Loading...
HomeMy WebLinkAboutSW6220902_Plansheet - Proposed Conditions_Site Plan_20221102 (5)CURVE TABLE CURVE LENGTH RADIUS BEARING CHORD C18 34.14 375.00 S69°35'59"E 34.13 C19 47.30 375.00 S63°22'40"E 47.27 C21 35.79 255.00 S55°44'38"E 35.76 C22 75.27 255.00 S43°16'01 "E 75.00 C23 75.27 255.00 S26°21'14"E 75.00 C24 34.84 255.00 S13°58'59"E 34.81 C25 38.87 25.00 S54°36'33"E 35.07 C26 39.27 25.00 N34°55'52"E 35.36 C27 94.05 205.00 N23°12'44"W 93.23 C28 83.75 205.00 N48°03'35"W 83.17 C29 70.58 325.00 S65°59'09"E 70.45 LEGEND: ECM® ECM -EXISTING CONCRETE MONUMENT EIP Oo EIP-EXISTING IRON PIPE EiR Oo EIR-EXISTING IRON ROD EPKO EPK-EXISTING PK NAIL ERBO ERB-EXISTING REBAR SRBO SRB-SET REBAR o COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE PROPERTY LINE NOT SURVEYED - OPL - - - OLD PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY SETBACK LINE ss SANITARY SEWER LINE SD STORM DRAINAGE w WATER LINE OVERHEAD UTILITY CREEK WETLANDS PERMANENT EASEMENT X FENCE LINE ❑ ❑ WOODEN FENCE TREE LINE PP 0 UTILITY POLE 1Do-MlD 00 � i � loom FID ,00rR FLD / \ ,DDyR FAD ,oe / / N82°42'00"E 100YR FLD / , 1 62.06' 5' SIDEWALK R35' v, 1 0. 5' OFF R/W C'26 I Lp I / �00 SF / (TYP) a-u HAOOL \ `L�i 2� S10°04'08"E G1 G 24.82' \ co 1 / J ,P I 2' CONC. FLUME ILc 1A 1 / 20' SEWER EASEMENT / 1W 4, I o X P •1 1 14,746 SF� S I 1 0.34 AC 1 /2 34.17' au HWOL ORa1.4 moot r:1 i TO BE REMOVED \�'� V0 / ERB 1 1 ;o LA 00 / I cn - � C� GUY WIRE ��e 1 /2" N WATER VALVE 0 � EIP IQ10,910 SF i lr-emDrHYDRANT 0000' 61,436 SF / , / 0.25 AC „W 85,g0' 1 (f SANITARY SEWER MANHOLE 0 GRAVEL ASPHALT �N07'1T5-02.01' WATER WETLANDS 3/4" ERB C2.1 at o, a,10' f� `1 0140' S82°36'27"W lto I 160.93' ♦� `V `V I Vol ` 1 1 � � � *0 *4��� k � Li, N82°33'04"E I �j ♦ 1 48.49' a N82°33'04"E 1 137.90' TOTAL 52.08' I oa"E i I 1 N . ♦ ♦. 31.51' o 41, SD / i ♦ .L� ♦ / / ■� tx 2' CONC. FLUME Iop 001-100, 01 � � 1 12,312 SF 0.28 AC 41, \p ♦ ♦ / 00 �� Qv �, o I 1 ✓ I S80°37'04"W ♦ / , `off < 49 \ \ N80°51'02"E 100.05' 00/ \ I 53.311' 12,723 SF � I - - - - - �/ CA S51°43'25"E \ �o�` \ 0.29 AC 1 .CM 1 / / O 57.24' �'SR35' 1 \ 56,064 SF / \ �� ��• \ v� 1.29 AC O (FUTURE DEVELOPMENT) / / 48 \0,- - / / 1 �, / 10F S10 04'0 / 1\ (�1 � 0.29AC 1 .........�-_l � G'L�� 25.22' 221 �. co 0 o�- / - - - - - 1 /2„ ERB i 00 w a-u axool. \O NS A, J O NC GRID NAD 83 (2011) y s Op 1 /2" EIP J H O I� �i 00 C2.4 TEE POST N N/F EIS z MELVIN L. WICK & 1 DANH T. WICK I � DB 940, PG 432 N C2.2 C2.3 0 SHEET KEY TEE Pi EIS 7 7 ' ii� ii� I ( MATCH LINE- SEE SHEET C-2.2 A CH ONE -to 'EE EIP SNECT C ft 2.3 GRAPHIC SCALE 40 0 20 40 80 160 ( IN FEET ) 1 inch = 40 ft. i 52D� 561 � I 1.41 AC 9• 55p0 o I / / � ,,� / 53 / ♦ / o O h (/ ♦ /� TO BE REMOVED/RELOCATED / a 10,400 SF - / v a 24" STD ROLL / �o� 0.24 AC / / � o N \ C&G (TYP) J � // ( / ♦ / j�♦. � c A \ X // 03 0 \ N23 00' 0 �k fil - o 1# 7° 02.2,0 BE REMOVED I �/ I\ 0 / / _10' UTILITY 54 / ■ EASEMENT I ♦ I,I ■ I 10,400 SF I CDTO BE REMOVED 0.24 AC° If■ \/ \ j -� ■ 15,665 SF / S3 20' DRAINAGE L 0.36 AC Oyu EASEMENT 00, /V1j•4;;322 "0 0C9/ 0W115.0 ` / 0955 ' 1' 10,117 SF SRBI \ / 21.4 \ 0.23 AC 21.26' \ \ \ W2 ♦ 1 \ S SRB`'/ ■ ls�_ 12,326 SF 0.28 AC l / �� 130 w ♦ I .` / •00 / / ■ r 5 1 SF -A N/F TON1 BE REMOVED ^vi N �• / / / J&K GENERAL CONTRACTOR, INC. 1 �• ti DB 1336, PG 761 \ \ / 100.200ACF / / / / I I44 /moo � / �' � ♦ � / � /, / �, �, .1, ■ / � � � 1 /2„ O /o o S1 j4, SRB \ 10,805 SF 1 -12.7 0.25 AC / o N o / 00? w �/ ♦ / �/ ♦ 1 I \ ° w 1/2" �. o �--� I N1 / / �; SRB / r `CO 4 1 I 13 , �l /� ,v 57 ♦ J&K GENERAL CONTRACTOR, INC. \ 3 g3, N / / , I' \ ^N 10,400 SF 30' NEGATIVE BUFFER DB 1336, PG 761 I I / v) / 0.24 AC / / / o � FROM TOP OF BANK�I PP 1 /2„ \ / l S1 4 j. \ ♦ �' `L `1' ` SRB 0.21 SF 32' 1 / ♦ -� .21 AC o / / l� \ o oo w �l h� ­4* 1 �\ o � \ I _ 4j32'f 1j / 00 l N Z ) RBII � ■ �`3 � 1 3 66 58 !) N/F I \ N ■ / / J&K GENERAL CONTRACTOR, INC. 10,400 SF • /�/ DB 1336, PG 761 0.24 AC 1 \ 1 • \ / ' / I S1 ♦. � � /2 1SRB '1 ,4�32»w 13 00\/ ♦ i Z i � I : � � � I _ -1 _4 a II. II. f MATCH LINE- SEE SHEET C-2.3 0site solutions civil engineering I Land surveying 409 Chicago Drive, Suite.U2, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com CAR, z Zp ��'•. FESS /0�41 i1 nab _ sF•::' suR�: ��`� 'zz 4,41 R till •ilP\`c N`` b+05.22 REVISIONS PROJECT NAME WOOD LAKE II PHASE II SUBDIVISION DETAILED SITE PLAN CLIENT RAEFORD DEVELOPMENT COMPANY, LLC 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: BRETT CHECKED BY: SCOTT PROJECT NUMBER: 1632 DRAWING SCALE HORIZONTAL: 1 "=40' DATE RELEASED APRIL 5, 2022 SHEET NUMBER G2.4