Loading...
HomeMy WebLinkAbout20221667 Ver 1_Shoreline Stabilization_20221129ab6-p-/Leip-+- DWR Division of Water Resources State of North Carolina Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 I. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Jerry Overcash Mailing Address: 1703 Stokes Ferry Road Salisbury, NC 28146 RECEIVED NOV 2 9 DEO WAT R RE8OURCES 401 & BUFFER PERMITTING e- ?v-(2-2-s—K27 3 kt 704 f3 7 -CO qq Telephone Number: 704AM-4773 Fax Number: E-mail Address: JL044FE@aol.com 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: N/A Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Person to receive the Certification Approval: II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 4 Ow. etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Rowan Nearest Town: Salisbury Subdivision name or site address (include phase/lot number): Lot 47, Driftwood Cove, 275 Knollwood Drive Directions to site - please include road names and numbers, landmarks, etc.: 1-85 to Longs Ferry Road Exit 81, E on Long Ferry Road, R on Goodman Lake Rd, L on Providence Church Road, L on Bringle Ferry Road, L on Clark Rd, L on Driftwood Trail, L on Knollwood Drive and property is at end of road on right. Latitude (in decimal degrees) 35.38.4618 Longitude (decimal degrees) 80.18.4525 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Existing developed residential property 6. Property size (acres): 0.60 acres 7. Lake/ river/ ocean adjacent to property: High Rock Lake 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize and existing eroded shoreline and protect It from further erosion. 9. Will work be conducted from land? From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 120 Sq. Ft. 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 780 Sq. Ft. 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Site has an existing house on the property. 1 or 2 trees will be impacted by the shoreline stabilization. er/Ag 1nt's Signature` [15A NCAC 02H .0502(f)1 Date `Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 Lake (At Full Pond/Normal Water Level) Full Pond/ Normal Water Level 1111101 -SME Shoreline SEE ATTACHED SITE PLAN AND DETAILS r®-MINI 'MIN Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Jerry Overcash Lot 47, Driftwood Cove STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 60 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 10 on NCDEQ Form) Area of Impact = Shoreline Length x Depth* x Slope 60LFx1ft.x2 = 120 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 11 on NCDEQ Form) Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 20 LF of Shoreline = 3 ft. Above Normal Pool Estimate 20 LF of Shoreline = 4 ft. Above Normal Pool Estimate 20 LF of Shoreline = 5 ft. Above Normal Pool Area of Impact = Length x Height x Slope (20' x 3' x 2) + (20' x 4' x 2) + (20' x 5' x 2) = 120 + 160 + 200 = 480 sq. ft. Impact From Construction Above Shoreline Stabilization - Assume 5 ft. Wide Zone Area of Impact = 60 x 5 ft. = 300 sq. ft. Total Area of Impact Above Normal Pool Level = 780 sq. ft. giveUt FEN-6E- Woof?Ti4gg buAuL Ow:, to dr 000 tem. 24,15tigs tA45-065 cpi,loggre 12.4104? PA-t 616 Sills& Whit • OSTA-LL (.60 LF STAIN 1,11 t ot-1 (:11,10zfrYi 51-014-5 wpvt,t._ 114 GooD CoOP I Tto,Ni _ 3 CLASS 2 RIP RAP VEGETATION AND EROSION CONTROL FABRIC 1 2 EROSION CONTROL FABRIC TYPICAL CONDITIONS • 36" TO 72" ERODED CUT • WAVE EXPOSURE EXISTING GRADE /\ . LAKE BOTTOM BOTTOM FOR: LOCATION: RESERVOIR: JERRY OVERCASH 275 KNOLLWOOD DRIVE HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: MODERATE RIP RAP STABILIZATION DETAIL 3 11/21/22, 2:45 PM 275 Knollwood Dr - Google Maps GOogle Maps 275 Knollwood Dr gRd File Rd � F as rarmhouse Furniture i Rustic Renovations 1s olf Ridgecrest Farn• 9 9 efr"We FQ`f}'ke Athena Marble s a 1 The. Dam at CedardHdl9 Hill's Minnow Farm 9 Lf pa oe Go,gIe 122121 Fox rfoiow. ! q Fox Hollow Farm RA Map data ©2022 1000 ft Reliah'. L r( ec< s, and Conutru( https://www.google.com/maps/place/275+Knollwood+Dr,+Salisbury,+N C+28146/@35.6357501,-80.3163651,15z/data=l4m6! 3m5! 1 s0x88538f051 bf97f4b:Ox8d286c0936d2fc3f!8m2!3d35.6461018!4d-80.... 1/1