Loading...
HomeMy WebLinkAbout20140275 Ver 4_CAMA Application_20221130ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director November 30, 2022 MEMORANDUM: FROM: NORTH CAROLINA Environmental Quality Gregg Bodnar, Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregq.bodnar@ncdenr.gov SUBJECT: CAMA Major Permit Renewal Review Applicant: TJs Land Development LLC. Permit No: 79-15 Project Location: adjacent Pungo Creek, off SR 1718 and Yeatesville Rd., near Belhaven DCM has determined that no substantial development has occurred since the last permit action, therefore, this project does not qualify for a renewal under CRC rule 15A NCAC 07J.0404(b). However, subsection (c) allows the Division of Coastal Management to circulate the request to the state agencies to determine if any changes in circumstances or in development standards warrant a new application and CAMA major permit review. DCM is not aware of any proposed changes to the previously authorized project. Please indicate below your agency's position or viewpoint on the proposed renewal request and return this form to Gregg Bodnar at the address above by December 30, 2022. If you have any questions regarding the proposed project, contact Shane Staples (252) 946- 6481. When appropriate, in- depth comments with supporting data is requested. REPLY: PRINT NAME AGENCY SIGNATURE DATE This agency has no objection to the renewal request as proposed. **Additional comments may be attached** This agency has determined that circumstances or development standards have changed and warrant a new CAMA major permit application review. See attached. £ D_E NORTH NA Department nt at at Environmental Duality North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1400 Commerce Avenue I Moorehead City, North Carolina 28557 252.808.2808 Pear. 'lass cA DED (CRC Variance) X STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission hermit for Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to TJ's Land Development, LLC., PO Box 125, Pantego, NC 27860 Permit Number 79-15 Authorizing development in Beaufort County at adj. Pungo Creek, off SR 1718, YeatesvilIe Road, near Belhaven , as requested in the permittee's application dated 5/5/15, including the attached drawing (1), dated revised 2/10/14. This permit, issued on December 17, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Marina 1) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility shall be installed in an .easily accessible Location, and a representative of the Division of Coastal Management shall meet on -site with the permittee to ensure that the required pumpout facility is in place and operable. The pumpout facility shall be operable and maintained for the life of the marina. 2) The marina shall display a sign showing the location of the on -site pumpout facility, including other appropriate waste disposal information, at the entrance and exit from each of the main piers. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. fAny maintenance work or project modification not covered hereunder requires further Division approval. 1 All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Bra ron C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee f• Land Development, LLC ADDITIONAL CONDITIONS Permit No. 79- Page 2 of 4 No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. The permittee shall provide a Spill Prevention Control and Countermeasure plan to the Division of Water Resources before fueling facilities are constructed and shall supply a copy of the plan to the Division of Coastal Management. Unless specifically altered herein, this permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non-waterdependent uses of structures shall be conducted on, in or over public trust waters without permit modification. In accordance with the CRC Variance granted on 11/17/15, all portions of the access pier/walkway built over Coastal Wetlands shall not exceed a width of eight (8) feet and shall be elevated a minimum of five (5) feet over the marsh substrate as measured from the bottom of the decking. No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee shall not be relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury that may be caused from existing or future operations undertaken by the United States in the public interest. 10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 11) This permit authorizes a maximum of 66 docking spaces. At no time shall more than 66 vessels be moored or docked at the marina facility. Easement 12) The permittee may be required to apply for a submerged lands lease from the Department of Administration's State Property Office. Contact the Department of Administration's State Property Office directly at (919) 807-4650 for this determination. Should it be determined that an Easement is required, the permittee shall supply a copy of the easement to the Division within 30 days of issuance of the Easement. r J'snd Development, LLC Permit No. 79-15 ADDITIONAL CONDITIONS Upland Development Page 3 of 4 13) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the campsites, bathroom facilities, laundry mat, store, reception venue, pond modification with associated bulkhead, and required access infrastructure, all as expressly and specifically set forth in the attached permit application and workplan drawings. Contact a Division of Coastal Management representative at (252) 946-6481 for this determination. Sedimentation and Erosion Control 14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales-or berms, etc.) 15) General The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the State of North Carolina. No claim shall be made against the United States or the State of North Carolina on account of any such removal or alteration. 16) No Coastal Wetlands shall be excavated or filled, even temporarily. 17) This permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. 18) No open water areas shall be excavated or filled, even temporarily. 19) This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including any authorizations from the NC DEMLR Stormwater Section. TJ''s Land Development, LLC Permit No. 79- . Page 4 of 4 ADDITIONAL CONDITIONS NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division of Costal Management at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that, in accordance with the rules of the Environmental Management Commission, many non -water dependent activities are not authorized within 50 feet of the normal water level or landward edge of any coastal wetlands, whichever is more restrictive. Contact the Division of Water Resources at (252) 946-6481 for project specific clarification. NOTE: The N.C. Division of Water Resources has authorized the proposed project under General Water Quality Certification No. 3900 (DWR Project No. 14-0275 V2), which was issued on 7/8/15. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-201501116. Coastal Management ENVIRONMENTAL QUALITY December 17, 2015 T J's Land Development, LLC P.O. Box 125 Pantego, N.C. 27860 Dear Sir or Madam: PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-12I.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, 05;74 V. Hugged/ Major Permits and Consistency Manager N.C. Division of Coastal Management Nothing Compares., State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Avenue I Morehead City, NC 28557 252-808-2808 Permit #: 7145— DCM Coordinator: StS MAILING DISTRIBUTION SHEET Permitee: ros14wbeV, . Agents:-IoQ Y1•ir�J, P4 DCM Field Offices Elizabeth City Morehead City Washington Wilmington US ACOE Offices: Washington: Wilmington Cultural Resources: Public Water Supply: DCM/ Fisheries Specialist NC DOT: DMF/ Shellfish Sanitation: State Property: Water Resources: Washington: Wilmington: DEMLR Washington: Wilmington: (with revised work plan drawings) Raleigh Bland William Westcott (NC DOT) Bill Biddlecome (NC DOT) Tyler Crumbley Liz Hare Renee Gledhill -Early Diane Williams (WIRO) Joey White (WARO) Shane Staples Gregg Bodnar Ken Pace Patti Fowler Shannon Jenkins Tim Walton Karen Higgins (Raleigh) John Hennessy (NC DOT) Anthony Scarbraugh-401 Joanne Steenhuis — 401 Chad Coburn - 401 Scott Vinson-Stormwater Georgette Scott- Stormwater Wildlife Resources: Maria Dunn LPO: Fax Distribution: Permitee #: Agent #: STATE OF NORTH CAROLINA ) BEFORE THE NORTH CAROLINA ) COASTAL RESOURCES COMMISSION COUNTY OF BEAUFORT ) CRC-VR-15-06 ) ) IN THE MATTER OF: ) FINAL AGENCY DECISION PETITION FOR VARIANCE ) BY TJ'S LAND DEVELOPMENT, LLC ) On October 2, 2015, Petitioner TJ's Land development, LLC submitted its request seeking a variance from 15A NCAC 07H .0208 to allow construction of an 8-foot wide dock over the wetlands adjacent to Pungo Creek near Bath in Beaufort County, North Carolina. This matter was heard on oral arguments and stipulated facts at the regularly scheduled meeting of the North Carolina Coastal Resources Commission (hereinafter Commission) on November 17, 2015 in Atlantic Beach, North Carolina pursuant to N.C. Gen. Stat. § 113A-120.1 and 15A NCAC 7J .0700, et seq. Assistant Attorney General Shawn Maier and Christine A. Goebel, Esq. appeared for the Department of Environmental Quality, Division of Coastal Management (DCM) and Franz Holscher, Esq., of Rodman, Holscher, Peck & Edwards, P.A. appeared on behalf of Petitioner. Upon consideration of the stipulated facts and stipulated exhibits which together comprise the record documents in this case and the arguments of the parties, the Commission adopts the following: FINDINGS OF FACTS 1. The Petitioner in this case is TJ's Land Development, LLC ("Petitioner"). 2. Petitioner is a North Carolina limited liability company. Tobin J. Tetterton, Sr., is the Registered Agent and sole member and manager of the company. (Stipulated Exhibit 1) 1 3. The property subject to this variance is owned by Petitioner, is located off of SR 1718 near Belhaven in Beaufort County, North Carolina, and has a physical address of 1711 Yeatesville Road, Bath, North Carolina 27808 ("Site"). Petitioner acquired this property in 2013 from John Tankard Jones and wife, Mary Etta Jones, through a deed recorded at Book 1809, Page 753 of the Beaufort County Registry. (Stipulated Exhibit 2) 4. The Site is adjacent to Pungo Creek. At this Site, the waters of Pungo Creek are classified by the Environmental Management Commission as SC NSW waters. These waters are Inland Waters regulated by the North Carolina Wildlife Resource Commission and are closed to shell fishing. 5. The Site has coastal wetlands, public trust, and public trust shoreline Areas of Environmental Concern ("AEC"). Pursuant to the North Carolina Coastal Area Management Act of 1974 ("CAMA"), any "development" proposed for these AEC requires authorization under CAMA and the North Carolina Dredge & Fill Law. N.C. Gen. Stat. § 113A-118 and §113-229. 6. Currently, the Site is undeveloped. As seen in photographs, the Site consists of a mix of cleared agricultural land, wooded 404 scrub shrub wetlands and coastal wetlands marsh. The total acreage of the property is 46.5 acres, which includes approximately 854 linear feet of coastal wetlands shoreline along Pungo Creek. The coastal wetlands are approximately 240 feet wide between the normal high water level of Pungo Creek and the waterward extent of the wetlands, and are vegetated with black needlerush (Juncus roemerianus), sawgrass (Cladium jamaicense), and giant cordgrass (Spartina cynosuroides). (Stipulated Exhibits 3, 5, and 7) 7. On May 20, 2015, DCM received a complete CAMA major permit application from Petitioner, through its authorized agent Hood Richardson requesting permission to 2 construct a 66-slip marina and accessway, the infrastructure for a 106-lot RV camping ground with associated septic systems, a community building (housing showers, laundry, a provisions store, and reception facilities), an upland pond (with bulkhead and pier), parking, and fuel and pump -out facilities. The marina is designed to provide dockage for the general public who desire to rent a slip, including patrons of the RV camping ground. (Stipulated Exhibit 6) 8. Petitioner proposed that the 66-slip T-head marina would be accessed by an 8-foot wide access dock of which approximately 50 feet is located over high ground, approximately 300 feet is located over wooded 404 wetlands, approximately 240 feet is located over coastal wetlands and approximately 140 feet is located over open water. Petitioner proposed the entire eight foot -wide dock be constructed five feet high, including the middle section over the coastal wetlands substrate. This is two feet higher than the three foot height required by the Commission's rules. 9. The access dock is designed to be eight feet wide by 586 feet long ending in a T- shaped dock with 66-slips. The dock will have a thirty foot square, roofed platform at the intersection with the access dock. This platform will support the fueling area and the marine pump -out. Two 15 by 30-foot slips will be used by boats fueling or pumping out onboard holding tanks. The dock will have two 25 foot square roofed platforms at each end of the dock, along with twenty-four I 8-foot by 40-foot slips with a "stern to" orientation on the offshore side of the dock accessed by fourteen finger piers. The inshore side of the dock will have forty 10 feet by 10 feet boat lifts accessed by twenty-two finger piers. (Stipulated Exhibit (6) 10. As part of the CAMA major permit process, notice was sent to the two riparian owners adjacent to the Site: JHG Farms, LLC and WMT Holding, LLC. These owners executed 3 an Adjacent Riparian Property Owners Statement indicating that they had no objection to the proposed development and JHG Farms, LLC agreed to waive the 15 foot pier setback. (Stipulated Exhibit 4) DCM received no additional feedback from these adjacent owners. 1 1. Also as part of the CAMA major permit process, notice was posted on Site and was published in the Washington, Daily News. DCM received no comments related to this proposed project. 12. Also as part of the CAMA major permit process, information about the proposed development, including the DCM Field Investigation Report (Stipulated Exhibit 5) was sent to state and federal resource agencies for comment. No adverse comments were received by DCM. The Division of Water Resources issued a 401 Certification for the project on June 8, 2015, 13. On August 4, 2015, DCM issued CAMA major permit 79-15 (the "Permit") (Stipulated Exhibit 6) authorizing construction of the 66-slip marina. However, Condition 6 of the Permit limited the proposed access dock to a maximum width of 6 feet in the middle section over approximately 240 feet of coastal wetlands as required by the Commission's rule found at 15A NCAC 7H .0205(b)(6)(C). 14. The Commission's rules generally prohibit development in the Coastal Wetlands AEC, but allow development for water dependent uses per 7H .0208(a)(1). The Commission's rule 7H .0208(b)(6)(A) requires piers located in AECs other than Coastal Wetlands to be six feet wide, but allows greater width " if the greater width is necessary for safe use, to improve public access, or to support a water dependent use that cannot otherwise occur." However, for the Coastal Wetlands AEC, the Commission's rule at 7H .0208(b)(6)(C) limits the pier width to six feet wide without exception. Given these rules, DCM permitted that portion of the access dock 4 located over the 404 wetlands and open water to be eight feet wide, but Iimited the width of that portion of the pier located over coastal wetlands to six feet as required by 7H .0208(b)(6)(C). 15. On October 2, 2015, DCM received Petitioner's variance petition seeking a variance from Condition No. 6 on the Permit in order to construct an 8 foot wide pier over the approximately 240 foot long middle section of the access dock located over the coastal wetlands. 16. The access dock currently permitted by DCM will shade approximately 1,440 square feet of coastal wetlands. If the variance is granted, the addition of two feet in width would shade approximately 480 additional square feet for a total of approximately 1,920 square feet shaded Coastal Wetlands AEC. 17. As part of its petition, Petitioner stipulated that constructing a pier eight feet wide over the coastal wetlands would not be consistent with 15A NCAC 7H .1205(d). 18. Aerial and ground -level photographs of the Site were provided to the Commission in DCM's PowerPoint presentation. (Stipulated Exhibit 7) STIPULATED EXHIBITS Included with the Petition and the Staff Recommendation for the Commission's review were the following Stipulated Exhibits: 1. TJ's Land Clearing, LLC Secretary of State filing; 2. Deed recorded at Book 1809, Page 753 of the Beaufort County Registry; 3. CAMA Major Permit application including the site plan; 4. Notice to Adjacent Riparian Owners; 5. DCM Field Investigation Report; 6. CAMA Major Permit No. 79-15, issued August 4, 2015; 7. Powerpoint Presentation with -aerial and ground -level photos of the Site, including google earth images from Petitioner. 5 CONCLUSIONS OF LAW 1. The Commission has jurisdiction over the parties and the subject matter. 2. All notices for the proceeding were adequate and proper. 3. Petitioner has met the requirements in N.C.G.S. § 113A-120. I (a) and 15 NCAC 07J .0703(f) which must be found before a variance can be granted as set forth below. A. • Strict application of the Commission's Rule limiting the width of the access dock will cause unnecessary hardships. The Commission affirmatively finds that strict application of Rule 15A NCAC 7H .0208(b)(6)(c) would cause Petitioner unnecessary hardship. Without the variance, the width of the access dock would be limited to six feet. Given the length of the proposed access dock and the extent of the marina traffic association with the proposed 66-slip facility, limiting the width of the dock would cause Petitioner unnecessary hardship and make it difficult to provide safe passageway to the marina. In addition, given Petitioner's voluntary elevation of the access dock to five feet above the coastal wetlands substrate, even though only a three foot elevation is required by rule, the impacts of the proposed design will be limited. For these reasons, the Commission affirmatively finds that Petitioner has met the first factor without which a variance cannot be granted. b. Petitioner has demonstrated that the hardship results from conditions peculiar to the property. The 46.5 acre Site has approximately 854 linear feet of coastal wetlands shoreline along Pungo Creek. In its Recommendation, DCM agrees that there was no other location on the Site to locate the access dock which would reduce the impact on the coastal wetlands. Additionally, the depth of the marsh and coastal wetlands extending landward from Pungo Creek requires a long 6 access pier of approximately 630 linear feet.to reach open water of sufficient depth to accommodate the marina. The access dock progresses from high ground over wooded 404 wetlands and coastal wetlands to the open water. Approximately 240 linear feet of the access dock is located over the coastal wetlands. Petitioner argues that the hardship is caused by conditions peculiar to the property such as the size of the property, the depth of the coastal wetlands, and the length of the pier required to bridge the coastal wetlands. Moreover, Petitioner argues that given the size of the property, it could be subdivided and applications submitted for additional access docks over the coastal wetlands. Petitioner represents that by requesting permission to build just one eight -foot wide dock over the coastal wetlandsinstead of two six-foot wide access docks, the impact to the coastal wetlands will be minimized. For the reasons set forth above, the Commission affirmatively finds that Petitioner has demonstrated that the hardship results from conditions peculiar to the property. Therefore, Petitioner has met the second factor required to grant its request for a variance. c. Petitioner has demonstrated that the hardship does not result from actions taken by Petitioner. The Commission affirmatively finds that Petitioner has demonstrated that the hardship does not result from actions taken by the Petitioner. Specifically, the shoreline at this Site are covered with coastal wetlands and there is no other location on the Site which could be used for the access dock that would significantly reduce the impact to the coastal wetlands. In addition, Petitioner has voluntarily proposed elevating the decking by two feet more than the minimum height required by the rules. The increased height of the access dock will reduce the impact of shading on the coastal wetlands. 7 For these reasons, the Commission affirmatively finds that Petitioner has taken steps to reduce the hardship while exercising its riparian rights. In this way, Petitioner has demonstrated that the hardships do not result from its action. Accordingly, Petitioner has met the third factor required for a variance. d. Petitioner has demonstrated that the requested variance is consistent with the spirit, purpose and intent of the Commission's rules, will secure public safety and welfare, and will preserve substantial justice. The Petitioner has demonstrated that the requested variance (a) is consistent with the spirit, purpose and intent of the Commission's rules, (b) will secure public safety and welfare, and (c) will preserve substantial justice. The principal purpose of the Rule limiting the width of piers located in coastal wetlands AECs is to minimize impacts to the coastal wetlands. 15A NCAC 7H .0208(b)(6)(c). However, the proposed expansion of this access dock would have minimal impacts to the coastal wetlands. As designed the eight foot wide dock would add shade approximately 480 additional square feet of coastal wetlands (based on an additional two feet in width for 240 linear feet over the coastal wetlands). Additionally, the design for the proposed development will elevate the access dock by two feet and in this way reduce shading impacts. For these reasons, the Commission affirmatively finds that Petitioner's proposed pier design is consistent with the spirit, purpose, and intent of the Commission's rule limiting the width of piers over coastal wetlands. The second assessment to be made is whether the variance proposed by the Petitioner will impact public safety and welfare. Petitioner argues and the Commission agrees that increasing the width of the access pier from six feet to eight feet will improve the safety and, welfare of persons using the marina by making it easier for people and carts to pass on the long narrow 8 access dock. In addition, the increased width will secure public safety and welfare by allowing the safe passage of golf carts in urgent/emergency situations, with limited impacts on the important Coastal Wetlands resources. For these reasons, the Commission agrees that the proposed development, if granted a variance, will have no adverse effect on public safety and welfare. Finally, the Commission agrees that a variance will preserve substantial justice by allowing Petitioner to reasonable exercise his riparian rights to develop the water -dependent marina while reducing impacts to the coastal wetlands on the Site. For all the reasons set forth above, the Commission affirmatively finds that Petitioner has met the fourth factor required by N.C.G.S. § 113A-I20.1(a). ORDER THEREFORE, the requested variance from 15A NCAC 7H.0208(b)(6)(c) is GRANTED. The granting of this variance does not relieve Petitioner of the responsibility for obtaining any required permits from the proper permitting authority. This variance is based upon the Stipulated Facts and Stipulated Exhibits. The Commission reserves the right to reconsider the granting of this variance if there is a material change to any of the stipulated facts. This the 10th day of December 2015. Anan4 0,atM,,r Frank D. Gorham, III, Chairman Coastal Resources Commission 9 CERTIFICATE OF SERVICE This is to certify that 1 have this day served the foregoing FINAL AGENCY DECISION upon the parties by the methods indicated below: Tobin J. Tetterton, Registered Agent TJ's Land Development, LLC P.O. Box 125 Pantego, NC 27860 Franz F. Holscher, Esq. Rodman, Holscher, Peck & Edwards P.O. Box 1747 Washington, NC 27889 Christine A. Goebel, Esq. Assistant Attorncy General N.C. Department of Justice Braxton C. Davis Angela Willis Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Certified Mail/ Return Receipt Requested and electronically: tobin®gotricounty.com U.S. Mail Electronically at cgoebel@ncdoj.gov This the 10th day of December, 2015 Electronically at braxton.davis@ncdenr.gov and an ge la. wi 1 l i s@ncdenr. go v L. L • sse Speci - r ty Attorney General and Commission Counsel N.C. r epartment of Justice P.O. Box 629 Raleigh, N. C. 27602 10 ::r::x:oo:asaa000:ceeees:eo::::ea::+041AIc•csa•eI NI+C11oene: Permit Class RENEWAL STATE ;OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ennit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Permit Number 79-15 Issued to TJ's Land Development, LLC., PO Box 125, Pantego, NC 27860 - Authorizing development in Beaufort County at adj. to Pantego Creek, off SR 1718, Yeatesville Road, near Belhaven , as requested in the permittee's application dated letter dated 11/3/20. This permit, issued on December 9, 2020 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to Permit No. 79-15, which was issued as amended by CRC Variance to the permittee on 12/17/15, and copies of both documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 14-0275 V3. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2015-01116. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on This permit and its conditions are hereby accepted. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Braxton C. Davis, Director Division of Coastal Management Signature of Permittee DCM Coordinator: Permit #: 161S ait€L - MAILING DISTRIBUTION SHEET Permittee: T S Lcv G.C.,( LK- Riof o 27 C) Agents: DCM Field Offices Elizabeth City Morehead City US ACOE Offices: Washington: Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLRIDWR: Washington: Wilmington: Wildlife Resources: Natural Heritage Program LPO: Washington Ve Wilmington IK+t`i (with revised work plan drawings) (OBJECTIONS ) Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Kim Harding David Harris Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan Clif Whitfield (WARO) Jimmy Harrison Chris Pullinger - 401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Robb Mairs — 401 (Brunswick, New Hanover) Holley Snider — 401 (Carteret, Onslow, Pender) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Maria Dunn (WARO) (NCDOT) Travis Wilson Rodney Butler Bodnar, Gregg From: Staples, Shane Sent: Tuesday, December 8, 2020 10:37 AM To: Bodnar, Gregg Subject: RE: TJs renewal After looking at the plans again and the site I am changing my previous e-mail and saying there is significant development. The pond/basin central to the campground permitted is being excavated. Shane Shane F. Staples DCM Field Representative Washington Regional Office shane.staples@ncdenr.gov office: 252-948-3950 cell: 252-204-4081 943 Washington Square Mall Washington, NC 27889 From: Bodnar, Gregg Sent: Tuesday, December 8, 2020 8:53 AM To: Staples, Shane <shane.staples@ncdenr.gov> Subject: FW: TJs renewal From: Staples, Shane <shane.staples{a ncdenr.eov> Sent: Monday, December 7, 2020 4:52 PM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: RE: TJs renewal Gregg, 1 dropped by the site today and I would say there has not be substantial development. A gravel/dirt path to the area near the pond is all that appears to have occurred. Let me know what else you need. I haven't dealt with a limited circulation renewal before. Shane Shane F. Staples DCM Field Representative Washington Regional Office shane.staplespncdenr.gov 1 A office: 252-948-3950 cell: 252-204-4081 943 Washington Square Mall Washington, NC 27889 From: Bodnar, Gregg Sent: Monday, December 7, 2020 8:38 AM To: Spivey, Kelly <kelly.spivev@ncdenr.gpv>; Staples, Shane <shane.star ies@ncdenr.gov> Subject: TJs renewal Hey all, Just wanted to check in about any evidence of substantial development. Thanks, Gregg Gregg Bodnar Assistant Major Permits Coordinator vision of Coastal Management Department of Environmental Quality 2S2 $08 280$ ext 2 iS (Office) GremBodnar@ncdenr.gov Emal conresponderrce to and from this address is subject to the North Carolina Pubtic Records Law anti may be disclosed Co third parties, NC Division of Coastal Management CAMA Major Permit Renewal Request District: WaRO Major Permit Stall:Gregg Bodnar Applicant Name: Td's Land Development LLC Request Date: Last Firs: Project Address: SRI718 Yeatesville Rd Belhaven 27810 Street Address City ZIP Code CAMA Permit Permit Expiration Payment No.: 79-15 Date:12/31/2020 $ 100.00 Chk.# 1166 Agent's Name: N/A District Manager/Field Rep Approve? (Initial Appropriate Box) YEpS NO DWR Project No: 14-0275V 3 Has substantial If Yes, YES NO Explain development occurred? ❑ ❑x USACE Action ID No.: SAW-201501116 RECEIVED YES NO Recommend to Renew? x❑ 0 NOV 1 2 2f?0 If Not Approved, provide Justification: SECTIO V! Staff Signature: Date: // io /2-07.—e_, TJ'S LAND DEVELOPMENT LLC P.O. BOX 125 PANTEGO NC 27860 252-943-6677 252-944-5555 'November 3, 2020 North' Carolina Division of Coastal Management Mr. Shane Staples 943 Washington Square Mall Washington, North Carolina 27889 near Mr. Staples: The purpose of this letter is to request a second renewal of Major CAMA permit no. 79-15 which Is set to expire on 31 December 2020. A copy of the last renewal is attached. Major CAMA permit 79-15 authorized the construction of an RV park and associated marina onsite my property located off SR 1718, Yeatesville road adjacent Pungo Creek near the Town of Belhaven in Beaufort County, North Carolina. A variance was granted by the Coastal Resource Commission (CRC) on 17 December 2015 which allowed me to construct the pier over a wide (±800') fringe. of coastal wetlands marsh 8' wide. Although no construction activities have been undertaken at the project site, I remain committed to undertaking and completing this project. I have demonstrated this commitment by seeking and obtaining all required permits from the Department of Environmental Quality and other state and local government for this project as well as the cost and time involved in obtaining the CRC Variance for the wider marina access pier. To obtain these authorizations it required me to hire experts in a wide array of disciplines including but not limited to a surveyor, engineer and Iawyer. My primary business and source of income is my marine construction business. As DCM field staff have witnessed first hand, the frequency of hurricanes has resulted in significant damage to structures associated with water access and shoreline stabilization for resdential lots. Since issuance of this permit this area has been subjected to Hurricane Mathew in 2016, Hurricane Florence in 2018 and Hurricane Dorian in 2019. I have committed a Iarge part of my construction staff to assist in recovery efforts after these storm events which has delayed starting construction of the RV park and marina. My plans, for the RV park and marina have not changed since the original issuance and renewal. 1 do not anticipate any changes to the project that would increase the scope and associated impacts ,not already approved. RECEIVED NOV 1 2 2020 MP SECTION �HC There has been no change in ownership of the property and I do not anticipate that ever happening because;this proposed development isTart ofa,family business plan. Attached; to this letter is a copy of the last renewal and a $100 check to cover the renewal fee. Thank for your time in processing this renewal request and if you require anything further or wish to speak with me please call my cell (252) 944-5555. Siri�Cerely,. Toby 'T�etterton TJ Land Development LLC RECE ED NOV 1 2 2020 �� SECTION bHD 1 ermit class RENEWAL STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ermtt for . Major Development in an Area of Environmental Concem pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 issued to _ TJ's Land Development, LLC„ PO Box 125, Pantego, NC 27860 -Authorizing development in • Beaufort County at adj, to Pantego Creek, off SR 1718, Yeatesville Road. near Belhaven , as requested in the pennittee's application dam letter' :datedr1/14119 This permit; issued on February 1. 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms inay be.subject to fines, -imprisonment or civil action; or may cause the permit to be null and void. Pennif 79-15' 1) This renewal shall be attached to Permit No. 79-15, which was Issued as amended by CRC Variance to the permittee on 12/17/15, and copies of both documents shall be readily available on site when a� Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. mag: The N.C. Division of Water Resources has assigned the proposed project DWR Project No, 14-0275 V2. The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2015-01116. NOTE:' A permit renewal application processing fee of $100 was received by DCM for this project.., Thispermfl action may be appealed by the permittee or other qualified persons within; twenty (20):days of the issuing date.. This permit' must be accessible on -site to Department -:personnel when the project Is inspected for compliance. Signed by the authority of the- Secretary of D1:Q and -the. Chairman of the Coastal Resources Commission: Any/ Braxton C / mawhnance work or project not covered vis, Director hereunder requires timber Division approval. Division of Coastal Management .All workntust cease when the permit expires on This permit and its conditionsFt &DOVE D} December 31, 2020 issuing this permit, the State of North Carolina agrees that 'your project is, consistent with the North Carolina Coastal Management Program. Nov 1 2 2020 Permit Class RENEWAL Permit Number 79-15 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission hermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to TJ's Land Development, LLC., PO Box 125, Pantego, NC 27860 Authorizing development in Beaufort County at adj. to Pantego Creek, off SR 1718, Yeatesville Road, near Belhaven , as requested in the permittee's application dated letter dated 1/14/19. This permit, issued on February 1, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to Permit No. 79-15, which was issued as amended by CRC Variance to the permittee on 12/17/15, and copies of both documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 14-0275 V3 NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2015-01116. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the perrnittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. G. // Braxton C ' ". vis, Director Division of Coastal Management All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Coastal Management ENVIRONMENTAL OUALITY TJ's Land Development LLC PO Box 125 Pantego, NC 27860 Dear Sir or Madam: February 1, 2019 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150E with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, If ktritr Dougi. Huggett Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 p ROY COOPER. Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director \: NORTH CAROLINA Environmental Quality To: Gregg Bodnar From: Steve Trowell Through: Jonathan Howell °Ca' Date: 18 January 2019 Subject: Renewal of Major CAMA 79-15 Mr. Toby Tetterton of T. J. Land Development LLC is requesting to renew Major CAMA permit no. 79-15. The aforementioned permit was issued on 4 August 2015 and amended by CRC variance on 17 December 2015. The permit authorized a 66 slip marina and associated campground on Mr. Tetterton's property located off SR 1718 adjacent Pungo Creek near Belhaven in Beaufort County, North Carolina. The CRC variance authorized Mr. Tetterton to construct an 8' wide pier over Coastal Wetlands marsh. This is the first renewal request for this permit. Mr. Tetterton has not undertaken any of the authorized activities under this permit. Per NCAC 7J.0404(b) staff recommends that the aforementioned permit be renewed as this is the first renewal request for this permit. Mr. Tetterton states that his marine contracting business has been busy with Hurricane Florence recovery work and has been unable to undertake any of the authorized activities. If you have any questions concerning this renewal request, please do not hesitate to call (252) 948-3854. RF,.,PCYNDEQ3 No.IMEmira taCNC\ North Carolina Department of Environmental Quality I Division of Coastal Management Washington Office 1943 Washington Square Mall I Washington, North Carolina 27889 252.946.6481 RECEIVED JAN 2 4 2019 DCM-MHD CITY TJ's LAND DEVELOPMENT LLC P.O.Box 125 Pantego, N.C. 27860 252-943-6677 Office 252-943-3949 Fax email: tobin@gotricounty.com January 14, 2019 Mr. Steve Trowell NC Department of Environment and Natural Resources 943 Washington Square Mall Washington, NC 27889 RE: Renewal Permit Number 79-15 Dear Mr. Trowell: Attached you will find a copy of Permit Number 79-15. Also a check in the amount of $100.00. We are requesting a extension of time for two years. No work has been completed during this time. The reason the project has been delayed is due to the fact of Hurricane Florence and the impact it did to this area. There has been no change of plan since the issuance of the original perrnit. Nor have there been any changes in ownership of the property. The project is in compliance with all conditions of the current permit. Sincerely, TJ's LAND DEVELOPMENT LLC Tobin 3. Tetterton Sr. RECEIVED JAN 18 2019 DCM-WARO RECEIVED JAN 2 4 LU19 OCM-MHD CITY NC Division of Coastal Management Cashier's Official Receipt '"7* /; Received From• 773- Jr7( 1�J ve: iv �, 1/fr 2 �G� $ � •/ low Permit No.:� /7�'�� [ Check No • Applicant's Name: 4:1 4G�.� L/" V County.Aff,Q 7493 AB C D Project Address. 04' /9 /p Ali' / Cif Date /P�i20/4 Please retain receipt for your records as roof of payment for permit issued. Signature of Agent or Applicant: Signature of Field Representative: Date. Date RECEIVED JAN 24MOS DCM-MHD CITY Permit Class NEW RECEIVED JAN 18 ZO19 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission DCM WARO x hermit for Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to TJ's Land Development, LLCM PO Box 125, Pantego, NC 27860 Authorizing development in Permit Number 79-15 Beaufort County at adi. Pungo Creek, off SR 1718, Yeatesville Road. near Belhaven , as requested in the permittee's application dated 5/5/15, including the attached drawing (1), dated revised 2/10/14 This permit, issued on August 4, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1 Marina Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility shall be installed in an easily accessible location, and a representative of the Division of Coastal Management shall meet on -site with the permittee to ensure that the required pumpout facility is in place and operable. The pumpout facility shall be operable and maintained for the life of the marina. 2) The marina shall display a sign showing the location of the on -site pumpout facility, including other appropriate waste disposal information, at the entrance and exit from each of the main piers. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit shall be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of Dl;rggg e- Chairman of the Coastal Resources Commission. 091.1)"/ ,--Olt-Braxton C. Davis, Director Division of Coastal Management JAN 24Z M-MHD This permit and its conditions are hereby accepted. Signature of Permittee TJ's Land Development, LLC. ADDITIONAL CONDITIONS Permit # 79-05 Page 3 of 4 Upland Development 13) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the campsites, bathroom facilities, laundry mat, store, reception venue, pond modification with associated bullhead, and required access infrastructure, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 946- 6481 for this determination. Sedimentation and Erosion Control 14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). General 15) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 16) No Coastal Wetlands shall be excavated or filled, even temporarily. 17) The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. 18) No open water areas shall be excavated or filled, even temporarily, 19) This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including any authorization required from the NC DEMLR Stormwater Section. RECEIVED JAN 2 4 2019 DCM-MHD CITY Tfs LAND DEVELOPMENT LLC P.O. Box 125 Pancego, NC 27860 Mr. Steve J. Trowell Coastal Management Representative NC Dept. of Environment & Naturai Resources 943 Washington Square Mall Washington, NC 27889 RECEIVED AN 24 N19 DCM-MHD CITY DCM Coordinator: ?:tob AIZ Permit #: 79--ts— Permittee: Agents: MAILING DISTRIBUTION SHEET 1 kAd Dm I �X DCM Field Offices Elizabeth City Morehead City Washington Wilmington US ACOE Offices: Washington: Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Washington: Wilmington: Wildlife Resources: Natural Heritage Program LPO: (with revised work plan drawings) -is+-Pe..t(( 14,4S?rLc) Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Peletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECitylWashington District) Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Shane Staples David Harris Shannon Jenkins / Sharron Gupton Tim Walton / Mike Moser Sheri Montalvo C1if Whitfield (WARO) Curt Weychert Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Robb Mairs - 401 (Carteret, Onslow, Pender) Chad Coburn - 401 (Brunswick, New Hanover) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Maria Dunn (WARO) (NCDOT) Travis Wilson Rodney Butler Fax Distribution: Permittee #: Agent# 4 ' Permit -Class NEW Permit Number 79-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission It etmit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to TJ's Land Development, LLC., PO Box 125, Pantego, NC 27860 Authorizing development in Beaufort County at adj. Pungo Creek, off SR 1718, Yeatesville Road. near Belhaven , as requested in the permittee's application dated 5/5/15, including the attached drawing (ll, dated revised 2/10/14 This permit, issued on August 4, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Marina 1) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility shall be installed in an easily accessible location, and a representative of the Division of Coastal Management shall meet on -site with the permittee to ensure that the required pumpout facility is in place and operable. The pumpout facility shall be operable and maintained for the life of the marina. 2) The marina shall display a sign showing the location of the on -site pumpout facility, including other appropriate waste disposal information, at the entrance and exit from each of the main piers. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit shall be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered. hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal .Resources _Commission. (37).074 V //lot- tta Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee TJ's Land Development, LLC. ADDITIONAL CONDITIONS Permit # 79-15 Page 2 of 4 3) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 4) The permittee shall provide a Spill Prevention Control and Countermeasure plan to the Division of Water Resources before fueling facilities are constructed and shall supply a copy of the plan to the Division of Coastal Management. 5) Unless specifically altered herein, this permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 6) All portions of the access pier/walkway located over Coastal Wetlands shall not exceed a width of 6 ft. and shall be elevated a minimum of 3 feet above the marsh substrate as measured from the bottom of the decking. 7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 8) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 9) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury that may be caused from existing or future operations undertaken by the United States in the public interest. 10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 11) This permit authorizes a maximum of 66 docking spaces. At no time shall more than 66 vessels be moored or docked at the marina facility. Easement 12) The permittee may be required to apply for a submerged land lease from the Department of Administration's State Property Office. Contact the Department of Administration's State Property Office directly at (919) 807-4650 for this determination. Should it be determined that an Easement is required, the permittee shall supply a copy of the easement to the Division within 30 days of issuance of the Easement. TJ's Land Development, LLC. ADDITIONAL CONDITIONS Upland Development Permit # 79-05 Page 3 of 4 13) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the campsites, bathroom facilities, laundry mat, store, reception venue, pond modification with associated bullhead, and required access infrastructure, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 946- 6481 for this determination. Sedimentation and Erosion Control 14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). General 15) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 16) No Coastal Wetlands shall be excavated or filled, even temporarily. 17) The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. 18) No open water areas shall be excavated or filled, even temporarily. 19) This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including any authorization required from the NC DEMLR Stormwater Section. TJ's Land Development, LLC. ADDITIONAL CONDITIONS Permit # 79-05 Page 4 of 4 NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division of Coastal Management at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that, in accordance with the rules of the Environmental Management Commission, many non -water dependent activities are not authorized within 50 feet of the normal water level or landward edge of any coastal wetlands, whichever is more restrictive. Contact the Division of Water Resources at (252) 946-6481 for project specific clarification. NOTE: The N.C. Division of Water Resources has authorized the proposed project under General Water Quality Certification No. 3900 (DWR Project No. 14-0275 V2), which was issued on 7/8/15. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW- 201501116. .PermitCIass NEW Permit Number 79-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission crmtt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to TJ's Land Development, LLC., PO Box 125, Pantego, NC 27860 Authorizing development in Beaufort County at adi. Pungo Creek, off SR 1718, Yeatesvjlle Road. near Belhaven , as requested in the permittee's application dated 5/5/15. including_the attached drawing (1), dated revised 2/10/14 This permit, issued on August 4, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Marina 1) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility shall be installed in an easily accessible location, and a representative of the Division of Coastal Management shall meet on -site with the permittee to ensure that the required pumpout facility is in place and operable. The pumpout facility shall be operable and maintained for the life of the marina. 2) The marina shall display a sign showing the location of the on -site pumpout facility, including other appropriate waste disposal information, at the entrance and exit from each of the main piers. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit shall be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. °au/ V ifft—,Braxton C. Davis, Director ` bivision of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Ti's Land Development, LLC. ADDITIONAL CONDITIONS Permit # 79-15 Page 2 of 4 No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. The permittee shall provide a Spill Prevention Control and Countermeasure plan to the Division of Water Resources before fueling facilities are constructed and shall supply a copy of the plan to the Division of Coastal Management. Unless specifically altered herein, this permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. All portions of the access pier/walkway located over Coastal Wetlands shall not exceed a width of 6 ft. and shall be elevated a minimum of 3 feet above the marsh substrate as measured from the bottom of the decking. No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury that may be caused from existing or future operations undertaken by the United States in the public interest. 10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 11) This permit authorizes a maximum of 66 docking spaces. At no time shall more than 66 vessels be moored or docked at the marina facility. Easement 12) The permittee may be required to apply for a submerged land lease from the Department of Administration's State Property Office. Contact the Department of Administration's State Property Office directly at (919) 807-4650 for this determination. Should it be determined that an Easement is required, the permittee shall supply a copy of the easement to the Division within 30 days of issuance of the Easement. TJ's Land Development, LLC. ADDITIONAL CONDITIONS Upland Development Permit # 79-05 Page 3 of 4 13) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the campsites, bathroom facilities, laundry mat, store, reception venue, pond modification with associated bullhead, and required access infrastructure, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 946- 6481 for this determination. Sedimentation and Erosion Control 14) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented toi ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). General 15) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, ' upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 16) No Coastal Wetlands shall be excavated or filled, even temporarily. 17) The permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. 18) No open water areas shall be excavated or filled, even temporarily. 19) This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including any authorization required from the NC DEMLR Stormwater Section. 1 TJ's Land Development, LLC. ADDITIONAL CONDITIONS Permit # 79-05' Page 4 of 4 NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of.the Division of Coastal Management at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that, in accordance with the rules of the Environmental Management Commission, many non -water dependent activities are not authorized within 50 feet of the normal water level or landward edge of any coastal wetlands, whichever is more restrictive. Contact the Division of Water Resources at (252) 946-6481 for project specific clarification. NOTE: The N.C. Division of Water Resources has authorized the proposed project under General Water Quality Certification No. 3900 (DWR Project No. 14-0275 V2), which was issued on 7/8/15. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW- 201501116. APPLICATION for Malor Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name 7--tJ f Lrni L 1..2.02Io"i84,p..4r L Project Name (if applicable) AVA- Applicant 1: First Name p E MI v. Last Name re rre A Tcifr� /114hr4-1 t A. Applicant 2: First Name #l#- MI te/4— Last Name NIA - If additionl applicants, please attach an additional page(s) with names listed. Mailing Address //// PO Box /6C CA i'Te90 State it c ZIP 27 etre Country geAvf=oAr'I II Phone No. / Sz-IY' 667 FAX No. - - Street Address (if different from above) � 7/.f—f 1%' I/i f , �r z44 64fr City iv'hi�z State /VC ZIP z ? g / U Email 2. Agent/ ' n Fonts R r f cite d Business Name. /14' /ii a /1-1s0 ,i? Agent/ Con actor 1 First Name MI i Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address //� SST/ �l�r STi/�eP�' PO Box ,C4 City 1vi S/( Tear State NL ZIP 7,i1 Phone No. 1 2�z- 3y7 ! Phone No. - A(//� ext. FAX No. 134144/4 Contractor # StreetAddress (ifdifferentfrom above) "C- //1- City / A State ZIP AVM Email 1 tr i Gt4 �n ,d.S31,l j"A&.)2 1 4" J 711 ,9 (4//r W RECEIVED .. . <Form continues on back> 252-808-2808 :: 1-888-4RCOAST .. www.nccoastaimanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) 6g4IForZr Street Address yi.rfli1le< kw 3fsJ-,Ai*1 J4r ,& State Rd. # !a'7f 45-<l7/8 Subdivision Name /go tie City 1. 1A.A✓eii State NC Zip 2 7Y/0 Phone No. 257-- !Y3- a77ext. Lot No.(s) (if many, attach additional page with list) LOWS,( rki(14014b 01{4/C4.Y7 A crce.r( a. In which NC river basin is the project located? TA —,/,Ai(iC0 b_ Name of body of water nearest to proposed project ficr).1Go CAec/< c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. 47 D CS e Q l< ■ Manmade ■ Unknown TT4!vatural '' e. Is proposed o°rk within city limits or planning jurisdiction? ❑Yes No f. If applicable, list the planning jurisdiction or city limit the proposed work falls within. 8eiv, oftr C6.v-WTX 4. Site Description a. Total length of shoreline on the tract (ft.) fry Diet b. Size of entire tract (sq.ft.) .16, Y7 /9c/ce.r c. Size of individual lot(s) CA0"fffA I"S► IC, TyIaI-LI'G 0$.7op4gT (lf many lot sizes, please attach additionl page with a list) d. Approximate elevation of tract above NHW (normal high water) or NWL(noonna!waterlevel} 7 4 f4 2 r Xd HW or ❑NWL e. Vegetation on tract 37.,S2- AcAes a F Pk 1t I-4Na �Nn c c�b4s i}.c4�s vF YoY � wer1-/4rgJ 4iLP( L ' f /I1- K cis /*et: PA /vs rn/Ne FJItes Es S✓A e1IY`e e,,. ,.Lrr�lg4, 1Li6oic) Acices ror41- f. Man-made features and uses now on tract , F fitr2d '► I r! r %} +1f cj Fr 1 I din r ,'i r N 'Hy g. Identify and describe the existing land uses adacent to the proposed project site. FAn,41I�ey A./a woa� /464d, h. How does local government zone the tract? � I`+I/ 4.9itF i. Is the proposed project consistent with the applicable zoning? (Attach zoning I-nce certificate, if applicable) MI Yes ❑No [OVA j. Is the proposed activity part of an urban waterfront redevelopment proposal? • Yes o Tl k_ Has a professional archaeological assessment been done for the tract? if yes, by whom? If yes, attach a copy. ■ Yes AfNo DNA I. Is the proposed project located in a National Registered Historic District or does it involve a ['Yes DNA RECEIVED National Register listed or eligible property? )2(No <Form continues on next pages MAT 27 2015 14)KM"Wit 252-848-2808 1-888-4RCOAST www,nccoastalmanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? (ii) Are there coastal wetlands on the site? (iii) If yes 10 either (i) or (ii) above, has a delineation been conducted? (Attach documentation, if available) 71Yes [No f res ❑No ?Yes ❑No n. Describe existing wastewater treatment facilities. tR e S� I+/ r L y . % Je qe n�.,,past d .Spr-er'►S 1.lze s.erri c -to yr4 6s()ltprr�. 13�AT /'l,.r p air r..:rl bt SE•ir To A f71, r4KI& rJrr d,`fp�s'r1. • 1' , "41"4, � �;� 1 re im 7-4' 7,4-e r A- eiy f P/A r • o. Describe existing drinking water supply source. '/1 < =++ T c y' 4,0e . N 1 M ' rc y w, / b 1O"s el42 Fro,-t Tit co ,A4 I4' T "-r p. Describe eiiusting storm water management or treatment systems. "c9X E • f7 o,v+t wr+ r eA, Lys' 6� "Aft NAi; by /lc PE I7 WQ , 5. Activities and Impacts a. Will the project be for commercial, public, or private use? Commercial ❑Public/Govemment CAPli-eft /8Airfj L j'igK,K J} ri d dQ,E+ r sc., / S' 1 ❑Private/Community b. Gi e a brief description o purpose, use, and daily operations of thr ct when complete. C A Pert /e pj - r/9 K w,r—ke• k'» r 5-z-1is, fr' .9-•Y.d 4iw r K ,fi,,,,,,Li i i 1 Y 116 lid, c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. C t,Al f r- "....-c r P,' e rt.. S /T i' Q mi W W/3 j� It iC=I� wr A b #A y e , Cv •v 1 T"i v 0 pie.ri 414 L4,1d (1$i#I ,6,1c.KAve A..rd pi le ei/tr`✓.Qre, d. List all development activities you propose. 4>crrT '<r CA) r',/24 p'i4Ai<J fh•Vt mt.,',A4.1 Arr d /eeev r'4t bo 0*T fL.ipr. e. Are the proposed activities maintenance of an existing project, new work, or both? /1 G✓t.9 nK, What is the approximate total disturbed land area resulting from the proposed project? 05q.Ft or Acres 33,sz /icrtvs IN4,41'.1(. CROSS 6+1Z CA,iAWRr/ANdS 4,./c1 DO "o`� wig. /I v g. Will the proposed project ncroach on any public easement, public accessway or other area ❑Yes o ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waterl of the state. J ivH l'+ c e. WA- ran /Zu� v-x f) 5-.4.er F ' i. Will wastewater or stormw ter be discharged into a wetland? 'es ❑No ❑NA AU ! 6 y $ `,CL1 . 1.,,,1✓cl e .•is l rj1 Uwda P..e AM, , If yes, will this discharged water be of the same salinity as the receiving water? ,Yes ❑No DNA RFCEIVF: j. Is there any mitigation proposed? ❑Yes No ❑NAAr 2 If yes, attach a mitigation proposal. 15 <Form continues on back> la �tU'n'r`rni 3 r52-606-ESu3 ..-884-4kGUAS y .. www.nccc,astainianagerpent.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information !n addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete Items (at— (t) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. /1 Try _ /1 J b. An accurate, dated work plat {including plane view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? ff previously a thonzed work. clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. ir7G. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. v 14412 K f _ d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. tr. e- e. The appropriate application fee Check or money order made payable to DENR, ifrritv f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit commentslon the proposed project to the Division of Coastal Management. Name W diet/ t /-ze f . L L—c � ! A Phone No.c� —5 (3 - 2 4e 1 Address 18 < 6 y i%$ # 14ii is!%i. A y til-5T !l>Q r('f )iG ) 7�,.,A Name j' 0 G (tp3`2 S LL // Phone No. Z 2 ) �J/� 7. t', (7.S' Add ress ! 2- �.,2 aqs h' QI 'r fii / v .C. .7ff f Name / / Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. r5l205.104 AHO S.a-.d iMa 47 ATea►v C4,^1Trw/ 042 rfrvp ,ZD/S OO7 i-zil yl w -re rGt/1r tikitiR /Y-cZ75 t' ' iO 3 i /4'.:.i/idyl;r 6 -- 6c h. Signed consultant or agent authorization form, if applicable. vL rrii L- i. Wetland delineation, it necessary. Rita.. I,( sly rr-Aaa, j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) N/1:1,„ k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expendit� of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act./ ' 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify t at the information provided in this application is truthful to the best of my knowledge. r Date J 57/ C Print Name go,S I L. g(-.4 �I�d (J Y•1 Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information CM MP-3 upland Development CM MP-4 Structures Information ❑DCM MP-5 Bridges and Culverts RECEIVED MAY 27 1015 252-808-2808 :: t-888-4RCOAST www.nccoastatrranagement.net Form DCM MP-3 UPLAND DEVELOPMENT (Construction andlor land disturbing activities) Attach this form to Joint Application for CAMA Major Permit. Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. /1:'4C /00 Cr- m s ps < s�► re S To ne.. ; rrf42, :114".si t ry r =f (t T r.e5 , c. Density (give the number of residential units and the units per acre). /L>6 c.� p vtS = 2. z C "y7 e. 1f the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? t,iifes ❑No ❑NA , (ii) If y s, list the date submitted: Se'4 /,�c" 144/7"— Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops. or to be used for vehicular driveways or parking. Wo►` g. i. Give the percentage of the entire tract 10 be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. j. 14 SS 1--#, S `24 Describe proposed method of sewage disposal. %�✓ r; 77 � tvr 7 A_ 1-7- =Ylca Ivt ri,' f r`l ooJ sx - /t✓llf.4 �l�t�1-1sY. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges,).. b. Number of lots or parcels. S'I 4,7 /. , j— -w-Gr Flier/f eftwi/4(21,- S f` r-Q-5 Ali !� e w d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 33,5-2- /Cn4s f. List the materials (such as marl. paver stone, asphalt, or concrete) to be used for impervious surfaces. H frc t / // d r rzr) h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes { No ❑NA W-44 rt ^LJ (ii) If yes. list the date submitted: /2k CIA( ►'vkiJ`J• ld9 k. Have the facilities described in Item (i) received state or local approval? EYes No DNA If yes, a ach appropriate documentation. m. Does the proposed project include an innovative sormwater design? ❑Yes ❑NA If yes, apitio ch appropriate documentation. 2ECE(VED MAY 27 1QS ed: 12126+06 Y Pt en MP! rt m. Describe proposed drinking water supply source (e.g., weli, community, public system, etc.) ��, y -ii !") i r Gv ivy r y �' rrir: 6N.— o. When was the lot(s) platted and recorded? rS,, / !/ / - C ,Q rRi4 471 n. (i) Will water be impounded? ❑Yes XI\Jo DNA (ii) If yes, how many acres? Of- re /9,..) 64 .II - if i. C /} v «fL • l e LS1` I f b k flG c'J G� (� 6ts i -r O /l-C .TO . -/4)4 p. If proposed development is a subdivision, will additional utilities be installed for this upl nd development? ❑Yes No NA Date /4lit Project Name ( o $ L.Ai,t,zt a s.„..6.)p , LLC� Applicant Name j9J,rd 1, �� A.LJ(( / l 21 7S/qire RECEIVED MAY 27 1 fl Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) .T L/I uc fi..evkl C p.44-o.c fLC C. Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 9. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i)IIsl1s��tthe docking facility/marina: tb. Commercial ❑PubhclGovemment ❑Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number I 1✓ `� L �� 1 (iii) Length $% C Ir4C4 V )26.3 jPZcNS ! (iv) Width• —r7— (v) Floating ❑Yes No I 1,7..Dc. 1c. 7 3° e. (i) Are Platforms included? Yes ❑Na If yes: (ii) Number l (iii) Lengths^ 30 f rk x, ," (iv) Width 1-3 0 F E r t 9,—S (v) Floating ❑Yes igkNo Note- Roofed areas are calculated from dnpfine dimensions. g- (i)//Number of slips proposed (ii) Number of slips existing i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel Open water; no dredging required ❑Other; please describe: k. m. Typical boat length: /2 Z FIE r E K ), .e 011 the facility have tie pilings? es ❑No (ii) If yes number of tie pilings? 410 d. ❑This section not applicable (i) �W���......,,,///iilll the facility be open to the general public? Yes ❑No (i) Are Finger Piers included? If yes: (ii) Number (iii) Length (iv) Width (v) Floating 36 20 14E6- f 3 Fr"r ❑Yes ANo f. (i) Are Boatlifts included? ,Yes ❑No If yes (ii) Number (iii) Length (iv) Width No h. Check all the types of services to be provided. ❑ Full service. including travel lift and/or rail, repair or maintenance service Dockage, fuel. and marine supplies � ❑ Dockage Net slips") only, number of slips' f r/ /4 ❑ Dry storage, number of boats N/ /4� ❑ Boat ramp(s); number of boat ramps. /]/ 4 ❑ Other. please describe: /it j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). / 7) fr rt., �9 t,c ei 54- i 1 £J � r I. (i) WiII e facility be open to the general public? Yes ❑No RECEIVED 44AN27NE 7 DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ❑This section not applicable a C each of the following sanitary facilities that will be included in the proposed project. Office Toilets Toilets for patrons; Number: D • Location: ON A. t`�Z y / ' i s c p4r4n do*K fTaxi. Par4/1.1 ro ki blov►+fcl Frto I Twe c.eKr�2i2 p. GK b. Describe treatment type and disposal location for all sanitary wastewater. I A 1/ bo,j rl will L �,ii t.e d rt2 vs-e. TH e �JJwl� a d. WAS re wr' ll �� pJy 7o Tana 4 m �i<� At 1iyk v► ci, t... p y..kd wr1) �.e_ X.'91, 41 ro AIv At,'t .�-4ri Tn ;ht ,r, t.�1 r tl a el r1. c. Describe a disposal of so id waste, i h offal and trash. J / 711445� C A4J 1vi1 A-e Di TA c lock • T e fr 6I,` dQfar.w'Ca0/ £y"owC srfFF. All 7kIJ!, wt 116-e e ,?paf.P.,Q (9,'•� .yK Apr'�.4.� ��•� f,7/. d. How will overboard discharge of sewage from boats be controlled? ,14yN��. Showers Boatholding tank pumpout; Give type and location: e. (i) Give the location and number of "No Sewage Discharge" signs proposed. 65rfv5 . Ar 21r✓� .e.ic� r /21es- A'fd (ii) Give the location and number of "Pumpout Available" signs proposed. t Y e S At.d2, / 0-c tyroKef d e.(cr., `..a" Pi a (e)(i) f. Describe the special design, if applicable, for containing industrial type pollutants. such as paint, sandblasting waste and petroleum products. /V 0 t dht /2:42//J / /1, 4"4? ly .�2.w44+a1-12%,/cy £,Jyrw.e wv/CA, A11 /Cep ro t`IS / Ft rs Tv 4- ,Q4 rri ✓.e d b y Art4o y 41(4.7 /e"ems 4I Kid g. Where will residue from ve sel maintenance be disposed of? Q rl" . Y "4"e4.y4,r,c A -ram 4 //a (4.J. /} //fie Firs �. ro I' -- $ 9'-e ,� y ,'( Ae r,l o ►y 4] R K< 1 sty /.ey l ("5 h. Give the number of channtl markers and No Wake" signs proposed. Z Z vN _5�Z/#1se7Cec1<, i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. Sri` a-�-- w' 14- ow L ,` L 9it r wd, air j //vJJ zvy�, w1tM Prt '�D , j. What will be the marina policy on overnight and live-alfoard dockage? t o /t Vim- f 6 9 An-c 4- 6 v.e. R r ✓,p To C.,,Jac yr 1 d ss /.ei..41 v49 Jt k. Describe design measures that promote boat basin flushing? 7-I {s NJ4si� I. If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED MAY 27 2015 OCV-nAHf tl." rS 252-808-2808 :: 1-888-4RCOAST :: www.nccaastalmanagement.net revised: 12127/06 F ' m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes No n, Is the mari(naldocking facility proposed within or adjacent to any shellfish harvesting area? Dies [ No o. Is the manna/docking facility proposed within or adjacent to coastal wettands/marsh (CIA✓), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. }CW I7Lb 05AV ❑SB WL ,26 GD ❑None P. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? Yes No If yes, give the name and address of the leasehoIder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑PublicIGovemment ❑PrivatelCommunity (i) Number (iii) Length (iv) Wrdth Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) 'This section not applicable a. (i) Number (li) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ")This section not applicable a. Length c. Maximum distance beyond NHW, NWL or wetlands b. Average distance from NHW, NWL, or wetlands 6. MOORING PILINGS and BUOYS This section not applicable a. Is the structure(s): ❑Commercial ❑PubliclGovernment ❑PrivatelCommunity b. Number c. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor. etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing RECCIVED MAN 27 Z015 r>cu-MN r,r. � e , • Farm DCM MP-4 (Structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines (so ` Faita. 4. d1.4)044. Note: For buoy or mooring piling, use am of swing including length of vessel. c. Width f water body e. (i) Will navigation&��aids be required as a result of the project? ❑Yes o DNA (ii) If yes, a lain what type and how they will be implemented. b. Proximity of structures) to adjacent docking facilities. APR t. iW i i r'7 f.0 i- favr'^ h4 MS, `Gc. /7e� d. Water depth at waterward end of structure at NLW or NWL 5iQ 8. OTHER )(This section not applicable a. Give complete description: Date -r\T t r)-N �s✓.4,f c/7 ; LL C Project Name T� 6i;b14 J. 14 fr r Lly, MR k,Ve" . Applicant Name/- °}4AW--- Applicant Srina �v RECENED µAy ¶ 7 24% DcM HO CtN !b 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANTS NAME: TJ's Land Development, LLC 2. LOCATION OF PROJECT SITE: Project site is located off SR 1718, Yeatesville Road, in existing farmland adjacent Pungo Creek near Belhaven in Beaufort County, North Carolina. Photo Index - 2006:117-8454; J-6 2000:117-1473; J-5 1995:117-1271; K-16 State Plane Coordinates - X: 2,669,200 Y: 646,200 Pantego Quad. (lower left corner) 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 29 August 2013 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received — 20 May 2015 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Beaufort County Land Classification From LUP — Rural with Services (B) AEC(s) Involved: PTA, PTS, CW (D) Water Dependent: Yes (D) Intended Use: Campground with associated marina. (E) Wastewater Treatment: Existing - None. Planned - Individual Septic (F) Type of Structures: Existing - None Planned - 106 camp sites, septic system for camp sites, 66 slip marina with fuel and pump and haul wastewater system. (G) Estimated Annual Rate of Erosion: Unknown 7. HABITAT DESCRIPTION: DREDGED [AREA] FILLED OTHER (A) Vegetated Wetlands 1,760 ft2 (Coastal Wetland shaded) 2, 600 ft2 (Wooded 404 shaded) (B) Non -Vegetated Wetlands Pungo Creek bottom 9,478 ft2(Shaded Creek bottom) (C) Other Uplands 33.5 acres (D) Total Area Disturbed: 1,473,969 ft2 (33.8 acres) (E) Primary Nursery Area: No (F) Water Classification: SC NSW Open: NO RECEIVED r` MAY 27 2y.#4015 �' y briAX1LIH I 8. PROJECT SUMMARY: The applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washer and dryers, and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Td's Land Development, LLC Pungo Creek Beaufort County Project Setting The 46.5 acre project site is located off SR 1718, Yeatesville road, adjacent Pungo Creek near Belhaven in Beaufort County, North Carolina. The most common land use near and adjacent to the project site is agriculture, with some scattered single family residences. The site consists of 33.5 acres of uplands that is currently used as row crop farmland and 12.9 acres of wetlands. The farmland has an elevation of ±7' above the normal water level (NWL) and consist of sandy loam soils. At the east end of the field is a borrow pond next to a broad expanse of scrub shrub wooded 404 wetlands that transition to a Coastal Wetland marsh adjacent Pungo Creek. This wetland area is approximately 540' wide between the uplands and the normal water level (NWL) of Pungo Creek. The wooded portion of the wetland is vegetated with bald cypress (Taxodium distichum), red bay (Persa borbonia), dead and stressed loblolly pines (Pinus taida), wax myrtle (Myrica ceriferra) and red cedar (Juniperus virginiana). The wooded wetlands transition to an herbaceous Coastal Wetland marsh vegetated with black needlerush (Juncus roemerianus), sawgrass (Cladium jamaicense), and giant cordgrass (Spartina cynosuroides). There is an unnamed tributary off of Banjo Creek, a tributary to Pungo Creek, whose channelized head waters traverse the existing project site/field. The channelization was undertaken most likely to improve agricultural drainage. An unimproved dirt road was constructed through the field to the existing borrow pond during the winter of 2013/14. This road crossed the channelized stream with a 36" culvert pipe. An "after -the -fact" 401 Water Quality Certification from the Division of Water Resources and a Nationwide Permit 14 from the US Army Corps of Engineers authorized this improvement. The project site has 854' of Coastal Wetland marsh shoreline adjacent Pungo Creek. Water depths in Pungo Creek range from 3' at the marsh edge to +5' below the NWL approximately 150' offshore. The Environmental Management Commission classifies Pungo Creek at this location as SC NSW and the NC Wildlife Resource Commission as Inland Waters. This area of Pungo Creek is closed to shellfishing. Project Description A pre -application scoping meeting was held for this project on 21 June 2013 in the Washington Regional Office. The applicant proposes to develop the farmland into a campground with 106 camping sites, that will include supporting infrastructure such as a 50' wide x 150' long building housing full bathroom facilities, laundry mat, store, and a 100 person reception venue. A 66 slip marina is proposed in Pungo Creek as well as a large groundwater fed pond to be used for recreational purposes including swimming. A road system will be constructed to access the camping spaces and other campground and marina facilities. A 90 RECEIVED space parking lot is proposed for the campground building and a 33 space parking lot is proposed AY 27 pub for the marina. Wastewater generated from the campground will be handled by onsite septic Nt.-N4-14i1"71,0 TJ's Land Development, LLC Pungo Creek Page Two systems. The marina will have a pump and haul system that will pump to a holding tank near the base of the marina pier from which the wastewater will be trucked to local municipality for disposal. The application did not include any documentation authorizing the proposed methods of wastewater disposal. The 66 slip marina will be accessed by an 8' wide pier of which ±50' is over highground, ±300' is over wooded 404 wetlands, ±240' is over Coastal Wetlands marsh and ±140' over open water. The applicant desires to build the pier 8' wide because of the distance to the slips and the extra width would allow traffic to pass on the pier. The applicant proposes to mitigate for this impact by constructing the pier with the decking elevated 5' above the ground level to reduce the shading impact. The pier will access an 8' wide x 586' long T-shaped dock with 66 slips. The dock will have a square shaped, roofed, platform 30' x 30' at the intersection of the access pier and dock. This platform will support the fueling area as well as the marine pumpout. Two 15' x 30' slips will be designated for use by boats fueling or pumping out onboard holding tanks. There is also proposed 2-25' x 25' roofed platforms at each end of the dock. There will be 24- 18' x 40' slips with a "stern to" orientation on the offshore side of the dock accessed by 14-3' x 20' finger piers. The inshore side of the dock will have 40-10' x 10' boat lifts accessed by 22-3' x 20' finger piers providing access to the boatlifts. The existing borrow pond will be modified and enlarged to 3.6 acres. An area of the existing pond will be filled ±50' x 250' for more highground space to accommodate camping spaces and the perimeter road around the campground. Fill generated from the pond excavation will be used onsite to build up the existing ground elevations where they do not meet the base flood elevation. Fill dirt will also be sold and trucked offsite. The applicant states that a mining permit application has been submitted to the Division of Land Resources. The applicant plans to construct a bulkhead around the perimeter of the pond. An 8' wide pier system with a covered platform and a 20' x 40' T-head platform are proposed to be constructed in the 3.6 acre pond. The pond will be pumped out to prevent putrefaction pumping the pond water to highground with sheetflow of more than 50' into ditches. Project Impacts The development of the campground spaces and associated infrastructure including the pond excavation will disturb 33.5 acres of uplands. The access pier over wetlands will shade 2,600 ft' of wooded wetlands and 1,760 ft2 of Coastal wetlands. The proposed dock, platforms and fmger piers will shade 9,478 ft2 of Pungo Creek bottom. Construction of the pier, dock and slips will result in some localized short-term turbidity. The marina will increase boat traffic in Pungo Creek and their associated impacts. Steve Trowel) — Washington Regional Office — 20 May 2015 RECEIVED MAY 2 7 Y015 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Tobin J. Tetterton County: Beaufort LOCATION OF PROJECT: Off of SR 1718, Yeatesville Rd., in existing farmland adjacent to Pungo Creek near Belhaven in Beaufort County, North Carolina. DATE APPLICATION RECEIVED COMPLETE BY FIELD: 20 May 2015 FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: No CONSISTENCY DETERMINATION: Attached: NO FIELD REPRESENTATIVE: Steve Trowell DISTRICT MANAGER REVIEW: To Be Forwarded: YES DISTRICT OFFICE: Washington B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: $ 400.00 (100% or 60/40) PUBLIC NOTICE REC'D: END OF NOTICE DATE: ADJ. RIP. PROP NOTICES REC'D: DEED REC'D: APPLICATION ASSIA� T5D T :1�[..f' C) 75 DAY DEADLINE. 0 DAY DEADLINE: MAIL OUT DATE: FEDERAL DUE DATE: ON: STATE DUE DATE: FED COMMENTS REC'D: DRAFT ON PERMIT FINAL ACTION: ISSUE DENY CEVED 205 AGENCY DATE COMMENTS RETURNED I OBJECTION S: YES N() NOTES Coastal Management - Regional Representative L.e/`>'CZ f (eltkf/ 7ce <IS Coastal Management - LUP Consistency Division of Community Assistance Land Quality Section Division of Water Quality 1,,/// Storm Water Management (DWQ) State Property Office ✓ Z4,41 Division of Archives & History Division of Environmental Health Division of Highways / ;. Wildlife Resources Commission v` Local Permit Office Division of Marine Fisheries ti/ Corps of Engineers ,; �, gee. Memorandum To: Daniel Govoni Through: Kelly Spivey From: Steve Trowell Date: 20 May 2015 Subject: TJ's Land Development LLC Major CAMA Permit Application Enclosed is a Major CAMA permit application package submitted by Mr. Hood Richardson on behalf of Mr. Toby Tetterton with TJ's Land Development, for the construction of a campground to be sited in an existing ag field and a 66 slip marina in Pungo Creek located off SR 1718, Yeatesville Road, near the Town of Belhaven in Beaufort County, North Carolina. This project was reviewed and discussed at a 21 June 2013 scoping meeting conducted in the Washington Regional Office. There were no significant objections or issues identified by the review agencies during this meeting. The marina will offer a pumpout to handle disposal of onboard waste water utilizing a pump and haul system. The marina will have a "no live aboard" policy. The marina will provide boat fueling services and there was no information in the application package concerning plans to handle fuel spills. Water depths at the proposed marina site are 5' or greater so there are no submerged aquatic vegetation issues and water depths will support the size vessels anticipated at this facility. Staff has reviewed the applicants project applying the use standards found in 7H.0207, 7H.0208 and most specifically those found in 7H.0208(b)(5)(A)-(Q) and 7H.0208(6)(A)-(J) and have found that the applicant's proposal is consistent with the exception of 7H.0208(b)(6)(C) that limits piers and docking facilities over Coastal Wetlands to 6' in width. The applicant is proposing an 8' wide access pier over wooded 404 wetlands and Coastal Wetlands. I feel this inconsistency can be handled by permit condition restricting the width over wetlands to 6'. Also, the marina will offer fuel services. Therefore, 1 feel the permit should be conditioned that an Emergency Fuel Spill Response Plan be submitted prior to DCM for approval prior to occupancy of any slip. These additional permit conditions along with the standard erosion control and marina development conditions, should prevent any inconsistency in the Divisions rules for marina development. Therefore, barring any significant objection to the project from the other state and federal regulatory or review agencies, staff recommends issuance of the permit. RECEIVED MAT 27Z015 Pat McCrory Governor ATA NCDEFIR North Carolina Department of Environment and Natural Resources Division of Coastal Management os.z2.&L- MEMORANDUM TO: Mrs. Maria Dunn NC Wildlife Resources Commission FROM: Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton Donald R. van der Vaart Secretary Respond to Daniel Govoni Morehead City Office PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowel] at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY Signed This office has no objection to the project as proposed. V This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Date G -3- 943 Washington Square Mall, Washington, NC 27889 hone: 252-946-64811 FAX: 252-948-0478 Internet: www.nccoastalmanagementnet An Equal opportunity ti, Atfirmative Action Employer - Made in part by recycled paper RECEIVED JUN 0 8 2015 N +6► +1H t-Nv I North Carolina Department of Administration Pat McCrory, Governor State Property Office Bill Daughtridge, Jr., Secretary June 5, 2015 To: Daniel Govoni Major Permits Processing Coordinator From: Joy Wayne. Real Property A P Y Re: CAMA /DREDGE : Permit Application Review Applicant — Tobin J. Te erton 66-slip marina Reply: The project will require a Submerged Land Easement provided that it is confirmed that the applicant is a riparian fee owner and can qualify for a submerged lands easement. Please confirm that the proposed facilities are not located within the USACE AIWW 1000' easement area. RECEfVED JUN 11 1015 Mailing Address: Telephone (919) 807-4650 Location: 1321 Mail Service Center Fax (919) 733-1431 116 West Jones Street Raleigh, N.C. 27699-1321 State Courier #52-71-78 Raleigh, North Carolina An Equal Opportunity / Affirmative Action Employer Web: httpalwww.ncspo.org NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory R EClfIretarywan der Vaart Governor TO: FROM: MEMORANDUM Mr. Tim Walton Director State Property Office Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 MAY 22? DOA STATE PROPERTY OFFICE Respond to Daniel Govoni Morehead City Office DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date 943 Washington Square Mall, Washington, INC 27889 Phone: 252-946-6481 1 FAX: 252-948-0478 Internet: www.nccoastalmanagement.net An Equal OpportunityAffirmative Action Employer - Made in part by recycled paper RECEIVED JUN I i 101 Pat McCrory Governor A.TA NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management MEMORANDUM TO: Mr. Lee Padrick Division of Community Assistance FROM: Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 Donald R. van der Vaart Secretary Respond to Daniel Govoni Morehead City Office DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY Signed This office has no objection to the project as proposed. L�This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Date 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-6481 ti FAX: 252-948-0478 Internet: www.nccoastalmanagement.net An Equal Opportunity i Affirmative Acton Employer - Made in part by recycled paper ! ECE(V&-D JUN 0 12015 Pat McCrory Governor TO: FROM: ATA NCDENR North Carolina Department of Division of Co Ms. Patti Fowler NCDENR Division of Environmental Health Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 d Natural Resources Donald R. van der Vaart Secretary Respond to Daniel Govoni Morehead City Office DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowel! at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Er PA, Date Sicdll S 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-6481 1 FAX: 252-948-0478 Internet: www.nccoasta{management.net An Equal Opportunity', Affirmative Action Employer - Made in part by recycled paper RECEIVED JUN 01 1015 r✓cam-uur7u 1.4a„ (252) 247-3330 fax daniei.govoni@ncdenr.gov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE 3 Govoni, Daniel From: Bland, Raleigh W SAW<Raleigh.W.Bland@usace.army.mil> Sent: Tuesday, June 30, 2015 2:58 PM To: Govoni, Daniel Subject: RE: Comments (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE T1's Land Development, LLC 201501116 PGP 198000291 Tier II 30Jun15 Fred Willard 201501013 PGP 198000291 Tier II 30Jun15 Thanks! Congratulations on your MOVE to the 2nd Floor! ----Original Message ---- From: Govoni, Daniel [mailto:daniel.govoni@ncdenr.gov] Sent: Tuesday, June 30, 2015 9:17 AM To: Bland, Raleigh W SAW; Pelletier, Josh R SAW Subject: [EXTERNAL] RE: Comments (UNCLASSIFIED) Any update on: Billy Roughton Fred Willard Tobin Tetterton thanks Daniel M. Govoni Policy Analyst NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 (252) 247-3330 fax daniel.govoni@ncdenr.gov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Original Message From: Bland, Raleigh W SAW [mailto:Raleigh.W.Bland@usace.armv.mil] Sent: Thursday, June 18, 2015 7:16 AM To: Govoni, Daniel 1 f Subject: RE: Comments (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE South Bay Pointe SAW 201501118 PGP 198000291 Tier 11 PGP 18Jun15 Eastern Carolina Yacht Club SAW 201501117 PGP 198000291Tier II PGP 18Jun15 Thanks! Original Message From: Govoni, Daniel[mailto:daniel.govoni@ncdenr.gov] Sent: Wednesday, June 17, 2015 9:54 AM To: Bland, Raleigh W SAW; Pelletier, Josh R SAW Cc: Huggett, Doug Subject: [EXTERNAL] Comments Hello, just a reminder on some projects I will need comments on soon: Billy Roughton, Dare County South Bay Point LLC, Beaufort County David Bradley, Currituck County Fred Willard, Tyrrell County Eastern Carolina Yacht Club Inc., Craven Thanks! Daniel M. Govoni Policy Analyst NC Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 P4 1 M:Ct.t. 1D: FROM: DATE: SUBJECT: APPLICANT: ATA NCDENR a Department of ar}vi.r onment and NaW MEMORANDUM Ms. Renee Gledhill -Early NC Department of Cultural Resources Archives & History Building Daniel Govoni Major Permits Processing Coordinator Coastal Management -Division 400 Commerce Avenue Morehead City NC 28557 ?� R OU t nnIti R. van d' Lr?c4.: r`ecral iy Respond to Daniel Govoni Morehead City Office t" PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by I 1 June 2015. Please contact Steve Trowel) at 252448-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. —I� Zell" Signed 21 May2015 CAMA Application Review Tobin .i, Tetterton This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments.. Date 6 . t6 , ts- MAY 2 7 2015 Pat McCrory Governor ATIA NcDFiR North Carolina Department of Environment and Natural Resources Division of Coastal Management MEMORANDUM TO: Mr. Shane Staples Division of Coastal Management 943 Washington Sq. Mall FROM: Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton Donald R. van derllaart Secretary Respond to Daniel Govoni Morehead City Office RECEIVED MAY 2 6 MI5 DCM-Fisherles WARO PROJECT LOCATION: SR 1718, Yeatesvdle Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping • sites; associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. P1eae indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project When appropriate, in depth comments with supporting data are requested. REPLY Signed This office has no objection to the project as proposed. / v This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. • Date 943 Washington Square Mall, Washington, NC 27889 Phone: 252 946-6481 k FAX: 252-948-0478 Internet www.nccoastalmanagement.ret An Equal opportunity 1 Affirmative Action Employer — Made In pad by retitled paper RMENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Govemor MEMORANDUM TO: Mr. Ken D. Pace NCDOT Roadside FROM: Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 ..3 R Donald R. van der Vaart JUN - 1 2015 I. v Respond to Daniel Govoni Morehead City Office DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. "PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY Signed This office has no objection to the project as proposed. ✓/ This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to -the proposed project for reasons described in the attached comments. Date AS- 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-6481 \ FAX: 252-948-0478 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 AtfrrnativeAden Employer— Made in pal by recycled paper Pat McCrory Governor TO: FROM: ATA NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management MEMORANDUM Ms. Maureen Meehan -Will District Planner Division of Coastal Management Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 Donald R. van der Vaart Secretary Respond to Daniel Govoni Morehead City Office DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowel) at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY )<. This office has no objection to the project as proposed. / This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached Date 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-6481 I FAX: 252-948-0478 Internet: www.nccoastalrnanagement.net An Equal Opportunity t Affirmative Action Employer - Made in part by recycled paper RECEIVED MAY 2 6 2015 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Pat McCrory Governor June 2, 2015 MEMORANDUM: To: Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City, NC 28557 From: Dyk Luben, P.E., Regional Engineer, PWSS/WaRO Subject: CAMA Application Review Applicant: Tobin J. Tetterton Donald R. van der Vaart Secretary Project Location: SR 1718, Yeatsville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, NC. Proposed Project: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. REPLY: This office has no objection to the project as proposed. XThis office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. RECEIVED SIGNED Public Water Supply Section Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 Phone 252-946-6481 \ FAX: 252-948-00401 Internet: www.ncwater.org/pws/ An Equal Opportunity \ Affirmative Action Emptoyer .JUN 05 7015 DATE G��/C __A NOT A CAMA PERMIT NCDETIR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Govemor Secretary June 8, 2015 DWR # 14-0275 Ver. 3 Beaufort County TJ's Land Development, LLC Attn: Mr. Tobin Tetterton PO Box 125 Pantego, NC 27860 Subject: Approval of 401 Water Quality Certification with Additional Conditions Approval of Tar -Pamlico River Riparian Buffer Impacts with Additional Conditions TJ's Land Development, LLC - Marina and Infrastructure Dear Mr. Tetterton: You have our approval for the impacts listed below for the purpose described in your application dated May 21, 2015 and received by the Division of Water Resources (Division) on May 26, 2015. These impacts are covered by the attached Water Quality General Certification Number 3900, Tar -Pamlico River Riparian Buffer Rules, and the conditions listed below. This certification is associated with the use of CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. Please note that you should get any other federal, state or focal permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCACO2B .0506(b)(c)] Type of impact Amount Approved (units) Permanent Amount Reduced (units) Temporary Plan location/ Reference Attached 404 Wetland W-1 (Access Pier) 0.05 (acres) 0 (acres) CAMA Permit Figure Coastal Wetlands W-2 (Access Pier) 0.04 (acres) Open Water OW-1 (Access Pier) 0.03 (acres) 0 (acres) CAMA Permit Figure Division of Water Resources —Water Quality Regional Operations Section — Washington Regional Office 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-64.811 Fax: 252-975-37161 Internet: www.ncdenr.gov An Equal Opportunity \ Aifinnative Acton Employer —Made in pat by recycled paper TJ's Land Development, LLC Attn: Mr. Tobin Tetterton DWR # 14-0275 Ver. 3 401 AND BUFFER APPROVAL Page 2 of OW-2 (Docking Facility) 0.19 (acres) 0 (acres) CAMA Permit Figure Buffers - Zone 1 B-1 (Access Pier) 240 (square feet) 0 (square feet) CAMA Permit Figure Buffers -Zone 2 B-2 (Access Pier) 160 (square feet) 0 (square feet) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. [15A NCAC 028.0507(d)(2)] 3. Water Quality Certification The proposed project must comply with all the conditions of the General Water Quality Certification(s) 3900. [15A NCAC 02B .0507(c)] Continuing Compliance 4. Pump-outs/Sewage Disposal No sewage shall be allowed to be discharged at any time from boats using the marina. Appropriate signage should be posted prohibiting sewage discharge and providing appropriate waste disposal information. j15A NCAC 02H .0506 (b)(3)] 5. Fueling Facilities Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)] 6. All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permitee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Washington Regional Office at 252.946.6481 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 02B .0200 (3)(f), and GS 143 Article 21A) 7. Turbidity Standard TJ's Land Development, LLC Attn: Mr. Tobin Tetterton DWR # 14-0275 Ver. 3 401 AND BUFFER APPROVAL Page 3 of 6 The Permittee shall adhere specially to 15A NCAC 02B .0220 Tidal Salt Water Quality for Class SC Waters (3)(g) pH: shall be normal for waters in the area, which generally shall range between 6.8 and 8.5 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions; (I) Turbidity: the turbidity in the receiving water shall not exceed 25 NTU; if turbidity exceeds this level due to natural background conditions, the existing turbidity level shall not be increased. (15A NCAC 02B .02201 8. Spills The permittee shall report to the local DWR Regional Office, within 24 hours, all significant spills as defined under Section 311 of the Clean Water Act (Ref; 40 CFR 110.10 and CFR 117.21) or section of CERCLA (Ref: 40 CFR 302.4). Additionally, the permittee shall report spills including: any oil spills of 25 gallons or more and any spill regardless of amount that causes sheen on surface waters. 9. Number of Slips/Dock Space Use of dock space other than the approved 66 slips is prohibited. Handrails or other devices, including signage, should be used to discourage use of any dock pace other than the 66 designated dockage slips as shown in the approved plan. [15A NCAC 07H .12051 Other Conditions 10. Re Opener Clause TJ's Land Development, LLC and their authorized agents shall conduct their activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. TJ's Land Development, LLC shall require their contractors (and/or agents) to comply with all of the terms of this Certification, .and shall provide each of their contractors (and/or agents) a copy of this Certification. A copy of this Certification shall be included in the construction contract and available on the job site at all times. If DWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, DWR may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the certification, DWR shall notify the TJ's Land Development, LLC and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 21-1.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to DWR in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. TJ's Land Development, LLC Attn: Mr. Tobin Tetterton DWR ti 14-0275 Ver. 3 401 AND BUFFER APPROVAL Page 4 of 6 11. Any marina project that proposes a pumpout with a storage tank are classified as a Non - Pumpers and will need to obtain a "Non -Pumper" permit from the Division of Waste Management, Solid Waste Section and provide a copy to this Office prior to the construction of the facility. [G.S. 130A-291.1(e1)] 12. Fueling at Marina Protects Any marina project that proposes to dispense or store fuel shall provide an EPA approved Spill Prevention Control and Countermeasure (SPCC) plan to this Office before the fueling facilities are constructed. 115A NCAC 02H .0506(b)(3)] 13. State Stormwater Management Plan (SMP) and General Permit No.NCG190000 Approved by Division Stormwater Program Required You are required to provide one copy of the state stormwater management plan (SMP) and National Pollutant Discharge Elimination System General Permit No. 190000 (NCG190000) approval letters from the Division of Energy, Mining and Land Resources (DEMLR) to the DWR 401 & Buffer Permitting Unit (1617 Mail Service Center, Raleigh, NC 27699-1617) before any impacts authorized in this certification occur. The project must be constructed and maintained in compliance with the approved SMP and NCG190000. After the approval letter is submitted to the Division, the SMP and NCG190000 may not be modified without prior written authorization from DEMLR. If the SMP and NCG190000 are modified in the future, then you shall provide an approval letter for the modifications to the DWR 401 & Buffer Permitting Unit prior to the commencement of the modifications. [15A NCAC 02H .0506(b)(5)] 14. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained to flow in a diffuse manner at a non -erosive velocities through the entire protected stream buffers without re -concentrating. If this is not possible it may be necessary to provide stormwater facilities that are considered to remove nitrogen and phosphorus. Additionally, a stormwater management plan for this project shall provided to this Office before any impacts approved herein are conducted. The plan shall specify all stormwater discharge points, plan details, and calculations to indicate that diffuse flow through the protected buffers or nitrogen and phosphorus removal as described above will be achieved. 15. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 & Buffer Permitting Unit, NC Division of Water Resources, 1617 Mail Service Center, Raleigh, NC 27699-1650. [15A NCAC 02H .0507 (c)) 16. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at i• TJ's Land Development, LLC Attn: Mr. Tobin Tetterton D W R # 14-0275 Ver. 3 401 AND BUFFER APPROVAL Page 5 of 6 http://portal.ncdenr.org/weJwq/swp/ws/401/certsandpermits/apply/forms). [15A NCAC 02H .0506(b)(5)] 17. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] These Certifications can be contested as provided in Articles 3 and 4 of General Statute 1.50E by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, Fedbc, etc.): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27509-6285 One (1) copy of the petition must also be served to DENR: Sam H. Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water. Please contact Anthony Scarbraugh at 252-948-3924 or anthonv.scarbramh@ncdenr.eov if you have any questions or concerns. Sincerely, Robert Tankard, Assistan Regional Supervisor Water Quality Regional perations Section Division of Water Resources, NCDENR Enclosures: GC 3900 Certification of Completion cc: Daniel Govoni, DCM Morehead City Steve Trowels, DCM WaRO Raleigh Bland, USACE Washington Regulatory Field Office (via email) Pat McClain, DEMLR WaRO (via email) Laserfiche File TJ's Land Development, LLC Attn: Mr. Tobin Tetterton DWR #114-0275 Ver. 3 401 AND BUFFER APPROVAL Page 6 of 6 aJf.i`Ou� W w..mA1. �.... VAN RIMS 0i 0 0•0 ®.0 10, 9 0.0 _ 0 7 1 :� 0 S I�kolcieO; M.CIIJKS:WV; Pei IT ramirISG 11'QI9il3L T Eli:A lir •M1. Ski ` Ww Main f+ ... i�.rdw •0•9••8•0..49.03.49.03..0.0 0.®.'®•O.. 0.01..0.0..0.O. PICfli [)EMAIL I e 0.0 0.e 0.0 0.0 I. .-. Er..,.. i.w f i AIIFIILl413 Pi'91Ei'ail-e iersatJEiid'ii i>t®®OLIZ.DY Ii91!LAIv NW MI MI LIM B..0.0..0•0..0.9..0.0.-0-0..0.0..0.0..0.0-0-0..0.0. ` NEW PIER LOICRUppI�HAL CROSS SECTIO9 T01B' g tips\ 10x07 ama Dar 11,1CA.1101 auan.grammnaa. puma .Aw:... ICILICAL•11••1•• MOIsTilreenerill AaIIVI Clieqr A ;1= AmAL10a11mraeaaalp 1102f1@3;C1m 11.111=1118m [A.IA 1)4•KI 1DTba t7-11NCi�N1�D ■arAmaA,o 11437 ��.w1.A..m.ro.�.ao 1<._ pPse.o1•®%u•••••am��a� sw '`v�>�• WI a lee 00. WO aa•.r. rAa-rnc.1:oralswl.P>•ne.d.umis•"aa+nte .r�s �......� car PIIJND DETAIL ;WC& r ,dam im' o' a/ m• I Y' . ORM +Out - h 0 . T•m.wx * aA F-•a.1 i r-Z I--0 Iri IY ( I I vl et 0 1.TE 0O6J'1001• OMIW1 i1W APPROVED NorRNGAOIPUAEIWIRONMENTALL IMALGBIENTCOMMPSSSON DIVISION OFWATD RESOURCES OWRPernary-a2-7rv7— X — x4.5 I jx*), 10111111I - ,, iy art 7248 ._ ap •�`�CIftE�4 -5d CAM PENIS comaing pm" row a. ru versa 153-14:.71 -w REIT 0 1= II 1 1 L=J mwn Lai • PloPtl1R or TJ'S LAND DEVELOPMENT, LLC .•1. 1111114 .1AiN1 eou.1 MORON CAP0U A mum P' • feY •3411 Mai PM.. la. X. NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor August 4, 2015 TJ's Land Development, LLC P.O. Box 125 Pantego, N.C. 27860 Dear Sir or Madam: Donald R. van der Vaart Secretary The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff - colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.I or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733- 2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure " ' Sincerely, • Doifglas V. Huggett Major Permits and Consistency Manager N.C. Division of Coastal Management 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nccoastalmanagement•net An Equal Opportunity / Affirmative Action Employer DCM Coordinator: Permit #: ' I - Permitee: MAILING DISTRIBUTION SHEET Agents: DCM Field Offices Elizabeth City Morehead City US ACOE Offices: Washington: Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: Water Quality: Washington: Wilmington: Wildlife Resources: LPO: (with revised work plan drawings) Tracey Wheeler William Westcott (NC DOT) Bill Biddlecome (NC DOT) Tyler Crumbly Cen Pace Patti Fowler iggins (Raleigh) ennessy-(NC-DOT) thony Scarbraugh- 1 rmwater Joanne Steenhuis — 401 Chad Coburn - 401 Linda Lewis - Stormwater Fax Distribution: Permitee #: Agent #: SCALE 1:24 000 5935 32'30" 3934 2 33 '32 650 000 FEET '30' 3931 3930 0.5 0 KILOMETERS 2 1000 500 0.5 0 METERS 0 1000 2000 1 1o60 0 10 MILES 0 1000 2010 0 3000 4003 5003 6000 7000 6000 9033 10060 90 FREE UNION CHURCH RD 10 5 5 5 Yeatesville 10 w.4TEzs 4,0 is BI Op RD FEET 5 • 0 Graveyard Point 10 0 70 SEED TICK NECK F RECEIVED MAY 2 7 1 76°45' 1 2 670 000 FEET 342 CONTOUR R4TERVAL 5 FEET NOUN AMEBIC N VERTICAL DATUM Of 1988 343 344 42'30" PANTEGO QUADRANGLE NORTH CAROL.INA-BEAUFORT CO. 7.5-MINUTE SERIES 346 7 P g1.0U1VT9 BAY p • 1 i1 A 6 r. . 112 a w 0 'l; 8WlMP\ RECEIVED Cv vra t . -ti/ui r. NARRATIVE CAMA Permit TJ's Land Development, LLC This project is to build a camp ground with marina on the Yeatsville Road fronting on Pungo Creek in Beaufort County. The entire tract of land is 46.47 acres with 12.95 acres of undisturbed 404 and CAMA wetlands. The remainder, approximately 33.52 acres, is farm land. There will be dockage for approximately 76 boats and more than 100 camp sites with sewage facilities for both the dockage and the camp sites. The wetland area is well defined and has been examined by the US Army Corps of Engineers and The Division of Coastal Management. No attempt has been made to make the distinction between CAMA and 404 wetlands because the only impact in these wetlands will be limited to pile driving. CAMA wetlands are along the Pungo Creek shore line. A pump out for boaters will be provided with disposal of the sewerage at a permitted facility. Bathrooms and other amenities will be provided at a high ground commercial facility located as shown on the plans. Elevations range from sea level to 10 feet. Generally the project area is flat with grades less than one percent. The entire project area to be disturbed is farm land and the existing excavated pond. Soils are Augusta and Altavista fine sandy loam. The project includes the excavation of an approximately 3.6 acre pond that is fed by ground water. There will be no surface water flow into the pond or natural discharge. The pond will not be connected to local ditches or streams. The existing borrow pit will be enlarged to construct the pond. A mine permit is being applied for concurrently with these applications. The purpose of these permits is to construct the pond and provide a partial place to place fill dirt resulting fromthat construction. The pond will be used for recreation including swimming. Putrefaction will be avoided by periodically decanting by pumping to high ground with sheet flow of more than 50 feet into ditches. An after the fact Tar -Pamlico buffer permit has been granted to resolve the road crossing issue at the head of the designated stream. Borrow will be used to raise the ground elevation at those camper Tots that are below the base flood elevation, and for raising the ground elevation at the septic tank disposal ground absorption drain fields as required by ground absorption permits. There will be an estimated surplus of about 114,000 cubic yards of borrow. The owner, TJ's Land Development, LLC intends do the excavation and construction of the property. Some of the borrow will be used on properties owned by Toby J. Tetterton who is also the owner of TJ's Land Development, LLC, and some of the borrow will be sold for use at other sites. Storm water strategy in these sandy silts is to avoid collecting rainwater into hardened or ditched conveyances. Roads will be constructed as nearly as possible without ditches. Gentle swales will be used. The Tar -Pamlico riparian buffer will be protected by sheet flowing all water into the buffer. density storm water project. This is a low q�1 it!,•l. rr. GAR°. RECEIVED MAY 27 2015 nine _;:'nuKi=IJ+r, 9pc00at Om'/ "0, r ap'Y� • //y�Lr % / 72 4 8 p ems+ o ' (` s 0LV yap l � y �... �s� •� 04,0 l�41-44au.6atJ ***This is a word processing form to be completed in Microsoft Word"* NC Division of Coastal Management Major Permit Application Computer Sheet (02/15/2010) Applicant: 7-3-..1.- / ,'-')d /) U,, ,z ti i Date: 5/20/2015 Project Site County _ _vIP Y Staff: S. >c___ /r- k // ! District: ■ Elizabeth City gWashington ❑Morehead City [Wilmington Project Name: �/- Rover File: _ Date application "received as complete" in the Field office (EX: 1/8/2007): (.56; L5--- Permit Authorization:JR1CAMA DDredge & Fill ❑Both SITE DESCRIPTION/PERMIT INFORMATION PNA: •Yes PjNo Photos Taken: YesZ No• Setback Required (riparian): ■Yes,2rNo Critical Habitat: ['Yes (k No ■ Not Sure 15 foot waiver obtained: ■Yes,No Hazard otification Returned: :Yes hNo SAV: ['Yes XINo IN Not Sure Shell Bottom: •Yes No • Not Sure Temporary Impacts: ■Yes ❑No Sandbags: ❑Yes ,No E Not Sure Did the land use classification come from Mitigation Required (optional): county LUP: M.Yes ■ No ■Yes No Moratorium Conditions: ■Yes ®No Environmental Assessment Done: ■ NA ■ Yes f No ❑ NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) • Future Water Supply (FWS) M Nutrient Sensitive Waters (NSW) ■ Swamp Waters (SW) ❑ High Quality Waters (HQW) ■ Outstanding Resource Waters (ORW) WETLANDS IMPACTED 0 (404) Corp. of Engineers (Jurisdictional wetlands) • (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort ( Salicornia sp.) 0 (CJ) Saw grass (Cladium jamaicense) • (SA) Salt marsh cordgrass (Spartina Z1 (SY) Salt reed grass (Spartina cynosuroides) alterniflora) ❑ (DS) Salt or spike grass (Distichlis spicata) ❑ (SC) Bullrush or three square (Scirpus sp.) • (TY) Cattail (Typha sp.) RECEIVED it (JR) Black needlerush (Juncus roemerianus) 0 (SP) SaltJmeadow grass (Spartina patens) NAY 272015 APPLICATION FEE ❑ No fee required - $0.00 ❑ III(A) Private w/ D&F up to 1 acre; 3490 can be applied - $250 X III(D) Priv. public or comm w/ D&F to 1 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major permit - $100 ❑ Major Modification to a CAMA Major permit - $250 ❑ IV Any development involving D&F of more than 1 acre - $475 E Permit Transfer - $100 • III(B) Public or commercial w/ D&F to 1 • Express Permit - $2000 acre; 3490 can be applied - $400 • Major development extension request - 0 II. Public or commercial/no dredge and/or fill - $400 $100 • I. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 252-808-2808 :: 1-888.4RCOAST :: www.nccoastalmanagement.net revised: 02/15/10 NC Division of/Coastal Mgt. Applicattin Computer Sheet, Page 2 of 3) Applicant: 7 j ( ',[� 4,/�f ,-z Date: 5/20/2015 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. Activity Name Number TYPE Choose One REPLACE Choose One Dimension 1 Dimension 2 Dimension 3 Dimension 4 4- &11- New Woork ❑ Maint Replace ❑ Y ❑ N /ji/, New Work Replace ❑ Y ®NAf Mant■ I New Work gl Replace ❑ Y al N r 3o 3d Maint ■ �r� r^� o� New Work Al Replace ❑ Y 01 N 73 icp / Maint ■ /], /f! New Work gl Replace Y 7r N / y�1_ ! Maint III i' I oq- if/kr �C New Work] Replace ❑ Y,[ f N t i25 1 3 Maint ■ if'/�p� „,s 16 New WorkA Replace ❑ Y XN Maint ■ // ] J New Work ■ Replace ❑ Y ❑ N Maint ■ New Work IN Replace ❑ Y ❑ N Maint ■ New Work ■ Replace ❑ Y ❑ N Maint ❑ New Work ■ Replace ❑ Y ❑ N Maint lU New Work ■ Replace Maint ■ ■ Y ❑ N New Work ❑ Maint ❑ Replace ❑ Y ■ N New Work ❑ Maint ❑ Replace ■ Y ❑ N New Work ■ Replace ❑ Y ❑ N Maint IN New Work ■ Replace ❑ Y ❑ N RC Ct:'VED Maint ❑ New Work ■ Replace ❑ Y ❑ N MA1 2 7 1015 Maint ❑ New Work ❑ Maint ❑ Replace ❑ Y ❑ N "��� New Work ❑ Maint ❑ Replace ❑ Y ❑ N New Work ❑ Maint ❑ Replace ■ Y ❑ N revised 02/15/10 NC Division of Coastal t. App"c ation Computer Sheet, Page 3 of 3) si Applicant: / 3( � liG :I!`/( IL Date: 5/20/2015 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) qm tait� Dredge ❑ Fill ❑ Both ■ Other . 5 vh6,-- V4,-,Ds 1 l l 2 t r Dredge p1 Fill Both4. Other ■ di/if ) 2-6 0 Dredge ■ Fill ■ Both • Other A • jetvp Dredge ❑ Fill ❑ Both i Other $ Dredge ❑ Fill ❑ Both ■ Other • Dredge ❑ Fill ■ Both ❑ Other ■ Dredge ❑ Fill ■ Both ❑ Other 0 Dredge ❑ Fill 0 Both ❑ Other ❑ Dredge 0 Fill 0 Both ❑ Other ❑ Dredge 0 Fill 0 Both ❑ Other ❑ Dredge 0 Fill ❑ Both ■ Other • Dredge ❑ Fill 0 Both ■ Other • Dredge ❑ Fill ■ Both ■ Other • Dredge ❑ Fill • Both • Other ❑ Dredge 0 Fill ■ Both ■ Other 0 RECEIVED MAY 2 7 I015 0.41.9—wkfll .I 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 02/15/10 Major Permit Fee Schedule Development Type Fee DCM % (14300160143510009316256253) DWQ % (2430016024351000952341) I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: $250 100% ($250) 0% ($0) I!. Public or commercial development that does not involve the filling or excavation of any wetlands or open water areas: $400 100% ($400) 0% ($0) III. For development that involves the tilling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, or D below applies: Itt(A), Private, non-commercial development, if General Water Quality Certification No. 3490 (See attached) can be applied: w $250 100% ($250) 0% ($0) Ill(B). Public or commercial development, if General Water Quality Certification No. 3490 (See attached) can be applied: $400 100% ($400) 0% ($0) III(C). If General Water Quality Certification No. 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 60% ($240) 40% ($160) \ $400 60% ($240) 40% ($160) II D). If General Water Qua Certification No. 3490 (see attached) cannot be applied. $475 60% ($285) 40% ($190) IV. Development that involves the filling and/or excavation of more than one acre of wetlands and/or open water areas: LIVED MAX 27 2015 j .,te tior-H.4,L'IW. Hood Richardson, PA C-576 Engineers — Surveyors — Geologists 110 West Second Street Washington, North Carolina 27889 (252) 975-3472 April5, 2015 CERTIFIED MAIL RETURN RECEIPT REQUESTED Att: Mr. William Tankard WMT Holdings, LLC 18764 US Highway 264 East Bath, N. C. 27808 Gentlemen: TP's Land Development, Tobin J. Tetterton Manager, is applying for a CAMA Major permit to build a camper park and marina located on the north side of your property on the Yeatsville Road and fronting on Pungo Creek in Beaufort County, North Carolina. The specifics of he proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, i am required as agent for Mr. Tetterton to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to the proposal, please send your written comments to Mr, Kelly Spivey, District Manager of the CAMA Washington Regional Office at 943 Washington Square Mall, Washington, N. C. 27889. Within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions about this project, please call me at 252-975-3472 or e- mail n e at hrichardsonpa@embarqmail.com. You may also contact Mr. Tetterton at 252-944-5555. Hood Richardson, PE, PLS, PG Disc S 12EC:E 't►D MAY 17 2.015 pcM a gA" Hood Richardson, PA C-576 Engineers — Surveyors — Geologists 110 West Second Street Washington, North Carolina 27889 (252) 975-3472 March 17, 2015 CERTIFIED MAIL RETURN RECEIPT REQUESTED Att: Mr. Gene Grant JHG Farms, LLC 42 Queens Way Bath, N. C. 27808 Gentlemen: TJ"s Land Development, Tobin J. Tetterton Manager, is applying for a CAMA Major permit to build a camper park and marina located on the south side of your property on the Yeatsville Road and fronting on Pungo Creek in Beaufort County, North Carolina. The specifics of he proposed work are in the enclosed application forms and drawings. As the adjacent riparian property owner to the aforementioned project, 1 am required as agent for Mr. Tetterton to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit application and drawings. Should you have any objections to the proposal, please send your written comments to Mr, Kelly Spivey, District Manager of the CAMA Washington Regional Office at 943 Washington Square Mall, Washington, N. C. 27889. Within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions about this project, please call me at 252-975-3472 or e- mail me at nrichardsonpa@embarcmaiLcom. You may also contact Mr. Tetterton at 252-944-5555. ood Richardson, PE, PLS, PG Agent Disc S RECEIVED MAY 2 71015 '`�. C ?V SENDER: COMPLETE THIS SECTION ■ item Complete ff items 1, 2, and 3. Aso complete ■ Printeyour name Restricted Delivery is desired. so thawe can return address on the se ■ Attach this card to the de of to bade m or on the front ff space arlpreae• .. r • 1. Article Addressed to: fTG�Gfn to.. at -re 2. Article Number (Transfer from service label) PS Form 3811, February 2004 Wet CO1.4PLETE THIS SECTION ON DELIVERY Signature X Agent ---O.Addissee i C. Data plvery 1 is deivery if address different from item 1? Yes deliveryter address below: ❑ No _4 y Type - '- Certlned Mau Express Mali ❑ insured Mali R' Rapt Merchandise ■ 4. Restricted Delivery? (Extra Fee) 7009 2250 0002 7303 5645 Domestic Return Receipt aueN „rawisod 3.0 6820 l 900Z 1.nfiny-00BE uugd Sd PJ2 ''7if 11 di o r ?tl veal! seed 2 et3elsnd relol (pel!+wald wewesJopug) ead'L'e iI a palopised (paxnbea luewasicpu3) sad ldranaa wntaa 094 P r1J 0 atialso 3 S fl 1 V8I`a wou-sdsrriams% le el+sgarn .lno llsiA uoilewioluf Lie/4; ap JDd (AOPMOJd abefa too eauejnsuf ON `.flop I1ew o#Jsawop) 1d133311 "11VW ❑31d111:133 r� ao�naas le/sod •S'fl ru ru Ln C1 fzi rti w Ln rr w ❑ Yes 102595-02-M 1540 NOTICE CAMA PERMIT APPLIED FOR PROJECT: ✓` kt.Y tk IOU c � uitzit v's ella) C° Cs .6' alm t �a,, fps scis,1 Q oc Q Pia U\ictslilerc aryl C�Y�E ru_ri et- IQ (Co e Y•AcuroNL -Pittss3i) io GYA piiriayth fie- tnbsk+�fan�Ly Q�eu(s a� mad aoLs COMMENTS ACCEPTED THROUGH 15 5�- aD►s APPLICANT: -rc% Lz.riCt -r LLC. Minurr 7•0.53)c 1a5 FOR MORE DETAILS CONTACT . THE LOCAL PERMIT OFFICER BELOW: q�C� v�a�4nt curt a,i.( 1n`a�Jn�-�On f1�C� a-78`�q NCDEFIR North Carolina Department of Environment and Natural Resources Division of Coastal Management Donald R. Secretary 21 May 2015 TJ's Land Development, LLC Mr. Tobin J. Tetterton, Manager PO Box 125 Pantego, NC 27860 RECE!VED MAY 2 7 1015 Dear Mr. Tetterton: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located off SR 1718,Yeatesville Road, in existing farmland adjacent to Pungo Creek, near Belhaven in Beaufort County, North Carolina. It was received on 20 May 2015, and appears to be adequate for processing at this time. The projected deadline for making a decision is 03 August 2015. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. Steve Trowell, Field Representative for the Division of Coastal Management is responsible for processing your permit and he can be reached at 252-948-3854 or via email at Steve.Trowell@,ncdenr.gov if you have any questions. If this agency does not render a permit decision within 70 days from the 20 May 2015, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of- way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. 943 Washington Square Mai!, Wasr:ington, INC 27889 Phone: 252-946-648 i l FAX: 252-948-0478 Internet: www.nccoastairnanagement.net An Equal opportunity t Affirmative Action Employe; - Made in part by recycled paper TJ's Land Development, LLC Mr. Tobin J. Tetterton, Manager 29 May 2015 Page 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Steve Trowell Coastal Management Representative Division of Coastal Management Washington Regional Office Enclosure Cc: Daniel Govoni WARO RECEJVED P4AY 27201c N404,/ vorl,. ar h4: N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM Date I 1 3CD/1 Na a of Property Owngrr Applying for Permit: P 1 L.ND �Jlz ✓-e /o r," i & f T, L L. C 7`0b ,:) A , Te rQ/t ro hc it- r)-(A- •€/2 Mailing Address: ' go)( filkerep 1`C. �84 a i I certify that I have authorized (agent) /% 1 & / ' AG .4,4 Liver. act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) /( �/ 'e !2 , /OVA<Gv G/l-t° eI< ePFF at (niy property located at)Xf.2 "1. T1' rf! i L _ %Z • This certification is valid thru (date) /2 / fs ti/30/(1 Property Owner Signature Date NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, lil Governor Secretary October 2, 2014 Trs Land Development, LLC Attn: Mr. Tobin Tetterton PO Box 125 Pantego, NC 27860 DWR # 14-0275 V. 2 Beaufort County Subject Approval of 401 Water Quality Certification with Additional Conditions Approval of Tar -Pamlico River Riparian Buffer Impacts with Additional Conditions Trs Land Development, LLC Property — Access Road (After -the -Fact) Dear Mr. Tetterton: You have our approval for the impacts listed below for the purpose described in your application dated September 20, 2014 and received by the Division of Water Resources (Division) on September 24, 2014 with subsequent information received on October 2, 2014. These impacts are covered by the attached Water Quality General Certification Number 3886, Tar -Pamlico River Riparian Buffer Rules, and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 14 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local perm is before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification and Tar -Pamlico River Buffer Rules are met. No other impacts are approved, including incidental impacts. Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Plan location/ Reference Attached IStream PCN Page 4 and Site Map Road Crossing 42 (linear feet) 0 (linear feet) Buffer —Zone 1 PCN Page 5 and Site Map Road Crossing 1,200 (square ft.) 0 (square ft.) Buffers — Zone 2 Road Crossing 600 (square ft.) 0 (square ft.) RECEIVED MAY 2 7 N15 i6-uuru7.1 F4440p Division of Water Resources - Water Quality Regional Operations Section - Washington Regional Office 943 Washington Square Mali, Washington, NC 27889 Phone: 252-946-6481 \ Fax: 252-975-3716\ Internet: wwvr ncdenr.00v TJ's Land Development, LLC Attn: Mr. Tobin Tetterton DWR#I 14-0275 V. 2 401 and Buffer APPROVAL Page 3 of 3 The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAK filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: if sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water and Tar -Pamlico Riparian Buffer Rules. Please contact Anthony Scarbraugh at 252-948-3924 or anttiony_scarbraugh@ncdenr.gov if you have any questions or concerns. Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDENR Enclosures: GC 3886 Tar -Pamlico River Riparian Buffer Rules Certification of Completion cc: Raleigh Bland, USACE Washington Regulatory Field Office (via email) Jennifer Burdette, DWR 401 & Buffer Permitting Unit Pat McClain, DELMR WaRO (via email) David Moye, DCM WaRO (via email) File RECEIVED MAY 27 Z015 Nf-1MI�YrIk� k;14Y. U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. SAW 2013-01409 County: Beaufort NO DEPARTMENT OF THE ARMY AUTHORIZATION REQUIRED Property Owner / Agent: Toby Tetterton Address: Post Office Box 125 Pantego, North Carolina 27860 Telephone Number: 252-943-6677 Size and Location of Property (waterbody, road name/number, town, etc.): Property contains approximately 46 acres located southwest of the Town of Belhaven, on the west side of Pungo Creek between Yeatesville Road and Pungo Creek. The Property contains approximately 29 acres of farmland, approximately 1 acre borrow pit, and approximately 15 acres of woodland. Most of the woodland is wetlands. PIN 07029943. Description of Activity: The applicant proposes to place fill material into the upland borrow pit to facilitate the development of a RV park. No fill is being placed in wetlands. Your work as proposed does not require Department of the Army authorization for the following reason(s): There are no jurisdictional waters or wetlands within the boundaries of the property. X The proposed project does not impact jurisdictional waters or wetlands. _ The proposed project is exempt from Department of the Army regulation. Specify: This Department of the Army determination does not relieve the permittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. For any activity within the twenty coastal counties, before beginning work, you must contact the N.C. Division of Coastal Management in Washington, North Carolina, at (252) 946-6481 to discuss any required State authorization. Any changes in the above described work must be coordinated with the Corps of Engineers prior to commencement. If you have any questions regarding the Corps of Engineers regulatory program, please contact William Wescott at telephone n bejr (910) 251 29. Regulatory Project Manager Signature 11 Date: 08/06/2013 RECEIVED NAY 2 7 2015 SURVEY PLATS, FIELD SKETCH,WETLAND DELINEATION FORM, ETC., MUST BE A "c:m ATTACHED TO THE YELLOW (FILE) COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Toby Tetterton e lefreet From: Wescott, William G SAW [William.G.Wescott@usace.army.milj Sent: Tuesday, August 06, 2013 11:02 AM To: tobin@gotricounty.com Subject: RV Park Toby, The 'No Permit Required' tearsheet to place fill in the borrow pit has been completed and should be going in the mail today. I talked with Raleigh Bland. I told him that you have a very clear break from uplands to wetlands on the creek side of the borrow pit. You are proposing the elevated boardwalk/pier to start on uplands and that you were not proposing any fill in wetlands. William RECEIVED MAY 271 A 1N n ivinu Yr r 1 ICCI-alG MIN a1809PC753 r /AIX. MUMS Des' Lisa wcocrta Q!ffCia3 p>•U dart aa4 -r rr 9 RAY906t. Azxx- s ts. Po Sat 8eaRr.exL SC _ 3 i : FOR REGISTRATION RE6l STEM Oi DEEDS Jere,y NN Laos.1N Yhs l.lw+rst y�aul eel fnN.,1v. NC felsr a 28, 2913 9d:30.96 Pli Balk i:t: Page 753-755 FEE s26 DO 11C P. WI&( StAI1p S400.00 lilSTitrElit $ 291)301235 \1llItL1Il111 The property herein conveyed is not the primary residence of' a Grantor. TAX PARCEL 07.029943 REVENUE STAMPS: S 400.00 STATE OF NORTH CAROLLEA COUNTY OF BEALFORT WARRANTY DEED } THIS DEED. made and entered into this the Utlay of February, 2013 by and brew JO} TANKARD JONES, and wife, MARY SETA JONES, 260 Yeatesville, Rosa, Bay , North Carotins 27808, hereinafter referred to as GRANTORS; to T J'S LAND DEVELOPMENT, LLC, PO Box 125, Parttzgo, North CaroUna 27860 hereinafter -rferred 'w as GR_ANTEE. WITNESSETH: Th.,tt the said Grantors in consideration of the sum of TEN DOLLARS (S 10.00) and esar: good sad %-aluabse consideration to them in hand paid by said Grantee, the receipt of *hies 3 hereby a rowiedged, have bargained and sold, and by these presents, do bar , sel and cots_, unto the said Grantee, its successors and assigns, the bayonet puce or tract of sand in die State of North Carolina, County of Beaufort, Bath To+Rm a ant more parneeisriy described as follows: 13eint that 46.4' acres, mote or less, shown on that map of survey entitled _P"vyL.t. of John Tankard Jones" by Hood Richardson PA, dated July 13, 2007 and. record it Plat Cabinet H at Slide 2-1 of the Beaufort County Registry. Mrs be same property conveyed to the Grantors by deed dated December 221.:998 and recorded in book 1124 at Page 3 I of the Beaufort County Registry. SUBJECT TO THE FOLLOWING RESTRICTIONS FOR AND DURING THE OF THE GRANTORS: Th:s pro?:,. canno: be used for a trailer park, but may be used for a roxcasiona vehicle (RV) park: and 2. This IA o c. canno: be used for strip mining; however the Grantee may dig woe: 3s property for its own use. `O HAVE AND TO HOLD the aforesaid tract or parcel of land and all privileges and spn.r:tenrxes :beret:o belonging unto the said Grantee, its successors and assigns frarver. E1809PG75f The Grantors covenant with the Grantee that they are seized in fee simple of the salad alone descnIed and have good right and tide to convey the same; that the same is Om and cis of all }Items and encumbrances, except ad valorem taxes for the current year, and tboae :esnieiotss stated above, and they will forever warrant and defend the title to I the sane against all Lawful claims end demands whatsoever. WflNESS WHEREOF, the Granto dsev seats this the day and year first above Jo MARY STATE OF NORTH CAROLfl A COUNTY OF BEAI'FORT hereunto set their bands and affixed o---r- (SEAL) Rc r, r , a Notary Public, of the aforesaid County and State, k do t reby thatf, dJOHN TANKARD IONES and MARY ETTA JONES personally € f appeared before Inc this day and acknowledged the due execution of the foregoing Deed. }' WITNESS try [sand and Notarial Seal, this the srb' day of February, 2013. !vfy Coramessioei Eta es: 31310 r• ol.a ..® 1o.a 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111110-111111111111111111IIIIINIIIIII11111IIIIIIIIIIII1110111111111111111Il111111111111Ii111111111111111111I BOAT 1AT5 _ BMT uR5 0 BCM uSTS a BOAT JETS 5 MAT LIFTS _ BOAT LIFTS _ BOAT LETS < SCAT OLIFTS 0 BOAT UM MAT LIFTS PP' PY P2PP - PY 404 WETLAND AT PRASE GRASS AT HIGH MIMEO 404 ',MILANO 70' ELEYAIED 5' CROSENO 10' TIP MINDEN • ■ 404 WETLAND MARINE GREBE PRISES 3�M 0Sc 1713 BISHOP ROAD ova 'rAF 2.Y awm-,r a[YEAr CONSTRUCTION ENTRANCE 10' X 60' CRUSHED STONE 11 LEGEND: O NEW IRON PIPE. CONTROL • RAILROAD SPQCH. CONTROL O POINT, CONTROL DnCR 404 WETLAND LINE - • — NORMAL WATER LINE �1-NOT TO SCALE RA.. INVERT (5.07. x SPOT ELEVATION B FINISHED ELEVATION ��'B•'-- SILT PENCE MOM ASPHALT(YBATESVIILE ROAD} �- 6--- CONTOUR LDIE PNISTEED CONTOUR MOSS CRASS AT AORW4. WATER LINE CROBBINO W RSM NO C S: TES vex, MIS NOT SHOW ALL OF PWNOS. FMTAP. -PAJ.Q300 RIPARIAN KIPPER DWQN14-0275 552d5. a'I �' x 1� 7W4PoNE. PELT PIMUNC'- 3B W. STATION 135' NEW PIER LONGITUDINAL CROSS SECT1O 0TO }A NO SCALE 7xx x T.3' 7a'x EN:6 IP' ACRES HIGH GROUND 33.52 DISTURBED CAMP / 404 WETLANDS 12.95 NOT DISTURBED TOTAL 46,47 L00 0 100 200 300 DIU.?PLI1 SCALE - FEET 111111111111111111111111111111111111111111111111IHI 1111111111111111111111111111111111=1111111111111111111111111II11111111111111111III11111 III11111111111111111111111111111#IIIIII IIIIIIII II BOAT LRS 5 10AT 7.7x r..r 5.5.4' 1A3 • OS' '4.0' T ELEVATION OATl1►G I1:E30M SSA 63 SIM I. NAE.3RE IN POWER POLE IA PEET ABOVE CADDIED THE POLE 13:00 PERT NORTH PROM A NEW MANTA ROAD A1033 PETT EAST FROM D0E OMER OF THE ASPHALT OP 3x 111E (5LLT8973J 13UWE-TSB 00L31s LABELED TENT 144 THE ERVATTCM OP T1T0 NAIL IS TO MET. T■M0: KAMSEPIN A POWER POLE 13 MDT ABOVEOEODND, 17U311220170 PEST NORTH PROM A34BT' MAVE, ROAD AND 13 PERT SAM REENTER CIENTE* Or Ism AE0NLI UPSR. Ittl(ILATElvlL 1A0AD).flh110LE I5I63E30 ITEM LINT. IKE ELEVATION OPTICS. NAIL LS IA MET. TEN 3.NAILSRT31 A 15.TN01 MAPLE MEE 33 MDT AEOYSEAOIP1D. TR■TR®13 33 PST NORM F OM PM CORNER OP APOND, ON THE30V0ffAST SASE OP A D1T01113ADLNO INTO Tlll WOODS AND ON THE COS.NER OF THE TREE LOTS THE S. EVARON OP TEE PAT. 1514 NET j/' of Ler BOOT LIF15 TU E 4, NAIL 937 DI A 17.000E GUM TTFOIA PEET ABOVE MOLTED. THB TREE 3 INPUT NORTH MOUTH! CORPS OP A YOTO AND ON ONETIME TAN& TNE148VAT10N Or TH&N..13 TO PIM NOR: THE 1011 DATUM BASE FLOOD ELEVATION MR rats LOT 13 Term Acco5550171 PIMA PL000 0301EANEE RATS IIAP 3176340001 DATES L1303 9 BOAT LETS SOOT WTI 9 BOAT uFIS 1 BOAT UM 7] x 7.4'x S'rtiG 15p BSL 0g' A903 1.,2' 09 A*. O4 77x 7.5'x RT% 5e ♦ rmg µa \xrJo, \..\ �. 194 W000 I5CE PC VOTER LENT 10' [MINIMUM NAPILING 0240E .fie. .i"L •'; PILING DETAIL TYPICAL MT TO SC4E1 AR 20' BASHERS & DRYERS 25' VENTING (STORE) PATIO a 30 " DRY KITCHEN STORAGE OFFICE I CANE ROOM 25' MALE FEMALE RESTROOM RESTROOM WITH SHOWERS SHOWERS -1 7 7 r F ---1 1- 1,71 117.1 STORAGE 1R' 75' 100 PERSON RECEPTION VENUE 1 STAGE PATIO 150' 20. R PATIO BUILDING FLOOR PLAN sc. P. ' a 20' ( (4.0') STREET TYPICAL CAMPER SITE GALE: 1' - 30' o Mir e l •��_ e •C y ✓� Or.6ec39JQi ttit y-Nese;rQ 4 AOt. °40e0a0og6 9 41 ?caaasallaEa°,' RESPONSIBLE PARTY: TOBIN J. TETTERTON, 252-843-EE77 9M1E0 5/65/I6A PAPA PI■1RT AEVa03 11/31/14o MRYITO EMIR I/RIB. NPR R 04FAR1 04 1 REAYO 2/10/71, BOAT UPI PROPERTY OF: TJ'S LAND DEVELOPMENT, LLC tih ,.ae .� �•� aDa, j/3 1.6.• u�r s {_ • 'A .2 w i .11 4 0 C•':'V CAME RI£K ,. RECEIVED MAY 27 2015 wA4A iyaU`A Al 1 El r`ITV BATH TOWNSHIP BEA0TORT COUNTY NORTH CAROLINA CALE: I• . 100' SURVEY DATE; N0VE4BER 22, 2013 IPAIYLITO 171 Nm0 AITHY59DA, At 04 W NEA-s0103 a14-k.APPMS rI;y:AnfON1.33)W ANANIO (Ns/ 15-347T SAM 13-01-1011-L r • RECEIVED MAY 2 7 205 — i 4 0 In BOAT 4414. &JAI- Lif •. •(4,0)• ?. •O3R!•<3)• •(3J• 4 35)• •:34�• 33 PIER :PHI I III ti di. 1.1I1ti I BOAT LIFTS BOA) LIE TS. BOA I UF.f BOAT , • -22'—+� -• _2?'. — 22' _._.. 4 `,s,, .. 0.2) (J)• •0.00)•('9)•• • • •(2f PIER DETAIL i E;OAT .LIFTS 4) • (52) MARINE • j PUMPOIJT FUEHN ;TAT'. �d BOAT LIFTS 2 - • r+ 31 -7-.-" ' •(20)•(1 '. BOAT LIFT`_; H- A( LIFTS -, 1 22' • (12)•(1) • •(10)•(9) lb 4 GAZEBO , caz /0' S.R. 1733 BISHOP ROAD 404 WETLAND AT HIGH GROUND 3t10' MARSH GRASS AT 404 WETLAND ELEVATED 5' CROSSING 10" TIP MINIMUM F? 404 WETLAND MARINE GRADE PILINGS 7.I�1 rrtt 24 -0 CONCRETE 1 0 Ct' VERT IVN CONSTRUCTION ENTRANCE 10' X 60' CRUSHED STONE LEGEND: 0 NEW IRON PIPE, CONTROL A RAILROAD SPIKE, CONTROL 0-POINT, CONTROL DITCH' 404 WETLAND LINE NORMAL WATER LINE NOT TO SCALE INVERT WATER DEPTH SPOT ELEVATION FINISHED ELEVATION SILT FENCE 404 WETLAND MARSH GRASS AT NORK4AL WATER LINE c20 ._.— --�� ELEVATED 5' CROSSING COASTAL MARSH MARSH ii ilf NOTE 1: THIS VIEW DOES NOT SHOW ALL OF PILINGS. 2'1343 W 3 g8< 6.2 4 9' AIX1rX 5.2' 6 INV 4 7.3V ASPHALT (YEATESVILLE ROAD) CONTOUR LINF: FINISHED CONTOUR 5 2AIN FIELD O ACK UP 5 4' DRAIN FIEL[. TAR PAMLICO RIPARIAN B[ PPER DWQ #14-0275 I 13 5' -'. _ 10 — +I tl 11' ` lit If 'II B4OLTT NEW PIER LONGITUDINAL CROSS SECTIO ® TO �4 D DRAIN FIELD DRAIN FIELD BACK UP- NO SCALE DRAIN j FIELD D'•N FIEL 2'x,\.J EL BACK P g 5 S 6-6' 7 ACRES HIGH .GROUND 13.52 DISTURBED CAMA / 404 WETLANDS 2.95 NOT DISTURBED TOTAL 46.47 100 0 GRAPHIC SCALE - FEET 100 200 300 WOOD DECKING W00D ' WATER 7 -'n GAZEBO am- cuL 3 9' CLiL 5.0' ELEVATION DATUM: 1988 (FROM BEA 6) TBM 1: NAIL SET IN POWER POLE 1.4 FEE I ABOVE GROUND. THE POLE IS 100 FEET NORTH FROM A NEW GRAVEL ROAD AND 33 FEE1 EAST FROM THE CENTER OF THE ASPHALT OF SR_ 1718 (YEATESVILLE ROAD). THE POLE IS LABELED TEMC 14884. THE ELEVATION OF THE NAIL IS 7.0 WET. , TBM 2: NAIL SET IN A POWER POLE 1.5 FEET ABOVE GROUND. THE POLE IS 320 FEET NORTH FROM A NEW GRAVEL ROAD AND 33 FEET EAST FROM TEH CENTER OF THE ASPHALT OF SA. 1718 (YEATESVELLE ROAD). THE POLE IS LABELED TEMC 15787. THE ELEVATION OF THE NAIL IS TO FEET. IBM 3: NAIL SET LN A 15-INCH MAPLE TREE 3.3 FEET ABOVE GROUND. THE TREE IS 35 FEET NORTH FROM THE CORNER OF A POND, ON THE SOUTHEAST BANK OF A DITCH HEADING INTO 11TE WOODS AND ON THE CORNER OF THE TREE LINE. THE ELEVATION OF THE NAIL IS 7.0 FM. TBM 4: NAIL SET IN A 15-INCF1 GUM TREE I .6 FEET ABOVE GROUND. THE TREE IS 120 FEFS NORTH FROM THE CORNER OF A POND ANDON THE TREE LINE. THE ELEVATION OP THE NAIL IS 7.0 FEET NOTE: THE 1988 DATUM BASE FLOOD ELEVATION FOR THIS LOT MAP 37206640001 DATED 5115/03. L oR- VENDING WASHERS & DRYERS OFFICE GAME ROOM 7PACING 1X6 WOOD DECKING �x5 'dOOD MINI'14UM GALVANIZED V NORMAI WATER LEVEL 10' MINIMUM MARINE GP AU PILING %5 PILING DETAIL TYPICAL (2) 1000 GALLON FUEL TANKS IN FENCE WATER, LEVEL OF EXISTING POND BANK OF EXISTING POND 14 PARKING SPACES PATIO DRY KITCHEN STORAGE PATIO BUILDING FLOOR PLAN 100 PERSON RECEPTION VENUE PATIO rEATIDNUE • 775 STREET 40' 14* TYPICAL CAMPER SITE 7 sg ins goo SIAITMFON WASOWILLE -73 • AREA MAP NO SCALE 0 0 'e4 REVISED 7/ 09/14: TOPO & DRAWING SCALE REVISED 2/18/14: PIER LOCATION REVISED 2/10/14: RCJAT SLIPS SEAL (1 L-2522 Ca PROPERTY OF: LYS LAND DEVELOPMENT, LLC J 411 r BATH TOWNSHIP BEAUFORT COUNTY NORTH CAROLINA SCALE: = 100' SURVEY DATE: NOVEMBER 22, 2013 110 WEST 2ND STREET EUAi i..F:S bjA LIFTS BOAT LIFTS . , r -04---22''-+i =.---22'---,.:- `-•►-22' —+ — J C.: � 0 S.R. 1733 BISHOP ROAD 404 WETLAND AT HIGH GROUND- 3' BOAT LIFTS BOAT LIFTS w '30' Y. a • 0 a. > J 7 !n W MARINE. ,PUMPOUT FUELING STATION 22' .:;..---. 22' ..:....;.- --- 22' 22' - -� MARSH GRASS AT 404 WET;_ANO �++ 300" I ELEVATED 5' CROSSING 10- -IP MINIMUM 404 WETLAND MARINE GRADE PILINGS 5 F' * AIN FIELD O DR*1 FIELD 4„ CONSTRUCTION ENTRANCE 10' X 60' CRUSHED STONE LEGEND: O NEW IRON PIPE. CONTROL A RAILROAD SPIKE, CONTROL O POINT, CONTROL DITCH 404 WETLAND LINE NORMAL WATER LINE 'G-- NOT TO SCALE INVERT WATER DEPTH SPOT FI.FVATION FINISHED FI .FVATION SILT FENCE RECEIVED ASPHALT (YEATESVILLE ROAD juN 06 10 75 CONTOUR LINE 4" -- - FINISHED CONTOUR TAR - PAMLICO RIPARIAN BUFFER DWQ #14-0275 MP DRAIN 25 FIELD A 41 ti j DRA 1 1 FIEL 11 1 BACM iI it — 1 NO SCALE DRAIN FIELD l`J BACK UP — — 13'',. DRAIN FIEL 2 X O BACK g.SISO MARSH GRASS AT NOR)AAL WATER LINE 220' — ELEVATED 5' CROSSING COASTAL MARSH FIEL() BACK UPS` v DRAIN F IELD BACK UP ACRES HIGH GROUND 33.52 DISTURBED CAMA / 404 WETLANDS 12.95 NOT DISTURBED TOTAL 46.47 100 0 GRAPHIC SCALE — FEET GAZEBO PUMPOUT SIGN 38' `a' �� : P' BOAT LIFTS WOOD DECKING c.n BOAT LIFTS WATER ELEVATION DATUM: 1988 (FROM BEA 6) TBM 1: NAIL SET IN POWER POLE 1.4 FEET ABOVEGROUND. THE POLE IS 100 FEET NORTH FROM A NEW GRAVEL ROAD AND 33 E+Tr..t.I EAST FROM THE CENTER OF THE ASPHALT OF S.R. 1718 (YEATESVILLE ROAD). THE POLE IS LABELED TEMC 14884. THE ELEVATION OF THE NAIL IS 7.0 FEET. 3' BOAT .LIFT`: 30'- GAZEBO • 22, 3 9't- INV. 2.4' .e METAL, cUL BOAT ttFTS t8 0UL 3.9' 5.0' At 1 BOAT LIFTS L BOAT LIFTS • +-- 22, BEACH 5 6' • TBM 2: NAIL SET IN A POWER POLE 1.5 FEET ABOVE GROUND. THE POLE IS 320 FEET NORTH FROM A NEW GRAVEL ROAD AND 33 PEE 1 EAST FROM TEH CENTER OF THE ASPHALT OF S.R. 1 718 (YEATESVILLE ROAD). THE POLE IS LABELED TEMC 15787. THE ELEVATION, OF THE NAIL IS 7.01-'U 1. TBM 3 NAIL SET IN A 15-INCH MAPLE TREE 3.3 FEET ABOVE GROUND. l'HE TREE IS 35 FEET NORTH FROM THE CORNER OF A POND, ON THE SOUTHEAST BANK OF A DITCH HEADING INTO THE WOODS AND ON THE CORNER OF THE TREE LINE. THE FI .FVATTON OF THE NAIL IS 7.0 FIE I . TBM 4: NAIL SET IN A 15-INCH GUM TREE 1.6 FEET ABOVE GROUND. THE TREE IS 120 FEET NORTH FROM THE CORNER OF A POND AND ON THE TREE LINE. - 1.00 200 300 THE FI:FVAT ION OF THE NAIL LS 7.O FEET. - NOTE: THE 1988 DATUM BASF. FLOOD ELEVATION FOR THIS LOT IS 7.01 EL ACCORDING TOFEMA-FLOOD INSURANCE RATE MAP 37206640001 DATED 5/15/03. - 10' 0 Q 0 — 38'-8' WASHERS & DRYERS OFFICE GAME ROOM BOAT LIFTS c�`-G ci5RM ' 0 6' VENDING (STORE) MALE RESTROOM WITH SHOWERS 1/ 2' SPACING 32 MINIMUM 1X6 WOOD DECKING GALVANIZED ROL IS V NORMAL WATER LEVEL 10' MINIMUM MARINE GRADE PILING DETAIL TYPICAL NOT Tt3 Sc F 46.47 ACRES (2) 1000 GALLON FUEL TANKS IN FENCE 8.0' WATER LEVEL OF EXISTING POND BANK OF EXISTING POND SPACES PATIO DRY KITCHEN FEMALE RESTROOm WITH SHOWERS STORAGE PATIO BUILDING FLOOR PLAN 100 PERSON RECEPTION VENUE STAGE \ ICO`CI 'ES PATIO o -73 STREET 40' TYPICAL CAMPER SITE -37 4 ti Iliteonatotisligni5/1 5. C AMA PER REVISED -2/18/14: NEIL LOCATION REVISED 2/10/14- BOAT SLIPS trN CTA C ROC 0,1 4'0- / SCALE AREA MAP 40 SCALE PROPERTY OF: TJ'S LAND DEVELOPMENT, LLC BATH TOWNSHIP BEAUFORT COUNTY NORTH CAROLINA SCALE: 1" 100' SURVEY DATE: NOVEMBER 22, 2013 SURVEYED BY: HOOD RICHARDSON, P.A. 10 WEST 2ND STREET WASHINGTON, N.C. 27889 PHONE: (252) 975-3472 GAM 13-01-109-L