Loading...
HomeMy WebLinkAbout20020672 Ver 3_Attachment 37 - 10-31-11 Wrenn e-mail to Christy Shumate_20141124From:Kym Hunter To:Kym Hunter; Subject:FW: DWQ-Permitting Issue of Concern 103111 Date:Tuesday, April 24, 2012 3:20:00 PM From: Wrenn, Brian Sent: Monday, October 31, 2011 1:01 PM To: Shumate, Christy; Hair, Sarah E SAW; McLendon, Scott C SAW; Matthews, Monte K SAW; Lespinasse, Polly; Chambers, Marla J; marella_buncick@fws.gov; Militscher.Chris@epamail.epa.gov; Gledhill-earley, Renee Cc: Harris, Jennifer; Jill Gurak; 'George.Hoops@dot.gov'; Karoly, Cyndi Subject: DWQ-Permitting Issue of Concern 103111 Christy, As we have discussed in the last few NCTA meetings regarding this project, DWQ will not accept a 401 application with the designs proposed by NCTA for the Gaston E-W connector. The recent court decision on the Monroe Bypass has no bearing on this decision. It comes down to the fact that design build team, which has yet to be named, has proprietary control over the design of the road. We see it as a waste of staff time to review an application with designs that likely will be thrown on the scrap heap in favor of the design build team’s design. Any accommodations that were made regarding application submittal for the Monroe bypass project were specific to that project and set no precedent as a way to do business for this or future projects. We have repeatedly informed NCTA of this fact and were told that a meeting would be arranged to discuss this matter. We have yet to hear from NCTA regarding any such meeting. It appears , on the surface, through your plans to submit a 404/401 application that you have ignored our issue of concern. In accordance with 23 USC, Sec. 139 (h)(3)(A), we request that you set up a meeting to resolve this issue of concern. If you have any questions regarding this matter, please let me know. Thanks and we look forward to meeting with you soon. Brian Brian Wrenn Transportation Permitting Unit, Supervisor NC Division of Water Quality brian.wrenn@ncdenr.gov Attachment 38 585 Waughtown Street Winston-Salem, NC 27107-2241 336-771-4952 (Winston-Salem no.) 336-771-4631 (Fax) or 1650 Mail Service Center Raleigh, NC 27699-1650 919-807-6365 919-807-6494 (Fax) From: Shumate, Christy Sent: Monday, October 31, 2011 11:19 AM To: Hair, Sarah E SAW; McLendon, Scott C SAW; Matthews, Monte K SAW; Lespinasse, Polly; Wrenn, Brian; Chambers, Marla J; marella_buncick@fws.gov; Militscher.Chris@epamail.epa.gov; Gledhill-earley, Renee Cc: Harris, Jennifer; Jill Gurak; 'George.Hoops@dot.gov' Subject: Gaston E-W Connector (U-3321) Update All, We would like to provide an update on the Gaston E-W Connector project since we last met in September. Now that the judge has ruled on the Monroe case, we will be pushing forward with completing the ROD for this project. We hope to have the ROD issued by the end of November. Permitting & Mitigation: Thanks to those of you who provided comments on the Water Quality Analysis report. Your comments have been incorporated into the report, and responses and the revised report will be distributed this week. We are preparing a permit application for the project based on designs discussed at the 4B (June 2011) and 4C (August and September 2011) meetings. The application will include a conceptual mitigation plan for the Linwood Springs Golf Course site, which has officially been turned over to NCDOT. Other onsite and nearby mitigation opportunities are also being pursued, and the latest status of this work will be included in the application. EEP has committed all credits from the Beaverdam Creek site to this project. Design-Build: Shortlisted teams for the West and East design-build contracts have been announced (see http://www.ncdot.gov/projects/gardenparkway/ then Contract Procurement). We are in the process of making all project documentation available to the teams. As part of this process, we have updated the Section 6002 Project Coordination Plan. As you know this project follows the Merger process. Changes the coordination plan are shown in the attached and are limited to updates to schedule, project contacts, and NCTA/NCDOT relationship since the previous update in 2008. Please contact us at any time if you have questions or comments about this project. Thanks, Christy Christy Shumate, AICP Senior Transportation Planner NCTA General Engineering Consultant 1578 Mail Service Center Raleigh, NC 27699-1578 Tel (919) 707-2700 Dir (919) 707-2729 cmshumate@ncdot.gov Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.