HomeMy WebLinkAbout20020672 Ver 3_Meeting Minutes_20141126
Introduction
This spreadsheet contains scores for all transportation projects, which are subject to North
Carolina’s new Strategic Transportation Investments (STI) Law. These scores can be found in
All Projects
the tab at the bottom.
These scores represent the cumulative Local Input and
Quantitative points assigned to each project only, and will be used
as input to the programming process. They are not representative
of whether a project will be funded.
The rank order must still be subject to other
STI requirements such as 10% corridor cap and federal action regarding tolling of existing
All data used for scoring and evaluating projects, including scores and initial point-in-
time cost estimates, have been generated by either the Department and/or through
coordination with local governments. The results are intended for use in the
Department’s Strategic Prioritization Process and for preliminary level planning,
scoring, and evaluation purposes only. Per the STI law, these scores will be used in the
Blue highlighted projects found in this spreadsheet represent Statewide Mobility
projects fully funded for construction which were not be eligible for local input point
assignment during the June 2 – August 29, 2014 window.
This spreadsheet uses macros.
Instructions
Full functionality requires Microsoft Excel 2007® or later.
You may need to enable editing, if
Earlier versions of Excel may disable some features.
prompted.
Projects are organized by SPOT ID, the unique identifier given to each project. Columns A - J
contain basic information about the project and the scores. Columns K - M contain the
total/final scores for each project, while Columns O - T list the quantitative scores and total
local input points for each project. Columns V-AX list the MPOs/RPOs, Divisions, and local
Search for projects by Mode, Region, Division, County or Metropolitan and Rural Planning
Organization (MPO/RPO) by clicking on the tan boxes at the top of the spreadsheet. You can
also filter or sort projects by route, funding category, total score, etc. by clicking the arrow on
green Clear Search
To remove all filters you have applied, click the box at the top of the
spreadsheet. Note that clicking the Clear Search box twice may result in an error message
The data used in the calculcation of the quantitative scores for each mode are shown on the individual modal tabs.
Last updated September 24, 2014
The data used in the calculcation of the quantitative scores for each mode are shown on the individual modal tabs.