Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0005763_2004 Annual Report_20050224
Tuckaseigee Water & Sewer Authority Serving Jackson County 1246 West Main Street Sylva, NC 28779 Ph. (828) 586-5189 Fax (828) 631-9089 �Q January 27th, 2005 DENR/DWQ/Water Quality Section Non -Discharge Compliance Unit 1617 Mail Service Unit Raleigh NC 27699-1617 Gentlemen; RECEIVED FEB - 3 200 WATER QUALITY SECTION Non -Discharge Conrknce Ent. Enclosed is the Annual Residuals Report for theTuckaseigee Water and Sewer Lime Stabilization facility (permit #WQ0005763) for the period of January 1, 2004 - December 31, 2004. Should you have any questions or if I can provide you any additional information, please don't hesitate to contact me. Smcer y, Stan Bryson Wastewater Plant Operations Superintendent Tuckaseigee Water & Sewer Authority Enc. D EE FFEB 4 7C,33 WATER QUALITY SECTION iHEVILLE REGIONAL OFFICE a ir, ANNUAL SEWAGE SLUDGE REPORT OF TUCKASEIGFE WATER AND SEWER AUTHORITY PLANT # 1-NPDES # NCO039578 (WQ0005763) for the period of January 1, 2004-December 31, 2004 as required by 40 CFR, PART 503 STANDARDS FOR THE USE OR DISPOSAL OF SEWAGE SLUDGE FEB — 3 2005 WATER QUALITY SECTION Non -Discharge Com;klce Ent. A J( TABLE OF CONTENTS (1) REPORTING REQUIREMENTS/PERTINENT INFORMATION (2) CERTIFICATION APPENDIX (a) 2004 sludge data �n (b) 2004 distrubution and marketing summary (c) 2004 laboratory analysis (d) 2004 lime stabilization record of operation RECEIVED FEB _ Z005 Non•Dischaml Cora REPORTING REQUIREMENTS Facilities responsible for reporting annually are described in the regulations as: 1. Publicly Owned Treatment Works (POTW) with an average design influent flow rate equal to or greater than 1.0 MGD. 2. POTW's serving a population of 10,000 or more. 3. Class I (facilities with an approved pretreatment program) sludge management facilities. The Tuckaseigee Water and Sewer Authority Wastewater Treatment Plant is a 1.5 MGD design facility. The facility also treats the sludge from two additional plants owned by the authority. Pertinent information includes: facility name: Tuckaseigee Water & Sewer Authority Plant # 1 NPDES # NCO039578 correspondence address: 1246 West Main St Sylva NC 28779 physical address: 1871 North River Rd Sylva NC 28779 facility operator: Stan Bryson Wastewater Plant Operations Superintendent ph. 828-586-9318 it I CERTIFICATION REQUIREMENTS PART I -POLLUTANT CONCENTRATIONS PARAMETER _ MAXIMUM Arsenic............................................:..........2.5 mg/kg Cadmium...................................................1.2 mg/kg Chromium..................................................80 mg/kg Copper.....................................................150 mg/kg Lead..........................................................9.6 mg/kg Mercury....................................................1.9 mg/kg Molybdenum.............................................2.6 mg/kg Nickel........................................................7.0 mg/kg Selenium.....................................................1.5 mg/kg Zinc...........................................................400 mg/kg PART H - PATHOGEN REDUCTION (40 CFR 503.321 X Class A Class B PART III - VECTOR ATTRACTION (40 CFR 503.34 Option 1 _ Option 2 —Option 3 _ Option 4 Option 5 X Option 6 — Option 7 —Option 8 PART IV - CERTIFICATION " I certify under penalty of law, that the Class A pathogen requirements in 40 CM Part 503. 32 have been met and the vector attraction reduction requirement in 40 CFR, Part [503. 33(b)(6)] has been met. I am aware that there are significant penalties for false certification including fine and imprisonment." Signed this 27th day of January , 2005. Stan Bryson, Was water Superintendent RECEIVE FEB - 3 ZM" WATER QUALITY SECTION Non -Discharge Conolance Ed ANNUAL DISTRI113t ION AND MARKETING/ SURFACE DISPOSAL CERTIFICATION AND 5UNDL4RP .FOILM PERIifI' #: 411 -5 63ACILIrY ]+TAME: PHONE -:gag- S,g(,, -9.3jk COUNTY: J0.C�K�,�,� OPERATOR: FACILITY TYPE (please check one): 9,Surface Disposal (complete Part A (Soarce(s) and *Residual IV Volume only) and Part C) IDistribution and Marketing (complete Parts A, B, and C) Was the facility in operation daring the past calendar year? C✓lea ] No No If No skip parts A, B, C and certify farm below Part A*: Part B*: Month Sources(s) (include NPDES d if applicable) Volume (dry ions) Recipient Information Admendment/ Bulking Agent Residual In Product Out Name(s) Volume (dry" tons) Intended use(s) January February March April May I n :r c` June July August September October November December Totats: .Annual (dry tons): A men ens use u ngAgent(s)use : z= w d U W W co U �cc Q U 29 � o 3 -�l N 0 i W * If more space than given is required, please attach additional information sbeet(s). ❑ Check box if additional sheet(s) are attached Part C: Facility was compliant during calendar yeas©]} with all conditions of the permit (including but nut limited to items 1-3 beiaw) issued by the Division of Water Quality. Yes ❑ No If r49, please provide a written description why the facility was not compliant. -��+ 1. All monitoring was done in accordance with the permit and reported for the year as required and three (3) copies of certified laboratory results are attached. W 2. All operation acid maintenance require-ments were compiled with oar, in the case of deviation, prior authorization was received from the Division of Water P Quality, m 3. No contravention of Ground Water Quality Standards occurred at vmonitoring well. W "I certify, wider penalty of law, that the above information is, to the best of my knowledge and belief, true, accurate and complete. I am aware 89 th t ere are . nifiean.t penalties for submitting false informaion, including the possibility of fines and imprisonment for knowing violations." Signature of Per . 'ee AD� Signature of Pregarer** Date (if different -from Per itte-e) "Preparer is defined in 40 CFR Part SD3.9(r) -2 ru Author Daryl D. Memtt DENR FORM DMSOF (7/ 002) I'IHK- 14:.it> FROM: T0:9882863190e9 . P:3/4 ANNUAL PATIROGEN AND VECTOR ATrRA. CTfOK REIDUCI' ON 1?ORK Facilify Name: f �1C t.5ei c�roP 1I` RJR- XW P,,� � A. Permit Number: '00 WWTP Name: %�t� j NPDES dumber: U 003!78- Monitoring Period: From 1 / i M .4 To t -n / �, ) ^ 11 Pathogen Reduction (40 CFR 503.32) - Please indicate level achieved and Alternative nerfnrmAde Class A- Aitemative 1 Lj Alternative 2 ❑ Alternative 3 ALJ Alternative 4❑ Altemative 5 LX . Alternative 6 ❑ If applicable to alternative performed (Class A only) indicate "Process to Further Reduce Pathogens": Compost LJ Heat Drying ❑ Heat Treatment ❑ Thermophilic L] Bela Ray ❑ lumina RayF1 Pasteurization Class B.- Alternative 1LJ I Alternative 2 L Altcmativc 3 ❑ If applicable to alternative .performed (ClaN.a B only) indicate `Process to Significantly Reduce Pathogens": Litne Stabilization [] Air Drying Composting LI Aerobic Digest9on (� Anaerobic Vigestion❑ ' If applicable to $Itc... I erformed Class A, or Class B) complete the following monitoring data: Parameter Level in Pathogen Density um cr o Exece- rcqucncy of Semple 112inimu Geo. Mean aximu Units rebth dcnces An�lvsis Type Tech- ni ue ' 2x10to power.MPN per swim of total Fecal Colifarm solids or 2 x 10to the bth power n I� C� Lk �v1, �y�j �� 6vl CFU per gram of �I I DOD mpn per smm of total solid (dry weight) Salmonella bacteria 3 MPH per 4 (in.licu of fecal stems total solid colifomt) (dry weight) Vector Attraction Reduction (40 CYR 503.33) - Please indicate option performed: 0ption t ❑ j0ption2 Lj 10ption 3 l _) Option 4 ❑ Option S ❑ Option 6 U.1 j0ption 7 a ion 8 Ft 0 laption 9 L-j (Option 10 Li I No vector attraction reduction options were performed ❑ �..wAlil'lVtf lJ.Vl\ oi.ts,dr,rru.t� 1 tprcase cile" tits appropriate statement) "I certify, under penalty of law, that the pathogen requirementA in 40 CFR 503.32 and the vector attraction reduction requirement in 40 Cl!R 503.33 have been met" i =7 "I certify, under penalty of law, that the pathogen requirements in 40 CPR 503.32 and the irector attraction reduction requirement in 40 CFR 503.33 have not been met." (Please note if you cheek this statement attach art explanation why you have not met one or both of the requirements.) "This determination has been made under my direction and supen.ision in accordance with the system designed to ensure that qualified personnel properly gather and evaluate the information used to determine that the pathogen and vector attraction reduction requirements have been met. I am ara that t ere are_signili ut penalties for fags rtification including; fine and imprisonment." �t) 1� V o Prep r Natne and T ie (typeor La ['tipplicr Name and Title (if applicable)(type or print) o1r1 ), Signature of Prcparer Daln Signature of Land A.pplier (if applicable) Date C Author Daryl D. Merritt DENR FORM RF (7,12002) Appendix (a) 2004 Sludge Data J APPENDIX A 20J SLUDGE DATA TWSA PLANT # 1 (1.5 mgd) NPDES # NC0039578 SLUDGE TO DIGESTOR.................................................................7,098,130 gallons totallbs..................................................................... 415, 0261b s totaltons.......................................................................208 tons total metric tons............................................................188.2 metric tons TWSA PLANT # 2 (.5 mgd) NPDES # NC0020214 J SLUDGE HAULED TO PLANT # 1........... total tons ......................... total metric tons .............. TWSA PLANT # 3 (.1 mgd) NPDES # NCO063321 ..............................................90,719 gallons ............................................... 9.35 tons ..............................................8.48 metric tons SLUDGE HAULED TO PLANT # 1......................................................... 148,689 gallons totaltons............................................................................ 11.62 tons total metric tons..............................................................10.5 Dry metric tons PROCESS SUMMARY SHEET T PLANT NAME TWSA #1 ANNUAL (2004) J FOR THE PERIOD OF 111104 THROUGH 12/31/04 A PLANT FLOW,.mgd 0.810 daily avg B INFLUENT BOD, mg/I 146.8 daily avg C EFFLUENT SS, mg/I 23.9 daily avg D MLSS, mg/I 3317 daily avg E RSSS, mg/I 5891 daily avg F WAS RATE, mgd 0.01945 daily avg G AER. BASIN VOL., mg 0.468 H CLARIFIER VOL, mg 0.1508 I F/M RATIO .......................................................... LB APPLIED/LB UNDER AERATION J MCRT DAYS ACTIVATED SLUDGE DATA DATE 30 MIN SETT. SLUDGE MLSS m /I MLVSS m /I EFF FLOW MGD RSSS m /I ZSV ft/hr SVI MCRT da s SLUDGE WASTING gallons Ibs JAN. 420 3850 2993 0.865 7129 4.2 108 14 654,000 38,816 FEB. 369 4660 3028 1.043 7490 3.9 91 22 324,000 20,795 MAR. 425 4026 3267 0.930 7325 4.6 104 12 721,000 44,779 APR. 316 3290 2598 0.943 6355 4.8 95 11 798,900 43,739 426 3783 2924 0.875 6433 4.3 112 17 546,000 30,906 JUN. 440 3878 2870 0.826 7408 4.4 111 16 524,730 35,149 JUL. 390 4300 3191 0.918 7569 4.6 90 15 727,500 45,070 AUG. 300 4175 2900 0.897 6720 4.9 72 14 804,300 45,563 SEP. 338 3909 2805 1.496 7190 4.5 86 16 411,000 24,343 OCT. 495 3518 2659 1.074 6040 3.5 139 14 638,250 32,890 NOV. 429 3616 2838 1.174 6602 4.1 118 13 657,450 37,924 DEC. 420 3439 2673 1.107 6211 3.3 121 23 291,000 15,052 AVG 318 3317 2482 0.810 5891 3.7 96 13 507009 MAX 495 4660 3267 1.496 7569 4.9 139 23 804300 45563 MIN 300 3290 2598 0.826 6040 3.3 72 11 291000 15052 Total Gallons Daily Average 7,098,130 415,026 T 19,447 208 T zuo i mai tons x .au t metric tonitngnsn ton= 188.2 Dry Metric Ton )tal lbs. )tal tons 2004 TWSA #2 SLUDGE PRODUCTION MONTH Gals Hauled.To TWSA # 1 AVG % SOLIDS TOTAL DRY TON January 0.00 February 0.00 March 12,424 0.5 0.26 April 9,318 2.6 1.01 May13,977 2.1 1.22 June 0.00 Julv 25,000 2.5 2.60 August 0.00 September 0.00 October 0.00 November 0.00 December 30 000 3.4 4.25 TOTAL 90,7191 9.35 TOTAL 9.35 X .907 metric ton/English Ton = 8.48 Dry Metric Tons 2004 TWSA #3 SLUDGE PRODUCTION MONTH Gals Hauled To TWSA # 1 AVG % SOLIDS TOTAL DRY TON January 4,370 1.7 0.31 February 8165 2.6 0.88 March 11788 2.1 1.03 April 15,410 1.4 0.90 May 19,138 1.4 1.12 June 22,770 1.9 1.76 Julv 26,394 1.8 1.96 August 7,821 1.9 0.61 September 8,798 2.2 0.81 October 0 0.0 0.00 November 24,035 2.3 2.25 December 0.00 TOTAL 148,689, 11.62 TOTAL 11.62 X .907 metric ton/English Ton =10.54 Dry Metric Tons Appendix (b) 2004 Di'strubution and Marketing Summary APPENDIX B TWSA PLANT # I ANNUAL DISTRIBUTION AND MARKETING SUMMARY 2004 VOLUVE IN DRY TONS MONTH ADNENDIVENT/ RESIDUAL PRODUCT BL LMNGAGENT IN IN CUT Janu 22.22 17.04 39.26 Febuary 13.53 11.18 24.71 IVwch 38.51 29.05 67.56 � 43.2 41.32 84.52 11.56 11.12 22.68 June 11.49 14.65 26.14 Jul 19.78 23.33 43.11 ust 19.02 20.93 39.95 ember 2.66 1.98 4.64 Octobff 35.54 33.39 68.93 November 25.96 20.25 46.21 Deoen'Der 12.52 9.77 22.29 Annual Dy Ton 255.99 234.01 490.00 APPENDIX B TWSA PLANT # 1 ANNUAL DISTRIBUTION AND MARKETING SUMMARY 2004 PART B RECIPIENT INFORMATION DATE NAMES LUME wet ton INTENDED USE 3117 Steve Ledford Franklin NC 50 Pasture/ha fields 3/23 Chester Sorrells (Waynesville NC 32 Commercial Hauler 3/26 Chester Sorrells (Waynesville NC 45 Commercial Hauler 3/26 Verlin B son Cullowhee NC 2 Garden and Pasture 3/29 Chuck Bates Franklin NC 30 Pasture/ha fields 3/30 Jim Rhinehart Webster NC 24 Pasture/ha fields 4/1 Verlin B son Cullowhee NC 2 Garden and Pasture 4/2 Chuck Bates Franklin NC 12 Pasture/ha fields 4/6 Chuck Bates Franklin NC 12 Pasture/ha fields 4/10 jJim Rhinehart Webster NC 24 Pasture/ha fields 4/15 Jim Rhinehart Webster NC 1.2 Pasture/ha fields 4/19 Chester Sorrells (Waynesville NC 21 Commercial Hauler 4/21 Chester Sorrells (Waynesville NC 50 Commercial Hauler 4/22 Chester Sorrells (Waynesville NC 60 Commercial Hauler 4/22 Jim Rhinehart Webster NC 12 Pasture/ha fields 4/23 lChester Sorrells (Waynesville NC 75 Commercial Haule 4/24 Jim Rhinehart Webster NC 12 Pasture/ha fields 4/28 Jim Rhinehart Webster NC 7 Pasture/ha fields 4/28 Chester Sorrells (Waynesville NC 45 Commercial Hauler 4/29 Chester Sorrells (Waynesville NC 90 Commercial Hauler 4/29 Jim Rhinehart Webster NC 7 Pasture/hay fields 4130 Jim Rhinehart Webster NC 21 Pasture/ha fields 4/30 Chester Sorrells (Waynesville NC 10 Commercial Hauler 5/8 Jim Rhinehart Webster NC 7 Pasture/ha fields 5/12 Jim Rhinehart Webster NC 7 Pasture/ha fields 5/25 Jim Rhinehart Webster NC 7 Pasture/ha fields 10/1 lChester Sorrells (Waynesville NC 21 Commercial Hauler 11/17 Chester Sorrells (Waynesville NC 28 Commercial Hauler 11/18 Chester Sorrells (Waynesville NC 34 Commercial Hauler Total 759 Appendix (C) 2004 Laboratory Analysis Summary 2004 Annual Residual Sampling Summary Form Attach this form to the corresponding Annual Report Please note that your permit may contain additional parameters to be analyzed than those required to be summarized on this form. Permit Number: WQ 0005763 Laboratory: 1) Pace Analytical Facility Name: Tuckaseigee Water and Sewer Auth 2) N.C. Dept. of Ag_ NPDES # orNC 0039578 3) WQ # : WQ 0005763 4) WWTP Name: TWSA Plant # 1 5) I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature o Prepar a7 b� Dat (TWSA Version) DENR FORM RSSF (7/2002) Appendix (d) 2004 Lime Stabilization Record of Operation TWSA LIME STABILIZATION DAILY RECORD DATE l ` START __ i � � P� UP RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS -- SLUDGE FEED % SOLIDS /p LIME/SLUDGE RATIO Inlet reached temp @ Outlet reached temp @ a :� PATHOGEN REDUCTION Tr• -��- TIME 96 INTO VESSEL OUT OF VESSEL OPERAT( �o/ lR l0 t 0 Ale; 7 3 NAM" PRESS, ",6 SOLIDS E=:==j.' TOTAL PRODUCTION, DRY TONS c VECTOR ATTRACTION REDUCTION 03 647— TIME. �IINITIAL PH .d3 (aLr -«. ---_2.HRS. 22 HRS. .: L .......................................... OPERATIONAL :LT PRESS SPEED, % LYMER PUMP SPEED, % 35' 1DGE PUMP SPEED, % j GPM �97 1 r F FEED AUGER, % LBS/HR �� ER SPEED, % 1 p 18/12/03 OPERATOR mmm .........................................: ......:......... ............... POLYMER USAGE YPE USED C. ANKS MIXED i 1 tKS/TANK D W-3 )b5 RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO Inlet reached temp @ Outlet reached temp @ r� PATHOGEN REDUCTION TEMPERATURE oF TWSA LIME STABILIZATION DAILY RECORD DATE 93 START STOP TOTAL .............. I........................ �' 3 0(5 VECTOR ATTRACTION REDUCTION TIME TON OPERATOR- �`3 '�INtT1AL PH 4 1 =�� f 2 HRS. `f � /22 HRS. ........... OPERAI"IONAL . ............................ .LT PRESS SPEED, % POLYMER SAGE )LYMER PUMP SPEED, % 3E TYPE USED �C UDGE PUMP SPEED, % d ANKS MIXED GPM Jro- Gf-3 4E FEED AUGER, % LBS/HR 6 0 ZER SPEED, % LITERS/TANK W 8i12/03 /� J�d TWSA LIME STABILIZATION DAILY RECORD r DATE START STOP TOTAL RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED °% SOLIDS LIME/SLUDGE RATIO p 2 Inlet reached temp @ , Outlet reached temp @ o PATHOGEN REDUCTION PRESS' °,6 SOLIDS [::::::= TOTAL PRODUCTION, DRY TONS • DRY TON O VECTOR ATTRACTION REDUCTION TIME � =t 3g� OPERATOR- INITIAL PH.A!_i `- 2-HRS. �•8"x.o3 � . a�� . `r 22 HRS. OPERATIONAL BELT PRESS SPEED, % 3 S POLYMER PUMP SPEED, % 3 S SLUDGE PUMP SPEED, % I GPM (, ►"" FEED AUGER, %__ LBS/HR f? MIXER SPEED, % % (� wised 8/12103 POLYMER USAGE YPE USED Q_ •ANKS MIXED FERSlTANK (� TWSA LIME STABILIZATION DAILY RVL--- DATE START RUN TIME, HRS E_Ti�' SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS c: 0 LIMEISLUDGE RATIO �� q Inlet reached temp @ Outlet reached temp @ ®� PATHOGEN REDUCTION TEMPERATURE OF =13 OPERATIONAL ELT PRESS SPEED, % DLYMER PUMP SPEED, % I 3 STOP TOTAL PRESS , % SOLIDS TOTAL PRODUCTION, DRY TONS D E:3, DRY TON VECTOR ATTRACTION REDUCTION TIME OPERATOR b ti_06— INITIAL PH �-a .5'_ 2 HRS. D 22 HRS. _UDGE PUMP SPEED, % GPM tf 1. FEED AUGER, % Gy LBS/HR Q XER SPEED, % (7 -d 8/12/03 POLYMER USAGE YPE USED ANKS MIXED ` • f / 14"(14 TWSA LIME. STABILIZATION. DAILY RECORD DATE' lI rg A M 41 ClTAP - RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED °% SOLIDS LIME/SLUDGE RATIO Inlet reached temp y. Outlet reached temp @ . d_ PATHOGEN REDUCTION TEMPERATURE OF VECTOR -ATTRACTION REDUCTION TIME �y� ; OPERATOR- 3_0 INITIAL PH- 2- HRS. =/'= 02 14 22 HRS... OPERATIONAL 3ELT PRESS SPEED, % 'OLYMER PUMP SPEED, % 'LUDGE PUMP SPEED, % :JT_ GPM FEED AUGER, % G j LBS/HR o� IIXER SPEED, % vised 8/12103 ................ POLYMER USAGE YPE USED - c' ANKS MIXED ILITERS/TANK � h 5� � � lb RUN TIME, HRS SLUDGE FEED, GAL. LIME FEED, LBS TWSA LIME STABILIZATION DAILY RECORD DATE (� START STOP TOTAL TON SLUDGE FEED % SOLIDS p I PRESS, % SOLIDS LIME/SLUDGE RATIO 1 TOTAL PRODUCTION, DRY TONS Q Inlet reached temp @ ` r /J=l`) k+ eZJVLe a� Outlet reached temp @ PATHOGEN REDUCTION . VECTOR ATTRACTION REDUCTION TIME OPERATOR INITIAL PH 2 HRS. ��- C64C 1 22 HRS._ OPERATIONAL 3ELT PRESS .SPEED, % 'OLYMER PUMP SPEED, % s >LUDGE PUMP SPEED, % GPM FEED AUGER, IIXER SPEED, % / 6 0 wised 8/12/03 POLYMER USAGE YPE USED ANKS MIXED AWL 2. q85 TWSA LIME STABILIZATION! DAILY RECORD j DATE _ 9-11 0 Lf START STOP TOTAL RUN TIME, HRS . DRY TON SLUDGE FEED, GAL (1� "�� L/no5 ,� fl\ <-) LIME FEED, LBS SLUDGE FEED °% SOLIDS o f PRESS, % SOLIDS LIME/SLUDGE RATIO °CJ TOTAL PRODUCTION, DRY TONS EU= Inlet reached temp @ Outlet reached temp @ e PATHOGEN REDUCTION TEMPERATURE of VECTOR ATTRACTION. REDUCTION INTO . OUT OF TIME VESSEL VESSEL OPERATOR TIME OPERATOR 3 -'10INITIAL PH �10 2 HRS. / 22 HRS. >9; OPERATIONAL POLYMER USAGE . BELT PRESS SPEED, % FA USED C 'OLYMER PUMP SPEED, MIXED SLUDGE PUMP SPEED, % GPM jFEED AUGER, %yILBS/HR /TANK 10 AIXER SPEED, % evised 8/12103 a RUN TIME, HRS SLUDGE FEED, GAL TVVSA LIME STABILIZATION DAILY' RECORD DATE' 1916 4, START STOP 'TOTAL DRY TON LIME. FEED, LBS ----------- SLUDGE FEED % SOLIDS s PRESS, % SOLIDS[ LIME/SLUDGE RATIO TOTAL PRODUC TION, DRY TONS c Inlet reached temp @ Igo kf3 Outlef reached temp @ PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION . TF=KfiP;=PATJ IP;= -_WE * INTO VESSEL OUT OF VESSEL OPERATOR 21f 62 IQ� ( 0-40 1 "o TIME OPERATOR- 7- INITIAL PH 2 HRS. 22 HRS. . ............ : ............ I ................ i ............... I .......... ............... ................................................. ............................... OPERATIONAL �2 <7 BELT PRESS SPEED, % POLYMER PUMP SPEED, % SLUDGE PUMP SPEED, % q GPM_ Lr'- FEED AUGER, LBS/HR MIXER SPEED, % 106 Revised 8112103 ................................................ : ............................. POLYMER 'USAGE YPE USED C, ANKS MIXED .ITERSITAN" q�- 9 [615 TWSA LIME STABILIZATION DAILY RECORD DATE___j START STOP TOTAL RUN TIME,.HRS SLUDGE FEED, GAL LIME. FEED, LBS TON SLUDGE FEED % SOLIDS -PRESS., %SOLIDS L I ]ME/SLUDGE RATIO TOTAL PRODUCTION, DRY TONS Inlet reached temp Outlet reached temp PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION ION /61 TIME #F. OP OPERATOR INITIAL PH - �- -�� 2 HRS. 37 22 HRS. .................................. : ........... I .................. : ................................................................................................... OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, % SLUDGE PUMP SPEED, % e7v GPM , 17 FEED AUGER, LB S/HR 13' AfX_ER SPEED,% !evised 8112103 1 ............................................................. 7 .......................... POLYMER USAGE TYPE USED TANKS MIXED 9.1 9 (0- . 1,03 TWSA LIME STABILIZATION DAILY RECORD DATE START STOP TOTAL RUN TIME, HRS ISLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED °% SOLIDS PRESS , °% SOLIDS[::::���� LIME/SLUDGE RATIO TOTAL PRODUCTION, DRY TONS O e Inlet reached temp 0 Outlet reached temp @ PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION TEMPERATURE of _ v INTO OUT -OF Poi TIME VESSEL VESSEL oPERATOR TIME 1�'6 OPERATOR C 7 ? - ' INITIAL PH 1A. • �-$'� 2 HRS. r o3A� 22 HRS. OPERATIONAL BELT PRESS SPEED, % - POLYMER PUMP SPEED, % . SLUDGE PUMP SPEED, % - (� GPM oO FEED AUGER, %° LBS/HR AIXER SPEED, % revised 8/12103 .--................................................................... POLYMER USAGE YPE USED 02 ANKS MIXED LITERS/TANK 14d0'3 TWSA LIME STABILIZATION DAILY RECORD ( DATE START STOP TOTAL s RUN TIME, HRS �.'� f n AA DRY TON SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED °% SOLIDS ® PRESS, °% SOLIDS LIME/SLUDGE RATIO �m TOTAL PRODUCTION, DRY TONS Inlet reached temp @ Outlet reached temp @ PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION TEMPERATURE of TIME 4 INTO VESSEL . OUT OF VESSEL OPERATOR I S� 1-�sco ffi / g qq Co aq 1 qq CD Jet TIME �a OPERATOR -` S. INITIAL PH 01 2 HRS. 22 HRS..' . OPERATIONAL BELT PRESS SPEED, .% -' l 6' POLYMER PUMP SPEED, % SLUDGE PUMP SPEED, % 0- GPM I• I I- eC FF_FD AUGER.. % LBS/HR .. I Ur JUIAL '1RUN TIME, HRS 60 SLUDGE FEED, GAL LIME, FEED, LBS V s SLUDGE FEED % SOLIDS PRESS, % SOLIDS[ LIME/SLUDGE RATIO TOTAL PRODUCTION, DRY TONS 9& 0 Inlet reached. temp @ F7O 6 0 71 Outlet reached temp PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION TEMPERATURE of` TIME ',i� INTO VESSEL OUT OF 'VESSEL OPERATOR r3 _5 �� 61. C CIO &62 '96A CIO 3`0 I'K7 'I `ace j i 7 TIME OPERATOR-', /0 -INITIAL PH*' S Jk7— - 2* HRS 3! /0 22 HRS. ................ ................................................... ...... ................. ...... : ................................ ............................ OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, % 146 SLUDGE PUMP S'PEED, % 0 GPM 73. L FEED AUGER, % LB 'S/H MIXER SPEED, % Revised 8/12/03 POLYMER USAGE TYPE USED TANK S MIXED ANK 9`�a�l� ohs RUNTIME, HRS SLUDGE FEED, GAL LIME FEED, LBS TWSA LIME STABILIZATION ' DAILY RECORD DATE START STOP TOTAL m SLUDGE FEED °% SOLIDS. `: O LIME/SLUDGE RATIO Inlet reached temp @ o Q Outlet reached temp @ ° PATHOGEN REDUCTION TFI1If[�F{?eT� roc „� TIME INTO VESSEL OUT OF VESSEL OPERATOR f: 63 1 0 113 OPERATIONAL BELT PRESS SPEED, % 30. 37, POLYMER PUMP SPEED, % SLUDGE PUMP SPEED, % GPM �13 L j FEED AUGER, %_ . LBS/HR �a MIXER SPEED, % I 0 0 PRESS ; °% SOLIDS E:== TOTAL PRODUCTION, DRY TONS VECTOR ATTRACTION REDUCTION TIME J .4W OPERATOR i �J INITIAL PH_Z�ff � 2 HRS. a�® 22 HRS. Revised 8/12/03 POLYMER USAGE PE USED TANKS MIXED LLITERSITANK TWSA LIME STABILIZATION DAILY RECORD DATE START STOP TOTAL RUN TIME, HRS 9 a ° DRY TON SLUDGE FEED, GAL Jo k q LIME FEED, LBS ( .33 SLUDGE FEED °% SOLIDS PRESS, °% SOLIDS LIME/SLUDGE RATIO TOTAL PRODUCTION, DRY TONS Inlet reached temp a@ A e � Outlet reached temp @ . 69 PATHOGEN REDUCTION TFMPFRATURF nF TIME INTO VESSEL OUT OF VESSEL OPERATOR &0 11�6 C lCU 'I qs C-10 VECTOR ATTRACTaN REDUCTION iY\3 TIME �' y �- ®.� $jam = �a a 1' OPERATOR INITIAL PH 2 HRS. Cp % 22 HRS. OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, %' SLUDGE PUMP SPEED, % GPM U1" FEED AUGER, % _ LBS/HR MIXER SPEED, % 1 Revised 8I12/03 POLYMER USAGE' UC�SAGE ` TYPE USED,3,39 C TANKS MIXED ANK /�1:9& /65 TWSA LIME STABILIZATION DAILY RECORD DATE CD' START STOP TOTAL: RUN TIME, HRS DRY TON SLUDGE FEED, GAL �. c LIME FEED, LEIS a" SLUDGE FEED % SOLIDS PRESS , % SOLIDS ------------- LIME/SLUDGE RATIO ' ® �' TOTAL PRODUCTION, DRY TONS C Inlet reached temp @ aq Outlet reached temp @ 7 PATHOGEN REDUCTION VECTOR TTRACTION REDUCTION TEMPERATURE of -TIME 7-7 INTO - VESSEL' OUT OF VESSEL. OPERATOR C�%50 lq# as �a .e3A( d3 .l is ; _ r" TIME OPERATOR :ad INITIAL PHIst 1� ►LP f�j P [� . � 2 HRS. . )4 22 HRS. �ED OPERATIONAL BELT PRESS SPEED, % 3S POLYMER PUMP SPEED, o° �SV SLUDGE PUMP SPEED, % 0 GPM. c3 L!' FEED AUGER, % l LBS/HR� CP�% MIXER SPEED, % /DD " Revised 8112/03 - POLYMER USAGE TYPE USED TANKS MIXED LITERS/TANK ,5e r/ lb i RUN TIME, HRS SLUDGE FEED, GAL TWSA LIME STABILIZATION DAILY RECORD d' DATE c START STOP TOTAL. LIME FEED, LBS SLUDGE FEED °% SOLIDS PRESS, °% SOLIDS LIME/SLUDGE RATIO J-- TOTAL PRODUCTION, DRY TONS 5 Inlet reached temp @ F Outlet reached temp PATHOGEN REDUCTION , VECTOR ATTRACTION REDUCTION TDneDPRATI P;= nF .TIME INTO VESSEL OUT OF VESSEL OPERATOR 60 a f, � .. it �I ll 07 /�— U. 9 Q - V �o / 75' TIME ��, —, /S-6 = �� - OPERATOR `1P INITIAL PH /d- 2 HRS/. les— Al /O 22 HRS._ OPERATIONAL BELT PRESS SPEED, '% 3 POLYMER PUMP SPEED, % `T SLUDGE PUMP SPEED, % GPM L_r_ LI' FEED AUGER; %1 LBS/HR MIXER SPEED, % Revised 8/12/03 POLYMER USAGE TYPE USED .?&;) TANKS MIXED tM ANK TWSA LIME STABILIZATION all DAILY RECORD' DATE •/ /ho START STOP TOTAL RUN TIME, HRS ' DRY TON SLUDGE FEED; GAL LIME FEED, LBS J�.J SLUDGE FEED °% SOLIDS �b PRESS, % SOLIDSE::::� LIME/SLUDGE RATIO .. 4 D L TOTAL PRODUCTION, DRY TONS ® s Inlet reached temp Outlet reached temp @. 4 PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION TEMPERATURE of TIME INTO VESSEL OUT OF VESSEL. OPERATOR. 103L5 A �.b ! .s- 1eq Ar TIME IS _ /,L y OPERATOR 'e�Ca INITIAL PH lig 15� 7) :s..,3 _ /,r 2 HRS. 3' 22 HRS. I Al UHLRATIONAL BELT PRESS SPEED, % 37 POLYMER_PUMP SPEED, %. SLUDGE PUMP SPEED, % 9-5 GPM a t> L)E FEED AUGER, % 50 LBS/HR ' MINCER SPEED, .% / p o POLYMER USAGE TYPE USED 33 -�, C_ ANKS MIXEDVAL TWSA LIME -STABILIZATION S" q DAILY RECORD } DATE START STOP TOTAL RUN TIME, HRS.' �oZ> -7 DRY TON SLUDGE FEED, GAL•�u, (� LIME FEED, LBSga SLUDGE FEED °% SOLIDS o PRESS, °% SOLIDS LIME/SLUDGE RATIO a) TOTAL PRODUCTION, DRY TONS e Inlet reached temp Outlet reached temp @ i PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION TEMPERATURE OF TIME INTO VESSEL OUT OF VESSEL oPERATOR 60 CIO -7if,3f l ff OPERATIONAL BELT PRESS SPEED, '% s3 POLYMER PUMP SPEED, SLUDGE PUMP SPEED, % 75' GPM ' LIME FEED AUGER, % LBS/HR Owl TIME /. =���6� OPERATOR DES' INITIAL PH Ica 1477 2 HRS. r-.s '- a ya m 22 HRS. TWSA LIME STABILIZATION DAILY RECORD' DATE START STOP TOTAL RUN-TIME, HRS DRY TON SLUDGE FEED, GAL LIME. FEED, LBS SLUDGE FEED .% SOLIDS t PRESS-,ObSOLIDS I !m I LIME/SLUDGE RATIO c TOTAL PRODUCTION, DRY TONS • Inlet reached temp Outlet reached temp @ PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION' TEMPERATURE of TIME -, Atp INTO :VESSEL OUT OF 'VESSEL OPERATOR � �, � Ise. q4 A 1)0 3r TIME OPERATOR INITIAL PH ' 2* HRS. 22 HRS. 1165 ................ ..................... ......................... .............................................................. ........................ ................... ................. ....... ............................ .... .... ................ ....... OPERATIONAL POLYMER USAGE BELT PRESS SPEED, % TYPE USED c2 C— POLYMER PUMP SPEED, % J S ANKS M.IXEDmilift SLUDGE PUMP SPEED, % GPM Ll UIE FEED AUGER, % S LBS/HR LITERS/TANK SLUDGE FEED, GAL. CJ Iwo 70—(-If I LIME FEED, LBS SLUDGE FEED % SOLIDS, d PRESS ,.% SOLIDS LIME/SLUDGE RATIO, lei rl..r TOTAL PRODUCTION, DRY TONS 9.1.q oq Inlet reached temp Outlet reached temp PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION TEMPERATURE of -)� = 7.7 -A I --TIME INTO VESSEL OUT OF VESSEL 'OPERATOR A '17 -7 o19 fig/OPERATOR- TIME INITIAL PH. A-5 14 2 HRS. z 22 HRS. . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .... . .. . . . . . .. . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...... ....................................... OPERATIONAL BELT PRESS SPEED, POLYMER PUMP SPEED, % Z-7 SLUDGE PUMP SPEED, % GPM 7�lel/ LIME FEED AUGER, % LBS/H MIXER SPEED, % Revised 8112103 POLYMER USAGE TYPE USED TANKS MIXED 71.4J 11[: LITERS/TANK TWSA LIME STABILIZATION DAILY RECORD' DATE START STOP TOTAL RUN TIME, HRS " /.:'J ! O SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED °% SOLIDS PRESS, °% SOLIDS LIME .SLUDGE RATIOTOTAL PRODUCTION, DRY TONS c Inlet reached temp @ �' GA` Outlet reached temp PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION TFi1rtPFRATI IF2F nF ,d ay ;TIME INTO VESSEL OUT OF. VESSEL . OPERATOR /0' g 0 60 4f' .D �J � kLI TIME i,� --r %� = ��°� OPERATOR 'L )p INITIAL PH' a 2 HRS. d 03(cb - a)-3) 22 HRS. Y t :............. ................................ ....... .......... .............. ;........................................................................... OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP.. SPEED, % SO SLUDGE PUMP SPEED, % _ 7 GPM -7 L1104E FEED AUGER, % LBS/HR f o� 7 �© .MIXER SPEED, Revised 8112/03 POLYMER USAGE TYPE USED Q TANKS MIXED TWSA LIME STABILIZATION DAILY RECORD' G �s `4e DATE START STOP TOTAL �s RUN TIME, HRS I i F il 4 SLUDGE FEED, GAL LIME FEED, LBS V SLUDGE FEED °% SOLIDS • . PRESS , °% SOLIDS ,LIME/SLUDGE RATIO TOTAL PRODUCTION, DRY TONS Inlet reached temp @ �= Outlet reached temp PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION TFMPFPATI IPF of 7 A it jA '.4 — 17 TIME INTO VESSEL OUT OF VESSEL OPERATOR P/A 1q l qs...y� '_07 TIME 1 �j��� Da"7 1 a 3 OPERATOR c� S� INITIAL PH / d' l�-,S � p p•� i= /�- j/ 2 HRS. 22 HRS. JaCIO OPERATIONAL' BELT PRESS SPEED, %;, .-5" POLYMER PUMP SPEED, % SLUDGE PUMP SPEED, % GPM= LIME FEED AUGER, % '3 ol- LBS/HR MC&ER SPEED, % �to Revised 8112/03 POLYMER USAGE TYPE USED TANKS MIXED b . ANK TWSA LIME STABILIZATION DAILY RECORD r q DATE P 1 . START. STOP TOTAL RUN TIME, HRS DRY TON SLUDGE FEED, GAL Jf LIME FEED, LBS b� f SLUDGE FEED °% SOLIDS r__( PRESS , °% SOLIDS . LIME/SLUDGE RATIO TOTAL PRODUCTION, DRY TONS 4 4 inlet reached temp @ 1 A " o Outlet reached temp PATHOGEN REDUCTION VECTOR ATTRACTION REDUiCTaIOirN. r=nno=DATI IRF nF n ® ` l r=J l� t 03 r 3q TIME INTO VESSEL -OUT OF VESSEL OPERATOR J_L_� TIME ja OPERATOR, - INITIAL PH 40 2 HRS.. C 'o - J - sy, 22 HRS. ?? OPERATIONAL BELT PRESS SPEED, % �7 POLYMER PUMP SPEED:, %� SLUDGE PUMP SPEED, % GPM LIME FEED AUGER, % `4 D LBS/HR � C®� MrxER SPEED, Revised 8/12/03 POLYMER USAGE TYPE USED TANKS MIXED 1 13 Im ,:Y23ti�Y TWSA LIME STABILIZATION : DAILY RECORD DATE TT -sue _ J ����r>�► a°!� ' START STOP TOTAL RUN TIME, HRS SLUDGE FEED, GAL DRY TON LIME FEED, LBS SLUDGE FEED % SOLIDS 6 PRESS, SOLIDS LIME/SLUDGE RATIO TOTAL PRODUCTION, DRY TO Inlet reached temp Q. F71+ !'� Outlet reached temp @ PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION rCRR:)CDATI fRF nF li' 3 (I'T — TIME c f INTO .VESSEL OUT OF VESSEL .OPERATOR r. TIME /�i.� ��7 ' " OPERATOR- i� INITIAL PH `f' �� _r7• '7J % �f = r A *0 2 HRS d al y �.� HRS..:: . 22 OPERATIONAL ' BELT PRESS SPEED, % POLYMER PUMP SPEED, O/o SLUDGE PUMP SPEED, % S GPM 2 e LIME FEED AUGER, % LBS/HR MIXER SPEED, % Revised 8/12103 POLYMER USAGE TYPE USED 33 0" C- TANKS.MIXED AN TWSA LIME STABILIZATION DAILY RECORD DATE START STOP TOTAL RUNTIME, HRS DRY TON SLUDGE FEED, GAL 6, o� -7 LIME FEED, LBS SLUDGE FEED % SOLIDS =PRESS , % SOLIDSF LIME/SLUDGE RATIO 0 TOTAL PRODUCTION, DRY TONS 110 U, Inlet reached temp Outlet reached temp @ _q PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION' of I if r7 Of ,TEMPERATURE -, I TIME INTO VESSEL OUT OF VESSEL OPERATOR F;33 )23 rsci E� No a® Z3 AT 71a� dle • TIME OPERATOR - INITIAL -PH' 0_9 As- tr) S� F 16s- Ljr— 2 HRS. Wa_ 22 HRS.:. -------------- ............................................................ ........... .................................. .............. ....... .................. ............................................. OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED,.% SLUDGE PUMP SPEED, % GP .1 1 PL BE: c7c: =n A I lr'-F=P 0/,FS LBS/HR POLYMER USAGE TYPE USED , 33 TANKS MIXED TWSA LIME STABILIZATION DAILY RECORD DATE START STOP TOTAL .RUN TIME, HRS If ' m 1. .1. DRY TON SLUDGE FEED, GqL-71 s� LIME FEED, LBS M SLUDGE FEED % SOLIDS r PRESS , % SOLIDS LIME/SLUDGE RATIp C 1 TOTAL PRODUCTION, DRY TONS qI / Inlet reached temp 9173 3 • Outlet reached temp @ • PATHOGEN REDUCTION VECTOR ATTRACTION REDUCTION rz= 0=0ATI Ipp nF TIME °ce%� INTO VESSEL OUT OF VESSEL OPERATOR / ` 84 o -5 a" TIME �� ^~. /� = /�-3 9'3 OPERATOR INITIAL PH jal�?d 2 HRS_ 22 HRS. OPERATIONAL BELT PRESS SPEED, % 3 ' POLYMER PUMP SPEED, % SLUDGE. PUMP SPEED, % GPM (- LIME FEED AUGER, % LBS/HR Fl / MiAER SPEED, % Y Revised 8112103 POLYMER USAGE TYPE USED S �� TANKS MIXED LITERS/TANK TWSA LIME STABILIZATION DAILY RECORD DATE -5—/ / / 1 a 4 Y, & 3 RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO Inlet reached temp @ Outlet reached temp @ 1 ! a. �7 PATHOGEN REDUCTION TFIIAPFRATI IRF nF I �11/1 I I I 1�101), TIME INTO VESSEL OUT OF VESSEL OPERATOR dip, 0 CIO PRESS, % SOLIDS - TOTAL PRODUCTION, DRY TONS OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, % 3 -7 VECTOR ATTRACTION REDUCTION TIME / o�- �'-'� 01? = $%4 �3 OPERATOR INITIAL PH l� "4 C _ 2 HIRS. ` 22 HRS. 29� SLUDGE PUMP SPEED, % GPM go • le — LIME 1 FEED AUGER, % LBS/HR -Z f1S. R SPEED, % 400 Revised 8/12/03 USAGE rYPE USED 3�3 TANKS MIXED 10,5;?", - ;� /65 N TWSA LIME STABILIZATION DAILY RECORD DATE RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS o LIME/SLUDGE RATIO Inlet reached temp @ —( Outlet reached temp @ 1 / r PATHOGEN REDUCTION TEMPERATURE of 1E INTO VESSEL OUT OF VESSEL OPERATOR I ? o / 59 E W;513 1914. 1, c a �C PRESS , % SOLIDS TOTAL PRODUCTION, DRY TONS s, VECTOR ATTRACTION REDUCTION TIME %�. �'� a�`s ' ��/ ��r OPERATOR �. INITIAL -PH o� 03(as—;Lqj) —j?=,o�.f 2 HRS. a� 22 HRS. OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, % SLUDGE PUMP SPEED, % % GPM LI111" TEED AUGER, %LBS/HR 42 MIXER SPEED, % % do I POLYMER USAGE I rYPE USED 3 TANKS MIXED AN I1(,& L(o5 Revised 8112103 TWSA LIME STABILIZATION DAILY RECORD DATE RUN TIME, HRS TOTAL 2 ^� DRY�T/ON p SLUDGE FEED, GAL � 0 0 3 a LIME FEED, LBS o 19,13 e V D SLUDGE FEED % SOLIDS �� O LIME/SLUDGE RATIO Inlet reached temp Outlet reached temp @ I C1 "o 1-5 PATHOGEN REDUCTION TFMPFRATI IRF nF j 7E INTO VESSEL OUT OF VESSEL OPERATOR B �13 hr- s-v-3 /e-7 / i� 14K •-_ �t •►I BELT PRESS SPEED, % POLYMER PUMP SPEED, % •jc- PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS q 57 VECTOR ATTRACTION REDUCTION TIME ,��f os'! = i�.�/�� OPERATOR INITIAL PH /�' S" t- 2 HRS. .63 -do, a 22 HRS. SLUDGE PUMP SPEED, of 0 GPM LIAR -ED AUGER, % LBS/HR (/ , 4 MIXER SPEED, % /60 I POLYMER USAGE I YPE USED ,. 33 9 c-- ANKS MIXED AN (q\QQ 1bs Revised 8/12/03 TWSA LIME STABILIZATION DAILY RECORD DATE START RUN TIME, HRS SLUDGE FEED, GAL STOP LIME FEED, LBS SLUDGE FEED % SOLIDS 1 LIME/SLUDGE RATIO Inlet reached temp.@ Outlet reached temp PATHOGEN REDUCTION TFIUIPF=PATI IRF nF r- jE 7-3 INTO VESSEL OUT OF VESSEL OPERATOR Ar PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS . OPERATIONAL BELT PRESS SPEED, % `1 6 POLYMER PUMP SPEED, % q VECTOR ATTRACTION REDUCTION � /�-r.�;--�� � . > _ •tea TIME l cr" oal �'`mil OPERATOR C>2i'?C:) 3 8� INITIAL P % S,F,da�_ �,�:A, 7 3 2 HRS. a 4':'6 22 HRS. t. , 6 (1-LAO wp pn_70 GPM SLUDGE p Lll ,jtED AUGER, LBS/HR • d.^e�3 MIXER SPEED, % 0 I POLYMER USAGE I E USED 13 -off' - KS MIXED %k," Revised 8/12/03 LT-rA TWSA LIME STABILIZATION " DAILY RECORD DATE P/ r / 0 14 START STOP TOTAL RUN TIME, HRS W - o -� !'N 'o SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO OU a Inlet reached temp 0 Outlet reached temp @ •� PATHOGEN REDUCTION --- TF.MPFRATURE of ( CIE 9 3 0 INTO VE(S�'SEL OUT OF OPERATOR 9 VESSEL eo— d s'35-.- U-0 l� PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS - ............ ��OPERATIONAL BELT PRESS SPEED, % �T 3 POLYMER PUMP SPEED, % SLUDGE PUMP SPEED, % GPM LIA. ..� EED AUGER, % ��. Z5 LBS/HR MIXER SPEED, % ' o b DRY TON VECTOR ATTRACTION REDUCTION TIME qt ay8 OPERATOR a: 10 INITIAL PH 03 (.L-r of = 1 = t o3 a,S f a3.� lolRS3 2 HRS. �la 22 HRS. I Z -s POL TYPE USED 3,5 G TANKS MIXED joa-a (b5 Revised 8/12103 TWSA LIME STABILIZATION DAILY RECORD DATE I� D START STOP TOTAL RUN TIME, HRS & e-3 - VX— '/, r1,5— DRY SLUDGE FEED, GAL ' Q )—o 0 � l LIME FEED, LBS SLUDGE FEED % SOLIDS . g PRESS , % SOLIDS PATHOGEN REDUCTION J.,,. VECTOR ATTRACTION' REDUCTION TFMPFRATI IRF nF, IE INTO VESSEL OUT OF:.,.; VESSEL- "OPERATOR iSL? c it 95 19 :. Zj OPERATIONAL IME %v�.�' , ov' !` /oL �,s-� OPERATOR y. - INITIAL PH = 2 HRS. 22 HRS. -� BELT PRESS SPEED, % 3 POLYMER PUMP SPEED, % SLUDGE PUMP SPEED, % -70 }Gann C& _ ,EED AUGER, LBS/HR Y _ MIXER SPEED, % Revised 8/12/03 POLYMER USAGE PE USED 3 1 3 TANKS MIXED LITERS/TANK TWSA LIME STABILIZATION DAILY RECORD DATE (o 116 4 START RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO o 2,T1 Inlet reached temp @ I i i 3-0 Outlet reached temp @ ti PATHOGEN REDUCTION TFMPFRATI IRF nF ( SAE INTO VESSEL OUT OF VESSEL OPERATOR C: 06 O l rim )_03 a o 1 6 � `o . I 0`o %Ld STOP DRY TON PRESS, °,6 SOLIDS TOTAL PRODUCTION, DRY TONS 1 3 o VECTOR ATTRACTION R DUCTION TIME %�-"T t • /�•Y�� OPERATOR INITIAL PH� 2 HRS.' 3rs.� 22 HRS. OPERATIONAL BELT PRESS SPEED, % "S POLYMER PUMP SPEED, % -6-, SLUDGE PUMP SPEED ,% S -7 GPM gI, j Uk !EED AUGER, % 3 0 LBS/HR l7 MIXER SPEED, % 00 Revised 8/12103 POLYM TYPE USED TANKS MIXED TWSA LIME STABILIZATION DAILY RECORD DATE START STOP TOTAL RUN TIME, HRS �` �� �� o � �._._ � / SLUDGE FEED, GAL LIME FEED, LBS 1 0 SLUDGE FEED % SOLIDS CJ a 1 LIME/SLUDGE RATIO Inlet reached temp @ Outlet reached temp @ PATHOGEN REDUCTION "LQ -711 PRESS , % SOLIDS E::::= TOTAL PRODUCTION, DRY TONS . VECTOR ATTRACTION REDUCTION TIME ��, y o g . �1 y OPERATOR `l® INITIAL PH l;L- s,- t- . 10IF--- /d.dear 2 HRS. -- 22 HRS.�s .................................................................... OPERATIONAL r ELT PRESS SPEED, % �{ OLYMER PUMP SPEED, % 5 _URGE PUMP SPEED % P FEED AUGER, % 3 LBS/HR I XER SPEED, % D sed 8/12103 POLYMER I Igor=� YPE USED ?3� t✓ ANKS MIXED /#b J6s TWSA LIME STABILIZATION DAILY RECORD DATE _ 7> Ica /D ST RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS I C(, 5 LIME/SLUDGE RATIO Inlet reached temp @ Outlet reached temp @ I q.P PATHOGEN REDUCTION TFMPF:PATI IPP: nF IE q- INTO VESSEL' OUT OF VESSEL OPERATOR D� ao . .�� 10-7 kr 1 OPERATIONAL BELT PRESS SPEED, % PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS b POLYMER PUMP SPEED, % SLUDGE PUMP SPEED, % GPM LIN )EED AUGER, %- LBS/HR MIXER SPEED, % _ 00 Revised 8112103 VECTOR ATTRACTION REDUCTION TIME a 4 7�-- /4 e = IX.-S"42' OPERATOR INITIAL PH �. y 2 HRS. 1 _O 22 HRS. I POLYMER USAGE I TYPE USED ly o C- TANKS MIXED / 1,!5-r g", tb 5 TWSA LIME STABILIZATION DAILY RECORD C DATE® RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS TON 0 1 q:?, 7ed I I `,~'_ "-z' d ao3 5-"oa LIME/SLODGE RATIO I ,� Inlet reached temp @ gz a 5 Outlet reached temp @ p� PATHOGEN REDUCTION TFMPFRATI IRF nF 1E INTO VESSEL OUT OF VESSEL OPERATOR lb,tgO A64 d, /;Z;SD oq C20 to C--,j a IDS Co -li PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS v VECTOR ATTRACTION REDUCTION Ir `� '_ � e" = .oFf, f'f3 l2-s a- • q) TIME %)_• y ,�.; ci Tq !-� /}" Vf f OPERATOR �-''03 INITIAL PH 1103 Cu—, W. () = O 2 HRS. nd4 22 HRS. .............................................. ........................................................................................................ OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, % (QO SLUDGE PUMP SPEED, % GP!l^ (¢ LIP. fEED'AUGER, % 3 I LBS/HR O Ib MIXER SPEED, % J-06 Revised 8/12/03 POLYMER USAGE TYPE USED �_ 3 Q C—' TANKS MIXED LITERS/TANK f1-16,g' TWSA LIME STABILIZATION DAILY RECORD M l DATE rl LlfLo ' J` RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS START STOP TOTAL s aD 1 -7j 1/,5-- 1 1 1..4 SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO Inlet reached temp @ Outlet reached temp @ PATHOGEN REDUCTION TFMPFRATI IRF nF G lE /:34tp INTO VESSEL OUT OF VESSEL OPERATOR Q04? ISO eo 103). /q3 Iq Co C-4 -713 OPERATIONAL BELT PRESS SPEED, % 3 7 POLYMER PUMP SPEED, % FLO TON PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS l 0 d VECTOR ATTRACTION REDUCTION �.� TIME /�� �'�'� OPERATOR 3'1NITIAL PHA 2 HRS. -1/0 ' 22 HRS. SLUDGE PUMP SPEED, % 0 GPM . -3 LIIY TEED AUGER, % LBS/HR $6�- MIXER SPEED, % / 6 0 Revised 8/12103 POL YPE USED 23a ANKS MIXED AN Ib6.lQ 1bs TWSA LIME STABILIZATION r DAILY RECORD DATE 4U START RUN TIME, HRS /®•. SLUDGE FEED, GAL LIME FEED, LBS N 1 ,cam 1 3�1/ 1 1 1'aq I SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO e_ Inlet reached temp @ Outlet reached temp @ �zI PATHOGEN REDUCTION TEMPERATURE of IE INTO VESSEL OUT OF VESSEL OPERATOR 3 o , PRESS, % SOLIDS_ TOTAL PRODUCTION, DRY TONS Q3. 4 S VECTOR ATTRACTION REDUCTION TIME ��_r t Jp� _ /.L(°�' OPERATOR INITIAL PH 2.HRS. %a"IfQ 3 yg 22 HRS. 1 OPERATIONAL BELT PRESS SPEED, % k� POLYMER PUMP SPEED, %y SLUDGE DGE PUMP SPEED, % �V GPM 6 �1 7 LII TEED AUGER, % rJLJ LBS/HR J0 MIXER SPEED, % Ida a Revised W12/03 POLYMER USAGE TYPE USED 3,39C TANKS MIXED Ill. I - ANK RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS TWSA LIME STABILIZATION DAILY.RECORD DATE co L/ TART STOP TOTAL :3D `7.'30 g ixx TON I 0 1 6393 1 &. I SLUDGE FEED % SOLIDSe LIME/SLUDGE RATIO O Z T, Inlet reached temp @ -00 Outlet reached temp PATHOGEN REDUCTION TEMPERATURE nF `1E . D INTO VESSEL OUT OF VESSEL OPERATOR %� cp,©q (9,01p CD PRESS, °% SOLIDS AL PRODUCTION, DRY TONS VECTOR ATTRACTION REDUCTION TIME !� O 8� ` ' OPERATOR Q) INITIAL PH 2 HRS. 1 �S ,o3 aoo3 c= 22 HRS. ...................................................... ....................................................................................................... OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, % �1 SLUDGE PUMP SPEED, % 60 GPM ��I LI%, _:r'EED AUGER, % LBS/HR MIXER SPEED, % J DD Revised 8112/03 POLYMER USAGE TYPE USED 33 a C, TANKS MIXED 'y7.6- i6-5 RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS TWSA LIME STABILIZATION DAILY RECORD DATE . Vh D 0 y START STOP TOTAL DRY TON C2 , r?oo 0 Ej SLUDGE FEED % SOLIDS O( « LIME/SLUDGE RATIO I _ Inlet reached temp @ ' Outlet reached temp @ PATHOGEN REDUCTION TEMPERATURE of j 1E INTO .VESSEL OUT OF VESSEL OPERATOR "f,2 l9s- BELT PRESS SPEED, % OPERATIONAL 4 PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS VECTOR ATTRACTION REDUCTION TIME /� S ,�.46f° /�-SF/� OPERATOR INITIAL'PH s-f-°rf 2 HRS. V30 22 HRS. POLYMER PUMP SPEED, % SLUDGE PUMP SPEED % GPM —7 Q LI11i.., ."'EED AUGER, %_ 39 LBS/HR MIXER SPEED, % 0 0 Revised 8112103 POLYMER USAGE TYPE USED TANKS MIXED fi'Da•a (b5 TWSA LIME STABILIZATION DAILY RECORD DATE START RUN TIME, HRS TOTAL DRY TON SLUDGE FEED, GAL L 0 I 33 LIME FEED, LBS 1 .0 1 /d, 7 SLUDGE FEED % SOLIDS �o LIME/SLUDGE RATIO a D +— Inlet reached temp @ I �� q Outlet reached temp @ PATHOGEN REDUCTION TFMPF_RATURF of 1E INTO VESSEL OUT OF VESSEL OPERATOR 107 io3 h-- PRESS, % SOLIDS_ TOTAL PRODUCTION, DRY TONS • 3 5r VECTOR ATTRACTION REDUCTION a315 TIME /J� �� �' _ 12"j"4'OPERATOR OPERATIONAL BELT PRESS SPEED, % 3 6 POLYMER PUMP SPEED, % f O SLUDGE DGE PUMP SPEED, % T7 GPM - /iV ../O 9 Llk,__-TEED AUGER, % �lT— LBS/HR MIXER SPEED, % 490 Revised 8/ 12/03 INITIAL PH j�- f 03 C — 3� J1,3 = .03% /�. S f' a. J-3,7 2 HRS. 22 HRS. ��• L TYPE USED 2- 9 C. TANKS MIXED f,o'9.;L, TWSA LIME. STABILIZATION DAILY RECORD START RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO ° Inlet reached temp @ 9 ©(� Outlet reached temp @ I o PATHOGEN REDUCTION TEMPERATURE of E C)��� INTO VESSEL OUT OF VESSEL OPERATOR jqlf 3% 3 11 h v`•l33 �, -19g, U� Ar DATE -�a, -T-'� AWN PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS 1 O ° 8 VECTOR ATTRACTION REDUCTION . 03().f )S-3 ®, = .o 9 TIME /)--"/ f- ° 9' /,.q.,qOPERATOR <� 3 d INITIAL PH16,77) O 2 HRS. 30 22 HRS. OPERATIONAL BELT PRESS SPEED, % q 49 POLYMER PUMP SPEED, % ` C! SLUDGE PUMP SPEED, % GPM WIL NEED AUGER, LBS/HR MIXER SPEED, % 0 0 Revised 8/12103 ........................._........................................................ POLYMER USAGE PE USED o� TANKS MIXED TWSA LIME STABILIZATION DAILY RECORD DATE _ % ,2- S)O e f ART P ' - 1 RUN TIME, HRS SLUDGE FEED, GAL ,LIME FEED, LBS 0 �r 3 '5-�e TOTAL SLUDGE FEED % SOLIDS LA PRESS, °% SOLIDS[::::::::::= LIME/SLUDGE RATIO EDV� TOTAL PRODUCTION, DRY TONS Inlet reached temp @ —! „ l,,� ; a a Outlet reached temp @ ; a g PATHOGEN REDUCTION VECTOR ATTRACTIONRfEDUCTION I D3 ��s-- Z �_ = ( - . d�l� TIME 1'�4 s- 5wg- OPERATOR - v J l./ INITIAL PH 1A "J" g,-g ' o 03 Cam— , of---�- 2 HRS: v� a �0 22 HRS. A.. ....................................................................................... ................................................................................................................................................................................... OPERATIONAL POLYMER USAGE 3ELT PRESS SPEED, % _ (l TYPE USED 'OLYMER PUMP SPEED, % 2 a ANKS MIXED ;LUDGE PUMP SPEED, % J.--) GPM Lo0 Ilh 1EED AUGER, %_ .3 : LBS/HR I LITERS/TANK IIXER SPEED, % !� d vised 8/12103 194(p f(o-5 DATE 0 Lt RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS TOT Tr, 3D _ 1 i'3o I g 1,%4 1 SLUDGE FEED % SOLIDS / p PRESS, % SOLID LIME/SLUDGE RATIO C OZ TOTAL PRODUCTION, DRY TONS Inlet reached temp a /. -04? Outlet reached temp @ PATHOGEN REDUCTION TFMPFRATI IRF nF JE . INTO VESSEL OUT OF VESSEL OPERATOR ao aotp E� koa a'o(o 6td10 Id/ )'_o s OPERATIONAL VECTOR ATTRACTION REDUCTION 63 CAI-- 7 TIME ��, S� ` j)-' ykl OPERATOR o� yd INITIAL PH �. S o3(AS'- act) _ l 033 2 HRS. 22 HRS. �— BELT PRESS SPEED, % POLYMER PUMP SPEED, % H L SLUDGE PUMP SPEED, % 60 GPM LIA ..TEED AUGER, % —i LBS/HR (QU MIXER SPEED, % / DO Revised 8/12/03 POL YPE USED 33 a C ANKS MIXED 5�7.6 ib5 RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS. TWSA LIME STABILIZATION DAILY RECORD DATE. ho /0 9 START STOP TOTAL q I � of I 1 D.S. � SLUDGE FEED % SOLIDS CPm I LIME/SLUDGE RATIO Inlet reached temp @ o •� Outlet reached temp @ PATHOGEN REDUCTION TFMPFRATLIRF nF ( E INTO VESSEL OUT OF VESSEL OPERATOR /9+ lsg fc � aol an y co BELT PRESS SPEED, % OPERATIONAL 4 POLYMER PUMP SPEED, % 110 PRESS, °% SOLIDS TOTAL PRODUCTION, DRY TONS SLUDGE pi i!!4P SPEED, % 60 GPPA O LIN, _ .,IEED AUGER, % 3 LBS/HR `Z MIXER SPEED, % / O O Revised 8/12/03 DRY TON * o 5- VECTOR ATTRACTION REDUCTION TIME /x S'/1a6y /X-SW OPERATOR INITIAL PH� 036�- U-'7)-- /.'7 = ,Ar/ 2 HRS. I)L,6 ro3(Xr---)5'7) &sy0%r0--r =& s�I 22 HRS. POLYMER USAGE TYPE USED ,33 �- TANKS MIXED TW_ AN TWSA LIME STABILIZATION DAILY RECORD a ff / DATE /// ST, RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS 1 .(:7) SLUDGE FEED % SOLIDS t3n U( LIME/SLUDGE RATIO a V 1 U=:1 Inlet reached temp @ s,6 q Outlet reached temp @ I A3 PATHOGEN REDUCTION TEMPERATURE of ( �1E INTO VESSEL OUT OF VESSELS OPERATOR OLO ),3 o` D,3 aD l �,.J sax3 mS v7 S' 3 �. 10.3 Aca Ar 71 Ad PRESS, % SOLIDS_ TOTAL PRODUCTION, DRY TONS �r DRY TON WE VECTOR ATTRACTION REDUCTION TIME /J.�l 12"`rlrOPERATOR INITIAL PH r 0 3 (x,- — U�)=4,3 = A, P 46" 2 HRS. ? JAW/ ff 03:7 22HRS. 0-6 OPERATIONAL BELT PRESS SPEED; % 3 POLYMER PUMP SPEED, %� SLUDGE pt mfip SPEED, 4! `7 GPM 1-I1�:`-.'EED AUGER, % LBS/HR q MIXER SPEED, % 400 Revised 8/12/03 TYPE USED g C1 TANKS MIXED AN TWSA LIME STABILIZATION DAILY RECORD RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS DATE`/D? START Sy/TOP TOTAL --T—i }��jl� FJ 9 r -7! //S— I f ` SLUDGE FEED % SOLIDS ' LIME/SLUDGE RATIO a Inlet reached temp @ 9 ; ©(� Outlet reached temp @ I q a ;71 PATHOGEN REDUCTION TEMPERATURE of 1E INTO VESSEL OUT OF VESSEL OPERATOR CID (m` C0 p.zo jqq SN 3 1 hr Ar DRY TON PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS 1 3.091 VECTOR ATTRACTION REDUCTION / 03� = S4= 3 _ ,0 9 TIME /)-'y /- c /' ' /, of OPERATOR INITIAL PH_ /I- J' A— U,77) I- ?_ ,off O 2 HRS. %�-- ix, �; 30 22 HRS. OPERATIONAL BELT PRESS SPEED, % 1149 POLYMER PUMP SPEED, % o SLUDGE PUMP SPEED, % y511, GPM 041 W rEED AUGER, % LBS/HR fLC MIXER SPEED, % 10 Z) Revised 8112103 POLYMER USAGE PE USED '2302 TANKS MIXED LITERS/TANK (67 jIC�•� I.�s RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS TVVSA LIME STABILIZATION DAILY RECORD DATE 12S)04 STOP ART TOTAL e— 'SLUDGE FEED % SOLIDS =-Li= PRESS, % SOLIDS[:::: LIME/SLUDGE RATIO TOTAL PRODUCTION, DRY TONS Ed� Inlet reached temp Q Outlet reached temp PATHOGEN REDUCTION TEMPERATURE of INTO OUT OF 'IE VESSEL VESSEL OPERATC JL11v INITIAL PH— / oeg- o3 ag'o);= 3 r of o 2 HRS., 0 os j rf 22 HRS. ........................................................................... OPERATIONAL POLYMER USAGE3ELT PRESS SPEED, %0���7 USED)OLYMER PUMP SPEED, %LIUDGE PUMP SPEED, % r_1 ANKS WED ------- PM 00 I EED AUGER, LBS/HR_�2� LITERS/TANK IIXER SPEED, % VECTOR ATTRACTION DUCTION A3 C) q9� TIME OPERATOR ��- TYPE vised 8112103 i RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS TWSA LIME STABILIZATION DAILY RECORD DATE`} START STOP TOTAL o .s c SLUDGE FEED % SOLIDS , LIME/SLUDGE RATIO t Inlet reached temp @ I 1 a�j Outlet reached temp @ I d, - I C) PATHOGEN REDUAON TFMPFRATI IRF nF TIME INTO VESSEL OUT OF VESSEL OPERATOR ,et ;11) /60 «s' .C-D PRESS, % SOLI TOTAL PRODUCTION, DRY TONS VECTOR ATTRACTION REDUCTION os� = TIME %a'u� �' OPERATOR�� INITIAL PH \ 2 HRS. �- 22 HRS.,, ................................................................... pc�.�,,,.......a6.p..-3.. v,�. ............... OPERATIONAL BELT PRESS SPEED, '% POLYMER PUMP SPEED, % S© / 33I URGE PUMP SPEED. o/ rn(r) _IME FEED AUGER, % S-5 LBS/HR POLYMER USAGE TYPE USED 48I&YR TANKS MIXED AN MIXER SPEED, % Z a O ?--t,6 t,6 5 TWSA LIME STABILIZATION DAILY RECORD DATE /© 0 f/51A START RUN TIME, HRS I-?-. Do SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO 1 Inlet reached temp Outlet reached temp @ PATHOGEN REDUCTION TFIIAPFC?ATI IGC .,m 1 nE Al 00 INTO VESSEL OUT OF VESSEL OPERATOR 1� � S; en )jo � OPERATIONAL BELT PRESS SPEED, % - G STOP TOTAL ® S?' A PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS , VECTOR ATTRACTION REDUCTION =- = fa d TIME OPERATOR INITIAL PH_J�—S' i;r—: 'YO 2 HRS. r 03 Cd..! t tip .f -"d "i= /X•'S�o i 22 HRS. POLYMER PUMP SPEED, %� SLUDGE PUMP SPEED, % GPM /lJ 10 LIN ,'EED AUGER, %— LBS/HR e MIXER SPEED, % tevised 8112103 POL YPE USED '"T ANKS MIXED ,5'�79`t )h5 TWSA LIME STABILIZATION DAILY RECORD DATE r START STOP TOTAL RUN TIME, HRS '.�� "7►� �� a SLUDGE FEED, GAL LIME FEED, LBS I SLUDGE FEED % SOLIDS L- L) . L I LIME/SLUDGE RATIO Inlet reached temp Outlet reached temp p e ! U PATHOGEN REDUCTION TEMPERATURE OF INTO IE VESSEL OUT OF VESSEL OPERATOR / q. r �Qj M P 171 11 *'e OPERATIONAL 3ELT PRESS SPEED, % 4 3 'OLYMER PUMP SPEED, % TON 16 PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS o VECTOR ATTRACTION REDUCTION 03 TIME %? �� �- ,�8'�/ =" I� r fi/6 OPERATOR INITIAL PH i c r l 2 HRS. . 22 HRS. A7'�- :' i iiDGE P %4P SPEED, % rpn4 / / INS. 1EED AUGER, % �b LBS/HR / ®O IIXER SPEED, % vised 8/12/03 ........................................................................................................... POLYMERR USAGE TYPE USED TANKS MIXED N I 1v31e' I'Vs TWSA LIME STABILIZATION DAILY RECORD DATE 119111 m 4 RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDSff . LIME/SLUDGE RATIO f Inlet reached temp @ EIK=o5 Outlet reached temp Ca ` PATHOGEN REDUCTION TFIIAPI=PAT7 IOC „c: YIE I,, W INTO VESSEL -7 OUT OF VESSEL A07 OPERATOR �,Z6 _51G iq s CzL5,0 �%I TON PRESS , % SOLIDS TOTAL PRODUCTION, DRY TONS VECTOR ATTRACTION REDUCTION TIME 1,2 , (p 5 ,QRATOR � oe INITIAL PH d 2 HRS. 1 , 22 HRS. f�.. OPERATIONAL 3ELT PRESS SPEED, %. d 5 'OLYMER PUMP SPEED, % :L! DGE PUMP SPEED, % p .r 111. TEED AUGER, % Gj LBS/HR MIXER SPEED, % avised 8112/03 .................... :......................................... .................. POLYMER USAGE YPE USED ANKS MIXED )Da.,P_ Hos _I 'I TWSA LIME STABILIZATION DAILY RECORD f 1 / f �(� DATE / D J/ a/ r L)T START STOP TOTAL RUN TIME, HRS : V b -7 j 7r�— >Q / a SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED °% SOLIDS LIME/SLUDGE RATIO f i Inlet reached temp @ I �1 •� Outlet reached temp @ PATHOGEN REDUCTION TFflAPFRGTI IPP nG 1E INTO VESSEL OUT OF VESSEL OPERATOR 60 E0 H 7 A/-- �7 ,fA( W r OPERATIONAL BELT PRESS SPEED, % DRY TON PRESS, °% SOLIDS TOTAL PRODUCTION, DRY TONS' CI VECTOR ATTRACTION REDUCTION TIME OPERATOR INITIAL PH-k 2 HRS. i vJJ 22 HRS. POLYMER PUMP SPEED, % 3-3 SLUDGE IDGE PUMP SPEED, °! 112 ® GPM _7 f Llf NEED AUGER, %_ '7 & LBS/HR 7 _` MIXER SPEED, % _ 106 Revised 8112103 L_ POLYMER USAGE TYPE USED TANKS MIXED LITERS/TANK 106 6- C b5 TWSA LIME STABILIZATION DAILY RECORD DATE , / / n4 START RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO E== Inlet reached temp Outlet reached temp @ ° PATHOGEN REDUCTION TEMPERATURE OF INTO OUT OF 'lIE VESSEL VESSEL OPERATnR tag ws t OPERATIONAL BELT PRESS SPEED, % 3 'OLYMER PUMP SPEED, % 3 STOP AL PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS . C� VECTOR ATTRACTION EDUCTION TIME _, ��� =, ��� OPERATOR INITIAL PH 006j- /�.- i ...3 0 2 HRS. O 22 HRS. i ,L UDGE PUMP. SPEED, °h -it 'EED AUGER, % 4:1- LBS/HR__T AIXER SPEED, % b evised 8/12/03 POLYMER USAGE YPE USED `� ANKS MIXED ERS/TAN )6)L90 91 TWSA LIME STABILIZATION DAILY RECORD , Lo DATE START STOP TOTAL RUN TIME, HRS DRY SLUDGE FEED, GAL�j r LIME FEED, LBS SLUDGE FEED %SOLIDS LIME/SLUDGE RATIO Inlet reached temp @ I g V Outlet reached temp 4 PATHOGEN REDUCTION TPnnDGDAT1 Io= AE /poq INTO VESSEL 1g • OUT OF VESSEL /s? OPERATOR co �; 19 ), 1 q� co [�Ajq / qy )`9� �w PRESS., % SOLIDS [:::::= TOTAL PRODUCTION, DRY TONS E::Io= VECTOR ATTRACTIO REDUCTI nor- to ��la ONc'O7� TIME 14 S' -- rd�8 = ` OPERATOR INITIAL PH ` /¢/ tJ 2 HRS. f �� a5.6) K Dz pal 22 HRS. , 3ELT PRESS SPEED, % 'OLYMER PUMP SPEED, % j ;Li DGE PUMP SPEED, % GPm U-3 Il, `EED AUGER, % !' .LBS/HR / 41XER SPEED, % avised 8/12103 YM YPE USED 4 ' & 4 ANKS MIXED I ERS/TANK W ���•� �1 5 TWSA LIME STABILIZATION DAILY RECORD RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO Inlet reached temp @ Outlet reached temp @ DATE ��% /fit /0'I START STOP TOTAL ` '7I3 PATHOGEN REDUCTION TFMPFRATI IRF nF f '1E INTO VESSEL OUT OF VESSEL OPERATOR ��� %s j ` o TON PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS 1 61 r VECTOR ATTRACTION REDUCTION TIME OPERATOR �3 INITIAL PH ? Qd jR S.� 2 HRS. f� J3 1 22 HRS. c� OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, % J SLUDGE PUMP SPEED, 4! &0 GPM '7d Llf ,,,EED AUGER, % LBS/HR ff6 MIXER SPEED, % 10-d Revised 8/12103 POLYMER USAGE YPE USED J/g 46 ANKS MIXED -hL I if, lwlQ 9 DAILY RECORD DATE ZD. i START STOP TOTAL RUN TIME, HRS %OD DRY TON SLUDGE FEED, GAL 7) � I S LIME FEED, LBS © ©? C) y SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO Inlet reached temp @ I 1 I Outlet reached temp @ 6 ; [ PATHOGEN REDUCTION TFMPFPATI IDC -= TIME INTO VESSEL OUT OF VESSEL OPERATOR 1,59 G!9 PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS l VL OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, % 3 SLUDGE PUMP SPEED, % GPM LIME FEED AUGER, % LBS/HR M, -,� SPEED, % _ / / o Revised 8112103 VECTOR ATTRACTION REDUCTION ,. 03()-r-10. y) = tV� =, /a r TIME a,,s - 138= %..3CZ OPERATOR %D INITIAL PH 6y��kl. q) 2 HRS. �S . ®?� ld.•5� 22 HRS .['ate Jr �. POLYMER USAGE YPE USED (4 1 ANKS MIXED S-7 (p 165 UPULT Mr—UUKU DATE /f / �/ •� � )1 START RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS m LIME/SLUDGE RATIO Inlet reached temp @ Outlet reached temp @ p,j g PATHOGEN REDUCTION TF=KAPFR®TI IRC nC TIME INTO OUT OF VESSEL VESSEL OPERATOR C-�.oa OPERATIONAL BELT PRESS SPEED, % 33 POLYMER PUMP SPEED, % 3 STOP TOT PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS / VECTOR ATTRACTION REDUCTION f & 3 - ;IL3 , Sj = I s- = 1 oy,S- TIME /)L• 5,'•Ogs— — /)-- t%S-Y—OPERATOR SLUDGE PUMP SPEED, % C) GPM LIME FEED AUGER, % �,� LBS/HR / M' � SPEED, % / DO Revised 6/12/03 INITIAL PH - /a S' #/ 2 HRS. 22 HRS. POLYMER USAGE PE USED =-F•?L� �,j TANKS MIXED LITERS/TANK r]3 fb s UHILT KtGUKD DATE N O 4 }t ` RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS E::� LIME/SLUDGE RATIO b L/ Inlet reached temp @ '` Outlet reached temp @ v o� PATHOGEN REDUCTION TEMPERATURE OF INTO OUT OF TIME VESSEL VESSEL OPERATOR /JA CID 3rs�� 03 l� / 0A� �P Rldo DRY TOP �-5e PRESS, % SOLIDS [���� TOTAL PRODUCTION, DRY TONS s f ..............................................................I ....................... OPERATIONAL BELT PRESS SPEED, %?� POLYMER PUMP SPEED, % 3 VECTOR ATTRACTION REDUCTION f 03(d-r— -Jx - l) %z �LrFz •'10 TIME /m - � - . 087 = 14 RS OPERATOR a, - -Or INITIAL PH_LIL- -5' jj 2 HRS. 23 C ,5,-/F. J= 5, 3 X, o j 22 HRS. a �� SLUDGE PUMP SPEED, %_ q.0 GPM g LIME FEED AUGER, % 3 LBS/HR 906 M" Z SPEED, % Revised 8/12t03 YPE USED cP i4NKS MIXED .IWJJ_L_ 51U, 1bs LJr%[L-T Mr-1-UKU DATEl% START STOP TOTAL RUN TIME, HRS t3c I F SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED °% SOLIDS e LIME/SLUDGE RATIO E:fa7l::] Inlet reached temp @ Outlet reached temp (g (' f PATHOGEN REDUCTION TEMPERATURE of INTO I OUT OF [/'4Z �d� 1 � b /SR., C 1) PRESS, °% SOLIDS [���� TOTAL PRODUCTION, DRY TONS VECTOR ATTRACTION REDUCTION TIME /� - , f ri =/,Z �/�/ OPERATOR 1 43- INITIAL PH G 2 HRS. --� 22H RS -s/�may ] � OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, % -30 SLUDGE PUMP SPEED, % GPM aO v �3 LIME FEED AUGER, %_ `�_ LBS/HR M" Z SPEED, % _ S Q 19 Revised 8/12103 POLYMER USAGE YPE USED i4NKS MIXED DATE _ �% (o I 0 q_ RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS 1 9 , LIME/SLUDGE RATIO 1 Inlet reached temp @ 00 Outlet reached temp @ "! ; 0�3 PATHOGEN REDUCTION TIME INTO VESSEL OUT OF VESSEL I OPERATO Co �Emu'mjgm ........................................................................................................................ OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, % 35` DRY PRESS, % SOLIDS E:::��� TOTAL PRODUCTION, DRY TONS . VECTOR ATTRA TION R DUCTIOV TIME 4,7- �'`�'-- %� �,/i�' OPERATOR INITIAL PH las. ©3 CAr /�- j ; �6 � z l y 22 HRS. SLUDGE PUMP SPEED, % 6o GPM o LIME FEED AUGER, %_ LBS/HR Mi; I SPEED, % _ z o o Revised 8/12/03 ................................................................................... POLYMER USAGE YPE USED _ 4 0 4,443 ANKS MIXED 77- 6 1155 ✓nIL I RCl-Vr[LJ DATE _ 11 11-y A RUN TIME, HRS I If 4113 a SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO Inlet reached temp @ ' Outlet reached temp @ PATHOGEN REDUCTION TEMPERATURE OF TIME% INTO VESSEL OUT OF VESSEL OPERATOR 1 ✓ t %j Z:�C)CD J STOP /30 PRESS, % SOLIDS [_���� TOTAL PRODUCTION, DRY TONS 4 c3 VECTOR ATTRACTION REDUCTION 6j, TIME �� (P - .f���%� �/3�' OPERATOR INITIAL PH -e 6r-- mj- = 7y G ``- � _ 2 HRS. �. -a 003 s a c 1 `3 (7` 22 HRS. a , S eA ..................................................................................................................................... OPERATIONAL BELT PRESS SPEED, % 3 7 POLYMER PUMP, SPEED, % 3 SLUDGE PUMP SPEED, % S-19, GPM J Ir LIME FEED AUGER, %_ LBS/HR M( Z SPEED, %' t Revised 8112103 YPE USED 6 �p ANKS MIXED _ITERS/TANK `p ' s- 7,Ag- V1 -5 unll- i mr_k,umjj DATE START RUN TIME, HRS 9 : 6-D SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED % SOLIDS LIME/SLUDGE RATIO E:j= Inlet reached temp @ Outlet reached temp @ ° PATHOGEN REDUCTION TEMPERATURE OF TIME INTO VESSEL OUT OF VESSEL OPERATOR �f6 C xos ................................................................................................................ OPERATIONAL BELT PRESS SPEED, % POLYMER PUMP SPEED, % 3 AL {?Q DRY TON PRESS, % SOLIDS [:::::::::= TOTAL PRODUCTION, DRY TONS VECTOR ATTRACTION REDUCTION Ito3 ( a1`.? a /ql_ ") _? - e i—/ TIME 116 )L I = /1-3- 1 OPERATOR / ®� INITIALPH % 2 HRS. e0_?04 =i•(. �16,)L Z- , Irr� 14�' � 22 HRS. ./�, q SLUDGE PUMP SPEED, % GPM Irk 3.3O LIME FEED AUGER, %_ LBS/HR M' Z SPEED, % p Revised all2103 ........................................................................ POLYMER u�ar� YPE USED Cam% ANKS MIXED Y 7. 6 1 ✓+"%IL 1 rRGVIJPUJ DATE RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS START STOP TOTAL a S", SLUDGE FEED % SOLIDS '7005 d LIME/SLUDGE RATIO Inlet reached temp @ % ; 911,1 Outlet reached temp @ PATHOGEN REDUCTION TIME INTO VESSEL OUT OF VESSEL OPERATOR 1 $rs JS0 ��- Igo y Ar TON PRESS, % SOLIDS TOTAL PRODUCTION, DRY TONS VECTOR ATTRACTION REDUCTION TIME OPERATOR fsS INITIAL PH 2 HRS. �o aCs 5aa��_ f'?,4x,&2 ,aaa 22 HRS. . j�► •3 OPERATIONAL BELT PRESS SPEED, % Alt POLYMER PUMP SPEED, % 3 SLUDGE PUMP SPEED, % GPM-70-17 LIME FEED AUGER, % S-O LBS/HR O - W R SPEED, % o n Revised 8/12/03 POLYMER USAGE YPE USED ANKS MIXED ,13•� Ibs m vr��L � RGIiV RU DATE - i , F i RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE FEED e% SOLIDS ^ 7 p LIME/SLUDGE RATIO. Inlet reached temp @ F% Outlet reached temp @ PATHOGEN REDUCTION TEMPERATURE of TIME INTO I VESSEL OUT OF VESSEL OPERATOR to f v`� d,03 l0 CIO DRY PRESS, °% SOLIDS TOTAL PRODUCTION, DRY TONS 1.0 ~ ...................................................................................................................................... OPERATIONAL BELT PRESS SPEED, % :3 6 VECTOR. ATTRACTION REDUCTION TIME OPERATOR 'l r ,S'— INITIAL PH r (� 2 HRS. A , S .4a 22.HRS. .....................................................................:............................... POLYMER `USAGE TYPE USED ' 1'? /" A 1110 POLYMER PUMP SPEED, % TANKS MIXED SLUDGE PUMP SPEED, % 5- GPM LIME FEED AUGER, % YY LBS/HR M. Z SPEED, % Ion Revised 8/12J03 � I, �v Ib's DATE 1�2 START . " STOP TOTAI RUN TIME, HRS SLUDGE FEED, GAL LIME FEED, LBS SLUDGE.FEED % SOLIDS / a 0 LIME/SLUDGE RATIO . Inlet reached temp @ Outlet reached temp PATHOGEN REDUCTION TFMPFRATI IRG ni= TIME- INTO VESSEL OUT OF VESSEL OPERATOR 'Al 1919 /S9 C 0 / 0 q e- 40 347 Cf. S ` "/ l PRESS, %.SOLIDS TOTAL PRODUCTION, DRY.TONS , Cr . VECTOR ATTRACTION REDUCTION f.02 Cyr — fro TIME S_ /yY����3dX OPERATOR ICJ 3! INITIAL PH 143 o, , a,s' �a 38T4 — �r 2 HRS. a 22 HRS. OPERATIONAL BELT PRESS SPEED, % 3 POLYMER PUMP SPEED, % q-3 SLUDGE PUMP SPEED, % GPM W, /O LIME FEED AUGER, % q 3 LBS/HR M, 3 SPEED, % Revised 8/12103 PE USED TANKS MIXED I�a•0, rbs