Loading...
HomeMy WebLinkAboutNC0063096_Pretreatment Audit_20221130DocuSign Envelope ID: 3037D3B3-B35A-491 E-AA56-79289043EC3B ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Mr. Seann Byrd Water Resources Director Town of Holly Springs P.O. Box 8 Holly Springs, NC 27540 NORTH CAROLINA Environmental Quality November 30, 2022 Subject: Pretreatment Audit Inspection Program: Town of Holly Springs Wake County, NPDES #: NC0063096 Holly Springs WWTP Dear Mr. Byrd: Enclosed please find a copy of the Pretreatment Audit Inspection form from the inspection conducted on September 2, 2022. The Pretreatment Audit Inspection was conducted by Cheng Zhang, Environmental Specialist II, of the Raleigh Regional Office. The assistance given by Ms. Karen Foster, the Environmental Compliance Manager, was greatly appreciated. The purpose of the pretreatment audit is to determine the effectiveness of the Pretreatment Program by reviewing the files, which include a review of POTW plant performance, sampling and compliance judgment program, adherence to the enforcement response plan (ERP), and evaluating how the program performs an industrial user inspection. The audit report is attached with findings and observations made during the inspection. Please review for more detail. Background The Town of Holly Springs has two (2) significant industrial users (SI Us), one (1) of which is categorical under 40 CFR 439 (Pharmaceutical). The Holly Springs WWTP is a 6.0 MGD permitted facility. Industrial User Permit (IUP) File Review Two permit files were reviewed. The pretreatment audit file review included South Wake Landfill and Novartis Vaccines & Diagnostics. Files were well organized and there was no difficulty finding any of the requested information. Copies of the facilities' spill control plans are on file. Industrial Inspection NORTH CAROLINA oay,rorem or Environmental ou.i� North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office I 3800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 DocuSign Envelope ID: 3037D3B3-B35A-491 E-AA56-79289043EC3B A thorough inspection was conducted at South Wake Landfill. All components of the inspection form were covered. Long Term Monitoring Plan (LTMP) The Town submitted update of LTMP on August 31, 2022, and a revised version on September 7, 2022 (with updated PQLs for some parameters), the LTMP was approved by the Division on September 12, 2022. Headworks Analysis (HWA) Update of HWA was submitted to the Division on September 14, 2022, which was due September 15, 2022. This Audit report indicates that the Town of Holly Springs' Pretreatment Program meets the pretreatment requirements as outlined in 15A NCAC 2H .0900 and 40 CFR 403 and the inspection is satisfactory and in compliance. Ms. Karen Foster is implementing the Pretreatment Program in a consistent and professional manner and her assistance during the inspection is greatly appreciated. Thank you for your continued cooperation with the Pretreatment Program. Please do not hesitate to contact Cheng Zhang at 919-791-4259 [Cheng.Zhang@ncdenr.gov] if you have any questions or concerns. program. Enclosure: 2022 Holly Springs PT Audit Form CC: Laserfiche Karren Foster, Town of Holly Springs (electronic copy only) D_E NORTH CARCLINA gaparhnanl of EnWrnmmonfal wary Sincerely, DocuSigned by: bL1tss t. (at/Li/id B2916E6AB32144F... Vanessa E. Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611 919.707.9000 DocuSign Envelope ID: 3037D3B3-B35A-491E-AA56-79289043EC3B NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT AUDIT REPORT Water Resources ENVIRONMENTAL QUALITY Background Information [Complete prior to audit; review Program Info Database Sheet(s)] 1. Control Authority (POTW) Name: Town of Holly Springs, Holly Springs WWTP 2. Control Authority Representative(s): Karen Foster 3. Title(s): Utilities Manager- Environmental Compliance 4. Address of POTW: Mailing PO Box 8 City Holly Springs Zip Code 27540 Phone Number 919-557-2907 Fax Number 919-577-2280 E-Mail karen.foster(i/hollyspringsnc.gov 5. Audit Date 9/2/2022 6. Last Inspection Date: 9/4/2020 Inspection Type: ® PCI ❑ Audit 7. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s) ? ® Yes ❑ No If No, Explain. 8. In the last year has the POTW experienced any NPDES or Sludge Permit compliance problems? ❑ Yes ® No If Yes, Explain. 9. Is POTW under an Order That Includes Pretreatment Conditions? ❑ Yes ® No Order Type and Number: Are Milestone Dates Being Met? ❑ Yes ❑ No ® NA Parameters Covered Under Order ICIS Coding Main Program Permit Number INICI0I0I6I3 I0 I9 I6I 10. Current Number of Sivnificant Industrial Users (SIUs)? 11. Number of SIUs with No IUP, or with an Expired IUP? MM/DD/YY 09 02 122 I 2 0 12. Number of SIUs Not Inspected by POTW in Last Calendar Year? 0 13. Number of SIUs Not Sampled by POTW in Last Calendar Year? 0 14. Number of SIUs in SNC for Limits Violations During Either of Last 2 Semi -Annual Periods? 0 15. Number of SIUs in SNC for Reporting During Either of Last 2 Semi -Annual Periods? 0 16. Number of SIUs in SNC with Pretreatment Schedule? 0 17. Number of SIUs on Schedules? 0 18. Current Number of Categorical Industrial Users (CIUs)? 19. Number of CIUs in SNC? 2 0 NC DWR Pretreatment Audit Form Revised: December 2016 Page 1 DocuSign Envelope ID: 3037D3B3-B35A-491E-AA56-79289043EC3B 20. PRETREATMENT PROGRAM ELEMENTS REVIEW- Review POTW files, verify POTW has copy of each Program Element in their File, complete with all supporting documents and PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 9/14/2022 01 Yes ❑ No 2/23/2018 0 Yes ❑ No 9/15/2022 Industrial Waste Survey (IWS) 9/30/2021 I4 Yes ❑ No 6/2/2022 I:1 Yes ❑ No 1/31/2027 Sewer Use Ordinance (SUO) 11/8/2012 /1 Yes ❑ No 127/2012 /1 Yes ❑ No Enforcement Response Plan (ERP) 6/22/2010 /1 Yes ❑ No 8/4/2010 /1 Yes ❑ No Long Term Monitoring Plan (LTMP) 8/31/2022 a Yes ❑ No 9/12/2022 /1 Yes ❑ No Legal Authority (Sewer Use Ordinance-SUO) 21. Do you have any towns and/or areas from which you receive wastewater which are not in your annexed jurisdiction? ❑ Yes ® No If yes, Please list these towns and/or areas. 22. If yes to #21, Do you have current Interjurisdictional Agreements (IJAs) or other Contracts? ❑ Yes ❑ No ® NA A copy, if not already submitted, should be sent to Division. 23. If yes to #21, Have you had any trouble working with these towns or districts? ❑ Yes ❑ No ® NA If yes, Explain. 24. Date of Last SUO Adoption by Local Council 11/6/2012 25. Have you had any problems interpreting or enforcing any part of the SUO? ❑ Yes ® No If yes, Explain. Enforcement (Enforcement Response Plan-ERP) 26. Did you send a copy of the ERP to your industries? ❑ Yes ❑ No If no, POTW must send copy within 30 days. 27. Have you had any problems interpreting or enforcing any part of the ERP (i.e. any adjudication, improper enforcement, etc? ❑ Yes ® No If yes, Explain. 28. List Industries under a Schedule or Order and Type of Schedule or Order None Resources 29. Please Rate the Following: S=Satisfactory M=Marginal U=Unsatisfacto Rating Explanation, if Unsatisfactory Personnel Available for Maintaining POTW's Pretreatment Program a S ❑M ❑U Access to POTW Vehicles for Sampling, Inspections, and Emergencies /1 S ❑M ❑U Access to Operable Sampling Equipment OS ❑M ❑U Availability of Funds if Needed for Additional Sampling and/or Analysis a S ❑M ❑U Reference Materials ►1S ❑M ❑U Staff Training (i.e. Annual and Regional Workshops, Etc.) a S ❑M ❑U Computer Equipment (Hardware and Software) a S ❑M ❑U NC DWR Pretreatment Audit Form Revised: December 2016 Page 2 DocuSign Envelope ID: 3037D3B3-B35A-491E-AA56-79289043EC3B 30. Does the POTW have an adequate data management system to run the pretreatment program? ® Yes ❑ No Explain Yes or No. Excel spreadsheet. Plans to upgrade to Utility Cloud or Linko. 31. How does the POTW recover the cost of the Pretreatment Program from their industries? Explain. Surcharge for BOD, TSS, TN, TP, NH3 based on exceeding domestic levels. Also, annual fee, permit fee and sampling fee. Public Perception/ Participation 32. Are there any local issues affecting the pretreatment program (e.g.. odor, plant closing, new or proposed plants)? ❑ Yes ® No If yes, Explain. 33. Has any one from the public ever requested to review pretreatment program files? ® Yes ❑ No If yes, Explain procedure. If no, how would the request be addressed? Several years ago requests for copies of HWA. Copies were provided. Any requests would be handled in the same manner. 34. Has any industry ever requested that certain information remain confidential from the public? ❑ Yes ❑ No If yes, Explain procedure for determining whether information qualified for confidential status, as well as procedure for keeping files confidential from public. If no how would the request be addressed? Made sure that the information was proprietary to their process and keeps information in a separate file. 35. In addition to annual inspection, does the POTW periodically meet with industries to discuss pretreatment? ® Yes ❑ No 36. Is the public notified about changes in the SUO or Local Limits? ® Yes ❑ No Announced on Council docket 37. Were all industries in SNC published in the last notice? ❑ Yes ❑ No ® NA Permitting (Industrial Waste Survey-IWS) 38. How does the POTW become aware of new or changed Users? Every new business receives a development package which includes a short form survey to complete and return. 39. Once the POTW becomes aware of new or changed Users, how does the POTW determine which industries have the reasonable potential to adversely impact the WWTP and therefore require a new permit or a permit revision? (Who is an SIU?) SIC codes, type of industry (categorical or potential to impact) water usage. 40. Does the POTW receive waste from any groundwater remediation projects (petroleum, CERCLA) or landfill leachate? ®Yes ENo If Yes, How many are there? Landfill is permitted as SIU. Also, a small groundwater remediation project for gasoline contamination, and Red Rock C&D Landfill, neither are active. Please list each site and how it is permitted, if applicable. 41. Does the POTW accept waste by (mark if applicable) ❑ Truck ❑Dedicated Pipe ® NA 42. If the POTW accepts trucked waste, what controls are placed on this waste? (example. designated point, samples drawn, manifests required) ® NA 43. How does the POTW allocate its loading to industries? Mark all that apply ❑ Uniform Limits ® Historical Industry Need ❑ By Surcharge ® Categorical Limits ❑ Other Explain Other: 44. Review POTW's copies of current allocation tables for each WWTP. Are there any over allocations? ❑ Yes ® No If yes, what parameters are over allocated? 45. If yes to #44, What is being done to address the over allocations? (short-term IUPs, HWA to be revised, pollutant study, etc.) 46. Does the POTW keep pollutant loading in reserve for future growth / safety? ® Yes ❑ No If yes, what percentage of each parameter 20% 47. Has the POTW experienced any difficulty in allocation? (for example: adjudication by an industry) ❑ Yes ® No If yes, Explain. 48. How does the POTW decide on which pollutants to limit in the permits? Monitor for? (for example: were only those pollutants listed on the application limited; categorical parameters; NPDES Pollutants of Concern) Limits for everything POTW has limits for, categorical parameters, monitoring for metals and priority pollutant scan I/year NC DWR Pretreatment Audit Form Revised: December 2016 Page 3 DocuSign Envelope ID: 3037D3B3-B35A-491E-AA56-79289043EC3B 49. How does the POTW decide what the monitoring frequency should be for the various pollutants in industry permits? Explain. Based on impact to WWTP. Landfill 2/month because of variability of loading. Novartis 1/month generally more consistent. Permit Compliance 50. Does the POTW currently have or during the past year had any permits under adjudication? ❑ Yes ® No If yes, which industries? What was (will be) the outcome of the adjudication? 51. Demonstrate how the POTW judges compliance. This should include compliance judgment on all violations of limits, reporting requirements, and permit conditions, as well as for SNC. Each month reports submitted by 20th day of month - does send NOVS if no 24-hour notice. Results are compared to permit limits. If there are violations contacts SIU, refers to ERP. Uses compliance judgement worksheet for semi-annual SNC. 52. Does the POTW use the Division's model inspection form or equivalent? ® Yes ❑ No If no, does the POTW form include all Division data? ❑ Yes ❑ No 53. Were all SIUs evaluated for the need of a slug/spill control plan during their most recent inspections? ® Yes ❑ No If no, Explain. Both have one. Asks at inspection if any updates. Novartis makes frequent updates POTW information is posted for notification. 54. What criteria are used to determine if a slug/spill control plan is needed? Looks for drains, plumbing where chemicals are stored or used. Potential impact to POTW from accidental discharge. 55. What criteria does the POTW use to determine if a submitted slug/spill control plan is adequate? Review at inspection: what actions are taken, how do staff know who to contact. 56. How does the POTW decide where the sample point for an SIU should be located? At SIU discharge (process wastewater only) prior to connection to collection system. 57. Has the POTW established a procedure to ensure that representative samples will be taken by the POTW or SIU each time? (example: correct location; proper programming of sampler; clean equipment; swirling the sample bucket uniformly) POTW: ® Yes ❑ No SIU: ® Yes ❑ No If yes, Explain. Inspects equipment; both have lsco samplers. Novartis is field certified. Has watched them collect samples. 58. Who performs sample analysis for the POTW for Metals Meritech+ Enthalpy (PFAS) Conventional Parameters In-house+Meritech Organics Meritech+Enthalpy 59. Explain the Chain of Custody Procedure used for both in house and commercial lab samples. Bench sheet of pH and temperature (same as used in plant). Has calibration info., start and stop times. Commercial lab has own COC. Long/Short Term Monitoring Plan (L/STMP) and Headworks Analysis (HWA) 60a. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES El NO 60b. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 60c. Is LTMP/STMP Data Maintained in Table or Equivalent? ® YES El NO Is Table Adequate? ® YES El NO 60d. All LTMP/STMP effluent data on Discharge Monitoring Report (DMR)? ® YES El NO Division Inspector, verify yourself! 60e. If NO to any above, list violations 60f. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? El YES ® NO If yes, which ones? Eliminated: Added: recently As, Se, Ag, Hg, Mo 61. Do you complete your own headworks analysis (HWA) ? ® Yes ❑ No If no, who completes your HWA? Phone ( ) -- 62. Do you have plans to revise your HWA in the near future? ® Yes ❑ No If yes, what is the reason for the revision? (mark all that apply) ❑Increased average flow ❑NPDES limits change ❑More LTMP data available ❑Resolve over allocation ®5 year expiration ['Other Explain. 63. In general, what is the most limiting criteria of your HWA? ❑Inhibition ® Pass Through El Sludge Quality NC DWR Pretreatment Audit Form Revised: December 2016 Page 4 DocuSign Envelope ID: 3037D3B3-B35A-491E-AA56-79289043EC3B 64. Do you see any way to increase your loading in the future (Example: obtaining more land for sludge disposal)? ® Yes ❑ No Explain. Future plant upgrade/expansion. Summary 65. Do you plan any significant changes to the pretreatment program or changes to the WWTP that may affect pretreatment? More staff, two new SIUs, and plant upgrade. NC DWR Pretreatment Audit Form Revised: December 2016 Page 5 DocuSign Envelope ID: 3037D3B3-B35A-491E-AA56-79289043EC3B INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS AND 1 IU INSPECTION) 66. User Name 1. South Wake Landfill 2. Novartis 3. 67. IUP Number 001 002 68. Does File Contain Current Permit? 0 Yes ❑ No 0 Yes ❑ No ❑ Yes ❑ No 69. Permit Expiration Date 12/31/2023 12/31/2022 70. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A N/A 439.17&47 71. Does File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? /1 Yes ❑ No /1 Yes ❑ No ❑ Yes ❑ No 72. Does File Contain Inspection Completed Within Last Calendar Year? /1 Yes ❑ No /1 Yes ❑ No ❑ Yes ❑ No 73. a. Does File Contain Slug/Spill Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a. ►Yes •No b. ■Yes MN() a. ►Yes •No b. •Yes MN() a. •Yes •No b. •Yes MN() Certification, Does File Contain a Toxic (TOMP)? ❑Yes❑NoON/A ❑ Yes ❑No®N/A ❑Yes❑No❑N/A 74. For 40 CFR 413 and 433 TTO Organic Management Plan 75. a. Does File Contain Original Permit Review Letter from Division? b. All Issues Resolved? a. ►Yes •No b.❑Yes❑No❑N/A a. ►Yes •No b.❑Yes❑No❑N/A a. •Yes •No b.❑Yes❑No❑N/A 76. During Most Recent Semi -Annual Period, Did POTW Complete its Sampling as Required by IUP, including Flow? 0 Yes ❑ No /1 Yes ❑ No ❑ Yes ❑ No 77. Does File Contain POTW Sampling Chain -Of -Custody Forms? Al Yes ❑ No /1 Yes ❑ No ❑ Yes ❑ No 78. During Most Recent Semi -Annual Period, Did SIU Complete its Sampling as Required by IUP, including Flow? ®Yes❑No❑N/A ® Yes ❑No❑N/A ❑Yes❑No❑N/A 79. During Most Recent Semi -Annual Period, Did SIU submit all reports on time? ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No❑N/A 80a. For categorical IUs with Combined Wastestream Formula (CWF), does file include process/dilution flows as Required by IUP? ❑Yes❑NoON/A ❑ Yes ❑NoON/A ❑Yes❑No❑N/A 80b. For categorical IUs with Production based limits, does file include production rates and/or flows as Required by IUP? ❑Yes❑No®N/A ❑ Yes ❑No®N/A ❑ Yes ❑No❑N/A 81. During Most Recent Semi -Annual Period, Did POTW Identify All Limits Non -Compliance from Both POTW and SIU Sampling? ❑ Yes ❑NoON/A ❑ Yes ❑NoON/A ❑ Yes ❑ No 82. During Most Recent Semi -Annual Period, Did POTW Identify All Reporting Non -Compliance from SIU Sampling? ❑ Yes ❑NoON/A ❑ Yes ❑NoON/A ❑Yes❑No❑N/A 83. a. Was POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations? b. Did Industry Resample and submit results to POTW within 30 Days? c. If applicable, did POTW resample and obtain results within 30 days of becoming aware of SIU limit violations in the POTW's sampling of SIU? a.❑Yes❑No®N/A b.❑Yes❑No®N/A c.❑Yes❑No®N/A a.❑Yes❑No®N/A b.❑Yes❑No®N/A c.❑Yes❑No®N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A c.❑Yes❑No❑N/A 84. During Most Recent Semi -Annual Period, Was SIU in SNC? ❑ Yes 1 No ❑ Yes /1 No ❑ Yes ❑ No 85. During Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in POTW's ERP (NOVs, Penalties, timing, etc.)? ❑Yes❑NoON/A ❑ Yes ❑NoON/A ❑Yes❑No❑N/A 86. Does File Contain Penalty Assessment Notices? ❑Yes❑NoNN/A ❑ Yes ❑No0N/A ❑Yes❑No❑N/A 87. Does File Contain Proof Of Penalty Collection? ❑Yes❑No ON/A ❑ Yes ❑NoON/A ❑Yes❑No❑N/A 88. a. Does File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order? a.❑Yes❑No®N/A b.❑Yes❑No®N/A a.❑Yes❑No®N/A b.❑Yes❑No®N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 89. Did POTW Representative Have Difficulty in Obtaining Any Requested Information For You? ❑ Yes A No ❑ Yes I1 No ❑ Yes ❑ No FILE REVIEW COMMENTS: Both SIUs were in compliance during the first semi-annual period of 2022. NC DWR Pretreatment Audit Form Revised: December 2016 Page 6 DocuSign Envelope ID: 3037D3B3-B35A-491E-AA56-79289043EC3B INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number IN I C 10I 01 6 1 3 1 0 1 9 1 61 MM/DD/YY 109 102 122 1. Industry Inspected: South Wake Landfill 2. Industry Address: 6000 Old Smithfield Road, Holly Springs, NC 27502 3. Type of Industry/Product: LandfilULeachate 4. Industry Contact: Seth Gundersen Title: Operations Supervisor Phone: Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ® Yes ❑ No 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ® Yes ❑ No B. Plant Tour ® Yes ❑ No C. Pretreatment Tour ® Yes ❑ No D. Sampling Review ® Yes ❑ No E. Exit Interview ® Yes ❑ No Industrial Inspection Comments: The inspection is thorough and detailed. Audit SUMMARY AND COMMENTS: Audit Comments: The program is well managed. Requirements: None Recommendations: None NOD: ❑ Yes ® No NOV: ❑ Yes ® No QNCR: ❑ Yes ® No POTW Rating: Satisfactory Marginal ❑ Unsatisfactory ❑ Audit COMPLETED BY: Cheng Zhang, Raleigh Regional Office DATE: September 2, 2022 NC DWR Pretreatment Audit Form Revised: December 2016 Page 7