Loading...
HomeMy WebLinkAboutNCC221680_MODIFICATION Supporting Documents_20221201DocuSign Envelope ID: 987E724B-2F9B-4909-AO23-FFEC7A5O949C ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality November 3, 2022 LETTER OF APPROVAL WITH MODIFICATIONS WSACC Attention: Chad VonCannon, Engineering Director 232 Davidson Highway Concord, North Carolina 28027 RE: Project Name: Rocky River Regional WWTP Expansion DB Phase 3 Project ID: CABAR-2022-072 Acres Approved: 19.7 County: Cabarrus City: Concord Location: 6400 Breezy Lane River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Brown and Caldwell Date Received by LQS: October 21, 2022 Plan Type: Revised Dear Mr. VonCannon: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed atdeg.nc.gov/NCGOI. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: D � North Carolina Department of Environmental Quality Dii1ision of Energy, Mineral and Resources Mooresville Reginal Office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 NORnicARouNn oopamaom of eaWmam l fmmuy 704.663.1699 DocuSign Envelope ID: 987E724B-2F9B-4909-A023-FFEC7A50949C Letter of Approval with Modifications WSACC November 3, 2022 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, DocuSigned by: 8637DAC4A10E49A... Kenny S. Llywelyn Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Brown and Caldwell Attn: George Anipsitakis 309 East Morehead Street, Suite 160 Charlotte, NC 28202 North Carolina Department of Environmental Quality Divlision of Energy, Mineral and Resources D E Q�� Mooresville Reginal Office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 NORTH CAROHNA 704.663.1699 6npanment of Environmental Wality DocuSign Envelope ID: 987E724B-2F9B-4909-A023-FFEC7A50949C Letter of Approval with Modifications WSACC November 3, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Rocky River Regional WWTP Expansion DB Phase 3 Project ID: CABAR-2022-072 County: Cabarrus Reviewed by: Kenny S. Llywelyn 1. Ensure diversion channels along the northern perimeter of the site that are designed to divert clean stormwater does not get mixed with site construction flows. Also, clean water diversions need to be permanently stabilized immediately after installation of the channel. NORTH CAROLIN D_ E Q�p� Department of Emironmental Quality North Carolina Department of Environmental Quality Divlision of Energy, Mineral and Resources Mooresville Reginal Office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 704.663.1699