Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6220902_Plansheet - Grading_Drainage Plan_20221102
zU SITE Y CJ Q 2 Z 0 ROCKF�S NORTI-1 VICINITY MAP NOT TO SCALE LEGEND: ECM® ECM —EXISTING CONCRETE MONUMENT EIP Oo EIP—EXISTING IRON PIPE EIR Oo EIR—EXISTING IRON ROD EPK0 EPK-EXISTING PK NAIL ERBO ERB-EXISTING REBAR SRBO SRB-SET REBAR o COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE - oPL - - - OLD PROPERTY LINE ADJACENT PROPERTY LINE - - RIGHT-OF-WAY -SETBACK LINE ss SANITARY SEWER LINE SD STORM DRAINAGE w WATER LINE OVERHEAD UTILITY - CREEK WETLANDS PERMANENT EASEMENT X FENCE LINE WOODEN FENCE — roc— roc— LIMITS OF CONSTRUCTION — sF — sF — SILT FENCE LINE TREE LINE PPS UTILITY POLE C• GUY WIRE WV N WATER VALVE xFIRE HYDRANT (J SANITARY SEWER MANHOLE GRAVEL HACKNEY LANE ` ASPHALT 60' PUBLIC R/W OWATER 0 WETLANDS 0INLET PROTECTION / 'vCHECK DAM -7 GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) I I N/F o DARREN PITTMAN & WIFE, 27 N/F RIS E. BRYSON B 785, PG 287 r� 28\1 N/F I TEREN J BRUNNER &WIFE o a 0 N TRACEY PITTMAN TRACT A OF DB 976, PG 674 PC 3, SLIDE 3-47, MAP 007 lo 50 II 11 N 49 1 ('� �I 1 CA f f �111�11� 48 1 TBM / 0 4D DISK #4 N 451,904.035 �� o �E 1,957,824.774 ELEV NC GRID71 NAD83 tr NAVD 188 LUaU arool El o 54 /III - �P 1 ,f 55 5 // 1 56 JGENERAL CONTRACTOR, INC. DB 1336,PG 761 I \ 57 � II II N/F I J&K GENERAL CONTRACTOR, INC. �p DB 1336, PG 761 I 3 I �� _ I 58 N/F 1 I I JK GENERAL CONTRACTOR, INC. I \ DB 1336, PG 761 5 [6 II I'd' / /// I ��2 �� 1 \ PP / l PP J&K GENERAL CONTRACTOR, INC. DB 1336, PG 761 1 /=I N/F J&K GENERAL CONTRACTOR, INC. I �` �- DB 1336, PG 761 \ I W I J 1 �l WOODROW WILSON 1 I DB 1310, PG 972 1 CA //l IN 1 , NF // ❑ �� ALLEN BAREFOOT JR. 1 / DB 769, PB 532 1 0— Know what's below. 63 �� Call before you dig. i / I LIDE 2-51, MAP 001 LEIA DAWNE BRUNNER Qo / O�\J� N F DB 300, PG 905 I PC 2, SLIDE 2-51, MAP 001 0 �QVV- ) CA4 75 74 73 72 p1V - �� STUART VALEVIS & WIFE N� �P`N QR\ o D 76 -- ((;A ,/ /�� RHON33 VELEVIS I Na � FLRI / � - p1V �� - CA � � DB 333, PG CONSTRUCTION SEQUENCE v -- / cJO g0 , 7 \-�?7��SF�D1 � DIV � � / � 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND 79 /'sue i ��- plV p1V S� — / _ —_ J% 69 - \ - HOLD PRE CONSTRUCTION CONFERENCE. // 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT \- FENCE, CHECK DAMS, SKIMMER BASIN, SEDIMENT TRAPS AND DISSIPATERS WHERE SPECIFIED. 50' BRIDAL PATH EASEMENT 3. CLEAR AND GRUB THE SITE AS NEEDED. PC 2, SLIDE 2-51, MAP 001 / 11 I I I _ - 111 4. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING i / '-^ j TO AREAS REMAIN GRASSED. `` ice% - 68 \ I N 5. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN. ` _sue0n a _� _�� , � 67 66 I CLAUDE THOI ` INSTALL UTILITIES. 4 DB 224, 7. INSTALL ALL RIP RAP DISSIPATERS AND INLET PROTECTION / ON ALL NEW STORM WATER INLETS. / _ 8. PERFORM FINE GRADING. CD CA 3� o° _ — J ` - W W W I -I 9. INSTALL AND PREPARE BASE COURSE. I / '� r- ! W W W W �� AND PARKING LOTS. 3000UTN ITYTY OEASEMENT / II 11F HOKE . FERTILIZ. PAVE E, SEED SAND MULCH ALL REMAINING DISTURBED W DB 885, PG 710 _ AREAS. PC 3, SLIDE 3-99, MAP 001 12. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO COUNTY OF HOKE ( REMOVE ALL TEMPORARY MEASURES. 30' UTILITY EASEMENT I - J \ 13. AFTER THE SITE HAS BEEN STABILIZED, REMOVE \ DB 885 PG 710 TEMPORARY CHECK DAMS AND FINAL GRADE THE % PC 3, SLIDE 3-99, MAP 003 PERMANENT SWALES FOR THE SITE. p)) \ 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED o / I AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND PO S G S / ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. \ INV219.000 �� ^ / / ` I Cq N/F N/F 15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL © \ JAMES WOOD &WIFE, I LUMBEE QUALITY BUILDERS INCORPORATED - STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST 11� BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF \ MARGA, PG 114 B. WOOD I DB 1228, PG 714 DB 11212TERMINATION (NOT). THE NOT IS AVAILABLE AT: 14 EROSION CONTROL NOTES BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH GRADING OR SITE �� / / ll) HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. / � \ 9'n , ��,p'� �P�\J� 1� O BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT � �9� \\ �(�►� �� I / / �` 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE AND EROSION DUE TO RAIN, WIND AND RUNNING WATER WITHIN 14 DAYS. USE MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE / / a FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED FROM THE SEEDING AND MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND \ OF TERMINATION PROCESS. SEDIMENT TRAP AND INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE MEASURES. USE I / `�\\\�\\ ❑ HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR REPLACED EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. PHASE 1 I / / . WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL DEVICES AFTER THE GRADING NOTES PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' PROTECTED AREA HAS UNDERGONE FINAL STABILIZATION AND PERMANENT PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. /j / DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO VEGETATION HAS BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE 1. ALL SPOT ELEVATIONS ARE TO THE EDGE OF PAVEMENT, UNLESS OTHERWISE 7. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH / / COUNTY OF HOKE � MAINTAIN A PROPER BARRIER. THE ACTION PRIOR TO REMOVAL. NOTED. 3:1 SLOPES AND SURROUNDED BY SILT FENCE. 30' UTILITY EASEMENT 2. TEMPORARY EROSION CONTROL FACILITIES AND/ OR PERMANENT FACILITIES 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE / / �j ��� /• / DB 885, PG 710 INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL \ INITIATION OF CONSTRUCTION ACTIVITY. 2. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING 8. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. PC 3, SLIDE 3-99, MAP 001 BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN 9. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A PO 14 / AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. \ OVER ALL OTHER CONSTRUCTION ACTIVITIES. ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL INV 21&70 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND NEIGHBORING ROADS. FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK ON THIS PROJECT. 3. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL \ \ 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL \ CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; DRAINAGE PATTERNS. PLANNING AND DESIGN MANUAL. STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS 10. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A MINIMUM OF IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE BEEN COMPLETED THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. , MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 4. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER 11. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED 910-433-3300 - 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND EQUAL SUBSTITUTE. PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE 12. STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF THE BOX FOR ALL WHEN TRACKING OCCURS. STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 PLAN STRUCTURES UNLESS OTHERWISE NOTED. 6. LOCATE SOIL STOCKPILES NO LESS THAN TWENTY-FIVE (25) FEET FROM ANY CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR 5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF 13. ALL STORM PIPE IS CLASS IV RCP UNLESS OTHERWISE NOTED. 1 i _ PUBLIC, OR PRIVATE ROADWAY OR FIFTY (50) FEET FROM A DRAINAGE OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. SHOWN ON THESE PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. EROSION FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 6. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER 3 TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY GRAPHIC SCALE FIVE FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT COMPLETION OF CONSTRUCTION DEVELOPMENT. 100 0 50 100 200 N/F MORE THAN 24 HOURS. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES / PC 4, SLIDE 4-108, MAP 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE SEDIMENT / UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT DURING THE COURSE OF CONSTRUCTION. _ TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES MULCHED ACCORDING TO THE DETAILS HEREIN. ( IN FEET ) IMMEDIATELY. 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON SITE IS 1 inch = 100 ft. 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH HAVE STEVE PHILLIPS. CONTACT 910-638-6102. W 11 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED S86°46'05"E 99.28' TIE 31 I 17 1 � oy 7o' GROVE WALK ROAD' 0:::- 50' R/W (PRIVATE) � r < O�D _ 71 0 I<b»<« �7�mil�m'>S 71 70 400 ■ site solutions Ocivil engineering I land surveying 409 Chicago Drive, Suite.U2, Fayetteville, NC 28306 office 1 910-426-6777 fax 1910-426-5777 license number I C-2354 www.4Dsitesotutions.com SEA 02 G � NE •: ja��� U`i U5=22 REVISIONS PROJECT NAME WOOD LAKE II PHASE II SUBDIVISION OVERALL GRADING AND EROSION CONTROL PLAN CLIENT RAEFORD DEVELOPMENT COMPANY, LLC 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: BRETT CHECKED BY: SCOTT PROJECT NUMBER: 1632 DRAWING SCALE HORIZONTAL: 1 "=100' DATE RELEASED APRIL 5, 2022 SHEET NUMBER