PUMP CENTERED IN BUCKET 12" MIN. AROUND ON ALL SIDES OF BUCKET 12" MIN. BELOW BUCKET LID WITH HOLE CUT FOR SUCTION LINE V PLASTIC 5—GALLON BUCKET WITH MANY $" HOLES DRILLED IN SIDES AND BOTTOM AASHTO #3 GRAVEL (CDOT SECT. 703. #3) ODEWATERING SUMP FOR SUBMERSED PUMP SECTION NTS Flow NC DOT #5 or #57 'washed stole Stream Channel l NCDOT ##5 or #57 washed stone diameter of pipe or 1e whichever is greater TEMPORARY STREAM CROSSING/ACCESS ROAD DETAIL Cross a Erosion Stone Copacity of pipe culverts together' - bonkf ull flow Filter Cloth NTS Class 13. Erosion Stone GROUND SURFACE SIGN TO INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA _111=11III I= � I=III=fe_11 I � Imo' 1I�-11 T-f 2�r�rr-r - 3H:1V SIDE SLOPES PLASTIC SHEETING OR GEOMEMBRANE, MIN. 10-MIL THICKNESS GROUND SURFACE H f ORANGE CONSTRUCTION FENCE ORANGE CONSTRUCTION FENCE AROUND WASHOUT STRUCTURE — 8'X8' MIN. OR AS REQUIRED TO CONTAIN CONCRETE WASTE BERM AROUND PERIMETER COMPACTED EMBANKMENT MATERIAL, TYP. SECTION H—H' ��� 1J�ll�ll1�J1"'-' ll1=- 11�111�11�11= �—III—III—III—I I I I I� I I —III —III —III —II —III —III —III —I _ .1= I1=1 I —III— — = = " 7rrrrr--r--_r�r--r--_r-�rrlr--_r�r--_ri-�rr�mom--_rirrlrrr_fir-n II... II—III—III—Js'—J, `',I�' >�il'�—'):'�%J'y'/7�—'jfS/J' III I TI LIIVRETIETHETTI /��i///i///ii�4')%%/i//ii//ii�/ii//i/� �I 1I I -IT ITI ii!::!!!!!!!!!!:771Mit �i////iii/ii�iii/iii/ii�iii�iii�ii�iii�// / , // ///// / / , , // f// %/ %/ / // // j / ;/', % j%jIII�I/j%�/j%�jj%�jj%/j%�jjf�j%%/j% /%IIIIIif ircill % /% j j%% j j %i/f/�i% j%//%I / gum I����iii�i$ ,-, M�!�ii�ii�/ �=1 =/f I1� I I`` i r-11/i//'i// / loll iTlillllll%��%�/; 1L�1J1 ill�i;�iiii/ i�/i�i ll // / I � �I � I� � I—III—III—I� r�, / /// 11=1I III //,/////=1 I I=11 I=1� I � 1=1 � 1�12 .. 111E1 --_T�fl // /// /1T�Tffii--i�IT=1Tf=TfII I� 511::!!!!!! 1/jai,j=III=III=I �I =I =: i jj; j jjtII--II I; jj;;jII IITIITI;� ,/; '/III/ ////I�// —M I=I; //;j/I-II1=1I //;;�/;=1 -III.///, //// j///////////1L�1111� ///j �j/�j j�j��jj jj� jj��,j j�,�/// ///�///�///�//�i//�i//�i/�ii/IIII %�;; /;;//;�//;j//;///�///j//////'1111E111�%�,'//ii�/ii�� ii��ii��i�;ii��i/�II—I�J/ // I-III/��i1/1:TEITHI/TE i/ii/i/i//11=111=1/�//�i; /�ii/ii�/ii�/ii��--I I I�--I I II � I� � I'=��`I I�I I=tlT�l i I� I I� "I I�I i I'� II �� 1 I��I I �I 1�11�11 I�I1I1 I��I ICI--iI 1�EEEE �ITIIIIII�II�IITITIIII�I�ITII�II�IITIII�III�111�11�1I-11II I II III II II II III IF TI�TI-u 1=1 IT1111 1 �I I_IITImI III 1 I 1 1 Ifll PLAN VIEW = f11E11E11I_ 1-11 El 1 E1 11-I BERM AROUND PERIMETER. COMPACTED EMBANKMENT MATERIAL, TYP. 1 E111m11E1 Inn H' } NOTES: 1. CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE; PLACED A MINIMUM 50' FROM STATE WATERS. 2. VEHICLE TRACKING CONTROL IS REQUIRED AT CONCRETE WASHOUT ENTRANCE IF ACCESS TO CONCRETE WASHOUT AREA IS OFF PAVEMENT. 3. A PLASTIC SHEETING OR GEOMEMBRANE LINER SHALL BE PLACED. MINIMUM 10-MIL THICKNESS.. 4. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND/OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY FOR WASTE CONCRETE. 5. WASTE MATERIAL FROM CONCRETE WASHOUT OPERATIONS MUST BE REMOVED AND LEGALLY DISPOSED OF WHEN IT HAS ACCUMULATED TWO-THIRDS OF THE WET STORAGE CAPACITY OF THE STRUCTURE AND AT THE END OF CONSTRUCTION. 6. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CLIENT. 7. NO STORMWATER RUN-OFF SHALL DRAIN INTO CONCRETE WASHOUT AREA. CONCRETE WASHOUT AREA DETAIL NTS (REINVENTING WHITEWATER S20 Design and Engineering Scott Shipley, P.E. 318 Mcconnell Drive Lyons CO, 80540, USA (303) 819-3985 1 Client: Town of Woodfin, NC Project Name: Woodfin Wave at Riverside Park Status: Erosion Control/Water Control/Construction Sequence Drawings for Permitting Drawing Name: Erosion Control Details 2 Revisions: 0 Drawn By: Riley Adams Checked By: Scott Shipley Date: October 10, 2022 Status: Issued For Permitting Stamp: NOT FOR CONSTRUCTION Scale: 1=40' Sheet: WWEC.7