Loading...
HomeMy WebLinkAboutSW6220806_O&M Agreement/Plan_20221128Operation & Maintenance Agreement Project Name: Project Location: McMillan Manor Subdivision Cumberland County Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & cc Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader - Filter Strip Proprietary System Treatment Swale Dry Pond Disconnected Impervious Surface User Defined SCM Low Density Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Present: Present: Present: g O&M sheets will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: ae aaaea automaticai lVegetated swales/roadside ditches I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature County of personally appeared before me this Ben Stout Managing Member - Stout Land Development, LLC 1786 Metromedical Drive Fayetteville, NC 28304 910-779-0019 ben@benstoutconstruction.com , a Notary Public for the State of , do hereby certify that day of acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, Date: and Seal STORM-EZ Version 1.5 My commission expires O&M Agreement 11 /28/2022 Page 1 of 1 Low Density Maintenance Requirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the sediment load to the vegetated conveyance or After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer will not be applied to the vegetated receiving The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. section activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Maintain grassed vegetation such that the swale or Vegetation is too short Vegetation vegetated area does not erode during the peak flow or too long. from the 10-year storm Remove the trash/debris. Areas of bare soil -Regracle the soil if necessary to remove the gully, an then re -sod (or plant with other appropriate species) and/or erosive gullies Vegetated receiving and water until established. Provide lime and a one - have formed. areas time fertilizer application. Trees and/or other Remove the trees and woody vegetation from the woody vegetation are swale, regrade the swale if necessary and re-establish present in the swale. grass as shown on the approved plans. Trash/debris is Remove the trash/debris. present. Areas of bare soil egra e the soil if necessary to remove the gully, an then re -sod (or plant with other appropriate species) and/or erosive gullies and water until established. Provide lime and a one- have formed. time fertilizer application. Sediment covers the Remove sediment and dispose in an area that will not grass at the bottom of Vegetated impact streams or SCMs. Re -sod if necessary. conveyances / the swale. The side slope is Regrade the slopes to the permitted configuration per swales / roadside ditches (other than steeper than the the approved plan and reestablish vegetation. If as - curb outlet swales) approved built or existing conditions do not allow the slopes to configuration. be regraded, contact the applicable permitting Determine the source of the problem: soils, Grass is dead, hydrology, disease, etc. Remedy the problem and diseased or dying. replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. rees an or other Remove the trees and woody vegetation from the woody vegetation are vegetated conveyance, regrade the vegetated present in the conveyance if necessary and re-establish grass as vegetated Ishown on the approved plans. Clogging has Clean out the outlet device. Dispose of the sediment occurred. off -site. The outlet device (if applicable) The outlet device is Repair or replace the outlet device. damaged Erosion or other signs Repair the damage and improve the flow dissipation of damage have structure. occurred at the outlet. The receiving water Discharges from the site are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receivin water.