HomeMy WebLinkAboutNCC203962_NOT Closeout Documents_20221201TOWN of
WAKE FOREST
Certificate of Completion
Erosion and Sediment Control
Town of Wake Forest Engineering Department
301 S. Brooks St.
Wake Forest, NC 27587
Phone: 919) 435-9443
Permit Number: 2020-00001673
Subdivision / Site Name:
Permit Issue Date:
Date of Final Inspection / walk thru:
Mason Oaks Phase 1/Mason Oaks Lots 62 & 40
10/28/2022
10/28/20022
Location:
Financial Responsible Party:
Contactor Phone Number:
HOLDEN MASON II LLC
Plan Specifications Met;
Local Ordinance Met:
Temporary Controls Removed:
Permanent Controls Installed and
Operational
YES
YES
YES
N/A
Additional Comments:
The undersigned (inspector) hereby accepts the installation
of permanent and removal of temporary erosion and sediment control devices (per plan and
specification) on behalf of the Town of Wake Forest. The owner is responsible for maintaining these devices, and in
no way holds the Town responsible for
cleanout or repair
I
Inspector:
Contractor:
Owner:
6),WV i V +