Loading...
HomeMy WebLinkAboutRE_ U-5738 wetland impactCarpenter, Kristi From: Euliss, Amy Sent: Monday, November 28, 2022 8:23 AM To: Wanucha, Dave; Alsmeyer, Eric C CIV USARMY CESAW (USA) Cc: Smith, Jeb S; Suggs, Phillip H Subject: RE: U-5738 wetland impact Attachments: julian rd 2jpg We were just outside of the wetland with the trackhoe. The attached picture shows the surveyed boundary of the wetland. Sorry for the false alarm. The Resident's office will ensure that all wetlands are staked and the orange fence is properly installed. Let me know if you need anything further. Amy From: Euliss, Amy Sent: Wednesday, November 23, 2022 11:04 AM To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Cc: Smith, Jeb S <jssmith8@ncdot.gov> Subject: U-5738 wetland impact Dave and Eric, While I was on vacation, we had an issue on the Julian Road widening project (U-5738) with a trackhoe getting into a wetland that was not supposed to be impacted. I believe the wetland is adjacent to permit sites 1A and 113. The area was restored as directed by our Roadside Engineer, Phil Suggs. It was mulched and seeded with native riparian seed mix. I have requested a full account of what happened and will share that with you as soon as I get it. USACE Action ID: SAW-2016-01370 DWR: 2020-1820 Amy Euliss Division 9 PDEA Engineer North Carolina Department of Transportation 336 747 7802 office aeuliss ncdot.gov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 tXATI Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.