Loading...
HomeMy WebLinkAboutNCC223909_Site Plan or Location Map_20221130DocuSign Envelope ID: ACD96136-91 E1-43B7-AEB7-832F892B3159 TEMPORARY SEEDING SCHEDULE (TO TEMPORARILY STABILIZE DENUDED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF 15 WORKING DAYS) SEEDING DATES: DECEMBER 1 THRU APRIL 15 SEEDING MIXTURE: SPECIES RATE RATE (LBS/AC) RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE) 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE SOIL AMENDMENTS: FOLLOW SOIL TESTS OR APPLY: 2,000 LBS/AC LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER MULCH: 4,000 LBS/AC — ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. SEEDING DATES: APRIL 15 — AUGUST 15 SEEDING MIXTURE: SPECIES RATE (LBS/AC) GERMAN MILLET 40 SOIL AMENDMENTS: FOLLOW SOIL TESTS OR APPLY: 2,000 LBS/AC LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER MULCH: 4,000 LBS/AC — ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OF A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. SEEDING DATES: AUGUST 15 THRU DECEMBER 15 SEEDING MIXTURE: SPECIES RATE (LBS/AC) RYE (GRAIN) 120 SOIL AMENDMENTS: FOLLOW SOIL TESTS OR APPLY: 2,000 LBS/AC LIMESTONE AND 1,000 LB/AC 10-10-10 FERTILIZER MULCH: 4,000 LBS/AC — ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OF A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE: REPAIR AND REFERTLIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LBS/AC OF NITROGEN IN MARCH.IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LBS/AC KOBE IN LATE FEBRUARY OR EARLY MARCH TEMPORARY SEEDBED PREPARATION 1. A GOOD SEEDBED IS WELL PULVERIZED, LOOSE, AND UNIFORM. 2.UMING — APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE PH (ACIDITY) OF THE SOIL IS NOT KNOW, AN APPLICATION OF GROUND AGRICULTURAL LIMESTONE AT THE RATE OF 1 — 1.5 TONS/ACRE ON FINE TEXTURED SOILS AND 2-3 TONS/ACRE ON COARSE TEXTURED SOILS IS USUALLY SUFFICIENT. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF THE SOIL. SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED. 3.FERTILIZER — BASE APPLICATION RATES ON SOIL TESTS. WHEN THESE ARE NOT POSSIBLE APPLY A 10-10-10 GRADE FERTILIZER AT 70D — 1000 LB/ACRE. BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 INCHES OF IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. 4.SURFACE ROUGHENING — IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE, ADDITIONAL ROUGHENING MAY NOT BE REQUIRED, EXCEPT TO BREAK UP LARGE CLODS. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING, OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING. SEE OTHER REQUIREMENTS FOR SURFACE ROUGHENING ON THIS SHEET. EROSION CONTROL CONSTRUCTION SEQUENCE AND NOTES 1. OBTAIN A LAND DISTURBING PERMIT FROM SCOTT REAMS AT 919-868-4986. 2.INSTALL GRAVEL CONSTRUCTION PAD, TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASINS OR OTHER MEASURES AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. SEED TEMPORARY DIVERSIONS, BERMS AND BASINS IMMEDIATELY AFTER CONSTRUCTION. 3. CALL ENVIRONMENTAL CONSULTANT, SCOTT REAMS AT 919-868-4986, FOR AN ONSITE INSPECTION BY THE ENVIRONMENTAL CONSULTANT TO OBTAIN A CERTIFICATE OF COMPLIANCE. 4. BEGIN CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED. ROUGH GRADE SITE. 5.INSTALL STORM SEWER, IF SHOWN, AND PROTECT INLETS WITH BLOCK AND GRAVEL INLET CONTROLS, SEDIMENT TRAPS OR OTHER APPROVED MEASURES AS SHOWN ON THE PLAN. BEGIN CONSTRUCTION, BUILDING, ETC. 6.STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION, PAVING, DITCH LININGS, ETC. SEED AND MULCH DENUDED AREAS PER GROUND STABILIZATION TIME FRAMES. 7.WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED COMPLETELY, CALL ENVIRONMENTAL CONSULTANT, SCOTT REAMS AT 919-868-4986 FOR AN INSPECTION. 8.I1' SITE IS APPROVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASINS, ETC., AND SEED OUT OR STABILIZE ANY RESULTING BARE AREAS. ALL REMAINING PERMANENT EROSION CONTROL DEVICES, SUCH AS VELOCITY DISSIPATERS, SHOULD NOW BE INSTALLED. 9. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR A FINAL SITE INSPECTION BY THE ENVIRONMENTAL CONSULTANT, SCOTT REAMS AT 919-868-4986. OBTAIN A CERTIFICATE OF COMPLETION. EROSION CONTROL MEASURES SELF INSPECTION 1. THE FINANCIALLY RESPONSIBLE PARTY, LANDOWNER, OR THEIR AGENT SHALL CONDUCT INSPECTIONS OF ALL EROSION CONTROL DEVICES AND PRACTICES IN ACCORDANCE WITH NCDENR DIVISION OF LAND RESOURCES REQUIREMENTS FOR SELF INSPECTION. 2. A SELF INSPECTION SHALL BE PERFORMED AFTER EACH PHASE OF THE APPROVED SEDIMENT AND EROSION CONTROL PLAN IS COMPLETE. THIS SHALL INCLUDE BUT SHALL NOT BE LIMITED TO THE FOLLOWING: 2.1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 2.2. CLEARING AND GRUBBING OF EXISTING GROUND COVER. 2.3, COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. 2.4.INSTALLA11ON OF STORM DRAINAGE FACILITIES. 2.5. COMPLETION OF CONSTRUCTION OR DEVELOPMENT 2.6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 3. PERSON PERFORMING INSPECTION MAY USE THE STANDARD FORM PROVIDED BY NCDENR DIVISION OF LAND RESOURCES OR MAY MARK UP A SINGLE COPY OF THE APPROVED SEDIMENT AND EROSION CONTROL PLAN. ANY DOCUMENTATION OF THE SELF INSPECTIONS SHALL BE MAINTAINED ON —SITE AND MADE AVAILABLE TO THE EROSION CONTROL INSPECTOR. 4. THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND —DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. AS OF AUGUST 1, 2013 THE SELF —INSPECTION PROGRAM WAS COMBINED WITH THE WEEKLY SELF —MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF —INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 46.0131. A COMBINED SELF —INSPECTION / SELF —MONITORING FORM IS AVAILABLE AT THE FOLLOWING WEB ADDRESS: HTTP: //PORTAL. N CDENR. ORG/WEB/LR/EROSION .IF YOU HAVE ANY QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE LAND QUALITY SECTION AT (910) 433-3300. N EROISON PLAN LOTS 21 37 THE MANORS VICINITY MAP WA TERSTONA WAKE FOREST TOWNSHIP WAKE COUNTY, NORTH CAROLINA C�ivplP CAWTHORNE, MOSS & PANCIERA, P.C. PROFESSIONAL LAND SURVEYORS, C-1525, 333 S. WHITE STREET, P.O. BOX 1253, WAKE FOREST, N.C., 27587, (919) 556-3148 EROSION AND SEDIMENT CONTROL APPROVED PLAN DATE PERMIT NO. S- Wake County Environmental Services Sedimentation & Erosion Control 919-856-7400 roue rM ENVIRONMENTAL CONSULTANT SIGNATURE FF71 BUILDER: KENDALL CUSTOM HOMES (919)710-1816 818 S WHITE STREET WAKE FOREST NORTH CAROLINA 27587 ,o•0 .�N ,CAROB'",,,. SSA - E SEAL �< L-4685 %% 14/2022 DocuSigned by: 1n� AF5DC1951AA8410... SOIL AND EROSION PLAN FOR LOTS 21 & 37 MANORS AT WATERSTONE RESERVE OWNER: KENDALL CUSTOM HOMES LLC 2360 BALLYWATER LEA WAY 2112 KINSALE MEADOW LANE D.B. 18468, PAGE 2607 B.M. 2021, PAGES 273-274 NEW LIGHT TOWNSHIP WAKE COUNTY, NORTH CAROLINA JANUARY 14, 2022 60 30 0 60 120 SCALE 1 0=60' SHEET 1 OF 3 DocuSign Envelope ID: ACD96136-91 E1-43B7-AEB7-832F892B3159 10-20-1 MINIMUM STANDARDS -ALL SOIL EROSION AND SEDIMENTATION CONTROL PLANS AND MEASURES MUST CONFORM TO THE MINIMUM APPLICABLE STANDARDS SPECIFIED IN NORTH CAROLINA'S EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND THE WAKE COUNTY SEDIMENTATION AND EROSION CONTROL PLAN REVIEW MANUAL. EROSION CONTROL DEVICES MUST BE INSTALLED TO PREVENT ANY OFFSITE SEDIMENTATION FOR ANY CONSTRUCTION SITE REGARDLESS OF THE SIZE OF THE LAND DISTURBANCE. SENATE BILL 1020; "SECTION 3.(H) ADDITIONAL STANDARDS FOR LAND -DISTURBING ACTIVITIES IN THE WATER SUPPLY WATERSHED": A. EROSION AND SEDIMENTATION CONTROL MEASURES, STRUCTURES, AND DEVICES SHALL BE PLANNED, DESIGNED, AND CONSTRUCTED TO PROVIDE PROTECTION FROM THE RUNOFF OF THE 25-YEAR STORM B. SEDIMENT BASINS SHALL BE PLANNED, DESIGNED, AND CONSTRUCTED SO THAT THE BASIN WILL HAVE A SETTLING EFFICIENCY OF AT LEAST SEVENTY PERCENT (70%) FOR THE 40-MICRON SIZE SOIL PARTICLE TRANSPORTED INTO THE BASIN BY THE RUNOFF OF THE TWO-YEAR STORM THAT PRODUCES THE MAXIMUM PEAK RATE OF RUNOFF C. NEWLY CONSTRUCTED OPEN CHANNELS SHALL BE PLANNED, DESIGNED, AND CONSTRUCTED WITH SIDE SLOPES NO STEEPER THAN TWO HORIZONTAL TO ONE VERTICAL IF A VEGETATIVE COVER IS USED FOR STABILIZATION UNLESS SOIL CONDITIONS PERMIT STEEPER SLOPES OR WHERE THE SLOPES ARE STABILIZED BY USING MECHANICAL DEVICES, STRUCTURAL DEVICES, OR OTHER ACCEPTABLE DITCH LINERS. Other Agency Approvals/Enforcement: Wake County's approval of this plan does not supersede any other required approvals or permits. See Wake County Unified Development Ordinance (UDO) 1-18-6 References to Other Regulations and 1-19-1 Conflict with State or Federal Regulations and 10-30-3 (H) SITE DATA TABLE ZONING DISTRICT R-80W RIVER BASIN NEUSE COUNTY WATERSHED FALLS LAKE WATERBODY INDEX 27-16.7— 2 LOT NUMBER LATITUDE LONGITUDE 21 35.987368—78.582290 37 35.989504—78.575391 N cn' PUBuC ROW CONSTRUCTION SEQUENCE 1.013TAIN A LAND DISTURBING PERMIT. 2. SUBMIT DOCUMENTATION REQUIRED UNDER THE SITE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY (NCGO10000) TO STORMWATER INSPECTIONS THROUGHOUT THE PROJECT. 3.INSTALL ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES. LIMIT CLEARING AND LAND DISTURBING ACTIVITY TO THE AREA NECESSARY TO INSTALL THE PERMITTED MEASURES. 4. CONSTRUCTION ENTRANCES SHALL BE LOCATED WHERE DRIVEWAYS WILL BE LOCATED. SILT FENCE SHALL BE INSTALLED ALONG PERIMETER OF EACH INDIVIDUAL LOT AS SHOWN ON PLAN, ENSURING TO REMAIN OUTSIDE OF WETLANDS AND BUFFERS. 5. UPON APPROVAL OF THE STORMWATER SITE INSPECTION, COMMENCE PERMITTED LAND DISTURBING ACTIVITY. 6. GROUND COVER SHALL BE PROVIDED AS FOLLOWS: 6.1 STABILIZE ANY AND ALL BASINS WITH GROUND COVER IMMEDIATELY AFTER INSTALLATION. 6.2 STABILIZE ANY AND ALL DIVERSION DITCHES INTENDED TO BE IN SERVICE FOR 30 DAYS OR MORE WITH TEMPORARY SEEDING AND EROSION CONTROL NETTING. FOR ALL AREAS OF MODERATE AND/OR STEEP SLOPES, PROVIDE TEMPORARY GROUND COVER IF THE SLOPE HAS NOT BEEN DISTURBED FOR A PERIOD OF FOURTEEN (14) DAYS. 6.3 PROVIDE GROUND COVER SUFFICIENT TO RESTRAIN EROSION ON ANY PORTION OF THE SITE UPON WHICH FURTHER LAND —DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN WITHIN FOURTEEN 6.4 (14) CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING LAND DISTURBING ACTIVITY. 6.5 ESTABLISH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN FOURTEEN (14) CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND/OR PRIOR TO FINAL INSPECTION. 7.INSTALL ADEQUATE EROSION AND SEDIMENT CONTROL MEASURES AND/OR INCREASE MAINTENANCE FREQUENCY WHERE APPROVED MEASURES FAIL TO PREVENT ACCELERATED EROSION, OFF —SITE SEDIMENTATION, OR REPETITIVE NON—COMPLIANCE ISSUES. & MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES IN GOOD WORKING ORDER. SILT FENCE, INLET PROTECTION AND OTHER SIMILAR MEASURES MUST BE CLEANED OUT BEFORE THEY ARE HALF FULL. CLOGGED STONE FILTERS MUST BE REFRESHED/REPLACED. SILT FENCE CAN NOT HAVE HOLES OR TEARS. 9.ONCE THE STORMWATER FINAL INSPECTION IS APPROVED, CLOSE THE GRADING PERMIT AND OBTAIN A CERTIFICATE OF COMPLETION. Y 50, PUBLIC RAW WA g p,LLE ATER LEA —13 . 49.8 L_ 7.75 is mZ zoo I c W SILT FENCE 36 z n o OUTLET WITH J m o HORSESHOE I z I PROTECTION i 20'X20' DRAINAGE i EASEMENT SILT FENCE i OUTLET WITH HORSESHOE PROTECTION ,5p�`L bV A., 1 I 00 II � J O SILT FENCE W OUTLET N 36 J 36,268 SQ.FT. - 0.833 AC. I g / 1 1�g 0 101 PROPOSED DISTURBED AREA 31,360 S.F. N /F / GERLAD W MARSHALL EVELYN MARSHALL D.B. 8193, PAGE 917 B.M. 1991, PAGE 888 VICINITY MAP LINE TYPE LEGEND PROPERTY LINE RIGHT—OF—WAY — — — — — — — DISTURBED AREA SILT FENCE ® SILT FENCE OUTLET TREE PROTECTION �oF ESS � �ti,9�► �,y•� s A s - SEAL s9 L-4685 41, n�yy�Wn�i:aaa. 1; � �qN PAR o" 1/14/2022 DocuSigned by: E � , 6r)Avu AFSDC 1951AA8410... SOIL AND EROSION PLAN FOR LOTS21 &37MANOR SAT WATERSTONE RESERVE OWNER: KENDALL CUSTOM HOMES LLC 2360 BALLYWATER LEA WAY 2112 KINSALE MEADOW LANE D.B. 18468, PAGE 2607 B.M. 2021, PAGES 273-274 NEW LIGHT TOWNSHIP WAKE COUNTY, NORTH CAROLINA JANUARY 14, 2022 40 20 0 40 80 CAWTHORNE, MOSS 8c PANCIERA, P.C. PROFESSIONAL LAND SURVEYORS, C-1525, 333 S. WHITE STREET, P.O. BOX 1253, WAKE FOREST, N.C., 27587, (919) 556-3148 SCALE 1 "=40' SHEET 2 OF 3 DocuSign Envelope ID: ACD96136-91 E1-43B7-AEB7-832F892B3159 Seeeding Schedule For Sholders, Side Ditches, Slopes (Max 3:1) Date Type Planting Rate Aug 15-Nov 1 Tall Fescue 300 IbsJacre Nov 1-Mar 1 Tall Fescue & Abruzzi Rye 3001bs/acre Mar 1-Apr 15 Tall Fescue 300 IbsJacre Apr 15 Jun 30 Hulled Common Bermudagrass 25Ibs/acre acre 125lbs Tall Fescue • 35 / ( } Tall Fescue AND Browntop Ibsfacre (Browntop Millet); 30 Jul 1-Aug 15 Millet or Sorghum -Sudan IbsJacre (Sorghum -Sudan Hybrids*** Hybrids) For Sholders, Side Ditches, Slope (3:1 to 2:1) Date Type Planting Rate Sericea Lespedeza (scarified) Mar 1-Jun 1 and use the following 50lbs/acre (Sericea Lespedeza); combinations: Mar 1-Apr 15 Add Tall Fescue 1201bsfacre Mar 1-Jun 30 Or add Weeping Love grass 10 Ibs/acre Mar1-Jun 30 Or add Hulled Common 251bsfacre Bermudagrass acre 120lbs Tall Fescue • 35 / ( } Tall Fescue AND Browntop Ibs acre(Browntop Mullet • 30 Jun 1-Sept1 Mullet or Sorghum -Sudan IbsJacre (Sorghum -Sudan Hybrids*** Hybrids) Sericea Lespedeza (unhulled - 70lbsf acre (Sericea Lespedeza); Sept 1-Mar 1 unscarified)AND Tall Fescue 120Ibsfacre(TaIIFescue) Nov 1-Mar 1 AND Abruzzi Rye 251bs/acre Consult S&EC Environmental Engineers far additional information concerning other alternatives for vegetation of denuded areas. The above vegetation rates are those that do well under local conditions; other seeding rate combinations are possible. *** TEMPORARY: Reseed according to optimum season for desired permanent vegetation. Do not allow temporary cover to grow more than 12" in height before mowing; otherwise, fescue may be shaded out. PERMANENT SEEDBED PREPARATION TREE PROTECTION FENCE SILT FENCE (SEE NOTES) OUTLET F­4 1 7 SILT FENCE 1 1 1 Li RIGHT OF WAY CONSTRUCTION ENTRANCE SILT FENCE OUTLET - _V, ,� WATTLES TOP OF SWALE AS NEEDED R DW Y EDCE OF TYPE A PAVEMENT OR CURB LEGEND FLOW DIRECTION - SF - SILT FENCE >> DIVERSION DITCH ( WATTLE - TP - TREE PROTECTION FENCE ® SILT FENCE OUTLET Q INLET PROTECTION DRIVEWAY PIPE CONSTRUCTION ENTRANCE r 1 Ir. - Ir. 1 N1 1 N1 1 N i �__ ETURN� SF SF li71 �1 i 1 1 i 8' RETURN- I TYPE B TYPE C TYPE D / TYPE E INLET PROTECTION CURB INLET NOTES: I. if required by Wake County, tree protection fence shall be 6. These details are for only lots with disturbed area less than one installed along the rear property line when adjacent to riparian acre. buffer zones, wetlands and/or 25 ft. Tree and Vegetation 7. If the disturbed area is greater than one acre, a custom erosion Protection Zone. If the lot is subject to a municipal planning control plan should be submitted for the 15-day review cycle. The jurisdiction, then the builder is responsible for verifying the plan should address berms/diversions and sediment traps and applicable tree protection standards and for installation of tree basins. protection measures as required b the municipality. P 9 YP 8. If multi le lots share silt fence with none installed between the 2. Install silt fence on low elevation sides of each lot and install silt lots a revised plan will be required. P 9 fence outlets shown on schematic/diagram and as needed. 9. Inlets downstream of disturbances should be protected, streets 3. Install required silt fence within 10 feet of property lines to should be swept as needed when sediment is present, and erosion ensure there is no conflict with septic system. It is the control measures removed or damaged by sub -contractors or responsibility of the builder to ensure septic system is not utilities shall be re -installed at the end of the work day. impacted by silt fence installation. 10. Details for silt fence, silt fence outlet, construction entrance and 4. It is the responsibility of the builder to ensure installation of other measures are provided on other sheets. erosion control measures does not impact septic system and 11. Erosion control details are not drawn to scale. repair areas. 12. If lots are contiguous and have different land owners, lots can not 5. Construction entrance should be installed for each lot and field share the silt fences. Each lot should have individual silt fences. located. TYPICAL INDIVIDUAL LOT SEDIMENT & EROSION CONTROL MEASURES DETAIL EFF9 \ 03 / / CLASS 1 RIP RAP (SEE SECTION THRU BASIN BELOW) 11\ L� / / . . \\ / / � � PZ 11 \ I I l - . i \ \\\` 1 /.i /./ INVERT - RIP RAP HEADWALL \ W - PIPE / :I". _ _ _ - •. - ( My y ••• I.-.....'".. ... •: '� #5 WASHED STONE. 1'-0" THICK x 3'-0" HIGH MINIMUM \ //////��,///////�/��/��/ f� / / ' Q/T STORAGE AREA- j \ ,.. \..� .��o / I PERSPECTIVE VIEW ../ /NO SCALE 1 It 1 AREAS TO BE DISTURBED SEDIMENT STORAGE RIP RAP • • (CUT, FILL, ETC.) FLOOD STORAGE ZONE � ( � HEADWALL I I PIPE NATURAL GROUND \ - F<Ow 1 '1 � INVERT 3 - �� 1.5' 3------------- FLOW 1 1.5' - it -fl----------_____ - CLASS 1 RIP -RAP MAXIMUM SEDIMENT DEPTH (CLEAN OUT POINT) #5 WASHED STONE • SECTION THRU CATCH BASIN, FILTER AND CULVERT PIPE NO SCALE 1 COUN STANDARD HORSESHOE INLET PROTECTION EFFECTIVE: 01/31/08 1 1 1. INSTALL NECESSARY MECHANICAL EROSION AND SEDIMENTATION CONTROL PRACTICES BEFORE SEEDING, AND COMPLETE GRADING ACCORDING TO THE APPROVED PLAN. 2. LIME AND FERTILIZER NEEDS SHOULD BE DETERMINED BY SOIL TESTS. SOIL TESTING IS PERFORMED FREE OF CHARGE BY THE INC DEPT. OF AGRICULTURE. SOIL TESTING LABORATORY. DIRECTIONS SAMPLE CARTONS AND INFORMATION ARE AVAILABLE THROUGH COUNTY AGRICULTURAL EXTENSION OFFICES OR FROM NCDA. BECAUSE THE NCDA SOIL TESTING LAB REQUIRES 1-6 WEEKS FOR SAMPLE TURN -AROUND SAMPLING MUST BE PLANNED WELL IN ADVANCE OF FINAL GRADING. TESTING IS ALSO DONE BY COMMERCIAL LABORATORIES. 3. WHEN SOIL TESTS ARE NOT AVAILABLE FOLLOW RATES SUGGESTED IN THE PERMANENT SEEDING SCHEDULE ON THIS SHEET. APPLICATION RATES USUALLY FALL INTO THE FOLLOWING RANGES: GROUND AGRICULTURAL LIMESTONE: LIGHT TEXTURED, SANDY SOILS: 1 - 1.5 TONS/ACRE HEAVY TEXTURED, CLAYEY SOILS: 2 - 3 TONS/ACRE FERTILIZER: GRASSES: 800 - 1200 LB/ACRE OF 10-10-10 (OR EQUIVALENT) GRASS -LEGUME MIXTURES: 800 - 1200 LB/ACRE of 5-10-10 (OR EQUIVALENT) 4. APPLY LIME AND FERTILIZER EVENLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL BY DISKING OR OTHER SUITABLE MEANS. OPERATE MACHINERY ON THE CONTOUR. 5. ROUGHEN SURFACES IN ACCORDANCE WITH THE NOTES ON SURFACE ROUGHENING ON THIS SHEET. 6. COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKING INTO A SMOOTH UNIFORM SURFACE ( ) SLOPES LESS THAN 3:1. FILL IN OR LEVEL DEPRESSIONS THAT CAN COLLECT WATER. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT HAS NOT BEEN SEALED BY RAINFALL N \� :-,sI, PA�1 PP CAWTHO TREE PROTECTION FENCE SILT FENCE -,,(SEE NOTES) OUTLET F �-3 � 7 SILT FENCE I i i RIGHT OF WAY CONSTRUCTION ENTRANCE SiLT FENCE OUTLET F. - . �F- WATTLES TOP OF SWALE AS NEEDED R ;D Y EDGE OF TYPE A PAVEMENT LEGENDS FLOW DIRECTION - SF - SILT FENCE DIVERSTON DITCH ( WATTLES - TP - TREE PROTECTION FENCE ® SiLT FENCE OUTLET ( WATTLES DRAINAGE PIPE CONSTRUCTION ENTRANCE ::] 7:: S� ' - ROADWAY TYPE B TYPE C TYPE D TYPE E NOTES: 1. TREE PROTECTION FENCE SHOULD BE INSTALLED ALONG THE REAR PROPERTY LINE WHEN ADJACENT 9. EROSION CONTROL DETAILS ARE NOT DRAWN TO TO RIPARIAN BUFFER ZONES, WETLANDS AND/OR 25 SCALE. FT. TREE AND VEGETATION PROTECTION ZONE. 10. ENSURE THAT LAND DISTURBANCE DOES NOT IMPACT 2. WRAP EACH INDIVIDUAL LOT WITH SILT FENCE ON SEPTIC FIELD OR REPAIR FIELD AS THIS MAY VOID ALL SIDES AND INSTALL SiLT FENCE OUTLETS SHOWN ON -SITE WASTE WASTER PERMIT VALIDITY, ON SCHEMATIC/DIAGRAM AND AS NEEDED. 11. IF LOTS ARE CONTIGUOUS AND HAVE DIFFERENT 3. CONSTRUCTION ENTRANCE SHOULD BE INSTALLED LAND OWNERS, LOTS CAN NOT SHARE THE SILT AT THE HIGH ELEVATION SIDE OF THE SITE. FENCES. EACH LOT SHOULD HAVE INDIVIDUAL SILT 4. THESE DETAILS ARE FOR ONLY LOTS WITH FENCES. THERE SHOULD BE A MINIMUM OF TWO DISTURBED AREA LESS THAN ONE ACRE.ROWS OF SILT FENCES BETRBEN THE LOTS. 5. IF THE DISTURBED AREA IS GREATER THAN ONE ACRE, 12. SILT FENCE SHOULD ONLY BE INSTALLED AT THE A PLAN SHOULD BE SUBMITTED FOR THE 30-DAY OF THE LIMITS OF DISTURBANCE OF THE BACK REVIEW CYCLE. THE PLAN SHOULD ADDRESSEDGE OF THE LOTS. BERMS/DIVERSIONS AND SEDIMENT TRAPS AND 13. STANDARD PLAN DOES NOT COVER THE FOLLOWING: BASINS. a. BASEMENT LOTS 6. IF MULTIPLE LOTS SHARE SILT FENCE WITH NONE b. LOTS WITH GREATER THAN 5 FEET ELEVATION INSTALLED BETWEEN THE LOTS, A REVISED PLAN THEM AND/OR LOTS WITH GREATER THAN WILL BE REQUIRED AND A NOTICE OF VIOLATIONBETWEEN 10 FEET ELEVATION FROM FRONT TO BACK (NOV) WITH CIVIL PENALTY WILL BE ISSUED. C. LOTS WITH CONCENTRATED FLOW/SWALES BETWEEN 7. INLETS DOWNSTREAM OF DISTURBANCES SHOULD BE THEM PROTECTED, STREETS SHOULD BE SWEPT DAILY, AND d. LOTS WITH STORMWATER CONTROL MEASURES MEASURES REMOVED OR DAMAGED BY (SCMS) SUB -CONTRACTORS OR UTILITIES SHALL BE C.LOTS WITH CUT SLOPES OR "RUN ON" RE -INSTALLED AT THE END OF THE WORK DAY. 8. DETAILS FOR SILT FENCE, SILT FENCE OUTLET, CONSTRUCTION ENTRANPROVIDED ON OTHER SHEETS. TYPICAL INDIVIDUAL LOT SEDIMENT & EROSION CONTROL MEASURES DETAIL TOP OF MUST BE ABOVE TI THE WAS STEEL FENCE POST, WIRE FENCE , HARDWARE CLOTH �, FILTER OF #57 WASHED STONE BURY HARE FENCE AND HARDWARE CLOTH ri EFFECTIVE: 01/31/08 4' MEN. .1 SILT FENCE CLOTH IN TRENCH STEEL FENCE POST SET MAX 2' APART MIN. 18" INTO sou GROUND 3' FILTER FABRIC ON GROUND NOTES: 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. JI \ II BURY 6" OF UPPER EDGE OF II FILTER FABRIC IN TRENCH 11 U SECTION VIEW STANDARD SILT FENCE OUTLET NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: THE SEDIMENT POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF MONITORING PROGRAM OF THE NPDES PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE SELF INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREAD SHEET FROM HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION . IF YOU HAVE ANY QUESTIONS OR CANNOT ACCESS THE FORM PLEASE CONTACT THIS OFFICE AT (919) 791-4200. 50' MIN. BUT SUFFICIENT TO KEEP SEDIMENT ON SITE .F� .t;r:,... .:� : :•k.,:.::.. ,:� :I 2"-3. "STONE TO BE USED:EXISTING •' `-'(SURGE STONE OR RAILROAD• >� ROADWAY •BALLAST): • • ' •' ..;.. ::, .1 r •. o- PLAN VIEW EXISTING ROADWAY --- 6" MIN. NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE STONE, THEN THE TIRES OF THE VEHICLES MUST BE WASHED 25' OR WIDTH OF BEFORE ENTERING THE PUBLIC ROAD. PROPOSED STREET, WHICHEVER IS 3. MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR GREATER. SEDIMENT FROM LEAVING CONSTRUCTION SITE. ENTRANCE WILL REQUIRE PERIODIC REMOVAL OF SEDIMENT -LADEN STONE AND REPLACEMENT WITH FRESH STONE. 35' MIN. 15' MIN. . - ti• s•' .. •'' . •. . "FABRIC UNDER STONE CROSS SECTION n STANDARD CONSTRUCTION ENTRANCE EFFECTIVE: 01/31/08 MINIMUM 10 LINE WIRES NOTE: 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE. COUN ORTH CAROLIN EFFECTIVE: 01/31(08 8'-O" MAXIMUM FRONT VIEW 'a STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC 0 o FILL SLOPE N Z :.' 6 w N ti' "' , ,z,-" 1. GRADE 6" MINIMUM COVER o OVER SKIRT * I N ANCHOR SKIRT AS DIRECTED BY ENGINEER * SIDE VIEW STANDARD TEMPORARY SILT FENCE NEW CONSTRUCTION 12" MIN. IMUM 12-1/2 GAUGE RMEDIATE WIRES GRADE NEW STABILIZATION TIME FRAMES SITE AREA DESCRIPTION STABILAZATION TIME FRAME EXCEPTIONS PERIMETER DIKES SWALES DITCHES & SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OF FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 5O' I N LENGTH. ALL OTHER AREAS WITH SLOPES WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMTER HOW ZONES ,,,,,,1\111111111/,/j,,,, ♦ / A ♦ 'N` R / ♦ \' O / ♦♦ 4 .\MMINI /I ♦♦ ` xsN '�„� Z� �i O r�'F ESS /Ow,,� + Z / �,9ty . Q �� - s 's -_ a SEAL -_ - �f S .' L 4685 - 9 0 i it r / ,s '"�„„ UR,„,x 4� / a1MM11t V / O N PA I 0% ���//1111111111 11/14/2022 DocuSigned by: y bV A4f V Y. ) AF5DC1951AA8410... SOIL AND EROSION PLAN FOR LOTS21 �c37MANORS'AT WATERSTONE RESERVE OWNER: KENDALL CUSTOM HOMES LLC 2360 BALLYWATER LEA WAY 2112 KINSALE MEADOW LANE D.B. 18468, PAGE 2607 B.M. 2021, PAGES 273-274 NEW LIGHT TOWNSHIP WAKE COUNTY, NORTH CAROLINA JANUARY 14, 2022 60 30 0 60 120 NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 NCG01 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 IIIIIIIIIIIIIIIIII !!I RNE, MOSS & PANCIERA, P.C. PROFESSIONAL LAND SURVEYORS C-1525 333 S. WHITE STREET P.O. BOX 1253 WAKE FOREST N.C. 27587, (919) 556- 3148 SCALE 1»=60' SHEET 3 OF 3 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this Ian sheet mill result in the construction p g P P actniib being considered compliant with the Ground Stabilization and Materials Handling / g o P g sections of the NCG01 Construction General Permit Sections E and F respectively). ( P Y). The ermittee shall comply with the Erasion and Sediment Control Ian approved b the P P Y P PP Y delegated authority having jurisdiction. All details and specifications shown on this sheet g V gl P may not apply depending on site conditions and the delegated authority havi ng jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance a Perimeter dikes swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None H W Zones Q I (c) Slopes steeper than If slopes are 10' er less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greaterthan 50' in length and with slopes steeper than 4:1 -7day s for perimeter dikes swales d Slo es 3:1 to 4:1 O p 14 ditches perimeter slopes andH W ,P P O Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, males, )e) Areas with slopes ditches, perimeter slopes and HQ\N Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge offluids. 2. Provide drip pans an ans under stored equipment. V 3. Identifyleaks and repair as soon as feasible or remove leaking equipment from the P g e profct. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dum stet e. trash P , rece tacle on site to contain construction and domestic wastes. p 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain direct) to a storm drain stream orwetland. P Y 5. Cover waste containers at the end of each workday and before storm events or provide sec. nda containment. Re air or replace damaged waste containers. P Y P P g 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste of -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonablyavailable. Note: After the permanent cessation of construction activities, any areas with temporary 3. Contain liquid wastes in a controlled area. ground stabilization shall be converted to permanent ground stabilization as soon as 4. Containment must be labeled, sized and placed appropriately for the needs of site. practicable but in no case longer than 90 calendar days after the last land disturbing 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from activity. Temporary ground stabilization shall be maintained in a mannerto render the construction sites. surface stable against accelerated erosion until permanent round stabilization is achieved. g P g PORTABLE TOILETS POLYACRYLAMIDES(PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMSIFlocculonts. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculonts and in accordance with the manufacturer's instructions. 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainahle provide relocation of ortable toilet behind silt fence or lace ,p P P on a ravel ad and surround with sand bags. g P g 2. Provide staking or anchoring of portahle toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portahle toilets and replace ONSITE CONCRETE WASHI STRUCTURE WnN LINER S u�m _ :d W---\L !D N yy T 'T--p' 6dBttti'k_ IR r 11 : oar N✓ doll I/fimP !EW Ietret.®to6,�l¢mum¢ AMM CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of or recycle settled hardened concrete residue in accordance with local P Y and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition lace the mixer and associated materials on Impervious barrier and within P P lot perimeter silt fence. 4. Install tent ora concrete washouts per local requirements, where applicable. If an P rY P q PP alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storm defective curb or sidewalk g sections. Stormwater accumulated within the washout may not he pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least SO feet from storm drain inlets and surface waters unless it an he shown that no other alprotection ternatives are reasonably available. At a minimum iV nstall of storm drain inlet(s) s closest to the washout which could receive P spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post si na a on the washout itselfto identify this location, g g Y 9. Remove leavings from the washout when at approximately 75%capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10, At the com Ietion of the concrete work remove remainin Icavin s and dispose of P g g P in an approved disposal facility. Fill pit, if applicahle, and stabilize any disturbance caused by removal ofwashout. with properly operating unit. --- - _. _- - ^ _- ^ -^_- - ^ ^- I 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 4. Provide pending area for containment of treated Stormwater before discharging oovid. 2. Place hazardous waste containers under cover or in secondary containment. S. Store flocculants in leak -proof containers that are kept under storm -resistant cover 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. or surrounded by secondary containment structures. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -ins -inspections are required during normal business hours in accordance with the table P q g below. When adverse weather or site conditions would cause the safer ofthe inspection Y P personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition when a storm event of equal to or p p q greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be ,clammed upon the commencement of the next business day. Anytime when inspections P. p Y Y p were delayed shall be noted in the Inspection Record. amquenry Inspett (di normal hu..- hours) Impettion records mart include: 1 Rain a Dail y Dail rainfallamounts. ma edge tl in If no tlai a observations are matle tlurin weekentl p ty rain gaug g ood[workin g g hnlida iods and .Trim,) -A:, .lint:-.11 of y per ma the t for mos Omer shame, com ,coat � r .,. ,-nded da and cif a �ededt. oa r' e lad u I IA n,, r. cu ,etl sit as The - another rain -man ,,, dew, r approved by the Div.- r 1. ldentiIIcatlon of theI e:,.0 re,in.�ectetl 2 mse Atiiisi rice ,e Measures 7c.I..dardav 2. Dateandtimeofthe in�.,r ...n, and within 3a• 3. Name athe a erformin the iris, p r., p p tt Y�,res hours .fa rain 4. Intllra[ion of whether [he mea were operating n t>1.o inch in properly, 24ehours 5. Description a maintenance n-d, for the measure, 6. Description.Adence,and dateofmrrectiv .dionsteken. (a)smrmwater At ,,:stone per 1. Identlflcati- ofthe discharge o u Uii, inspected, discharge 7calendar days 2. Date:,r,dtimeoftheins aion, oudalls SDOs I ) antl within 24 3. Name ufthe a erformin the ins,dion rson p g p hours ofa n 4. Evider ce of indicamrs of smrmwamr ,,liar uch as oil P ent>I.Oanch in _ oration g rsusp , sheen I,.f o em.,ti lidsorh.s 24 hours 5. Indlca:ion of visible sediment leavin the si i g 6. Description, evidence, and tlate of wrreQive aGions taken. IFvlsible..ed mentatwi, isfoundodtsidesite limits, then,r w (4)Perimeter of AtleaAonceper 7, I.ndard.ys e and within 24 of thefullowi dshallbemad.- L ed... rlek ,,cleanuporstabilizethesedimentthathaslea hours ,fa in the site lira e >1.0i-I, in 2. Description evidence,anddateofcorrecdveactionsuken,and 24hours ,11I—az to he s chaos taken m control future 3. en ­­ elect 5 streamsor wetlands onsae At least oncepr a 7pa1endar aays If thest.... ..etldalese nd has:...,esed visibd-n-i-ora an®mn,,,-,Iola, in_reared tnrhhnck apm me conro-pcnon r pffsRe antl wiMin 24 aetivlry, Le o,d of Lel�llo,ving shall ba matle. Iwher hours ofa 1. Des r r taken and �uf a[ cesslble I ent>30Inch In 2 R d.l h d 11-I p PProp 24 hod Rg rlJ P m121 [i- permit. 1. Tnepha,e,,fg,ad,ng(i-,,,,dam,,n cf,,,, rr," ease me ,n , rn draw : re•I I III 1-liL," d ni; (6)Grountl s Ibi eiton easures After- phase ofgrading r ,,, „r rP,ry ,l,,.,rne t, pe"nanent �: sr.. ro n 2. Doe, rn , egni d grou nd stabilize have be `_tin metroc. en prow the required"c me or - assurance that they will he provided - :.,, p 11, le. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC Ian as well as an approved deviation shall be kept on the site. The PP p V PP p approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The followingitems pertaining to the E&SC Ian shall be kept on site and available for P g P P inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date II dimensions and relative elevations and sign aninspection p s ection report that lists each shown on the approved E&SC Ian. ppr p E&SC measure shown on the approved E&SC ppr plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. b A phase of radio has been completed. () P g g P Initial and date a co of the approved E&SC Pp at plan o complete, date and sign an inspection report indicate completion ofthe rep p construction phase (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in -rdance with the approved E&SC plan orcomplete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. IdJ The maintenance and repair Complete, date and sign an inspection report. requirements far all E&SC measures have been performed. IeJ Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan rIncomplete, date and sign an spection report to indicate the completion of the eetive action. 2. Additional Documentation to be Kept on Site In addition to the E&SC Ian documents above the following items shall be kept on the P g P site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of P q electroniraI ly-available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three years All data used to complete the a-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.411 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: p g (a) Visible sediment deposition in a stream orwetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). c Releases of hazardous substances in excess of re ortable uantiues under Section 311 () P q ofthe Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements P g q After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the tmeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discci and Other Requirements (a) Visible sediment • WRMn 24 hours, an oral arelertronic notification. deposition in • WithM 7mlendarda0, a report that contains a description ofthe stream or wetland sediment and actions taken to address the cause ofthe deposition. Division staff may waive the requirement for a written report on a se by case basis • Ifthe streams named onthe NC303fd1 llstas impaired for sediment related causes, the permittee may be required W perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance wfth the federal or state im red -waters conditions. poi ( 1 Oilspills Ills and . WAhln 24 hours an oral o r electron is notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (.)Anticipated . A report of least ten days before the date afthe bypass./fpocslble. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated . WRhfn 24 hours, an oral orelectronlc notification. bypasses [40 CFR . Wlthfn 7mlendar day4 a report that includes an evaluation ofthe 122.41(m)(3)] quality and effect ofthe bypass. (e) Noncompliance . Wlthln 24 hours, an oral -electronic notification. with the conditions . Wlthln 7mlendardays, a report that contains a description ofthe oftNs permitthat noncompliance, n ompliance, and Its causes,the period of noncompliance, may endanger ,,),ding exact dates and times, and ifthe nonrompliance has not health or the been corrected, the anticipated time noncompliance is expected to ent[40continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). . Dims -staff may cacti- the requirement for a written report ona se -by -case basis.