Loading...
HomeMy WebLinkAboutWQ0006075_Rescission Denial Letter_20221128ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director MADONNA FOX — OPERATIONS MANAGER POST OFFICE BOX 488 SPRUCE PINE, NORTH CAROLINA 28777 Dear Ms. Fox: NORTH CAROLINA Environmental Quality November 28, 2022 Subject: Application No. WQ0006075 Permit Rescission Denial Gem Mountain Gemstone Mine CLRS Closed -Loop Recycle System Mitchell County This letter is in reference to your permit rescission request received November 17, 2022. The Central and Asheville Regional Offices have reviewed your permit rescission request and have determined that the following items need to be addressed: 1. As indicated in the September 22, 2022 Compliance Inspection Report (attached), this facility does not currently recycle water from the mining operations. The recycled water needs to be pumped from the final settling pond into the sluice operation to avoid any potential discharge from the final settling pond into surface waters. 2. A freeboard marker needs to be installed in the final settling pond to monitor freeboard levels. Per Condition IIL6. of your existing permit, the final settling pond shall maintain a two foot freeboard at all times. 3. Develop and provide a spill control plan to address the release of wastewater. Accordingly, your permit rescission request has been denied because your facility does not currently meet the deemed permitted requirements in 15A NCAC 02U .0113(a)(18). Please contact the Asheville Regional Office at (828) 296-4500 if you need assistance completing the above items. Once these items have been addressed, you may resubmit your permit rescission request. If you need additional information concerning this letter, please contact me at (919) 707-3653 or nathaniel.thomburg &ncdenr. gov. Sincerely, Nathaniel D. Thornburg, Branch Chi f Division of Water Resources cc: Asheville Regional Office, Water Quality Regional Operations Section (Electronic Copy) Laserfiche File (Electronic Copy) D_E Q�� North Carolina Department of Environmental Quality i Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH GARouNn ©'"d-od Emlmnmenml Q_[m� 919,707,9000 ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED September 22, 2022 Madonna K Buchanan Kay Buchanan Emailed to: info@gemmountain.com SUBJECT: Compliance Inspection Report Gem Mountain Gemstone Mine CLRS Non -discharge Permit No. WQ0006075 Mitchell County Dear Permittee: The North Carolina Division of Water Resources conducted an inspection of the Gem Mountain Gemstone Mine CLRS on 9/20/2022. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in Non -discharge Permit No. WQ0006075. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". There were no significant issues or findings noted during the inspection and therefore, a response to this inspection report is not required. If you should have any questions, please do not hesitate to contact Melanie Kemp with the Water Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at melanie.kemp@ncdenr.gov. ATTACHMENTS Ec: LF Sincerely, EP DocuSigned by: ¢1wAi¢. 66E104D6013524FD... Melanie Kemp, Environmental Specialist Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ North Carolina Department of Environmental Quality I Division of Water Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 828.296.4500 Compliance Inspection Report Permit: WQ0006075 Effective: 11/21/17 Expiration: 10/31/22 Owner: Charles R Buchanan SOC: Effective: Expiration: Facility: Gem Mountain Gemstone Mine CLRS County: Mitchell 13780 Hwy 226 S Region: Asheville Spruce Pine NC 28777 Contact Person: Madonna K Buchanan Title: Co -Owner Phone: 828-765-6130 Directions to Facility: Take Hwy. 226 north to Spruce Pine. The facility is located on the left approximately 1 mile south of the Blue Ridge Parkway. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site representative Kay Buchanan Related Permits: Inspection Date: 09/20/2022 Entry Time 10:OOAM Primary Inspector: Melanie Kemp Ds Secondary Inspector(s): Mk Reason for Inspection: Routine Permit Inspection Type: Closed -Loop Recycle Facility Status: Compliant ❑ Not Compliant Question Areas: Miscellaneous Questions Record Keeping (See attachment summary) Exit Time: 10:30AM Phone: Inspection Type: Compliance Evaluation Storage Page 1 of 4 Permit: WQ0006075 Owner - Facility: Charles R Buchanan Inspection Date: 09/20/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Melanie Kemp with the Asheville Regional Office performed a compliance evaluation inspection on September20, 2022 of the Gem Mountain Gemstone Mine, associated with non -discharge permit number W00006075. Site representative Kay Buchanan was present during the inspection, as well as the facilities manager. When needed (approximately every other week during operation), water is piped from East Fork Grassy Creek into a storage pond where it is then pumped up to the facility for use. The discharge pipe located within the storage pond was observed to be capped during the inspection, to prevent discharge to the creek. The effluent water flows to two concrete settling tanks before draining into a final settling pond. The residuals from the settling pond are removed monthly and the settling tanks are cleaned weekly. A maintenance and operation log, as well as notes regarding residuals removal, were kept on site in the office area. Photographs associated with the site inspection are included below. The owner indicated that there is not enough discharge water in the final settling pond to pump back into to the operations for reuse. A freeboard marker was not observed in the final settling pond during the time of the inspection. As a reminder, freeboard should be measured and recorded from the final settling pond in accordance with Section IV.3 of the permit. Page 2 of 4 Permit: WQ0006075 Owner - Facility: Charles R Buchanan Inspection Date: 09/20/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Type Yes No NA NE Infiltration System ❑ Reuse (Quality) ❑ Lagoon Spray, LR ❑ Single Family Spray, LR ❑ Activated Sludge Spray, LR ❑ Activated Sludge Drip, LR ❑ Activated Sludge Spray, HR ❑ Single Family Drip ❑ Recycle/Reuse Record Keeping Yes No NA NE Is a copy of current permit available? 0 ❑ ❑ ❑ Are monitoring reports present: NDMR? ❑ ❑ 0 ❑ NDAR? ❑ ❑ 0 ❑ Are flow rates less than of permitted flow? ❑ ❑ ❑ Are flow rates less than of permitted flow? ❑ ❑ ❑ Are application rates adhered to? ❑ ❑ 0 ❑ Is GW monitoring being conducted, if required (GW-59s submitted)? ❑ ❑ 0 ❑ Are all samples analyzed for all required parameters? ❑ ❑ 0 ❑ Are there any 2L GW quality violations? ❑ ❑ 0 ❑ Is GW-59A certification form completed for facility? ❑ ❑ N ❑ Is effluent sampled for same parameters as GW? ❑ ❑ 0 ❑ Do effluent concentrations exceed GW standards? ❑ ❑ 0 ❑ Are annual soil reports available? ❑ ❑ 0 ❑ # Are PAN records required? ❑ ❑ 0 ❑ # Did last soil report indicate a need for lime? ❑ ❑ 0 ❑ If so, has it been applied? ❑ ❑ 0 ❑ Are operational logs present? 0 ❑ ❑ ❑ Are lab sheets available for review? ❑ ❑ 0 ❑ Do lab sheets support data reported on NDMR? ❑ ❑ 0 ❑ Do lab sheets support data reported on GW-59s? ❑ ❑ 0 ❑ Are Operational and Maintenance records present? 0 ❑ ❑ ❑ Were Operational and Maintenance records complete? 0 ❑ ❑ ❑ Has permittee been free of public complaints in last 12 months? ❑ ❑ ❑ Is a copy of the SOC readily available? ❑ ❑ 0 ❑ Page 3 of 4 Permit: WQ0006075 Owner - Facility: Charles R Buchanan Inspection Date: 09/20/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine No treatment units bypassed since last inspection? 0 ❑ ❑ ❑ Comment: FINAL SETTLING POND Storage Yes No NA NE Storage Type? Pond Storage amount? 2000 Square Feet # At what point is side -stream wastewater returned to treatment? Is there a Spill Control Plan? ❑ ❑ N ❑ Aerated or Mixed? If aeration is present, is it adequate? ❑ ❑ ❑ If present, are diffusers cleaned regularly? ❑ ❑ 0 ❑ Is influent structure acceptable? ❑ ❑ 0 ❑ Are banks/berms free of seepage and erosion? 0 ❑ ❑ ❑ Are banks/berms free of excessive vegetation? 0 ❑ ❑ ❑ Is pond lined? ❑ 0 ❑ ❑ Liner Type Unlined Is liner acceptable? ❑ ❑ 0 ❑ Are baffles/curtains acceptable? ❑ ❑ 0 ❑ Does the pond have a freeboard marker? 0 ❑ ❑ ❑ Required freeboard? 24 Inches Actual freeboard? 24 Is there suitable grassed vegetation? 0 ❑ ❑ ❑ Is the vegetation maintained? 0 ❑ ❑ ❑ Is the area free of excessive weeds and/or woody species? 0 ❑ ❑ ❑ Is the area free from signs of overflow? 0 ❑ ❑ ❑ Is color acceptable? 0 ❑ ❑ ❑ Are floating mats acceptable? ❑ ❑ 0 ❑ No excessive buildup of solids? ❑ ❑ ❑ Are aerators/mixers acceptable? ❑ ❑ N ❑ Is effluent structure acceptable? ❑ ❑ 0 ❑ If present, is pond cover acceptable? ❑ ❑ 0 ❑ Comment: The pond is not lined. Page 4 of 4 � a �� `., � � t: a ��y A s , t