Loading...
HomeMy WebLinkAboutGW1-2022-10403_Well Construction - GW1_20221116 WELL CONSTRUCTION RECORD For Internal Use ONLY: This form can be used for single or multiple wells 1.Well Contractor Information: 14.WATER ZONES D.T. CHALMERS, JR. FROM TO DESCRIPTION Well Contractor Name ft. It 4146A ft. fL NC Well Contractor Certification Number 15.INNER CASING OR TUBING eothermaI closed-loo FROM TO DIAMETER THICKNESS MATERIAL CATLIN Engineers and Scientists 0 ft 5 f,.l 1 Sch.40 1 PVC Company Name 16.OUTER CASING for multi-cased wells OR LINER(ifapplicable FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: N/A ft. ft. in. List all applicable well permits(i.e.County,State, Variance,Injection,etc.) ft ft. in. 3.Well Use(check Well use): 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public 5 ft. 15 ft. 1 in. SIDt.010 Sch.40 PVC ❑Geothermal(Heating/Cooling Supply) ❑Residential Water Supply(single) ft. fL in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT FROM I TO MATERIAL EMPLACEhIENr1,ETHOD&AMOUNT ❑Irrigation fL rt. Non-Water Supply Well: - MMonitoring ❑Recovery rL rL Injection Well: fL ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK ira licable ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM To I MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. fL ❑Experimental Technology ❑Subsidence Control 0 ft. 15 ft. Natural Backflll 20.DRILLING LOG attach additional sheets if necessary ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION color hardness,soillrock type,Brain size etc. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under 921 Remarks) fL fL 4.Date Well(s)Completed: 11/01/22 Well ID#: TMW-04 rL rt. M ft. n. ,D �O 5a.Well Location: �N . �♦ NCDEQ-Tackett Residence N/A ft. ft. ` Facility/Owner Name Facility ID#(if applicable) fL ► °�' "-r 13117 N.ROXBORO ST,ROUGEMONT,27572 Physical Address,City,and Zip n. n. 21.REMARKS WAKE N/A County Parcel Identification No.(PIN) Dl4/R 3 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: (if well field,one tat/long is sufficient) 36.22135487 N -78.92777856 W 11/8/2022 Signature of Certified Well Contractor Date 6.Is(are)the well(s): ❑Permanent or M Temporary Br signing this form,1 hereby certify that the well(r)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Slandardr and that a cony of 7.Is this a repair to an existing well: ❑Yes or ®No this record has been provided to the well owner. If this is a repair,fill out known well consiniction information and explain the nature of the repair tinder#21 remarks section a•on the back ofthis form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the sauce construction,you SUBMITTAL INSTRUCTIONS can submit one form. 9.Total well depth below land surface: 15.0 (ft.) 24a.For All Wells: Submit this form Within 30 days of completion of well For multiple wells list all depths in different(example-3@200'and 2@100) construction to the following: 10.Static water level below top of casing: 8.65 (g,) Division of Water Resources,Information Processing Unit, Ifwater level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 4.25 (in.) 24b.For Infection Wells ONLY: In addition to sending the form to the address in 24a above,also submit a copy of this form within 30 days of 12.Well construction method: HSA completion of well construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) Method of test: 24c.For Water Svpplv&Infection Wells: Also submit one copy of this form Within 30 days of completion of well 13b.Disinfection type: Amount: construction to the county health department of the county where constructed. Adapted from Form GW-1 North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised 2-22-2016 ENVIRONMENTAL,CIVIL GEOTECHNICAL CATLIN NAlirongton,Raleigh,Washington, Charleston Engineers and Scientists WELL LOG 221052 SHEET 1 OF 1 PROJECT NO.: 221052 1 STATE: NC I COUNTY: WAKE LOCATION: ROUGEMONT PROJECT: TACKETT RESIDENCE LOGGED BY: T. PARK WELL ID: DRILLER: D.T. CHALMERS JR. TMW-04 NORTHING: 899488 1 EASTING: 2021304 CREW: C. BLACK SYSTEM: NCSP NAD 83 USft BORING LOCATION: -45 feet North of MW-01 T.O.C.ELEV.: NM DRILL MACHINE: Diedrich D-50 METHOD: HSA 0 HOUR DTW: N/A TOTAL DEPTH: 15.0 START DATE: 11/1/22 END DATE: 11/1/22 124 HOUR DTW$.7 Dry WELL DEPTH: 15.0 BLOW COUNT OVA o L SOIL AND ROCK WELL DEPTH 0.5ft 0.5ft 0.5ft 0.5a (PPM) B. s G DEPTH DESCRIPTION DETAIL 0.0 LAND SURFACE 0.0 0.0 '—,":_ 0.5 (CL)-Brown to orange,Clayey TOPSOIL 0.0 2 2 (CL)-Brown to orange grading to green,CLAY _ 3 0.0 M _ 3 a 0 t U - 5.0 5.0 2 - 3 3 0.0 M 5 o L) oa 10.0 3 !� 6 11 10.8 D 16 12.0 (ML)-Tan to green,SILT(SAPROLITE) 13.0 - 19 16 12.1 D -_ 31 'LfL15.0 15.0 15.0 _ 15.0 BORING TERMINATED AT DEPTH 15.0 ft In SILT SAPROLITE LL Native Backfill