Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6200404_Design Calculations_20221123
ADDITION OF SOF SSA SITE PERMIT MOD. 09/21/2022 Ft Bragg GSB Stormwater Pond Volume Comparison January-2020 Wet Pond Contour Interval (ft) NCDEQ Requirements (cf) EISA Option #2 Requirements (cf) Pre vs Post Development (10-yr) Provided in Design (cf) Volume Main Pool Vrotr 237 - 242.50 114,602 444,4a-� 114,972 118,621 Volume of Forebay VFe 240 - 243 17,190 17,246 17,682 Design Volume Dv 243 - 245,50 47,045 46rk9� 84,681 100,831 Pre -Development = 140,276 cf Post -Development = 255,248 cf A = 114,972 cf