Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6200404_As-Built - Certification_20221123
Special Operations Forces (SOF) Group Support Battalion (GSB) TEMF - PN79453 Stormwater Management Permit SW6200404 Cumberland County Designer's Certification I, ; . JA2- d,4*)L- , as a duly registered- ^' ��n-- in the State of North Carolina, having been authorized to observe nodicali eekly/ full time) the construction of the project, 9WtX . ©?C-Z *IXW S 't RVI3 - Csot � Ga.wV ("fi) •r rMrl - PW7WSs.3 (Project Name) for Acc t', V�rw`=v4J (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specification: SEAL Signature L� — - — Registration Number 039 S9 8 Date I12A k,*Z-?— Submit this Designer's Certification to: NCDEQ Fayetteville Regional Office Division of Energy, Mineral and Land Resources 225 Green Street, Suite 714 Fayetteville, NC 28301 It. SCHEDULE OF COMPLIANCE 1. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The permittee shall at all times provide the operation and maintenance necessary to assure every SCM functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. • Semi-annual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of.all slopes in accordance with approved plans and specifications. f. Debris removal -and unclogging of all drainage structures, orifice device, flow spreader, catch basins and piping. g. Access to the SCM and outlet structure must be available' at all times. 3. F.ecords of maintenance activities must be kept for the SCM and made available upon request to authorized personnel of the. Division of Energy, Mineral and Land Resources. The records will indicate the date, activity, name of person performing the work and what actions were taken. 4. The SCM shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and with other supporting data. 5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the SCM certifying that it has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 6. SCMs impacted by sedimentation and erosion control during the construction phase shalt be cleaned out and converted to its approved design state. 7. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to :he approved plans, including, but i of limited to, those listed below a. Any rei ision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfe A of ownership. d. Redesk .n or addition to the approved amount of built -upon area orto the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the prof ►ct area. The project. area. Is defined as all property owned by the perrhittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 8. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of Eight years from the date of the completion of construction. 9. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit s written time schedule to the Director for modifying the site to meet minimum requirement.9. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made.