Loading...
HomeMy WebLinkAbout20221347 Ver 1_Application Attachments_20221202Midyette Street Project Project Narrative The Midyette Street Project proposes a docking facility to provide wet storage slips for future property owners of the site. Specifics to the docking facility are as follows: • Pier — 5' x 80' • T- Platform — 5' x 70' • Angled Platform — 5' x90' • Step Down — 5' x 20' • 6 Tie Pilings • Five Finger Piers — 3' x 20' each • 50' x 50' Gravel Parking Area The dock will be constructed of wooden pilings, bracing and trim. Concrete "hog slat" or Marine Panels will be used for decking. Most construction will be conducted waterward of the shoreline. A barge equipped with an excavator with a vibrating head will drive pilings and set concrete slats. A small amount of pilings installation will take place from land. Matts will be utilized in order to minimize any damage done to existing wetlands. We would also like to request a permanent maintenance corridor along the walkway that will lead to the pier. We propose a maintenance corridor of 25', 10' on either side of pier and 5' underneath of the decking. The Corridor will be maintained in accordance with CAMA Standards for Coastal vegetation. This would allow for easier access to the docking facility and protect the pier from becoming overgrown with the wetlands that currently grows on site. A 50' x 50' Gravel Parking Area will be installed for those that are using the marina. There are no homes built on site at this time, so anyone using the marina will most likely be driving from another area and will need somewhere to safely store their vehicle when utilizing their boat. Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. n/a 50' x 50' Gravel Parking Area c. Density (give the number of residential units and the units per acre). n/a e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes ❑No ®NA (ii) If yes, list the date submitted: d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 50' x50' f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Granite Gravel g. Give the percentage of the tract within the coastal shoreline AEC to h. Projects that require a CAMA Major Development Permit may also be covered by impervious and/or built -upon surfaces, such as require a Stormwater Certification. pavement, building, rooftops, or to be used for vehicular driveways (i) Has a site development plan been submitted to the Division of or parking. Water Quality for review? 0% ❑Yes ❑No ®NA i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 1% j. Describe proposed method of sewage disposal. n/a (ii) If yes, list the date submitted: k. Have the facilities described in Item (i) received state or local approval? ❑Yes ®No ❑NA If yes, attach appropriate documentation. I. Describe location and type of proposed discharges to waters of the m. Does the proposed project include an innovative stormwater state (e.g., surface runoff, sanitary wastewater, industrial/ design? commercial effluent, "wash down" and residential discharges). ❑Yes ®No ❑NA n/a If yes, attach appropriate documentation. 252-808-28082 :: 1-888-4RCOAST :: www.nccoastaimananement.net revised: 12/26/06 -r■++ DCM MP-3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) n/a o. When was the lot(s) platted and recorded? September 21, 2011 November 21, 2022 Date Ragan- Midyette Street Project Project Name Brandi P. Robertson Applicant Name Applicant Signature n. (i) Will water be impounded? ❑Yes ®No ❑NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes ❑No ®NA sunty, State of North Carolina DOT. Esn, . �. .