Loading...
HomeMy WebLinkAboutNC0030970_Correspondence_19950309State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director NolD3oqZb mat'ti �fIfez. riric March 9, 1995 Mr. Richard Higgins, Town Manager Town of Spring Lake P. O. Box 617 Spring Lake, North Carolina 28390 Dear Mr. Higgins: QEHN1 SUBJECT I : Town of Spring Lake Wastewater Facilities In -Progress Plan Review Conference It This is to advise of the State requirement that final plans, specifications and supporting design data must be submitted for State review and approval, before State loan funding can be approved for the subject project. In accordance with the established schedules, the complete/final plans and specifications should be submitted by June 1, 1995 in order comply with the rules governing the State Clean Water Bond Loan Program. A review of the plans, specifications, supporting documents and checklist (see below) in conference with the Town's authorized representative and the Consultant Engineer at the 10% and 50% level of completion is required. The 10% In -Progress Plan review conference should be held in early April. Therefore, when the detailed project design with preliminary plans and specifications is initiated, you or your engineer must advise us of the time and date chosen for the 10% "In -Progress" plan review conference as soon as possible. The attendance of the Town's authorized representative at the 10% In -Progress conference is required; and the conference is not to be scheduled until this person can be present. A. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper PAGE 2 Attached is the "In -Progress Review Checklist" which includes review items to be discussed in our 10% and 50% conferences with you and the consulting engineer. You and your consultant engineer should review this prior to our conference, so that any questions can be resolved; or any needed clarification/information can be provided during this conference. If there are any questions concerning this matter, please do not hesitate to contact Mr. Robert Teulings, the State Project Review Engineer, at (919) 733-6900, extension 610. Sincerely, 4,e„7/- /ems /.;7f W. S. Hoffman, Supervisor I Construction Grants & Loans Section Design Management Unit Attachment RPT:vk cc: MacConnell & Associates Fayetteville Regional Office Mr. John R. Blowe Mr. Allen Wahab Mr. Joe Martin Mr. Tom Fahnestock Ms. Colleen Sullins Mr. Donald Safrit Ms. Ruth Swanek Mr. Robert Teulings DMU SBF