Loading...
HomeMy WebLinkAboutNCC192857_NOT Closeout Documents_20221128North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Guilford Project: 275 N Elm Street Person financially responsible: 275 North Elm Partners, LLC Address: 909 Ridgebrook Rd. Suite 216, Sparks, MD 21152 1. Project Location: N Elm St., High Point Pictures: No 2. Weather and soil conditions: 80s, Clear, Workable 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Yadkin-PeeDee Project #: GUILF-2020-012 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Rodney Powell Inspection report: Sent Report 9. Corrective action needed: Title: Project Superintendent Date given/sent: May 19, 2022 N/A 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Turney Others present: Date of inspection: May 19, 2022 Time arriving on site: 11:30 AM Time leaving site: 12:00 PM