Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6220806_Design Calculations_20221128 (3)
Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Jun 30 2022 Pipe 3 (25-yr) Invert Elev Dn (ft) = 158.40 Calculations Pipe Length (ft) = 48.00 Qmin (cfs) = 11.80 Slope (%) = 0.42 Qmax (cfs) = 11.80 Invert Elev Up (ft) = 158.60 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 11.80 No. Barrels = 1 Qpipe (cfs) = 11.80 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 4.34 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 5.81 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 160.02 HGL Up (ft) = 159.83 Embankment Hw Elev (ft) = 160.42 Top Elevation (ft) = 161.30 Hw/D (ft) = 0.91 Top Width (ft) = 32.00 Flow Regime = Inlet Control Crest Width (ft) = 10.00 El ow (t) 162A0 161.00 160.0E 156A0 157A0 0 Pipe 3 (25-yr) 5 10 15 2� 25 34 35 40 45 50 55 60 cirWffcWvert HGL Embank Hw Depth (t) 3-40 2.40 1-40 0-40 -0Js0 -1.60 65 7. Reach Iftl