Loading...
HomeMy WebLinkAboutNCC205325_NOT Closeout Documents_20221202L� Catawba county utilities & engineering November 1, 2022 Cataler North America 2002 Cataler Drive Lincolnton, NC 28092 RE: CNA 2►,d Plant Project CBPR-11-2020-36077. ECPC-11-2020-141547 Dear Mr. Carswell: a site inspection was performed on CNA 2nd Plant Project on October 6, 2022. Permanent ground cover sufficient to restrain erosion was established and the permit has been closed. No additional self -monitoring or self -inspections are required. The project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated. For more information or any questions, please call me at (828) 465-8161. Sincerely, Toni Norton, P.E., LEED A.P., CPESC Water Resources Engineer Cc: File catawbacountync.gov Catawba County Government Center 25 Government Drive I Newton NC 28658 1 828.465.8261 MAKING. LIVING. BETTER.