Loading...
HomeMy WebLinkAboutWQCS00370_NOV-2022-PC-0639 Response - Potential Scope for Review-8-22-22_202211162019 Sanitary Sewer Improvements Project CS370698-01 August, 2022 Wastewater System Improvements Total Expected Project Cost Separate Bid Alternate 1 CSXT Related Work Base Bid- Improvements Item No. Description p Unit Quantity Estimated Unit Price Extended Total Price -Original Estimate Update Ratio Based upon Recent Bids Extended Total Price -Adjusted Actual Bid Unit Price Extended Total Bid Price Differential Revised Total for Reduction Potential Reduced Cost Unit Price Extended Reduced Total 1 Mobilization (Maximum 3% of Total Bid) LS 1 $27,000 $27,000 $54,000 $54,000 $150,000 $150,000 $96,000 1 $75,000 $75,000 2 By -Pass Pumping LS 1 $30,000 $30,000 $60,000 $60,000 $326,000 $326,000 $266,000 1 $120,000 $120,000 3 Erosion Control LS 1 $10,000 $10,000 $20,000 $20,000 $30,000 $30,000 $10,000 1 $20,000 $20,000 4 Batchelor Pump Station (PS-1) Improvements LS 1 $70,000 $70,000 $140,000 $140,000 $447,000 $447,000 $307,000 0 $447,000 $0 5 Pine Needles Pump Station (PS-2) Improvements LS 1 $70,000 $70,000 $140,000 $140,000 $482,000 $482,000 $342,000 0 $482,000 $0 6 Brickyard Pump Station (PS-3) Improvements LS 1 $231,000 $231,000 $462,000 $462,000 $1,185,200 $1,185,200 $723,200 1 $1,185,200 $1,185,200 7 Barnhill Pump Station (PS-4) Improvements LS 1 $70,000 $70,000 $140,000 $140,000 $435,000 $435,000 $295,000 0 $435,000 $0 8 Taylorwoods Pump Station (PS-5) Improvements LS 1 $75,000 $75,000 $150,000 $150,000 $351,000 $351,000 $201,000 0 $351,000 $0 9 Airport Pump Station (PS-6) Improvements LS 1 $90,000 $90,000 $180,000 $180,000 $612,000 $612,000 $432,000 0 $612,000 $0 10 Fawn Pump Station (PS-7) Improvements- Auto- dialer Only LS 1 $5,000 $5,000 $10,000 $10,000 $25,000 $25,000 $15,000 0 $25,000 $0 11 Mack Industries Pump Station (PS-8) Improvements LS 1 $70,000 $70,000 $140,000 $140,000 $326,000 $326,000 $186,000 0 $326,000 $0 12 RBI Pump Station (PS-9) Improvements- Auto- dialer Only LS 1 $5,000 $5,000 $10,000 $10,000 $25,000 $25,000 $15,000 0 $25,000 $0 13 Manhole Improvements -Type 1-See Detail EA 9 $1,500 $13,500 $3,000 $27,000 $2,975 $26,775 ($225) 9 $2,975 $26,775 14 Manhole Improvements -Type 2-See Detail EA 10 $1,800 $18,000 $3,600 $36,000 $2,500 $25,000 ($11,000) 10 $2,500 $25,000 15 Manhole Improvements -Type 3-See Detail EA 3 $3,500 $10,500 $7,000 $21,000 $32,000 $96,000 $75,000 0 $32,000 $0 16 Gravity Sewer Main Cleaning and CCTV Inspection (8-inch to 12-inch Mains) LF 14,300 $3 $42,900 $6 $85,800 $7 $100,100 $14,300 14,300 $7 $100,100 17 Point Repair for 8-inch Main (Include up to 6 feet of New Main) Depth 5' to 8' EA 3 $3,000 $9,000 $6,000 $18,000 $6,500 $19,500 $1,500 3 $6,500 $19,500 18 Point Repair for 8-inch Main (Include up to 6 feet of New Main) Depth 8' to 12' EA 4 $3,200 $12,800 $6,400 $25,600 $8,400 $33,600 $8,000 4 $8,400 $33,600 19 Point Repair for 8-inch Main (Include up to 6 feet of New Main) Depth 12' to 16' EA 3 $3,500 $10,500 $7,000 $21,000 $13,700 $41,100 $20,100 3 $13,700 $41,100 20 Point Repair for 10-inch Main (Include up to 6 feet of New Main) Depth 12' to 16' EA 2 $4,000 $8,000 $8,000 $16,000 $14,700 $29,400 $13,400 2 $14,700 $29,400 21 Point Repair for 12-inch Main (Include up to 6 feet of New Main) Depth 5' to 8' EA 2 $3,500 $7,000 $7,000 $14,000 $7,800 $15,600 $1,600 2 $7,800 $15,600 22 Point Repair for 12-inch Main (Include up to 6 feet of New Main) Depth 8' to 12' EA 1 $4,000 $4,000 $8,000 $8,000 $9,700 $9,700 $1,700 1 $9,700 $9,700 23 Point Repair for 12-inch Main (Include up to 6 feet of New Main) Depth 12' to 16' EA 3 $4,300 $12,900 $8,600 $25,800 $15,500 $46,500 $20,700 3 $15,500 $46,500 24 Point Repair for 12-inch Main (Include up to 6 feet of New Main) Depth 16' to 18' EA 2 $4,600 $9,200 $9,200 $18,400 $21,200 $42,400 $24,000 2 $21,200 $42,400 25 Additional Main Footage for 8-Inch Point Repairs Depth 5' to 8' LF 40 $35 $1,400 $70 $2,800 $190 $7,600 $4,800 40 $190 $7,600 26 Additional Main Footage for 8-Inch Point Repairs Depth 8' to 12' LF 24 $38 $912 $76 $1,824 $360 $8,640 $6,816 24 $360 $8,640 T.Tripp NC 017480 The East Group 324 Evans Street Greenville, NC 27858 Seperate Bid Alternate 1 CSXT Page 1 2019 Sanitary Sewer Improvements Project CS370698-01 August, 2022 Wastewater System Improvements Total Expected Project Cost Separate Bid Alternate 1 CSXT Related Work Base Bid- Improvements Item No. Description Unit Quantity Estimated Unit Price Extended Total Price -Original Estimate Update Ratio Based upon Recent Bids Extended Total Price -Adjusted Actual Bid Unit Price Extended Total Bid Price Differential Revised Total for Reduction Potential Reduced Cost Unit Price Extended Reduced Total 27 Additional Main Footage for 8-Inch Point Repairs Depth 12' to 16' LF 36 $45 $1,620 $90 $3,240 $405 $14,580 $11,340 36 $405 $14,580 28 Additional Main Footage for 10-Inch Point Repairs Depth 12' to 16' LF 24 $37 $888 $74 $1,776 $595 $14,280 $12,504 24 $595 $14,280 29 Additional Main Footage for 12-Inch Point Repairs Depth 5' to 8' LF 40 $40 $1,600 $80 $3,200 $240 $9,600 $6,400 40 $240 $9,600 30 Additional Main Footage for 12-Inch Point Repairs Depth 8' to 12' LF 24 $42 $1,008 $84 $2,016 $430 $10,320 $8,304 24 $430 $10,320 31 Additional Main Footage for 12-Inch Point Repairs Depth 12' to 16' LF 36 $46 $1,656 $92 $3,312 $625 $22,500 $19,188 36 $625 $22,500 32 Cap Service in Weaver MHP and Adjacent MHP EA 136 $600 $81,600 $1,200 $163,200 $2,000 $272,000 $108,800 100 $2,000 $200,000 33 Additional Trench Stabilization Stone Requested by Engineer Ton 500 $45 $22,500 $90 $45,000 $100 $50,000 $5,000 500 $100 $50,000 34 Pavement Replacement SY 300 $45 $13,500 $90 $27,000 $190 $57,000 530,000 300 $190 $57,000 35 Select Backfill CY 400 $30 $12,000 $60 $24,000 $52 $20,800 ($3,200) 400 $52 $20,800 36 Cut -In Connection to Existing 6-inch Force Main LS 1 $1,500 $1,500 $3,000 $0 $0 $0 37 6-Inch Force Main -Ductile Iron Pipe LF 580 $85 $49,300 $170 $0 $0 $0 38 6-Inch Force Main Drop & Connection to Exist Manhole LS 1 $2,500 $2,500 $5,000 $0 $0 $0 Total Administrative Costs Including Engineering -Grant Administration -Legal Contingency Total Project Estimated Project Cost Bid Alternate 1- Force Main in CSXT Right -of -Way $1,103,284 $279,250 $109,766 $1,492,300 $2,099,968 $279,250 $109,766 $2,488,984 $5,367,195 $279,250 $109,766 $5,756,211 $2,205,195 $279,250 $144,000 $2,628,445 Item No. Description Unit Quantity Estimated Unit Price Extended Total Price -Original Estimate Update Ratio Based upon US Bureau of Statistics CPI Inflation Calculator Extended Total Price -Adjusted Actual Bid Unit Price Extended Total Bid Price Revised Total for Reduction Actual Bid Unit Price Extended Total Bid Price 36 Cut -In Connection to Existing 6-inch Force Main LS 1 $1,500 $1,500 $3,000 $3,000 $5,450 $5,450 $2,450 0 $5,450 $0 37 6-Inch Force Main -Ductile Iron Pipe LF 580 $85 $49,300 $170 $98,600 $75 $43,500 ($55,100) 0 $75 $0 38 6-Inch Force Main Drop & Connection to Exist Manhole LS 1 $2,500 $2,500 $5,000 $5,000 $9,200 $9,200 $4,200 0 $9,200 $0 T.Tripp NC 017480 The East Group 324 Evans Street Greenville, NC 27858 CSXT License Fee/Encroachment Agreement Total Bid Alternate Costs $106,600 $33,500 $140,100 Total Revised Project Cost with Bid Alternate Included $2,629,084 $58,150 $33,500 $91,650 $5,847,861 $0 $0 $0 $2,628,445 Seperate Bid Alternate 1 CSXT Page 2