HomeMy WebLinkAboutNCC201768_NOT Closeout Documents_20221130North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
FB-Fort Bragg Drilling Mud Disposal
County: Cumberland Project: Project River basin: Cape Fear
Person financially responsible: Piedmont Natural Gas -Joseph Heckman, Project project #: CUNME-2020-156
Manager NCC201768
Address: 4720 Piedmont Row Drive, Charlotte, NC 28210
1. Project Location: Smith Lake Road, Fort Bragg
Pictures: No
2. Weather and soil conditions: sunny/workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Joe Heckman/Stephen Williams Title: Duke Energy
Inspection report: Sent Report Date given/sent: November 30, 2022
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Penny Markle Others present: Lee Ward
Date of inspection: November 23, 2022 Time arriving on site: 10:47 AM Time leaving site: 11:02 AM
cc: