Loading...
HomeMy WebLinkAboutSW6200404_Supplement-EZ Form_20221123SUPPLEMENT-EZ COVER PAGE FORMSLOAD�D PROJECT INFORMATION 1 Project Name SOF Group Support Battalion (GSB) TEMF 2 Project Area ac 16.2 3 Coastal Wetland Area ac 0 4 Surface Water Area (ac) 0 5 Is this proect High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 021-1.1003(4) 7 Width of vegetated setbacks 8 Will the vegetated setback rei 9 if BUA is proposed in the sett 10 Is streambank stabilization pr does it meet NCAC 02H.1 ad on this project? 30+ Yes No _ No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 'Sand Filter 1 17 lRainwater Harvesting RWH 18 Green Roof 19 Level Spread er-Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 1 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 _ iFilterra FORMS LOA-, DESIGNER CERTIFICATION 27 IName and Title: Matthew Haley, P.E. 28 fOrganization, Cape Fear Engineerin , Inc. 29 Street address:__ 151 Poole Road Suite 100 30 City, State, Zip: Leland, NC, 28451 31 Phone number(s): (910) 383-1044 32 Email: matt.haley@capefearengineering.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. w��,r�4iin�cegaJd�gr ,� 09/21 /22 Signature of Designer Date DRAINAGE AREAS 1 Is this a high density Project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 11-versions? If so number of low density drainage areas 0 Is all/part of this project subject to previous rule No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond 5 Total drainage area (sq ft705672 6 Onsite drainage area (sq ft705672 7 Offsite drainage area (sq ft0 8 Total BUA in project (sq ft588727 sf Increased by 11,993 sf New BUA on subdivided lots (subject to 9permitting) s ft New BUA not on subdivided lots (subject to 10 Dermittina) (sf) BUA (sq ft) I 12 113reakdown of new BUA not on subdivided lots: _ Parkin (sq ft) 404305 sf Sidewalk (sq ft) Roof (sq ft) 75971 sf Roadway sq ft) Future (sq ft) 0 sf Other, please specify in the comment box below s ft 108451 sf New infiltrating permeable pavement on 13 subdivided lots (sq ft) New infiltrating permeable pavement not on 14 subdivided lots (sq ft) Existing BUA that will remain (not subject to 15 permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed Lq_ft)__ 18 Percent BUA 83% 19 Design storm (inches) 1.0 in 20 Design volume of SCM (cu ft) 100831 cf� 21 Calculation method for design volume HIRT ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): "Other" BUA of 108,451 sf consists of aggregate surface in the existing GSB TEMF site and the proposed SOF SSA site. 90,673 Decreased by 152,460 sf Increased by 43,111 s WET POND 1 Draina a area number 1 2 Minimum required treatment volume (cu ft) 100831 cf -GENE 3 DC FROM 02H .1050 Is the SCM sized to treat the SW from all surfaces at build -out? Is the SCM located away from contaminated soils? W hat are the side slopes of the SCM H:V ? Does the SCM have retaining walls, gabion walls or other engineered side slopes? 4 5 6 7'Are the inlets, outlets, and receiving stream protected from erasion 10- ear storm)? 8 Is there an overflow or bypass for inflow volume in excess of the desi n volume? 9 What is the method for clewatering the SCM for maintenance? 10 If applicable, will the SCM be cleaned out after construction? 11 Does the maintenance access comply with General MDC 8 ? 12 Does the drainage easement comply with General MDC 9 ? 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? 14 Is there an O&M Agreement that complies with General MDC (11)? 15 Is there an O&M Plan that complies with General MDC 112j? Does the SCM follow the device specific MDC? Was the SCM designed by an NC licensed professional? MDC FROM 02H .1053 Sizing method used Has a stage/storage table been provided in the calculations? Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl Elevation of the main pool bottom (top of sediment removal) (fmsl) Elevation of the bottom of the vegetated shelf (fmsl) Elevation of the permanent pool (fmsl) Elevation of the top of the vegetated shelf fmsl) Elevation of the temporary pool (fmsl) Surface area of the main permanent pool (square feet) Volume of the main permanent pool (cubic feet) 1 Average depth of the main pool (feet)_ Average depth equation used E, If using equation 3, main pool perimeter (feet) 16 17 WET POND 18 19 20 21 22 23 24 25 26 27 28 29 30 Yes Yes 3:1 No Yes Yes Other Yes Yes Yes N/A Yes Yes Yes Yes HRT Yes 136.00 ?37.00 ?43.00 ?42.50 r44.00 r45.50 24185 8621 cf 300ft cation 2 31 If using equation 3, width of submerged veg. shelf (feet) _ 32 Volume of the forebay (cubic feet) _ 33 Is this 15-20 % of the volume in the main pool? 34 Clean -out depth for forebay (inches) 35 Design volume of SCM (cu ft) 36 Is the outlet an orifice or a weir? _ 37 If orifice orifice diameter inches) 38 If weir, weir height (inches) 39 If weir, weir length inches 1 8930.0 ft _ Yes 12 in 100831 cf Orifice 6 in 40 Drawdown time for the tem ors ool days) 2.9 41 Are the inlet(s) and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance (inches1 48 in 44 Depth of forebay at exit (inches) -- 48 in 45 Does water flow out of the forebay in anon -erosive manner?� Yes 46 Width of the vegetated shelf (feet) _' 6 ft 47 Slo e of vegetated shelf (H:V) 10:1 48 Does the orifice drawdown from below the top surface of the No_.. permanentpool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes 24-hr storm? 50 Are fountains proposed? (If Y, please provide documentation that No MDC(9) is met.) �51 Is a trash rack or other device provided to protect the outlet system? i Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Sod (Zoysia) 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about the 55 wet pond(s)- 1,1jet Pond 1 12:44 PM 9/21/2022