HomeMy WebLinkAbout20191155 Ver 2_CAMA Application_20221109NC Division of Coastal Management
CAMA Major Permit Renewal Request
District: WiRO Major Permit Staff: Brendan Brock
Applicant Information
Applicant Ta ng lewood POA
Name:
Last h irs1
Project 3185 Waterview Dr SW
Address:
Sheet Address
LAMA Permit 94-1 9
No.:
Agent's Name: n/a
Request Date: 1 0.25.22
Received in Office: 1 1.3.22
Supply 28470
Co
ZIP Code
Permit Expiration Date: 12.31.22 _ Payment $ 100.00
YES NO
District Manager/Field Rep Approve? (Initial Appropriate Box) F6—/] ❑
Other Information
DWRProject 2019-1155 USACE Action 2019-01709
Nw ID No,:
Has substantial
development occurred?
Recommend to Renew?
If Not Approved, provide
Justification:
YE If Yes,
Explain:
YES NO
Ramp was romplated on 1111W202p, want to improve s1Upe of ramp, , maintenance ramp as noeded
Staff
Brendan
Brock Digitally signed by Brendan Brock
Date: 2022.11.031fi:36:18 04'00'
1 1
Signature:
.3.22
Date
9 . f D KQ5
North Carolina Department of Environmental Quality I Division of Coastal Management
Washington Office 1 443 Washington Square Mall I Washington, North Carolina 27889 1 252.946.6481
Wilmington Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 1 910.7963215
Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 1 25ZB08,2808
Tanglewood POA
P.O.9ox 324
Shallotte, NC 28459
To: Mr. Brendon Brock
Ref: Permit 94-19 Boat Ramp & Fixed Pier Ext.
RECEIVE[
NOV 0 3 2022
DCM WILMINGTON, NC
October 25, 2022
Mr. Brock, A new boat ramp was designed and installed for TPOA at 3185 Waterview Drive
under Permit 94-19. The ramp was completed on November 19, 2020 by H5 construction under
the supervision of Right Angle Engineering, Mr. Shane Lippard. There has been no change in
ownership and the project was completed in compliance with all the conditions of the permit.
At this time, TPOA would like to extend this existing permit 94-19 to allow time for the
association to investigate the possibility of improving the slope of the ramp, the feasibility of
dredging a canal at the end of the existing ramp, and to make maintenance repairs to the fixed
pier.
Thank you so much for your consideration.
Erskine Blount
President TPOA, 910-880-1193
Permit Class Permit Number
—NEW
94-19
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission p
Jprrmit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS I I3A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Tan lewood POA PO Box 324 Shallotte NC 28549
Authorizing 4evelopment in Brunswick County ad'. to AIWW at 31$S Waterview Drive SW
in Supply , as requested in the permittee's application dated 05/15/19 MP-1 &MP-2 and
08/08/19 (MP-4), including attached workplan drawings 2 C1-C2 both dated 08/02/19.
This permit, issued on _ December 6, 2019 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action, or may cause the hermit to he nnli and void
Boat Ramp & Fixed Pier Extension
1) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or
poured entirely within a watertight containment structure. Live concrete shall not be allowed to
contact waters of the State or waters that will enter waters of the State.
2) Unless specifically altered herein, this permit authorizes one concrete boat ramp, as indicated on the
attached workplan drawings.
3) In accordance with commitments made by the permittee, the boat ramp shall be poured entirely
within a watertight containment structure. Live concrete shall not be allowed to contact waters of the
State or waters that will enter waters of the State.
(See attached sheets for Additional Conditions)
I.L, t., III IL a4,LIVu IlLdy ue appcaicu oy Lne perminee or otner
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2022
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
5fgned by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
le-r Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are.he by accepted.
aftlo
IR
re"., 4
0 03'1ij
i.
nr
,tAWILMING"1101 KWe of Permittee
Tanglewood POA Permit No. 94-19
Page 2 of 3
ADDITIONAL CONDITIONS
4) Placement of fill materials below normal high water level shall be limited to the concrete ramp structure,
rip rap, and vinyl sheet pile walls.
5) Excavation and ground disturbing activities, associated with the placement of the boat ramp, rip rap and
sheet pile walls, above and below the normal high water line shall be limited to that absolutely necessary
to establish adequate ramp slope and provide a ramp no greater in size that specified in the attached
permit application and workplan drawings.
6) Any portion of the permitted access pier built over Coastal Wetlands shall not exceed six (6) feet in
width and shall be elevated a minimum of three (3) feet over the wetland substrate as measured from the
bottom of the decking.
7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors should be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
Sedimentation and Erosion Control
8} In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
9) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property.
NOTE: An Erosion and Sedimentation Control Plan may be required for this project. This plan should be
filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this
plan to the Department of Energy, Mineral, and Land Resources, Land Quality Section, 127
Cardinal Drive Extension, Wilmington, NC 28405.
Stormwater Manaeetuent
NOTE: A Stormwater Permit may be required for this project. This plan should be filed at Ieast thirty
(30) days prior to the beginning of any land disturbing activity. Submit this plan to the
Department of Energy, Mineral, and Land Resources, Land Quality Section, 127 Cardinal Drive
Extension, Wilmington, NC 28405.
General
10) The permittee and/or his or her contractor shall meet with a representative o�the 1��o�r to
project initiation.
11) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a thirO%rty without
written approval of the Division of Coastal Management. Iot4
�CONI11-M�N�
Tanglewood POA
ADDITIONAL CONDITIONS
Permit No. 94-19
Page 3 of 3
12) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water Ievel.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of Nationwide
Permit No. 3 (SAW Action Id. No. 2019-01709) which was issued on 12/6/19.
NOTE: The N.C. Division of Water Resources assigned the project DWR Project No. DWR-2019-1155.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.