Loading...
HomeMy WebLinkAbout20051764 Ver 1_Meeting Minutes_20040105v~ SfATE ° - > ~,®~~.. DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR January 5, 2004 MEMORANDUM TO FROM: SUBJECT: Widening of SR 1158 (Airport Blvd.) to a multi-lane facility, from NC 42 to US 264, Wilson County, Federal Aid Project STP-1158(2), WBS Element 34981.1.1, State Project 8.2341801, T.I.P. U-3823 A concurrence meeting has been scheduled for Tuesday, January 20, at 10:30 am. The meeting will be held in the Board Room in the Transportation Building, 1 South Wilmington St., Raleigh. The purpose of this meeting is to complete approval for Concurrence Point No. 4A, Avoidance and Minimization. STATE OF NORTH CAROLINA U-3823 Merger Team Beth Smyre @@ ~~@`~ Project Development Engineer LYNDO TIPPETT SECRETARY The information packet is enclosed. Please review this material prior to the meeting. If you have any questions, please contact me at (919) 733-7844 x333 or bsmyre@dot.state.nc.us. Please RSVP if you will not be attending. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1548 MAIL SERVICE CENTER RALEIGH NC 27699-1548 TELEPHONE: 919-733-3141 FAX: 919-733-9794 WEBSITE: WWN!DOH.DOT.STATE.NC.US LOCATION: TRANSPORTATION BUILDING 1 SOUTH WILMINGTON STREET RALEIGH NC CONCURRENCE POINT #4A - AVOIDANCE & MINIMIZATION Proposed Widening of SR 1158 (Airport Blvd.) to a multi-lane facility From NC 42 to US 264, Wilson County TIP Project U-3823 State Project 8.2341801 Federal Aid Project STP-1158(2) WBS Element 34981.1.1 January 20, 2004 Purpose of Today's Meeting The North Carolina Department of Transportation's (NCDOT) approved 2004-2010 Transportation Improvement Program (TIP) includes a project to widen SR 1158 (Airport Blvd.) from NC 42 to US 264 in Wilson County (see Figure 1). Concurrence Point 3, selection of the Least Environmentally Damaging Practicable Alternative (LEDPA), was reached on August 14, 2003. The purpose of this meeting is to complete approval for Concurrence Point No. 4A, Avoidance & Minimization. Project Description TIP Project U-3823 is described in the approved 2004-2010 TIP as widening SR 1158 (Airport Blvd.) to amulti-lane facility, from NC 42 to US 264, a distance of approximately 2 miles (see Figures 1 & 2). SR 1158 (Airport Blvd.) is currently atwo- lane facility that connects US 264 and NC 42; both US 264 and NC 42 serve as east-west radials for traffic travelling into and through the Wilson area. Afive-lane facility is proposed for the project except for the section in the vicinity of Bloomery Swamp, where a four-lane facility is proposed to minimize impacts to wetlands. The widening will be done with a combination of symmetric and asymmetric widening, in order to provide a "best-fit" alignment. The proposed design will replace the existing box culvert at Bloomery Swamp with a bridge 200 feet in length. A curb and gutter section will be used along the entire length of the project. Several additional turn lanes are also proposed as part of the project scope. U-3823 Merger Team Meeting January 20, 2004 Project Schedule/Cost Right-of way acquisition for the project is scheduled for federal fiscal year 2004 and construction is scheduled for federal fiscal year 2005. The most recent cost estimates for the project are shown in Table 1: Table 1. Project Cost Estimates '. TII'Estimate: ~~~_!C'urrcnt Estimate~~;°_'~ CunsU-uctiun b ~, ~UU,000 `~ (i.~UU,000 .Right of~i~ay $ 1,200,000 $ I,Oi5,00~* Total ~ $ 7,500,000 ~ $ 7,615,000 *Note: The Right of Way total reflects the 110 feet of right of way required by the preferred alternative. The estimate listed in the EA incorporated 100 feet of right of way. The total cost for the structure (included in the construction cost) is $935,000. Concurrence History Concurrence Point No. 1: Project Purpose & Need (Approved December 2001) The purpose of the project is to improve capacity and safety along this section of SR 1158 (Airport Boulevard). Concurrence Point No. 2: Design Options for Detailed Study (Approved December 2001) At this meeting, the decision was made to study widening SR 1158 (Airport Blvd.) to a five-lane facility. Concurrence Point No. 2A: Bridging Decisions and Final Alternatives to Carry Forward (Approved May 2002) At this meeting, the merger team agreed to carry forward six design alternatives, involving curb and gutter, shoulder, culvert extension, and bridge scenarios. 2 U-3823 Merger Team Meeting January 20, 2004 Concurrence Point No. 3: Selection of Least Environmentally Damaging Practicable Alternative (LEDPA) (Approved August 2003) Alternative 4 was selected as the LEDPA on August 14, 2003. It replaces the existing box culvert at Bloomery Swamp with a bridge 200 feet in length (see Figure 3). The project will have a curb and gutter typical section. Concurrence Point 4A: Avoidance/Minimization By the very nature of this project (widening), the ability to avoid and minimize impacts is limited. However, both avoidance and minimization have been incorporated into the preliminary design through the strategic placement of the right-of--way limits. The decision was made early on to pursue a "best fit" alignment. This has allowed the estimated impacts to wetlands be reduced to 0.664 acres (with an additiona10.14 acres available for potential restoration credit from the removal of fill material). Estimated impacts for surface waters, wetlands, and buffer zones are included below in Tables 2, 3, and 4. The majority of this impact reduction occurred in the Bloomery Swamp area, with the remainder in the unnamed tributary to Bloomery Swamp. The roadway alignment, positioned to avoid impacts to a cemetery, has been designed to limit the total number of relocations to one. Originally, as many as 3-4 properties were in danger of being relocated. The widening will occur on the south side of the existing roadway in the area of Bloomery Swamp, because the wetlands on the northern side were determined to be of higher quality. The roadway will be widening to four-lanes in the vicinity of Bloomery Swamp (instead offive-lanes) in order to minimize impacts. Hazardous spill control basins, which should minimize the effects of any illicit discharges from the roadway, will also be installed near Bloomery Swamp. Table 2. Estimated Impacts to Surface Waters Surface~~'"ater~; .~ - [mpacts Bloomery S~~~amp - _ --- 0 feet ~ Unnamed Tributary -- 87 feet ~I Total 87 feet Table 3. Estimated Impacts to Wetlands Wetland. Initial Impacts 1 --Restoratiort~ : '... -Final Impacts ( ,.. .. ~,° .Potential Bl~x~m~~r~~ Swam~~ ~ O.SUU acres - _ ~ 0.140 ~` ~lcrrs ! 0.660 acrd -- - -- =- - - T Wetland along li1~ 0.004 acres " N/A 0.004 acres Total I 0.804 acres 0.140 acres I 0.664 acres *Note- 0.140 acres of possible restored wetlands available from fill removal 3 U-3823 Merger Team Meeting January 20, 2004 I aple 4, t stimaiea impa cts to Ki parian afei~ t~c~:; ~; o ~ ~_ 1 ~.~~~ Resource ~~ y { ~:Communi _ ;~ ~' - - .. 7~ne 1 Zone 2 Bloomery Bottomland Swamp .hardwood 11.05: ft.' 7 ~ 0 ft.' Unnamed Bottomland Tributary hardwood, 779 ft.2 104 ft.2 agricultural -- _ Total 1K$-l ft.' 834 ft.` Today's meeting will include a discussion of the 25% roadway and drainage plans as well as an update on the proposed stormwater management plan for the project. Buffers 4 ti ~/ if ...... ..~_ ~ C l' TO N C 42 ~~ ~~ ~, ~ t r ~ r ~ x ~ ~ r x ~ ~ ~ ~ k ~ ~ & Y ~ ~ '~ ~ ~ Y k k ~ ~ k ~ i ~ ~ ~ ~ ~ -- ~~ e ~ ~~ r } ~ ~ Y i 1'. Ir e ~ ~ + ~ ,x ~ ~ ~ y x d X ' ~ !/Z~~ ~' _.5. ~. - C. 5_i1,x y, /- -,- ~ _. ~ r ~ ~ ~ Y ~ ~ ~ ~ ~ ~ ~ K r ~ ~ r ~ .~ + ~ x ° ~ ~ ............ ................. .1 .......~~.. \\ \\ I \\ \\ ~~ ~~~ ~~ ~~` ~~ ~~~ 1'0 US 264 x ~ rt ~ ~ ~ ~ ~ ~ ~ Y ~ ~ \\ ~ ~ ~ Y~ ~ ~ k .~ i 2 i ~ ~ ~ t ~ Y ~ M '~ ~.:~ 1 ~K ~ ~ i L Mil ~ ---._-__. __ _~. 1 III: ~ ~ .._~. ~ Cj ES ~ . _ _ r _~ ~ ~ I \ .. Ir ~ \ ~ x ~ ~ + ~ ~ ~ + r ~ r t ~ ~ r ~ ~ ~ ~ ~ t 1' k ,~ Y Y F ~\ \ ~ 1' ~ 2 ~ k ~ r ~k ~ ~ ~ ~ ~ ~ x i 2 x K 7 y + ~` ~ \ x r ~ a ~ ~ \ ~ ~ ~ G` \\ Y ~ ~ ~ ~ .................. r ~ ~ r ~..._t....~ .... ~,~ ~_.r.._..._.. ..~\ ~~'~. ~.. x ~~ GRAPHIC SCALES PROPOSED PAVEMENT ~o0 50 0 ~o0 200 ~_ pROPOSED RIGHT OF WAY PLANS ^ 200' BRIDGE ® WETLANDS IMPACTED ® WETLANDS RESTORED WETLANDS RECOMMENDED ALTERNATIVE; 200` BRIDGE AT BLOOMERY SWAMP y/~.M~~t, NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ~° ~' DIVISION OF HIGHWAYS V\,., g i ~,~~ DIVISION FOUR DDC SR 1158 (AIRPORT BLVD.) FROM NORTH OF NC 42 TO US 264 WILSON COUNTY TIP PROJECT U-3823 FIGURE 3