Loading...
HomeMy WebLinkAboutSW6221102_Stormwater Narrative_20221128OVERVIEW This report contains the storm water management overview for the residential project Ashley Heights on Reservation Road in Hoke County. The project site is currenfly undeveloped. The proposed site consists of 91286 acres. The proposed site is located 'n Flood Zone -X' as shown on FFMA FIRM Panel 3710848800J w4h an effective cate of 10/111/06. Fieod zones are subject to change by F MA. There are no existing stream o, wetland features on the proposed property. There ere three proposed storm wa=er moncgement facilities (one infiltration basin, and two wet ponds and) outlined in this report and have been designed for post —development peak cttenuation to treat the irnperv;ous areas of the development. The infiltra= on Basin SCM 1 is designed to capture a drainage area of 11.92 ac with an impervious area of 2.36 cc. The Wet Fond SCM 2 is designed to capture a drainage area of 13.55 ac with an impervious area of 3.17 ac. The Wet Pond SCM 3 is designed to capture a drainage area of 62.66 cc with an impervious area of 14.54 ac. The balance of the site Is open space and will by—pass tree proposed SCMs. The SCMs are designed to Erect a 1,0" storm event. Impervious Area Summary — Infiltration Bgain SCM i Roadway 29,771 sf 0.68 ac Sidewalk 4 896 sf 0.11 ac Roof 17 lots @ 4,000 sf lot 68,000 sf 1.56 ac Offsite 300 sf 0.01 ac Total IA to Pond 102,967 sf 2.36 ac Impervious Area Summary- Wet Pond SCM 2 Roadway 36,007 sf 0.83 ac Sidewalk 5 822 sf 0.13 ac Roof 23 lots @ 4,000 sf lot 92 000 sf 2.11 ac Total IA to Pond 133,829 sf 3.07 ac Impervious Area Summary— Wet Pond SCM 3 Roadway 140 016 sf 3.21 ac Sidewalk 23 700 sf 0.55 ac Roof 90 lots @ 4 000 sf lot 360,000 sf 8.27 ac Offsite 109 858 sf 2.52 ac Total IA to Pond 633,574 sf 14.54 ac Sails The County Soils Survey indicc`es that Candor Scnd, Blaney Locmy Sand, Gheea Loamy Sand, crd Vaucluse Locmy Sand are present on the site.