HomeMy WebLinkAboutSW6220902_Plansheet - Misc. Detail_20221102TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR LATE WINTER AND EARLY SPRING)
SEEDING MIXTURE:
SPECIES RATE (LB./ACRE)
RYE (GRAIN) 120
ANNUAL KOBE LESPEDEZA 50
OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT EXTEND BEYOND JUNE.
SEEDING DATES:
JANUARY 1 - MAY 1
SOIL AMENDMENTS:
FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LBJACRE GROUND AGRICULTURAL LIMESTONE AND 750
LBJACRE 10-10-10 FERTILIZER.
MULCH:
APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL.
A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.
MAINTENANCE:
REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING
EROSION OR OTHER DAMAGE.
TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR SUMMER)
SEEDING MIXTURE:
SPECIES RATE (LB./ACRE)
GERMAN MILLET 40
A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LBJACRE.
SEEDING DATES:
MAY 1- AUGUST 15
SOIL AMENDMENTS:
FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LBJACRE GROUND AGRICULTURAL LIMESTONE AND 750
LB./ACRE 10-10-10 FERTILIZER.
MULCH:
APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL.
A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.
MAINTENANCE:
REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING
EROSION OR OTHER DAMAGE.
TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR FALL)
SEEDING MIXTURE:
SPECIES RATE (LB./ACRE)
RYE GRAIN 120
SEEDING DATES:
AUGUST 15 - DECEMBER 30
SOIL AMENDMENTS:
FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND
1,000 LBJACRE 10-10-10 FERTILIZER.
MULCH:
APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL.
A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.
MAINTENANCE:
REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB./ACRE OF NITROGEN IN MARCH. IF
IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LBJACRE KOBE LESPEDEZA
IN LATE OR EARLY MARCH.
1 TEMPORARY SEEDING SPECIFICATIONS
CURB AND GUTTER TO BE POURED
IN 10' SECTIONS WITH EXPANSION
JOINTS EVERY 50'
(90' IF MACHINE PLACED)
11 3/8"
(END OF CURVE)
CVCN
(V
rn 3000 PSI
CONCRETE
(LOW POINT INBCURVE)
24"
7 24" STANDARD ROLL CURB
10
1/8" RADIUS
II
4"
1/2" JOINT FILLER GROOVE JOINT IN SIDEWALK
TRANSVERSE EXPANSION
JOINT IN SIDEWALK
5' 5.5'
11.0
-I I I -I I ME El III -III 4
T-
NOTE:
JOINT SEALER
1/8" TO 1/4"
1. PROVIDE CONTROL JOINTS AT DISTANCE EQUAL TO WIDTH OF
SIDEWALK, PROVIDE 1/2" EXP. JOINTS WITH PRE -MOLDED E.J.
FILLER AT MAX. 30' O.C.
2. CONCRETE COMPRESSIVE STRENGTH SHALL BE 3000 PSI.
IN 28 DAYS.
SIDEWALK WITH CURB
NTS
NTS
SEEDING MIXTURES:
SPECIES RATE (LBS./ACRE
TALLFESCUE 80
PENSACOLA BAHIAGRASS 50
SERICEA LESPEDEZA 30
KOBE LESPEDEZA 10
SEEDING NOTES:
1. FROM SEPT. 1 TO MAR. 1 USE UNSCARIFIED SERICEA SEED.
2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LBJACRE.
3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LBJACRE.
NURSE PLANTS:
BETWEEN APRIL 15 AND AUG. 15, ADD 10 LBJACRE OF GERMAN MILLET OR 15 LBJACRE SUDANGRASS. PRIOR TO MAY 1
OR AFTER AUG. 15, ADD 25 LB./ACRE RYE (GRAIN).
SEEDING DATES:
BEST POSSIBLE
EARLY SPRING: FEB. 15 - MAR. 20 FEB. 15 - APR. 30
FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31
SOIL AMENDMENTS:
APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 - 5,000 LBJACRE GROUND AGRICULTURAL
LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB./ACRE 10-10-10 FERTILIZER.
MULCH:
APPLY 4,000 LB./ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY
TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH
BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL.
MAINTENANCE:
IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO THE SOIL TESTS OR
TOP DRESS WITH 500 LBJACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE.
RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY.
SEEDING MIXTURE
SPECIES RATE (LB./ACRE)
COMMON BERMUDAGRASS 40-80(1-2 LB./1,000 FTC)
SEEDING DATES:
COASTAL PLAIN: APR. - JULY
SOIL AMENDMENTS:
APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 LBJACRE GROUND AGRICULTURAL LIMESTONE
AND 500 LB./ACRE 10-10-10 FERTILIZER.
MULCH:
USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF
CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON
CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000
LB./ACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP.
MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOG
DRAINAGE DEVICES.
MAINTENANCE:
A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECTION AND REPAIR MULCH FREQUENTLY.
REFERTILIZE THE FOLLOWING APR. WITH 50 LBJACRE NITROGEN.
2 PERMANENT SEEDING SPECIFICATIONS
SUBGRADE
CARRY BASE COURSE 1'
BEYOND BACK OF CURB
N
00
COMPACTED
C
NTS
8 ASPHALT PAVEMENT
GRASSED OR RIP RAP LINED SWALE
NOTE: THIS CROSS SECTION IS TO BE USED FOR THE
ENTIRE LENGTH OF THE SWALE.
SEE PLAN FOR WIDTH
GRASS OR EROSION EXISTING
CONTRL LINING SEE GROUND
GRADING PLAN
SEE PLAN FOR
1L DEPTH
3 1
3 CONSTRUCTION SPECIFICATIONS:
-III I I III-11 1. REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER
-1I 1-1I II I II I OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA.
2. EXCAVATE THE CHANNEL AND SHAPE IT TO NEAT LINES
COMPACTED AND DIMENSIONS SHOWN ON THE PLANS PLUS 0.2 FT
SUBGRADE OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW
2.0' UNLESS FOR BULKING DURING SEEDBED PREPARATIONS AND SOD
OTHERWISE SHOWN BUILDUP.
3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL
SO THAT SURFACE WATER MAY ENTER THE CHANNEL
FREELY.
4. ESTABLISH GRASS IN THE CHANNEL IMMEDIATELY.
5. USE SEEDING SPECIFICATIONS SHOWN ON THIS SHEET
TO SEED SWALES.
MAINTENANCE & CONSTRUCTION:
1. INSPECT THE SWALE FOR EROSION ONCE A WEEK AND AFTER EVERY RAINFALL.
2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED AREAS.
3. MAINTAIN PROPER CROSS SECTION UNTIL THE SWALE IS STABLE.
4. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES.
11 TYPICAL SWALE CROSS SECTION
1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND
STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL
BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE
MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH
CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK.
2. THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITY
ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE
WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING
ACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION.
3. IF POSSIBLE ALL EROSION AND SEDIMENT CONTROL MEASURES
ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL
PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS
OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT
LIMITED TO OFF -SITE BORROW OR WASTE AREAS STAGING OR
STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT
A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR
REVIEW AND TO NCDENR REGIONAL OFFICE FOR APPROVAL.
CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL
NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE
CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A
COPY OF THE AMENDED PERMIT.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY
ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT
EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENR
ORTHE ENGINEER.
7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT
CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING
ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL
STABILIZATION IS ACHIEVED.
8. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE
IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND
STABILIZED.
9. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED
INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO
RECEIVING OUTLET.
10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL
MEASURES WEEKLY AND AFTER EACH RUNOFF -PRODUCING EVENT
ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE
EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE
MADE IMMEDIATELY.
11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE
REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT
GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE
ENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED.
12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE
REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND
ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED AREA.
13. WHEN CROSSING CREEK OR DRAINAGE -WAY, THE CONTRACTOR
SHALL RIP -RAP WITH FABRIC DISTURBED BANKS AND CHANNEL AND
RESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN
2:1 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZED
IMMEDIATELY.
GRAVEL ENTRANCE SHALL BE 50 FEET
IN LENGTH AND 12 FEET IN WIDTH
WITH 20 FOOT RADIUS AT EXISTING
ROADWAY
36-0" MIN 4'-0" 10'-1"
6"�
a
FILTER FABRIC 2-3" WASHED STONE
GRAVEL CONSTRUCTION ENTRANCE
�6" IN. THICKNESS
_ �V/
6" MIN. THICKNESS \\V//
2-3" COURSE
DESIGN CRITERIA
AGGREGATE SIZE - USE 2-3 INCH WASHED STONE
DIMENSION OF GRAVEL PAD
THICKNESS-6INCHES MINIMUM
WIDTH- 12 FT. MINIMUM OR FULL WIDTH AT ACCESS
POINTS OF THE VEHICULAR ENTRANCE AND EXIT
AREA, WHICHEVER IS GREATER
LENGTH - 50 FT. MINIMUM.
LOCATION - LOCATE CONSTRUCTION ENTRANCES AND
EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE
AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL
CONSTRUCTION VEHICLES. AVOID STEEP GRADES
AND ENTRANCES AT CURVES IN PUBLIC ROADS.
CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL
CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS
REQUIRED FOR STAGING AND/OR BORROW AREAS AND
MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER.
CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL
CONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINAL
ACCEPTANCE.
MAINTENANCE
MAINTAIN THE GRAVEL PAD INBA CONDITION TO PREVENT MUD OR
SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY
REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH
RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND
CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL
OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO
PUBLIC ROADWAYS.
NTS
3 GENERAL EROSION AND SEDIMENT CONTROL NOTES 4 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE
DRIVE STEEL POSTS 18" INTO THE GROUND ATTACH WIRE FENCE TO POSTS AND EXTEND NOTES:
MAXIMUM 8' O.C. AND EXCAVATE A 4" X 8" THE BOTTOM OF THE FENCE 8" INTO THE
TRENCH UPHILL ALONG THE LINE OF EXCAVATED TRENCH AND TURNED OUT
POSTS. 4" IN THE TRENCH. 1. WIRE SHALL BE A MINIMUM OF 32 INCHES IN WIDTH AND
TOP & BOTTOM STRAND SHALL HAVE A MINIMUM OF 6 WIRES WITH 12" STAY SPACING. STANDARD METAL POSTS 2'-0" IN GROUND
MIN. 10 GA. WIRE
2. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND
STEEL POSTS STAY WIRES SHALL BE FASTENED ADEQUATELY TO THE WIRE WITH #9 WIRE
MIN. 12-1/2 GA STAPLES 1-1/2" LONG. FABRIC THAT DETERIORATES TO SUCH 19 GAUGE HARDWARE CLOTH (1/4
LINE WIRES EXTENT THAT ITS EFFECTIVENESS IS REDUCED SHALL BE MESH OPENINGS)
MIN. 12-1/2 GA. REPLACED BY CONTRACTOR AT CONTRACTOR'S EXPENSE.
3. STEEL POSTS SHALL BE A MIN. OF 5' HEIGHT AND SHALL BE
THE SELF FASTENER ANGLE STEEL TYPE.
�- CONSTRUCTION SPECIFICATIONS
4. CONTRACTOR SHALL REVIEW SILT FENCE ONCE PER WEEK
_ AND AFTER EACH RAINFALL OCCURRENCE. ANY NECESSARY _ C - 1. UNIFORMLY GRADE A SHALLOW DEPRESSION
_ REPAIRS OR CLEAN-UP TO MAINTAIN THE EFFECTIVENESS OF I - •�• $ - APPROACHING THE INLET.
THE DEVICE SHALL BE MADE IMMEDIATELY.
` 1 4 3 2. DRIVE 5-FOOT STEEL POSTS 2 FEEr INTO THE GROUND
/ 761 5. REMOVE DEPOSITED SEDIMENT ALONG THE FENCE TO SURROUNDING THE INLET. SPACES POSTS EVENLY AROUND
U j�I PROVIDE ADEQUATE STORAGE VOLUME AND TO REDUCE
' PRESSURE ON THE FENCE AS NEEDED. - `}30 THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET
STEP 1 STEP 2 .� ��� O �- APART.
5. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE y�
CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENR j6p p1II>U 4 -U� O -_ 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE
ATTACH THE FILTER FABRIC TO THE WIRE FENCE, BACKFILL THE TRENCH AND COMPACT THE SOIL REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE �O 1 g CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT
EXTEND THE BOTTOM OF THE FABRIC 8" INTO THE FIRMLY TO ANCHOR THE BOTTOM OF THE SILT CONTRIBUTING DRAINAGE AREA IS STABLE. 4to
de& rrrppp THE TOP, MIDDLE AND BOTTOM. PLACING A 2 FOOT FLAP
TRENCH AND TURNED OUT 4" IN THE TRENCH. FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. �goOF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING
96o19mcul� 00. O ODo• - IS RECOMMENDED.
POSTS MAX 8' O.C. -� 4. PLACE CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON
A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES AROUND THE
JXFILTER
FENCE "HOG WIRE' 2:1 SLOPE GRAVEL FILTER 57 WASHED STONE PLACED TO A HEIGHT OF 16" WIRE AND SMOTH TO AN EVEN GRADE.
A R FABRIC MINIMUM ABOVE TOP OF BOX
5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN
_ $ QRE STAPLES 1-1/2° LONG STABILIZED, REMOVE ACCUMULATED SEDIMENT AND
ESTABLISH FINAL GRADING ELEVATIONS.
TOM OF WIRE FENCE AND
FABRIC BURIED 8" IN 6. COMPACT THE AREA PROPERLY AND STABILIZE IT WITH
\ wAVATED TRENCH & TURNED GROUNDCOVER.
x4" IN THE TRENCH
_FLOW
STEEL POST DRIVEN
24" INTO GROUND
A._ y(
STEP 3 STEP 4 SECTION A -A
MAINTENANCE
1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. MAINTENANCE
2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER)
RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE
3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT
PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. THE WIRE MESH DURING THE SEDIMENT REMOVAL. REPLACE STONE AS NEEDED.
4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE AFTER NTS NTS
THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED AND NCDENR APPROVES REMOVAL.
5 SILT FENCE 6 HARDWARE CLOTH & GRAVEL INLET PROTECTION
0
0' UTILITY
ASEMENT
5'
1.5% _ - I 1.5%
- - - - -
Sdope -I I -1 11=1 11=1 11 -I
I,�II
14'
2' 12'
3%
8" CABC
50' ROW
2"
10' UTILITY
EASEMENT
14' 6' 4.5' �a+1
12' 2' 1 SjQ j
E 1 .5%
S9.53 3% r 1.5%
GROUP II
NOTES
1. SECTION SHOWN TO DEPICT TYPICAL CUT & FILL CONDITIONS
ONLY. GRADING PLAN SHOWS WHETHER SECTION IS IN CUT,
FILL OR BOTH
2. GEOTECHNICAL ENGINEER SHOULD BE CONSULTED TO DETERMINE
DEPTH OF ABC NEEDED TO MEET NCDOT REQUIREMENTS
3. DEVELOPMENT WILL HAVE SIDEWALK ON ONE SIDE OF THE ROAD,
SEE PLAN FOR SIDEWALK LOCATIONS.
ROADWAY TYPICAL SECTION
1-
MAX. 25' RADII ALONG THE EXISTING ROAD AT ALL NEW ROAD CONNECTIONS.
NTS (60' MIN. FLOOR WIDTH) NTS
[NOT PERMISSIBLE FOR NEW CONSTRUCTION]
12 HANDICAP RAMP WITH TRUNCATED DOMES 13
GROUND STABILIZATION CHART
SITE AREA
STABILIZATION
STABILIZATION TIME
DESCRIPTION
TIME FRAME
FRAME EXCEPTIONS
PERIMETER DIKES,
SWALES, DITHCES
7 DAYS
NONE
AND SLOPES
HIGH QUALITY
WATER (HQW)
7 DAYS
NONE
ZONES
IF SLOPES ARE 10' OR
SLOPES STEEPER
7 DAYS
LESS IN LENGTH AND ARE
THAN 3:1
NOT STEEPER THAN 2:1,
14 DAYS ARE ALLOWED
SLOPES 3:1 OR
7-DAYS FOR SLOPES
FLATTER
14 DAYS
GREATER THAN 50 FEET
IN LENGTH
NONE
ALL OTHER AREAS
(EXCEPT FOR
WITH SLOPES FLATTER
14 DAYS
PERIMETERS AND
THAN 4:1
HQW ZONES)
GROUND STABILIZATION CHART
NTS
NTS
site
solutions
civil engineering I land surveying
0409 Chicago Drive, Suite 112, Fayetteville, NC 28306
office 1 910-426-6777 fax 1910-426-5777 license number I C-2354
www.4Dsitesotutions.com
REVISIONS
PROJECT NAME
WOOD LAKE II
PHASE II
SUBDIVISION
EROSION
CONTROL & SITE
DETAILS
CLIENT
RAEFORD
DEVELOPMENT
COMPANY, LLC
645 Laurinburg Highway
Raeford, North Carolina 28376
Phone: (910) 638-6102
PROJECT INFORMATION
DESIGNED BY:
CHRIS
DRAWN BY:
BRETT
CHECKED BY:
SCOTT
PROJECT NUMBER:
1632
DRAWING SCALE
NOT TO SCALE
DATE RELEASED
APRIL 5, 2022
SHEET NUMBER
C-600