Loading...
HomeMy WebLinkAbout20141255 Ver 1_stones landing drawings_20150116h 0 0 0 0 1^I y 1 ' S11 3 = 145 r � "s,Oj;.NG�tw i 11�0111 . - * Ali Ex. Design 0& Towne 'Pointe Boulevard Impal ` 60 RAW Wetic ' ; E>r.aesiga Sectim1,AtlOnWlcMe Strew Q at NOW Bay �'�r � � Claar�beutlopment,Ina. U,CAPil.336 �� ►�►' Mi. 60, Pg. 181 rr ►►► 9167,Pg,186 GRAPHIC SCALE,111:N (Tract 3) 0 100 X00 300 600 900 %M66e7T 0000,11a MotIIN.McboweAl b.B.A,pi260 I b,B,663,Pg,210 U. 0, P9,1B1 I Vw lhbc opmmt,lac, 0109,N.336 M,B,6o,Pg,181 9167,P1,186 (Tract 3) 01& Towne Pointe Boulevard ffR/W clearly buipmant, Inc. DJAB9, Pg.336 AlV,Pg,186 (Trod 3), alwrf bardopmwt,Inc, 3,4139,Pg336 91 67,P1,186 (Tract 3) Crossroads Store Drive ,,—KkW Notes. VICINITY SKETCH NOT TO SCALE Overall Wetlands Impact Map - Sheet 7 of 2 Le end. D.B. - Deed Book M.B. - Map Book Pg, - Poge R/W - Right-of -way Typ, • Typical •Wetlands Site p�1 Sio�alordi�g, Stein y �gf e,o� oHi aai a3'�4' y,Pal Porod'� NO P�1I a doed" Bq SOW, Sutanl �y � �tl�1i� fgvt NOW Bcr 1, Wetland crossing: initial disturbance of this area shall be limited to only that area needed to allow passage of construction equipment to prepay¢ for the installation of the crossing and to execute upland construction on the opposing side of the crossing, Clearing, grubbing or land disturbance of the subject area shall not be performed until all equipment, water, sewer, storm drain and erosion and sediment control materials or devias sufficient to substantially complete the construction and st6ili2otion of the crossing ore staged or stockpiled at the location, Due consideration shall be given to impending inclement weather conditions that may adversely offect the completion of the crossing in the shortest time practicable, 2, istoblish clearing limits per approved plops, Clear and grub wetlands area as needed. Immediately install silt fence at the wetlands line, and along existing creek top of bank Install erosion control fabric along ditch bonks, Do not clear or disturb any unpermitted areas, 3. No construction of the crossing shall commence in the wetlands until all materials needed for the crossing are staged on site, 4. When possible, work in the wetlands shall be done during periods of dry weather, 5. Work in the wetlands shall be completed in the minimum time necessary. 6, Contractor shall install temporary sand bags and/or sheet pilings in the stream prior to construction and bypass water as needed via a pump around, Pump around shall discharge into a rip rap lined basin or a sediment bag to keep sediment out of stream. 7, During excavation, stockpile the top 12 114 of topsoil, and reuse topsoil as the top layer of soil when bockfilliog, 8, Install sewer then storm drain pipe, then water pipe. Backfill, compact and regrode grade area to original contours, 9. Install silt fence at top of ditch bank and at wetlands line to prevent erosion, 10, After installation of sewer, temporary impact areas shall be restored to original grade, (ditch to be reshaped to original width end depth), with natural soils, then seeded with annual seed, and matted to restabilize, 11, If wetland or stream areas are disturbed, outside of the impact areas, they shall be regraded to original contours using topsoil for the top layer, and the stream banks shall be seeded, with annual seed, then lined with high velocity excelsior matting then stoked with live willow stakes at 3' on center to stabilize the banks to 5' beyond the top of bank 12, See rest of design plans for additionol detail, Pry Owners; Date: T26/14 Parker &Associates, Inc, STONES LANDING, SECTION I Scale, P.O Consulting Engineers - Land Surveyors - Land Planners 3 1144.k Clearly Development, Inc. Field book: NIA P.O. Box 876 - 26541 -0976 AT ONSLOW BAY File Name; SL•Wetland Impact,dwg 906 Now Bridge Street - 26640 100 Carolina Plantations Boulevard Disk Name: ACRD #2510 Jacksonville, North Carolina 3acksonville, North Carolina 28546 Drawn, III, Phone (910) 466 -2414 - Fag (910) 455 -8441 White Oak TO., Onslow Co,, North Carolina (910) 455.6956 Firm Ueense Nulaaber; F -0106 F w 0 N 0 N Pra'ett, TOB of bank Wetlands line) (Tvn') L D L , CR I I� it "- �s �Wetlantls LIM (Tip') TOB of stream bank Wetlands Impact Plan View 5cole :1 " :40' I Ac, • Acreoge i• Centerline CB • Catch Basin Elev. • Elevation Ex. • Existing Inv, • Invert LF - lireorPeet M,B, • Map Baok Min. • Minimum ro MH • Manhole Pg, Page N RCP • Reinforced Concrete N 0 RIW • Right•of -Mq t` S,S, Sonital5¢wer $ta•Station TOB • Top of Bank TO. • Typical ■••— • flow Arrow +� • Pipe Flow Arrow • Pip¢ Al Wetloqs 9F •Silt fence •-- — — ---• Waterline —. Wetlonds line Note: 1, See Notes on Sheet 1 of 2 For Additional Information. 2, Wetlands impact area dots not include stream area (top of bank to top of bank), 3, See design plans for additional information. 1111111 H 1111111 11 CA% k% l� PANIC SCALE:1 ':40' 0 40 80 120 SEAL ' Wetlands Impact 14575 F T Profile View �,0���yy'��'�bis '�T�` Scale Harz, 1'100' ',fill, 'tY �' Vert, 1'1:4' �� 1 ` Wetlands Impact Map Impact Area Sheet 2 of 2 r 11111111111111 Owners; STONES LANDING, SECTION Clearl y Development, Inc. ATONSLOW BAY White Oak Up,, Onslow Co., North Carolina 100 011110 Plantations Boulevord Jacksonville, North Carolina 28546 (910) 455.6956 Dote, 11126114 Parker & Associates, Inc, scale, As Noted Consulting Engineers - Land Surveyors - Land Planners4i B0r0�e Field book NIA PA Box 976 - 26541 -0876 Pile Name; Sl Welland Impoct,dwg 300 New Bridge Street - 26540 Disk Name ACRD 010 Jeeksonde, North Carolina Drawn, JA Phone (910) 455 -2414 - Fax (910) 4669441 Firm license Number: F -0106 al 1 '' aw `' r r` i IV rss,ry ma rm. ". 7 I .Mr„ 1m� ► I r A V 8 140,x' 8 o ~�_r�ad �'rr,; . �a �• �' a ►I I' m ry i''+ LO d ar a I � � I I ► � ro 193 ' I' � 160, Pty NI h,, � N w �iW r. W C 1 W I Oil I� �� I p IIt a, W I �a ,,, t'` 196,01 $ I po W o t w� �I w o ti I D � I I I ao � �►. 1' f f �, p I� 11046 � W I jy to t a t ✓�°tI ,, �, , � I I s� I ! rn /,� } � a� W." Q 0 Q 6t f f �f If '" � ' N peWN N \ � II! ,, o E a � � ►' a ti � 1n � '� �' +° 4 a a � 1 m I � INI s / �4 f I �' w 14661 `! a ► It � �'�',� 1�9, ) a 116,1 ate, aI '' � � �, I � � � ,tip � � G� t • I , , � ,a � w� 1L+j 1i , Ni' 1 N I 'P / '•�l r , 6 N ,�� t lE , � w -010 /A It r ` hh It 10,10 w ti ' Jim r 10 k off' cly Q 1 M Ill All /Al 14 ��f �I b a f I, 1 P I Off `'' ~II, 11� I� w �! 1' D I`