HomeMy WebLinkAboutSW6200404_Stormwater Narrative_20221123Stormwater Management Narrative & Calculations For SOF Supply Support Activity Fort Bragg, North Carolina Prepared for Fort Bragg Water Management Branch Date: September 21, 2022 Prepared by Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 Belville, NC 28451 (910)383-1044 NC License No. C-1621 DESIGN NARRATIVE The SOF Supply Support Activity project site is located at the northwest corner of the intersection of Eagle Talon Drive and Tora Bora Boulevard. The GSB TEMF building is located west of the project site. The project consists of the design and construction of a general-purpose warehouse, a covered storage shed, access drives, utility installations, and stormwater conveyance infrastructure. The project site is located within a previously established stormwater permit boundary. As such, this is a submittal to modify the existing SOF GSB TEMF PN79453 Stormwater Permit (SW6200404). This modification will require any revisions remain in compliance with EISA Section 438 as prescribed by the original permit. 1*114kiIf1►`1W111I5I11211111010U]0Y11[110 The site has been previously cleared and rough graded. The existing site topography where most of the construction will occur is flat with slopes ranging from 1 to 2%. There is an existing stormwater treatment pond directly east of the project site. On the project side of the existing pond, elevations drop from 259 to 246 feet (pond top of bank) at an approximate 3:1 slope. A swale is located at the top of the slope to direct water to an existing catch basin. Existing stormwater infrastructure as well as existing utilities are located north and south of the project site. Portions of existing silt fence and a chain link fence will be removed as required for construction. An existing Conex Storage Container will also be removed from the project site. There are no known contamination areas located within the project site. The presence of unexploded ordnance or other hazardous materials are not anticipated. The project is located in the Cape Fear River Basin and drains to Stewarts Creek (Stream Index 18-31-24-5-4 Stream Class Q. PROPOSED IMPROVEMENTS Proposed improvements include a general-purpose warehouse, a covered storage shed, access drives, utility installation, and stormwater conveyance infrastructure. Heavy -Duty concrete pavement will be utilized for the circulation apron surrounding the buildings. The perimeter of the site will be paved with gravel. A segmented block retaining wall will be built between the perimeter gravel and existing stormwater pond. DRAINAGE CONSIDERATIONS: Proposed grading will consist of fills varying from 1 to 5 feet. Areas between the perimeter gravel and retaining wall will require additional fill. Positive drainage away from the building and within paved areas will be provided. Paved areas will be designed to have slopes between 1.0% and 5.0 max%. Runoff will be collected by catch basins in paved areas and then conveyed via stormwater pipes to the existing stormwater treatment pond. The bulk of the impervious area for the SOF SSA site was reallocated from the future impervious area bank previously established in the permit. However, the finalized site plan of the SOF SSA site resulted in a net increase of 0.28 acres within the overall stormwater pond drainage area boundary. Additionally, the drainage area of the permit boundary has been expanded to include the ingress driveway into the project site. Note that the originally permitted drainage area only measures 15.84 acres even though the pond design, calculations, and permit were based on a total contributing drainage area of 16.2 acres. The expanded drainage area to include the driveway extension was an additional 0.17 acres. Therefore, the total measured drainage area equals 16.01 acres which is still less than the originally designed and permitted 16.2 acres. As such, there was no drainage area increase consideration in this modification. Applicable original calculations provided by Mason & Hanger have been revised to reflect the net impervious area increase. The revised calculations show there is still sufficient existing pond geometry by NCDEQ Water Quality (1.0" storm) and EISA 438 standards (1.8" storm). Furthermore, the revised composite curve number calculation to include the SOF SSA site shows that the overall composite curve number has remained the same. Therefore, no hydrologic and pond routing calculations required any revisions. Any revisions to the original Mason & Hanger calculations will be crossed out and updated values will be provided in red text. Tables 2, 3, & 4 from the original permit report are provided below to show an overall summary of values that have remained unchanged or have been revised. The following items are included in this permit modification submittal: • Stormwater Management Permit Application • Revised Wet Pond Supplement • Revised Water Quality Calculations • Project Site Stormdrain Calculations • Project Site Outlet Protection Calculations • Project Site Stormwater & Erosion Control Plans TABLE 2 PRE -DEVELOPED COMPOSITE RUNOFF CURVE NUMBER CALCULATIONS AND PEAK FLOW AREA (AC) WEICNTED ? DRAINAGE AREA Q1 (CFS) 010 (CFS) Q25 (CFS) Wet Pond 17,E 56 1.31 17.28 28.52 TABLE 3 POST -DEVELOPED COMPOSITE RUNOFF CURVE NUMBER CALCULA T1ONS AND PEAK FLOW AREA (AG) WEIGHTED DRAINAGE AREA DRAINAGEQ1 (CFS) Q10 (CFS) j Q25 (CFS) Wet Pond `16.2 191 51.48 106.52 132.28 'Total drainage area and weighted CN remains unchanged. TABLE 4 WET POND VOLUME REQUIREMENTS WET POND MIN VOLUME REQUIRED (CF) NCDEQ EISA OPTION #2 REQUIRED (CF) VOLUME PROVIDED CF Volume Main Pool -.-4r6021 I4,15e2 l4 972 118,621 Volume of Forebay 18,889 17,190 17,246 17,682 Design Volume 5- 47,045 8; 84,681 100,531 `Volume Lased on the diiierence of the pest-deveiopment runoff volume and pre -development runoff volume for the 24-hour 10-year storm event- No change in this value, as the total drainage area and past -development ON has remained unchanged.