Loading...
HomeMy WebLinkAboutSW6220806_Design Calculations_20221128 (15)CALCULATIONS sheet only set up to handle Tc from 5 min to 30 min A. Cross -pipes to use 25-yr storm inensity Rainfall Intensity rm Event 5-m 10-yr 7.92 6.33 5.34 3.87 25-yr 8.94 7.12 6.02 4.46 50-yr 9.65 7.68 6.49 4.89 100-yr 10.30 8.23 6.93 5.31 Tc Drainage Storm Rainfall Pipe No. Area (ac) C Kerby Kirpich Event (yr) Intensity Q (cfs) Total Tc Tc Used (in/hr) L (ft) n s Tom L (ft) S T, 1 13.90 0.45 n/a 1390.0 0.007 13.86 13.86 15 25-yr 6.02 37.66 2 4.99 0.45 n/a 720.0 0.012 6.79 6.79 5 25-yr 8.94 20.06 3 2.93 0.45 n/a 700.0 0.012 6.64 6.64 5 25-yr 8.94 11.79 4 1.59 0.45 n/a 450.0 0.011 4.89 4.89 5 25-yr 8.94 6.40 5 1.35 0.50 n/a 590.0 0.005 8.16 8.16 10 25-yr 7.12 4.79 6 2.37 0.45 n/a 390.0 0.017 3.70 3.70 5 25-yr 8.94 9.53 7 0.29 0.45 n/a 130.0 0.010 1.95 1.95 5 25-yr 8.94 1.15 8 0.48 0.45 n/a 170.0 0.005 3.13 3.13 5 25-yr 8.94 1.94 9 3.56 0.45 n/a 680.0 0.008 7.78 7.78 10 25-yr 7.12 11.40 10 4.65 0.45 n/a 770.0 0.008 8.36 8.36 10 25-yr 7.12 14.89 11 4.92 0.35 n/a 925.0 0.012 8.23 8.23 10 25-yr 7.12 12.26 printed: 11/28/2022 1:37 PM Page 1 of 1