HomeMy WebLinkAboutNCC213367_MODIFICATION Supporting Documents_20221129 (2)N
b
N
J
Y
Q
Y
D
Z
J
Y
Q
J
NS ROAD
STATION SITE
LO CATI 0 N MAP
TOWN OFFICIALS
MAYOR
MAYOR PRO TEMPORE
COMMISSIONERS
TOWN MANAGER
PUBLIC UTILITIES DIRECTOR
ENGINEERING DIRECTOR
MILES ATKINS
THURMAN HOUSTON
BOBBY COMPTON
EDDIE DINGLER
LI SA Q UALLS
GARY WEST
BARBARA WHITTINGTON
RANDY H EMAN N
ALLISON KRAFT, P.E.
J 0 NATHAN YOUNG, P.E.
CONTRACT DRAWINGS
WIGGINS ROAD SEWER FACILITIES
CONTRACT 81.0
PUMP STATION
TOWN OF MOORESVILLE
NORTH CAROLINA
g VV uullllffo
E N G I N E E R S
31 OCT 2022
ssiotiq''
SEAL
49997
N11PAP4•J
i
z
J
z
I
N
N
Y
J
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
STAGING AND
STOCKPILE AREA
� I �
I � I
I I I I I
I I /
� I I
I
LIMITS OF
DISTURBED AREA
ASPHALT I
ACCESS DRIVE
I I
' SCREENING AND I
' ODOR CONTROL I
r .�
� I
I ■ x
' I I
I CONCRETE
' I PAVEMENT9
I
I L--J
' ■ I I PUMP
i STATION I
' ■ I I I
' L. x . . ■ . . . . ■ . x�
I
I
I
I
31 OCT 2022
CARS/ /////
\�'�o�oFEssioti
SEAL
49997
Isi I Ip \```�
VAA'k-s -Pt�'
IN CHARGE CAW j r
DESIGNED SSP
MADE BY S S P
CHECKED GJW
AREA MAP
50' 0 50' 100'
3
REVISED AREA MAP
31 OCT 22
2
REVISED AREA MAP
13 OCT 22
1
REVISED DRAWING INDEX
04 JUN 21
MAN
uu 'I 'I ffo
E N G IN E E R S
L
,e321,11121:7_11
G-1
DRAWING
INDEX AND NOTES
G-2
SITE PLAN
G-3
GRADING
PLAN
G-3A
GRADING
PLAN
G-4
DETAILS
G-5
DETAILS
G-6
GROUND
STABILIZATION DETAILS
G-7
GROUND
STABILIZATION DETAILS
G-8
LANDSCAPING PLAN
ARCHITECTURAL
PUMP STATION
G102 CODE DATA AND SUMMARY
G103 CODE DATA AND SUMMARY AND DETAILS
G104 LIFE SAFETY PLAN
A101 MAIN LEVEL FLOOR PLAN
A102 ROOF PLAN AND REFLECTED CEILING PLAN
A201 BUILDING ELEVATIONS
A301 BUILDING SECTIONS AND TOILET DETAILS
A302 WALL SECTIONS
A501 ROOF DETAILS
A502 MISCELLANEOUS DETAILS
A601 DOOR AND ROOM DETAILS
STRUCTURAL
SCREENING
S-1 PLANS
S-2 PLANS
S-3 SECTIONS
S-4 SECTIONS
TOWN OF M 00 R ESVI LLE
GENERAL NOTES:
1. CONSTRUCTION ENTRANCE SHALL BE LOCATED AS SHOWN ON CONTRACT DRAWINGS.
2. PROPERTY LINES AND RIGHT-OF-WAYS SHOWN ARE APPROXIMATE. ALL WORK SHALL
BE COMPLETED WITHIN CONSTRUCTION EASEMENTS OR RIGHT-OF-WAYS.
3. CONTRACTOR SHALL COORDINATE PUMP STATION STARTUP WITH CONTRACTOR FOR
CONTRACT 82.1. PUMP STATION SHALL NOT BE COMMISSIONED UNTIL THE FORCE MAIN
AND GRAVITY SEWER HAVE BEEN SUCCESSFULLY TESTED AND CONNECTIONS COMPLETE.
CONTRACTOR WILL NOT BE PROVIDED ADDITIONAL COMPENSATION FOR REMOBILIZATION
OR COORDINATION ACTIVITIES AS REQUIRED.
4. BENCHMARKS WILL BE PROVIDED PRIOR TO CONSTRUCTION.
5. SIZE AND LOCATION OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. THE
CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION
AND IS RESPONSIBLE FOR ANY UTILITY DAMAGE.
6. ORIGINAL DISTURBED AREA PREVIOUSLY APPROVED UNDER PERMIT ID:
IREDE-2021-006 IS 3.0 ACRES. ADDITIONAL DISTURBED ACRES UNDER PERMIT ID:
IREDE-2023-001 IS 4.0 ACRES. TOTAL DISTURBED AREA DELINEATED BY LIMITS OF
CONSTRUCTION IS 7.0 ACRES.
7. ANY DISTURBED DITCH WHERE SILT CHECK DAMS ARE INSTALLED SHALL BE RESTORED
WITHIN 7 DAYS.
SCHEDULE OF SYMBOLS
ORIGINAL DISTURBED AREA = 3.0 ACRES PROPERTY LINE
- - - - J PERMIT ID: IREDE-2021-006
- - - CREEK CENTERLINE
ADDITIONAL DISTURBED AREA = 4.0 ACRES xx xx SILT CHECK FENCE
- � PERMIT ID: IREDE-2023-001
EXISTING CONTOUR
LIMITS OF DISTURBANCE
PROPOSED GRADE
PUMP STATION
S-5
FOUNDATION PLAN
S-6
PLAN ®
ELEV. 734.00
S-7
PLAN ®
ELEV. 751.00
S-8
PLAN ®
ELEV. 764.50
S-9
PARTIAL
PLAN ® ELEV. 764.50
S-10
PARTIAL
PLAN ® ELEV. 764.50
S-11
FRAMING
PLANS
S-12
SECTION
S-13
SECTION
MISC. DETAILS
S-14 STAIR DETAILS
S-14A STAIR DETAILS
S-15 HOIST FRAME DETAILS
S-16 GENERAL DETAILS
S-17 GENERAL DETAILS
S-18 CANOPY PLAN AND DETAILS
S-19 CANOPY CONNECTION DETAILS
S-20 CANOPY CONNECTION DETAILS
S-21 HELICAL PIER DETAILS
S-22 ELECTRICAL SLAB DETAIL
MECHANICAL
SCREENING
M-1 PLANS
M-2 PLANS
M-3 SECTIONS
M-4 SECTIONS
PUMP STATION
M-5
PLAN ®
ELEV.
738.50
M-6
PLAN ®
ELEV.
751.00
M-7
PLAN ®
ELEV.
764.50
M-8
PARTIAL
PLAN
® ELEV. 764.50
WIGGINS ROAD SEWER FACILITIES
�<« TEMPORARY DIVERSION DITCH
M-9 PARTIAL PLAN ® ELEV. 764.50
M-10 SECTION
M-11 SECTION
M-12 DETAILS
M-13 DETAILS
INSTRUMENTATION AND CONTROL
M-14 CONTROL SCHEMATICS
M-15 CONTROL SCHEMATICS
M-16 CONTROL SCHEMATICS
ELECTRICAL
E-1 SITE PLAN
SCREENING
E-2 POWER AND LIGHTING PLANS
PUMP STATION
E-3 POWER PLAN
E-4 POWER PLANS AND SECTION
E-5 LIGHTING PLANS
E-6 POWER RISER DIAGRAM
E-7 DETAILS
E-8 GENERATOR PLAN AND DETAILS
PLUMBING
P-1 PLAN 0 ELEV. 764.50
HEATING AND VENTILATING
H-1 GENERAL NOTES, DETAILS, AND SCHEDULES
H-2 PLAN ® ELEV. 764.50
H-3 PLAN ® ELEV. 747.00
H-4 PLAN ® ELEV. 733.67
DRAWING INDEX AND NOTES
912.126
G1 REV2.DWG G -1
OCTOBER 2022
I
i
z
J
J
z
I
N
10
N
23 APR 2021
z
CAR4��'%,,
Y
= SEAL
z
49997
z
-Li
IN
��''%NFE S.
J
R W 24" FORCE MAIN
- _ BY OTHERS
- - (CONTRACT 82.1:
UT�
�Ur
- -
[IF,
36" SEWER BY OTHERS
(CONTRACT 82.1)
R/W-
T
Ur
EXISTING
UNDERGROUNE
TELEPHONE
—F° — — — — U' UT u UT UT UT UT
F0 �
I Fp _
Fp �
F❑ D — —
F° �/LCGIN� - - - - -
UT
_R.�W F° R EXISTING GUARDRAIL
�� ° F❑ EXISTING FIBER
F❑ F❑ F❑
I _ OUTLET PROTECTION. F0 F°
SEE DETAIL SHEET G-7
0
CONNECT TO FORCE MAIN - O0 �g'C�Q,
MANHOLE 1A BY INSTALLED BY OTHERS
OTHERS (CONTRACT 82.1). SEE R W �
(CONTRACT 82.1) CONNECTION DETAIL SHEET G-4
48LF, 18"RCP.
MANHOLE 1 TO BE PROVIDED SEE NOTE 2
\__12" SEWER BY OTHERS BY OTHERS WITH BOOT AND
h
(CONTRACT 82.1) PLUG (CONTRACT 82.1). SEE
4" DRAIN. SEE CONNECTION DETAIL SHEET G-4 BEGIN CONCRETE
I SHEET P-1 165' PAVEMENT (TYP)
I ASPHALT
X X �C X X X X X X X� FES 1 ACCESS DRIVE
x 24" FORCE MAIN x SEE SHEET G-5
(2) 10'
JOHN AND PAIGE II WIDE GATE
MEADOWS i CHEMICAL 36" SEWER N
DEED 1124/1067 x FEED SYSTEM
YARD HYDRANT ODOR CONTROL
PIPING OVER
SIDEWALK PAVEMENT. SEE x
x DETAILS SHEET 32 LF, 15" RCP
- - - - M-12 - �' - - -' - - - FES 2 WITH FES, EACH END 35' R (TYP)
I
ODOR x
x CONTROL
I
1 x
x 1 0
I I�
I I
x
10' PUMP STATION 1Lo
u I SCREENING 10'
I�l 34'-6" ° x
0 1 " WATER YARD HYDRANT (TYP)
N x 36" DIP •
0 Ir,
I x (TYP)
x
I ASPHALT
ACCESS DRIVE
12" THICK x SEE SHEET G-5
x 01 CONCRETE PAVEMENT 5 R (TYP)
l %_8" THICK ELECTRIC GATE
%_12" THICK CONCRETE
PAVEMENT
x N CONCRETE
PAVEMENT x o
N
I
o •
x
r 1 I�RESERVED FOR 56 LF, 15"
FUEL o
I ; f' FUTURE GENERATOR RCP WITH FES
TANK I I x 5' (TYP)
I II I
x I I I NEW POTABLE
❑ L _ _ J 1 1 WATER. SEE WATER WELL FES 3
- - - - J M-SHEETS (TYP) NEW FENCE x
GENERATOR o
x � J
I X X x X X X X X X X
IP
ROBERTS. EDMISTON, JR. FAMILY 6" THICK
DEED 1369/1222 GRAVEL DRIVE
IN CHARGE CAW j r
DESIGNED S S P
MADE BY S S P
CHECKED GJW
■ ■
VVuu I I ffo
E N G I N E E R S
TOWN OF MOORESVILLE
WIGGINS ROAD SEWER FACILITIES
F❑
UT /
an
NOTES:
1. FENCE CORNERS, PUMP STATION CORNERS, AND
MANHOLES WILL BE STAKED PRIOR TO CONSTRUCTION.
2. LOCATE NEW ASPHALT ACCESS DRIVE AT EXISTING
GRAVEL DRIVE. REMOVE EXISTING 18" RCP DRIVEWAY
CULVERT AND REPLACE WITH NEW EXTENDED CULVERT.
RE -WORK UPSTREAM AND DOWNSTREAM DITCHES TO
DRAIN.
3. ALL NEW PROCESS, SANITARY SEWER, AND DRAIN PIPING
SHALL BE DIP EXCEPT WHERE NOTED OTHERWISE. ALL
STORM DRAIN SHALL BE CLASS III RCP.
4. YARD HYDRANTS SHALL BE 1" FREEZE PROOF YARD
PES 1 HYDRANTS INSTALLED WHERE SHOWN.
5. 100-YR FLOOD ELEVATION AT THE SITE IS 762.50.
`9' CONCRETE PARALLEL
I PIPE END SECTION
I CONFORMING TO NCDOT
STANDARDS 310.02
STORM DRAIN SCHEDULE
I STRUCTURE INV. TOP OF
I AC STING
-- 769.34
PES 1 770.78
FES 1 763.00
I FES 2 763.32
EXISTING FES 3 766.44
GRAVEL DRIVE DI 767.00 769.33
NOTE:
I PROVIDE OUTLET PROTECTION AT FES 1 AND
FES 3. SEE DETAIL SHEET G-7.
I
I
20'
I
I
I
I
DROP INLET (DI)
I
I
I
ANEW 16' FARM GATE.
I SEE DETAIL SHEET G-5
9li
912.126
SITE PLAN I G2REV2.DWG G - 2
APRIL 2021
J
Y
J
Y
z
Y
J
13 OCT 2022
CARo
Essioti
SEAL
49997
751
�S�
EXISTING
UNDERGROUND
�{ F❑ / - - - UT UT TELEPHONE
-- ---------- -
___[
— — — -UT UT UT Ur
UT UT
Fo
Fo
/ �aN1GGINS ROF❑ 39
/WFO
) EXISTING GUARDRAIL
❑/// z- - - - —
EXISTING FIBER
//l
A\����— _—— __ ------ — ______ -----FQ--- F❑
/I/�=---- ------ --- — ----_— --- F❑ F❑ —
/j//////IIII Io-o��� �- -- --___ - -_-__— _- - _ -_F F❑ _
////////I I c°�'co°�' g000a6n —----_-------_ __—__ —__ _ _ —
000� ........ ------ - --- _--- -
/ s\ -76aJ 1 7
RGV
lill
IIIIIIII1I1I1I�I1I1I //� / � 1/l /1l /1 I I I I 1 l I 1 I I I II I /II I I I II/ I
/
� /
pR�Hspj ��0�
(n
/
TEMPORARY
10 SKIMMER SEDIMENT STRAW i
-� BASIN NO. 1 WATTLE (TYP)
SKIMMER
IIII // // // 1 / / 1 1 / OUTLET BEGIN CONCRETE
JOHN AND PAIGE /� l/l j / I I 762 PAVEMENT (TYP) /
MEADOWS // % / I
DEED 1124/1067 X X X X X �X X X X X X X X X X X X
(2) 10' 1
WIDE GATE
—
�'/ CHEMICAL
lI lull/ l l Il \ FEED SYSTEM
\ SIDEWALK
764 763.44 764.4
\ V B-02 0 B 03 ODOR
I \\ � CONTROL —
co
\ � BORE LOCATION
IIIIII I I I�111111 I I I II I I I v� l 1 (TYP)
-
, I I II I I III v ■ �' _
IIIIII I I I IIII I I I I \ V A A 764
X
\ \ V A A \ OB-05
V A\ \ \ \\ \\ \\ \ x PUMP STATION cry SCREENING
1764.42764.42
IIIIII � IIII 11 I I I I I I � � I x � +764.42 764.42 // �// // \
ASPHALT
V A \ x / ACCESS DRIVE
V \ OB- 01 OB 04 / / SEE SHEET G 5
,I I I I II I A I Ix I
IIII 11 1 1� I I rllllllll I I I V A 1 \ I I x � / / / / I I 11
CONCRETE PAVEMENT +764.42
\ /
\ I V A AV A A \ x 764 / / / / ELECTRIC GATE
it IIII V A \\ VA\\VA\ \ AV A _ AV A \ � I / x ��► mod` �
/A VA \ \ V A \ \ VA\\VAVv v V A V A v CONCRETE
\ VAA \ \ \ VA\ \ V A V v - co 764.42 PAVEMENT / / /
X/
\\VAVAVA\\ V A V A\AVA \ �A A V A Arl
FUEL RESERVED FOR
\VAA\VAV AVA\\ V AA�0 762 x TANK I / / //x
I B- 6 � FUTURE GENERATOR / / // / / /
x
\ VAA\VA\ \ VV VVA i RIP RAP APRON x I / / / / / / / /
(TYP). SEE NOTE 4.El
GENERATOR \ NEW FENCE
740
I I I I
\\VA\ V A\\\\\\\ 1 xix x x x x x�x x x x x—I—x xl�xx x
�\VAVA\\\\�CG o0� I I I I I
\\\\ \ \\\\ \\\ ooD
`�vvvvvvv`�v�` . 11 .�vvvvvvv g I � I I I I 11 11 I I IIII i I vv
vvvvv v vv III vv v I � I I I��
IN CHARGE CAW j r
DESIGNED SSP
MADE BY S S P
CHECKED GJW
UT
mommimiNW
Q'm il; V`
)0V-_
00
(o
VAVAA\VAVAA\V I � I VAVA\\\\\\ I IP
6a
v SKIMMER z 6
OUTLET x
SKIMMER SREDIMENT ROBERT S. EDMISTON, (L �2 NEW GRAVEL DRIVE.
pi/
BASIN NO. 2 JR. FAMILY � � \
\ \ I IIIIIIIIII 1 DEED 1369/1222 ~ Z \ / SEE NOTE 2. /
E \\\ IIIIII �0 \ ��
0 SILT FENCE
\ \1 C C II I I I1111111 i (TYP)
I
1 \ X_�oLx�����"�I X El���`X�� x�x
E E E E E C C C C C�I I TCE
IIII�I���III A 11\\illll111I I I l l � i � I I I I � /
1 REVISED LIMITS OF DISTURBANCE 13 OCT 22
■ ■
`% V
E N G IN E E R S
TOWN OF M 00 R ESVI LLE
WIGGINS ROAD SEWER FACILITIES
NOTES:
/
1.
ALL GRASS LINED DITCHES AND SLOPES 4V:1 H
AND GREATER SHALL BE STABILIZED WITH
EXCELSIOR MATTING.
2.
TRANSITION NEW 6" THICK GRAVEL DRIVE AT
TEMPORARY
END OF ASPHALT ACCESS DRIVE TO EXISTING
CONSTRUCTION ENTRANCE
GRAVEL DRIVE.
3.
PROVIDE TEMPORARY DIVERSION DITCHES TO
DIVERT DRAINAGE TO TEMPORARY SKIMMER
SEDIMENT BASINS DURING CONSTRUCTION.
- -
_
DIVERT FLOW FROM EXISTING ROADSIDE DITCH
-
- -
AROUND WESTERN SEDIMENT BASIN.
4.
PROVIDE MIN. 15' LONG CLASS I RIP RAP
APRON, MIN. 18" THICK.
5.
PROVIDE AND MAINTAIN DROP INLET
PROTECTION FOR DROP INLET UNTIL
UPSTREAM GROUND COVER IS ESTABLISHED.
'
6.
100-YR FLOOD ELEVATION AT SITE IS 762.50.
1
40' TEMPORARY
CONSTRUCTION
1
LIMITS OF '
CONSTRUCTION
U
1
U
1
U
r
1
U
r
_ � 1
i
1
w�
i1
I /
I
/ I /
I I I l
IIII / l l l l
II l I I I
III I I I I
I I I I I I
NEW GRAVEL DRIVE.
SEE NOTE 2.
I I
I i
STAGING AND
STOCKPILE AREA.
..P"-- SEE SHEET G-3A
GRADING PLAN
912.126
G3REV.DWG
OCTOBER 2022
G-3
NOTES:
J
Y
J
Y
J
7
I
is;
31 OCT 2022
Room A \ \
40011
TEMPORARY �� v� LIMITS OF
STOCKPILE v v v DISTURBANCE
41*
DRAINAGE AREA TRIBUTARY
TO SKIMMER SEDIMENT
BASIN NO. 3 = 3.45 ACRES
O
ROBERT S. EDMISTON,
JR. FAMILY —
,��� DEED 1369/1222 _ _ —
PUMP STATION SITE.
SEE SHEET G-3
«TDt«�«TDC«
SILT FENCE
SKIMMER /
OUTLET
ASIN /
VLET
— TEMPORARY SKIMMER
SEDIMENT BASIN NO.
1. 100—YR FLOOD ELEVATION AT SITE IS 762.50.
J N \\\\\\\\iiniiiij1111 � A R
z '
— ��o`�oFEssio
Y = SEAL
49997
z
912.126
•,,�f�N HGINE� � IN CHARGE CAW j r 40, 0 40' s o' ■ ■ TOWN 0 F M 0 0 R E S V I L L E
-LiF DESIGNED S S P ®A,
,�s;„p,,,\, GRADING PLAN
n MADE BY SSP �VUV G-3AREV.DWG G-3A
WIGGINS ROAD SEWER FACILITIES
J E N G I N E E R S
CHECKED GJW 1 ADDED SEDIMENT BASIN NO. 3 31 OCT 22 OCTOBER 2022
Y
Q
J
09 OCT 2020
CARo
Essioti
SEAL
49997
-INE��
IN CHARGE CAW j r
DESIGNED SSP
MADE BY S S P
CHECKED GJW
765
765
760
zl
Lo
o r s
O N
w
760
Z
w
o '
r�
v"
z w
o =
w
N ~^
OR rn
qtn co
UN
0ui
<00K
qt M� 0;
O
0�
<»
zz
Mqtnnz2
�
=
zI-
755
lr:
U)
o z z
J
755
o�
=~z
ww
z z
_ _
cno
Nz
750
36"
® 0.200%
1750
7451 I '--36" ® 0.200% 1 1 I745
RESTRAINED
JOINT. SEE NOTE
HORZ. 1 " = 50'
VERT. 1 " = 5'
SEWER PROFILE
BELOW
GRADE
4' MAX.
1'-0"
MAX.-
INSIDE PUMP
STATION
COMPRESSION
SEAL
NOTE:
24" FORCE MAIN SHALL HAVE METAL -TO -METAL
RESTRAINED JOINTS. JOINTS SHALL BE "TR-FLEX"
AS MANUFACTURED BY US PIPE COMPANY OR
EQUAL. MEGA -LUGS SHALL NOT BE PERMITTED.
PIPE Z WALL PENETRATION DETAIL
NEW 24" RJ
FORCE MAIN -
SOLID SLEEVE
RJ COUPLING-
PLAIN END
DIP
TFORCE MAIN BY
CONTRACT 82.1
NOTES:
1. AFTER NEW FORCE MAIN HAS BEEN PRESSURE
TESTED, CONNECT TO FORCE MAIN BY OTHERS
WITH PLAIN END SPOOL PIECES AND A SOLID
SLEEVE RJ COUPLING AS SHOWN.
2. JOINTS SHALL BE "TR-FLEX" AS
MANUFACTURED BY US PIPE COMPANY OR
EQUAL. MEGA -LUGS SHALL NOT BE PERMITTED.
3. CONTRACTOR SHALL COORDINATE CONNECTION
WORK WITH CONTRACTOR FOR CONTRACT 82.1.
CONNECTION TO FORCE MAIN
FROM
MH 2
36" SEWER BY
OTHERS
(CONTRACT 82.1)
12" SEWER BY
OTHERS
(CONTRACT 82.1)
FROM —
MH 1A —
INVERT=749.87
36" SE
TO
MH A
NOTES:
1. EXISTING MANHOLE MH 1 HAS PARTIALLY
FORMED INVERT WITH BOOT AND PLUG.
7.97
' DIAMETER MANHOLE
IH 1 BY OTHERS
CONTRACT 82.1)
7.87
CONNECTION TO EXISTING MANHOLE MH 1
)ACKFI LL
:MBEDMENT
36" SEWER
1 /8 OF PII
DIA. (4" M
NOTES:
1. BEDDING SHALL BE PROVIDED AS SPECIFIED.
2. GRANULAR MATERIAL SHALL BE NO. 57 STONE COMPACTED TO
90% STANDARD PROCTOR.
3. EMBEDMENT SHALL BE SUITABLE NATIVE SOIL OR GRANULAR
MATERIAL COMPACTED TO 90% STANDARD PROCTOR.
4. FOR SEWER UNDER PAVEMENT, EMBEDMENT SHALLL EXTEND TO
PAVEMENT SUBGRADE.
5. BACKFILL SHALL BE SUITABLE NATIVE SOIL LIGHTLY COMPACTED.
BEDDING DETAIL
MANHOLE
STEPS
16" O.C.-
MANHOLE FRAME rCONCRETE PAVEMENT
AND COVER
&s
s
4'-0" DIAMETER
MANHOLE DETAIL
SITION SLAB
/:1
z
i�
NEW 36" SEWER
2' 0 2' 4' ■ ■ 912.126
TOWN OF M 00 R ESVI LLE
MooDETAILS G4.DWG (3-4
4' 0 4' s' UV I I ffO WIGGINS ROAD SEWER FACILITIES
E N G I N E E R S OCTOBER 2020
20'-0"
10'-0" (MAX.)
c
I
r
I
09 OCT 2020
SEAL
49997
75
S.
n e nnrn ___... .
7_11-0-- 1 %L-1 1 14 1 %.1' 1 %%.,11 10.7 TV I I %L-
IN CHARGE CAW j r
DESIGNED SSP
MADE BY S S P
CHECKED GJW
FENCE AND MANUAL GATE DETAIL
20'-0"
NOTE:
PROVIDE 6" CONCRETE PAD FOR GATE OPERATOR.
ELECTRIC GATE DETAIL
5'-0" (TYP)
ONTRACTION JOINT
IIN. 1 " DEEP
x
NOTES:
1. 1 /2" EXPANSION JOINT FILLED WITH
BITUMINOUS FIBER, REQUIRED EVERY 40'-0".
2. ALL SIDEWALKS TO BE 4'-0" WIDE UNLESS
OTHERWISE SHOWN.
S I D EWALK
12" THICK
GAL`
STEI
\ \\ \\\\\\\
o MD%a -3 i UNE
20'-0"
77
PER 1'-0"
1 R'—not
NOTE:
PROVIDE CHAIN FOR INTERLOCKING PROPERTY
OWNER LOCK AND LOCK FOR THE TOWN.
TYPICAL PAVEMENT SCHEDULE
8" NCDOT B25.00
4" NCDOT 119.00
2" NCDOT S9.5C
ACCESS DRIVE SECTION
8" THICK
NOTES:
1. CONTRACTOR SHALL SUBMIT SKETCH OF
CONTRACTION JOINT LAYOUT FOR CONCRETE
PAVEMENT WITH DIMENSIONS AS A SHOP DRAWING.
2. UNLESS OTHERWISE NOTED, PROVIDE 1/2"
EXPANSION JOINT BITUMINOUS FIBER WHERE
CONCRETE PAVEMENT ABUTS ADJACENT STRUCTURES.
■ ■
E N G I N E E R S
CONCRETE PAVEMENT
TOWN OF M 00 R ESVI LLE
WIGGINS ROAD SEWER FACILITIES
FARM GATE
11
o rrDt.0 STONE
CONCRETE DOME
BOLLARD, 6" STEEL
FILLED WITH CONCRETE &
PAINTED SAFETY YELLOW-
FINISHED GRADE
D ETAI LS
CONCRETE
PIPE BOLLARD
912.126
G5. DWG
OCTOBER 2020
G-5
STAKES
STRAW WATTLE
Y
J
EROSION CONTROL NOTES:
1. THE CONTRACTOR SHALL TAKE WHATEVER MEASURES NECESSARY TO MINIMIZE SOIL EROSION
AND SILTATION. HE SHALL KEEP FULLY INFORMED OF ALL SUCH REGULATIONS WHICH AFFECT
THE CONDUCT OF THE WORK, AND SHALL AT ALL TIMES OBSERVE AND COMPLY WITH ALL
SUCH REGULATIONS.
2. REQUIREMENTS FOR GROUND STABILIZATION AND MATERIALS HANDLING ARE DEFINED IN THE
CONTRACT DOCUMENTS SECTION 01 57 13 - GROUND STABILIZATION AND MATERIALS
HANDLING. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS AS DEFINED
IN THIS SECTION AND AS SPECIFIED IN THE GENERAL PERMIT NO. NCGO1.
3. PERMANENT GROUND COVER SHALL BE ESTABLISHED AS SPECIFIED IN SECTION 01 57 13 -
GROUND STABILIZATION AND MATERIALS HANDLING SECTION 1.02.A. THE CONTRACTOR WILL BE
REQUIRED TO FOLLOW THE LAND DISTURBING ACTIVITIES (AS CLOSELY AS PRACTICAL) WITH
RESTORATION, FERTILIZING, SEEDING, AND MULCHING.
4. ALL DISTURBED AREAS SHALL BE SEEDED WITH PERMANENT SEED FOR PRIMARY STABILIZATION
AND TEMPORARY SEED FOR IMMEDIATE GROUND STABILIZATION. REQUIREMENTS FOR TEMPORARY
SEED ARE OUTLINED IN SECTION 01 57 13 - GROUND STABILIZATION AND MATERIALS
HANDLING SECTION 1.03. REQUIREMENTS FOR PERMANENT SEED ARE OUTLINED IN SECTION 32
92 00 - TURF AND GRASSES.
5. FERTILIZER AND MULCH SHALL BE APPLIED WITH ALL SEEDING ACTIVITIES IN ACCORDANCE WITH
SECTION 32 92 00 - TURF AND GRASSES.
6. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSPECTED AT LEAST ONCE PER 7
CALENDAR DAYS AND WITHIN 24 HOURS OF A RAIN EVENT GREATER THAN 1.0 INCHES.
7. ANY NEEDED REPAIRS TO EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY AND
PROPERLY DOCUMENTED WITH AN INSPECTION REPORT. REQUIREMENTS FOR INSPECTION
REPORTS ARE OUTLINED IN SECTION 01 57 13 - GROUND STABILIZATION AND MATERIALS
HANDLING SECTION 3.11.
8. THE CONTRACTOR SHALL MAINTAIN A RAIN GAUGE AT THE PROJECT SITE AND PROVIDE WEEKLY
AND POST RAINFALL INSPECTION REPORTS IN ACCORDANCE WITH NPDES REQUIREMENTS AND
THE REQUIREMENTS OF GENERAL PERMIT NCGO1. THESE REQUIREMENTS ARE OUTLINED IN
SECTION 01 57 13 - GROUND STABILIZATION AND MATERIALS HANDLING SECTION 3.10.
9. THE CONTRACTOR, UPON COMPLETION OF THE PROJECT, SHALL LEAVE INTACT THOSE
TEMPORARY EROSION CONTROL DEVICES DEEMED NECESSARY BY THE ENGINEER FOR FUTURE
PROTECTION.
10. ORIGINAL DISTURBED AREA PREVIOUSLY APPROVED UNDER PERMIT ID: IREDE-2021-006 IS 3.0
ACRES. ADDITIONAL DISTURBED ACRES UNDER PERMIT ID: IREDE-2023-001 IS 4.0 ACRES.
TOTAL DISTURBED AREA DELINEATED BY LIMITS OF CONSTRUCTION IS 7.0 ACRES.
EROSION CONTROL CONSTRUCTION SEQUENCE:
1. INSTALL EROSION CONTROL MEASURES IN ADVANCE OF LAND DISTURBING ACTIVITIES.
2. CONSTRUCT FACILITIES.
3. MAINTENANCE OF EROSION CONTROL DEVICES IS THE CONTRACTOR'S RESPONSIBILITY.
EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RAIN
EVENT. THE DEVICES SHALL BE INSPECTED FOR DAMAGE AND REPAIRS SHALL BE
COMPLETED IMMEDIATELY.
4. RESEED, MULCH, AND STABILIZE DISTURBED AREAS AS SOON AS PRACTICAL FOLLOWING
UTILITY INSTALLATION.
5. MAINTAIN ALL EROSION CONTROL MEASURES. FOLLOW THE SPECIFIC MAINTENANCE
INSTRUCTIONS LISTED FOR EACH EROSION CONTROL DEVICE.
6. AFTER PROJECT AREA IS STABILIZED, REMOVE EROSION CONTROL DEVICES.
10'-0" (MIN.)
A SILT
FENCE
x xx xx xx xx xx
x (TYP) -
x
I x
0
0
0
0
0
O O O
xx xx xx xx
12'-0"
(MIN.)
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH RAINFALL
EVENT GREATER THAN 1.0 INCHES.
2. MAINTAIN THE ENTRANCE TO PREVENT MUD OR
SEDIMENT FROM LEAVING THE SITE.
3. TOP DRESS WITH NEW WASHED STONE AS NEEDED.
4. IMMEDIATELY REMOVE ALL OBJECTIONABLE
MATERIALS SPILLED, WASHED, OR TRACKED ONTO
PUBLIC ROADWAYS.
L. A
P LAN
0
x
0 x
x
o
x
x
x
O SILT FENCE
(TYP)
x
x
xx xx
SANDBAGS OR
STAPLES (TYP)
10 MIL
PLASTIC LINING
SECTION A -A
NOTES:
1. ACTUAL LOCATION OF CONCRETE WASHOUT SHALL BE
DETERMINED IN THE FIELD WITH THE ENGINEER.
2. CONCRETE WASHOUT STRUCTURE SHALL BE CLEARLY MARKED
WITH A SIGN. MINIMUM SIGN SIZE SHALL BE 18"X24".
MAINTENANCE:
1. REMOVE LEAVINGS FROM THE WASHOUT WHEN AT
APPROXIMATELY 75% CAPACITY TO LIMIT OVERFLOW EVENTS.
REPLACE THE TARP, SAND BAGS, OR OTHER TEMPORARY
STRUCTURAL COMPONENTS WHEN NO LONGER FUNCTIONAL.
WHEN UTILIZING ALTERNATIVE OR PROPRIETARY PRODUCTS,
FOLLOW MANUFACTURER'S INSTRUCTIONS.
2. AT THE COMPLETION OF THE CONCRETE WORK, REMOVE
REMAINING LEAVINGS AND DISPOSE OF IN AN APPROVED
DISPOSAL FACILITY. FILL PIT, IF APPLICABLE, AND STABILIZE
DISTURBANCE CAUSED BY REMOVAL OF WASHOUT.
CONCRETE WASHOUT STRUCTURE
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE
13 OCT 2022 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL
\,CAR��CONFORM TO DETAIL 6.06 OF THE EROSION AND
SEDIMENT CONTROL PLANNING AND DESIGN MANUAL
Essioti
� SEAL �
49997 _=
IN CHARGE CAW j r ■ ■
g, QO����`\\\ DESIGNED SS P ®A ■
,,,,,\\\�� NOT TO SCALE
MADE BY SS P V V
�uul Is
Is, {�� CHECKED GJW 1 �DDED MAINTENANCE MEASURES 13 OCT 2022 E N G IN E E R S
SANDBAGS OR
STAPLES (TYP)
8'-0"
(MAX )
■■■■■I
1■■■■■r■■■■■■■
III■■■■■■■■■■■■�
FILTER FABRIC
FILTER FABRIC
WIRE FENCING -
STEEL POST
EXTEND FABRIC AND WIRE
INTO TRENCH AND BACKFILL
WITH COMPACTED SOIL
PLASTIC OR
WIRE TIES
II
I
II N
II
II
u
11
AREA TO BE
PROTECTED
SECTION
DI ANI
NOTE:
1. WATTLES SHALL BE SECURED TO
GROUND EVERY 2'-0" BY WOOD STAKES.
2. ALL DISTURBED DITCHES SHALL BE
STABILIZED WITH EXCELSIOR MATTING.
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH RAINFALL
EVENT GREATER THAN 1.0 INCHES.
2. REPLACE WATTLE IF CLOGGED OR DAMAGED.
3. IF PONDING BECOMES EXCESSIVE, REPLACE
WATTLE WITH A LARGER DIAMETER OR
DIFFERENT MEASURE.
STRAW WATTLE
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH RAINFALL EVENT GREATER THAN 1.0
INCHES.
2. SHOULD THE FABRIC COLLAPSE, TEAR, DECOMPOSE OR BECOME
INEFFECTIVE, REPLACE IMMEDIATELY.
3. REMOVE SEDIMENT DEPOSITS AS NEEDED TO PROVIDE ADEQUATE STORAGE
VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE.
TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND
BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING
DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.
TOWN OF M 00 R ESVI LLE
WIGGINS ROAD SEWER FACILITIES
SILT CHECK FENCE
SILT CHECK FENCE SHALL CONFORM TO
DETAIL 6.62 OF THE EROSION AND SEDIMENT
CONTROL PLANNING AND DESIGN MANUAL
GROUND STABILIZATION DETAILS
912.126
G6REV.DWG
OCTOBER 2022
G-6
TOP OF
EMBANKMENT
4'-0" MAX
0
I 0
N
5' STEEL T-POST
1.25 LB/LI N EAR FT
,,19 GAUGE HARDWARE
CLOTH WITH 1 /4"
MESH OPENINGS
NCDOT #5 OR #57
WASHED STONE
2:1 SLOPE AWAY
II
II
Z
II
II
�
II
II
o
II
II
N
U
U
15" CLASS
RCP (TYP)-
P LA N
31 OCT 2022
CARS ///,/
Essioti
_ SEAL
49997
bli
vAA'k_s -P&At�'
NOTE:
1. CONTRACTOR MAY USE BLOCK AND GRAVEL
INLET PROTECTION IN ACCORDANCE WITH
EROSION CONTROL DETAIL 6.52 IN LIEU OF
WOVEN MESH PROTECTION.
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH RAINFALL
EVENT GREATER THAN 1.0 INCHES.
2. CLEAR THE MESH WIRE OF ANY DEBRIS OR
OTHER OBJECTS TO PROVIDE ADEQUATE FLOW
FOR SUBSEQUENT RAINS. TAKE CARE NOT TO
DAMAGE OR UNDERCUT THE WIRE MESH DURING
SEDIMENT REMOVAL. REPLACE STONE AS NEEDED.
DROP INLET PROTECTION
DROP INLET PROTECTION SHALL CONFORM TO
DETAIL 6.51 OF THE EROSION AND SEDIMENT
CONTROL PLANNING AND DESIGN MANUAL
4'-6" x 3'-6"
FRAME AND GRATE
BRICK COPIN
1
3" MIN
SECTION
NOTES:
1. PRECAST STRUCTURES SHALL MEET
H-20 WHEEL LOAD.
2. STEPS SHALL BE PROVIDED FOR ALL
STRUCTURES OVER 3'-6" IN DEPTH.
3. WEEP HOLES SHALL BE LOCATED ON
BACK WALL OF STRUCTURES.
DROP INLET WITH GRATE
IN CHARGE CAW j r
DESIGNED SSP
MADE BY S S P
CHECKED GJW
NOT TO SCALE 3 REVISED SEDIMENT BASIN DETAIL
2 ADDED MAINTENANCE MEASURES
1 REVISED SEDIMENT BASIN DETAIL
2'-0" (MIN.)
F�
18"
'��/\\/i\ (MIN.)
SOIL
COMPACTED
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH RAINFALL
EVENT GREATER THAN 1.0 INCHES.
2. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW
AREA AND REPAIR THE DIVERSION RIDGE.
3. CAREFULLY CHECK OUTLETS AND MAKE TIMELY
REPAIRS AS NEEDED.
4. WHEN THE AREA PROTECTED IS PERMANENTLY
STABILIZED, REMOVE THE RIDGE AND THE
CHANNEL TO BLEND WITH THE NATURAL GROUND
LEVEL AND APPROPRIATELY STABILIZE IT.
TEMPORARY DIVERSION DITCH
TEMPORARY DIVERSION DITCH SHALL CONFORM
TO DETAIL 6.20 OF THE EROSION AND SEDIMENT
CONTROL PLANNING AND DESIGN MANUAL
C
0
FLARED END
SECTION
24" CULVERT PIPE
C) o
oo��
��Dc)o
CD 0
u�
c 0
oo oo 0
o co
o,�o
L=12'
CLASS I RIP RAP
MIN. 12" THICK
FILTER
FABRIC
SECTION
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH RAINFALL
EVENT GREATER THAN 1.0 INCHES TO SEE IF
ANY EROSION AROUND OR BELOW THE RIP
RAP HAS TAKEN PLACE OR IF STONES HAVE
BEEN DISLODGED.
2. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO
PREVENT FURTHER DAMAGE.
OUTLET PROTECTION
OUTLET PROTECTION SHALL CONFORM TO
DETAIL 6.41 OF THE EROSION AND SEDIMENT
CONTROL PLANNING AND DESIGN MANUAL
31 OCT 2022
13 OCT 2022
13 OCT 2022
■ ■
E N G I N E E R S
OUTLET ZONE (25%
OF SURFACE AREA)
SKIMMER DEWATERING DEVICE
WITH ORIFICE MEETING DETAILS
OF 6.64. SEE TABLE BELOW
FOR SIZE REQUIREMENTS
SECOND CHAMBER (25%
OF SURFACE AREA)
FIRST CHAMBER (25%
OF SURFACE AREA)
EARTHEN
EMBANKMENT
WITH STABILIZED
SIDE SLOPES
%STORAGE AREA
0
0�b
PLAN RIP RAP OR
SLOPE DRAIN
EMERGENCY SPILLWAY
POROUS BAFFLE
EROSION CONTROL
DETAIL 6.65 (TYP OF 3)
INLET ZONE (25% OF
SURFACE AREA)
SKIMMER TOP OF
DEWATERING DEVICE EMBANKMENT 5' MIN.
/VA/VA/VA/V�/VA 1.5' (MIN.)
/\/\/ l X
2 / /VA/VA/VAA 2
EMERGENCY \ 1
/sPll I wA%l
STORAGE AREA. POROUS
BAFFLES NOT SHOWN IN
SECTION FOR CLARITY
SECTION AT CENTER LINE
DRAPE BAFFLE MATERIAL
OVER WIRE STRAND AND EXTEND 9 GAUGE WIRE TO BASIN
SECURE WITH PLASTIC SIDE OR INSTALL T-POST TO
TIES AT POSTS AND ON ANCHOR BAFFLE TO SIDE OF BASIN
WIRE EVERY 12" AND SECURE TO VERTICAL POST
9 GAUGE MIN. HIGH 4' MAX
TENSION WIRE STRAND
SHALL BE SECURED
TO POST TO SUPPORT illimiff iiiiiiiii
BAFFLE MATERIAL /
a iVA/AAA/�A/�A�/�A \ SECURE BOTTOM OF
BAFFLE TO GROUND
WITH 12" STAPLES AT
12" MAXIMUM SPACING
BAFFLE MATERIAL
BAFFLE DETAIL
STORAGE AREA SCHEDULE DIMENSIONS
BAFFLE
MATERIAL
11 GAUGE
LANDSCAPING
STAPLE
i
STEEL POST
2' DEEP
NOTE:
BAFFLE MATERIAL SHOULD BE SECURED
TO THE BOTTOM AND SIDES OF BASIN
USING 12" LANDSCAPE STAPLES.
BAFFLE POST DETAIL
NO. LONG WIDE DEEP SPILLWAY SKIMMER ORIFICE
kM kET-a kD:a 40:a SIZE IN SIZE IN
1 65 30 2 6 2 1.0
2 65 30 2 5 2 1.0
MAINTENANCE: 3 92 45 2 13 2 1.0
1. INSPECT WEEKLY AND AFTER EACH RAINFALL EVENT GREATER THAN 0.5 INCHES.
2. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES
TO ONE HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE
SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT
JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF
THE BASIN DOES NOT HOLD DOWN THE SKIMMER.
3. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING
UNDERNEATH OR AROUND THEM.
4. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING ON
THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW.
IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVE THE
DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO, REMOVE THE
DEBRIS.
5. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE
OBSTRUCTION CLEARED WITH A PLUMBERS SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE
THE ORIFICE BEFORE REPOSITIONING THE SKIMMER.
6. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT
SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR
EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY
REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS.
7. FREEZING WEATHER CAN RESULT IN ICING FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD
BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE.
TEMPORARY SKIMMER SEDIMENT BASIN
TOWN OF M 00 R ESVI LLE
WIGGINS ROAD SEWER FACILITIES
TEMPORARY SKIMMER SEDIMENT BASIN SHALL
CONFORM TO DETAIL 6.64 OF THE EROSION AND
SEDIMENT CONTROL PLANNING AND DESIGN MANUAL
912.126
GROUND STABILIZATION DETAILS G7REV2.DWG
OCTOBER 2022
G-7
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH
THE NCG01 CONSTRUCTION GENERAL PERMIT
Implementing the details and specifications on this plan sheet will result in the construction
activity being considered compliant with the Ground Stabilization and Materials Handling
sections of the NCG01 Construction General Permit (Sections E and F, respectively). The
permittee shall comply with the Erosion and Sediment Control plan approved by the
delegated authority having jurisdiction. All details and specifications shown on this sheet
may not apply depending on site conditions and the delegated authority having jurisdiction.
SECTION E: GROUND STABILIZATION
Required Ground Stabilization Timeframes
Stabilize within this
Site Area Description
many calendar
Timeframe variations
days after ceasing
land disturbance
(a) Perimeter dikes,
swales, ditches, and
7
None
perimeter slopes
(b) High Quality Water
7
None
(HQW) Zones
(c) Slopes steeper than
If slopes are 10' or less in length and are
3:1
7
not steeper than 2:1, 14 days are
allowed
-7 days for slopes greater than 50' in
length and with slopes steeper than 4:1
-7 days for perimeter dikes, swales,
(d) Slopes 3:1 to 4:1
14
ditches, perimeter slopes and HQW
Zones
-10 days for Falls Lake Watershed
-7 days for perimeter dikes, swales,
(e) Areas with slopes
ditches, perimeter slopes and HQW Zones
flatter than 4:1
14
-10 days for Falls Lake Watershed unless
there is zero slope
Note: After the permanent cessation of construction activities, any areas with temporary
ground stabilization shall be converted to permanent ground stabilization as soon as
practicable but in no case longer than 90 calendar days after the last land disturbing
activity. Temporary ground stabilization shall be maintained in a manner to render the
surface stable against accelerated erosion until permanent ground stabilization is achieved.
GROUND STABILIZATION SPECIFICATION
Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the
techniques in the table below:
Temporary Stabilization Permanent Stabilization
• Temporary grass seed covered with straw or • Permanent grass seed covered with straw or
other mulches and tackifiers other mulches and tackifiers
• Hydroseeding • Geotextile fabrics such as permanent soil
• Rolled erosion control products with or reinforcement matting
without temporary grass seed • Hydroseeding
• Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered
• Plastic sheeting with mulch
• Uniform and evenly distributed ground cover
sufficient to restrain erosion
• Structural methods such as concrete, asphalt or
retaining walls
• Rolled erosion control products with grass seed
POLYACRYLAMIDES (PAMS) AND FLOCCULANTS
1. Select flocculants that are appropriate for the soils being exposed during
construction, selecting from the NC DWR List of Approved PAMS/Flocculants.
2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.
3. Apply flocculants at the concentrations specified in the NC DWR List of Approved
PAMS/Flocculants and in accordance with the manufacturer's instructions.
4. Provide ponding area for containment of treated Stormwater before discharging
offsite.
5. Store flocculants in leak -proof containers that are kept under storm -resistant cover
or surrounded by secondary containment structures.
EQUIPMENT AND VEHICLE MAINTENANCE
1. Maintain vehicles and equipment to prevent discharge of fluids.
2. Provide drip pans under any stored equipment.
3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the
project.
4. Collect all spent fluids, store in separate containers and properly dispose as
hazardous waste (recycle when possible).
5. Remove leaking vehicles and construction equipment from service until the problem
has been corrected.
6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products
to a recycling or disposal center that handles these materials.
LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE
1. Never bury or burn waste. Place litter and debris in approved waste containers.
2. Provide a sufficient number and size of waste containers (e.g dumpster, trash
receptacle) on site to contain construction and domestic wastes.
3. Locate waste containers at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
4. Locate waste containers on areas that do not receive substantial amounts of runoff
from upland areas and does not drain directly to a storm drain, stream or wetland.
5. Cover waste containers at the end of each workday and before storm events or
provide secondary containment. Repair or replace damaged waste containers.
6. Anchor all lightweight items in waste containers during times of high winds.
7. Empty waste containers as needed to prevent overflow. Clean up immediately if
containers overflow.
8. Dispose waste off -site at an approved disposal facility.
9. On business days, clean up and dispose of waste in designated waste containers.
PAINT AND OTHER LIQUID WASTE
1. Do not dump paint and other liquid waste into storm drains, streams or wetlands.
2. Locate paint washouts at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
3. Contain liquid wastes in a controlled area.
4. Containment must be labeled, sized and placed appropriately for the needs of site.
5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from
construction sites.
PORTABLE TOILETS
1. Install portable toilets on level ground, at least 50 feet away from storm drains,
streams or wetlands unless there is no alternative reasonably available. If 50 foot
offset is not attainable, provide relocation of portable toilet behind silt fence or place
on a gravel pad and surround with sand bags.
2. Provide staking or anchoring of portable toilets during periods of high winds or in high
foot traffic areas.
3. Monitor portable toilets for leaking and properly dispose of any leaked material.
Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace
with properly operating unit.
EARTHEN STOCKPILE MANAGEMENT
1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least
50 feet away from storm drain inlets, sediment basins, perimeter sediment controls
and surface waters unless it can be shown no other alternatives are reasonably
available.
2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of
five feet from the toe of stockpile.
3. Provide stable stone access point when feasible.
4. Stabilize stockpile within the timeframes provided on this sheet and in accordance
with the approved plan and any additional requirements. Soil stabilization is defined
as vegetative, physical or chemical coverage techniques that will restrain accelerated
erosion on disturbed soils for temporary or permanent control needs.
(>' l, ro> NORTH CAROLI NA
£nvironmentat Quality
ONSITE CONCRETE WASHOUT
STRUCTURE WITH LINER
0 o ,a
n 0 0 3�
0 0
00 0
r�
C[IL� MIIO lm111Q
l �-�
a� Lei .`LIYL lLG1O1 QIasO YI
IOI� tVfY •IdY 1W &C Un
L A�p
C1111L YJIIOI �CIF�OO N f60 IYI� '�lV'�"'f[�N'MalOu t M CYtl[1[ Wd�
L M {Ytrl[ V1.OR a�r.wr. yyyy t1MCTO LYIl s sm
�[ IMM�NO NY M LYm NOIa NCI M W K ma
! f M T w lIACT� MMtl1Y 1= �• 110[
S.&L 10349 C VMMM :sumac � m a ELft u wso Q nmu m
OSM w Wne m MW awa. amnnc wmart n.en.c
BELOW GRADE WASMOnT STRUCTURE ABOVE GRADE WASPT STRUCTURE
CONCRETE WASHOUTS
1. Do not discharge concrete or cement slurry from the site.
2. Dispose of, or recycle settled, hardened concrete residue in accordance with local
and state solid waste regulations and at an approved facility.
3. Manage washout from mortar mixers in accordance with the above item and in
addition place the mixer and associated materials on impervious barrier and within
lot perimeter silt fence.
4. Install temporary concrete washouts per local requirements, where applicable. If an
alternate method or product is to be used, contact your approval authority for
review and approval. If local standard details are not available, use one of the two
types of temporary concrete washouts provided on this detail.
5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk
sections. Stormwater accumulated within the washout may not be pumped into or
discharged to the storm drain system or receiving surface waters. Liquid waste must
be pumped out and removed from project.
6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it
can be shown that no other alternatives are reasonably available. At a minimum,
install protection of storm drain inlet(s) closest to the washout which could receive
spills or overflow.
7. Locate washouts in an easily accessible area, on level ground and install a stone
entrance pad in front of the washout. Additional controls may be required by the
approving authority.
8. Install at least one sign directing concrete trucks to the washout within the project
limits. Post signage on the washout itself to identify this location.
9. Remove leavings from the washout when at approximately 75% capacity to limit
overflow events. Replace the tarp, sand bags or other temporary structural
components when no longer functional. When utilizing alternative or proprietary
products, follow manufacturer's instructions.
10. At the completion of the concrete work, remove remaining leavings and dispose of
in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance
caused by removal of washout.
HERBICIDES, PESTICIDES AND RODENTICIDES
1. Store and apply herbicides, pesticides and rodenticides in accordance with label
restrictions.
2. Store herbicides, pesticides and rodenticides in their original containers with the
label, which lists directions for use, ingredients and first aid steps in case of
accidental poisoning.
3. Do not store herbicides, pesticides and rodenticides in areas where flooding is
possible or where they may spill or leak into wells, stormwater drains, ground water
or surface water. If a spill occurs, clean area immediately.
4. Do not stockpile these materials onsite.
HAZARDOUS AND TOXIC WASTE
1. Create designated hazardous waste collection areas on -site.
2. Place hazardous waste containers under cover or in secondary containment.
3. Do not store hazardous chemicals, drums or bagged materials directly on the ground.
NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING
EFFECTIVE: 04/01/19
PART III I PART III I PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING SELF -INSPECTION, RECORDKEEPING AND REPORTING SELF -INSPECTION, RECORDKEEPING AND REPORTING
SECTION A: SELF -INSPECTION
Self -inspections are required during normal business hours in accordance with the table
below. When adverse weather or site conditions would cause the safety of the inspection
personnel to be in jeopardy, the inspection may be delayed until the next business day on
which it is safe to perform the inspection. In addition, when a storm event of equal to or
greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be
performed upon the commencement of the next business day. Any time when inspections
were delayed shall be noted in the Inspection Record.
Frequency
Inspect
(during normal
Inspection records must include:
business hours)
(1) Rain gauge
Daily
Daily rainfall amounts.
maintained in
If no daily rain gauge observations are made during weekend or
good working
holiday periods, and no individual -day rainfall information is
order
available, record the cumulative rain measurement for those un-
attended days (anc this will determine if a site inspection is
needed). Days on which no rainfall occurred shall be recorded as
"zero." The permittee may use another rain -monitoring device
approved by the Division.
(2) E&SC
At least once per
1. Identification of the measures inspected,
Measures
7 calendar days
2. Date and time of the inspection,
and within 24
3. Name of the person performing the inspection,
hours of a rain
4. Indication of whether the measures were operating
event > 1.0 inch in
properly,
24 hours
S. Description of maintenance needs for the measure,
6. Description, evidence, and date of corrective actions taken.
(3) Stormwater
At least once per
1. Identification of the discharge outfalls inspected,
discharge
7 calendar days
2. Date and time of the inspection,
outfalls (SDCs)
and within 24
3. Name of the person performing the inspection,
hours of a rain
4. Evidence of indicators of stormwater pollution such as oil
event > 1.0 inch in
sheen, floating or suspended solids or discoloration,
24 hours
S. Indication of visible sediment leaving the site,
6. Description, evidence, and date of corrective actions taken.
(4) Perimeter of
At least once per
If visible sedimentation is found outside site limits, then a record
site
7 calendar days
of the following shall be made:
and within 24
1. Actions taken to clean up or stabilize the sediment that has left
hours of a rain
the site limits,
event > 1.0 inch in
2. Description, evidence, and date of corrective actions taken, and
24 hours
3. An explanation as to the actions taken to control future
releases.
(5) Streams or
At least once per
If the stream or wetland has increased visible sedimentation or a
wetlands onsite
7 calendar days
stream has visible increased turbidity from the construction
or offsite
and within 24
activity, then a record of the following shall be made:
(where
hours of a rain
1. Description, evidence and date of corrective actions taken, and
accessible)
event > 1.0 inch in
2. Records of the required reports to the appropriate Division
24 hours
Regional Office per Part III, Section C, Item (2)(a) of this permit.
(6) Ground
After each phase
1. The phase of grading (installation of perimeter E&SC
stabilization
of grading
measures, clearing and grubbing, installation of storm
measures
drainage facilities, completion of all land -disturbing
activity, construction or redevelopment, permanent
ground cover).
2. Documentation that the required ground stabilization
measures have been provided within the required
timeframe or an assurance that they will be provided as
soon as possible.
NOTE: The rain inspection resets the required 7 calendar day inspection requirement.
SECTION B: RECORDKEEPING
1. E&SC Plan Documentation
The approved E&SC plan as well as any approved deviation shall be kept on the site. The
approved E&SC plan must be kept up-to-date throughout the coverage under this permit.
The following items pertaining to the E&SC plan shall be kept on site and available for
inspection at all times during normal business hours.
Item to Document
Documentation Requirements
(a) Each E&SC measure has been installed
Initial and date each E&SC measure on a copy
and does not significantly deviate from the
of the approved E&SC plan or complete, date
locations, dimensions and relative elevations
and sign an inspection report that lists each
shown on the approved E&SC plan.
E&SC measure shown on the approved E&SC
plan. This documentation is required upon the
initial installation of the E&SC measures or if
the E&SC measures are modified after initial
installation.
(b) A phase of grading has been completed.
Initial and date a copy of the approved E&SC
plan or complete, date and sign an inspection
report to indicate completion of the
construction phase.
(c) Ground cover is located and installed
Initial and date a copy of the approved E&SC
in accordance with the approved E&SC
plan or complete, date and sign an inspection
plan.
report to indicate compliance with approved
ground cover specifications.
(d) The maintenance and repair
Complete, date and sign an inspection report.
requirements for all E&SC measures
have been performed.
(e) Corrective actions have been taken
Initial and date a copy of the approved E&SC
to E&SC measures.
plan or complete, date and sign an inspection
report to indicate the completion of the
corrective action.
2. Additional Documentation to be Kept on Site
In addition to the E&SC plan documents above, the following items shall be kept on the
site and available for inspectors at all times during normal business hours, unless the
Division provides a site -specific exemption based on unique site conditions that make
this requirement not practical:
(a) This General Permit as well as the Certificate of Coverage, after it is received.
(b) Records of inspections made during the previous twelve months. The permittee shall
record the required observations on the Inspection Record Form provided by the
Division or a similar inspection form that includes all the required elements. Use of
electronically -available records in lieu of the required paper copies will be allowed if
shown to provide equal access and utility as the hard -copy records.
3. Documentation to be Retained for Three Years
All data used to complete the e-NOI and all inspection records shall be maintained for a period
of three years after project completion and made available upon request. [40 CFR 122.41]
PART II, SECTION G, ITEM (4)
DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT
Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down
for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather).
Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met:
(a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal
shall not commence until the E&SC plan authority has approved these items,
(b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit,
(c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include
properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems,
(d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above,
(e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and
(f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States.
SECTION C: REPORTING
1. Occurrences that Must be Reported
Permittees shall report the following occurrences:
(a) Visible sediment deposition in a stream or wetland.
(b) Oil spills if:
• They are 25 gallons or more,
• They are less than 25 gallons but cannot be cleaned up within 24 hours,
• They cause sheen on surface waters (regardless of volume), or
• They are within 100 feet of surface waters (regardless of volume).
(c) Releases of hazardous substances in excess of reportable quantities under Section 311
of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA
(Ref: 40 CFR 302.4) or G.S. 143-215.85.
(d) Anticipated bypasses and unanticipated bypasses.
(e) Noncompliance with the conditions of this permit that may endanger health or the
environment.
2. Reporting Timeframes and Other Requirements
After a permittee becomes aware of an occurrence that must be reported, he shall contact
the appropriate Division regional office within the timeframes and in accordance with the
other requirements listed below. Occurrences outside normal business hours may also be
reported to the Department's Environmental Emergency Center personnel at (800)
858-0368.
Occurrence
Reporting Timeframes (After Discovery) and Other Requirements
(a) Visible sediment
• Within 24hours, an oral or electronic notification.
deposition in a
• Within7colendardays, a report thatcontains a description of the
stream or wetland
sediment and actions taken to address the cause of the deposition.
Division staff may waive the requirement for a written report on a
case -by -case basis.
• If the stream is named on the NC 303(d) list as impaired for sediment -
related causes, the permittee may be required to perform additional
monitoring, inspections or apply more stringent practices if staff
determine that additional requirements are needed to assure compliance
with the federal or state impaired -waters conditions.
(b) Oil spills and
• Within 24hours, an oral or electronic notification. The notification
release of
shall include information about the date, time, nature, volume and
hazardous
location of the spill cr release.
substances per Item
1(b)-(c) above
(c) Anticipated
• A report at least ten days before the date of the bypass, if possible.
bypasses [40 CFR
The report shall include an evaluation of the anticipated quality and
122.41(m)(3)]
effect of the bypass.
(d) Unanticipated
• Within 24 hours, an oral or electronic notification.
bypasses [40 CFR
• Within 7 calendar days, a report that includes an evaluation of the
122.41(m)(3)]
quality and effect of the bypass.
(e) Noncompliance
• Within 24hours, an oral or electronic notification.
with the conditions
• Within 7 calendar days, a report that contains a description of the
of this permit that
noncompliance, and its causes; the period of noncompliance,
may endanger
including exact dates and times, and if the noncompliance has not
health or the
been corrected, the anticipated time noncompliance is expected to
environment[40
continue; and steps taken or planned to reduce, eliminate, and
CFR 122.41(I)(7)]
prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6).
• Division staff may waive the requirement for a written report on a
case -by -case basis.
_ wa,
k NORTH CAROLI NA
Environmental Quality
I NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING � EFFECTIVE: 04/01/191