Loading...
HomeMy WebLinkAboutSW4221101_Recorded Document_20221128WATAU GA COUNTY Planning a&Inge Of 126 Poplar Grove Connector Suite 201 'Boone, North Carolina 28607 Phone (828) 265-8043 FAX (828) 265-8080 October 6, 2022 E Squared Holdings 553 Oak Street Boone, NC 28607 To whom it may concern: This office has reviewed the subject sedimentation and erosion control plan. We find the plan to be acceptable and hereby issue this letter of approval. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0029. Be advised that Title 15 NCAC 4B.00I7(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter to give the Notice required by GS I I3A-61(d) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance oriented, requiring protection of the natural resources and adjoining properties. If following commencement of this project it is determined that the plan is inadequate to meet the requirements of the Sedimentation and Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and its implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form which you have provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference, we will plan to attend. Please be aware that if more than one acre is to be disturbed by this project, you will need to apply for a general storm water permit NCGOI (Construction Activities) through NC Department of Energy, Mining and Land Resources (DEMLR). Your cooperation is appreciated and we look forward to working with you on this project. Sincerely, Chris Grubb Propeyty Development Coordinator PROJECT NAME: Solace Preserve PROJECT ID: 20220006 LOCATION: Little Laurel Extension DISTURBANCE: 3.29 Acres SUBMITTED BY: Interface Environmental Consulting DATE RECEIVED: 9-16-22