HomeMy WebLinkAboutNC0030970_Authorization to Construct_20160318AJCyO 30 q
Town of Spring Lake
Spring Lake WWTP
Authorization to Construct No. 030970A03
Issued August 14, 2014
Engineer's Certification
RECEIVED/NONCOM
MAR 231016
Water Quaf
Permitting Section
c &tihPi`/, as a duly registered Professional Engineer in
6ty ��Cr
the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the modifications and improvements to the Spring Lake Wastewater
Treatment Plant, located in Cumberland County, hereby state that, to the best of my abilities, due
care and diligence was used in the observation of the following construction:
Installation of new 5 HP mechanical grinder system designed for 7.1 MGD
peak flow including new channel with bypass overflow, and controls; in
conformity with. the project plans, specifications, and other supporting
documentation comprising the ATC Permit Application package submitted to
the Department of Environment and Natural Resources.
Icertify that the construction of the above referenced project was observed to be built within
substantial compliance, intent and in conformity with all applicable regulations and statutes and
the project plans, specifications, and other supporting documentation comprising the
Authorization to Construct Permit Application package.
Signature
Date ✓z//�li
Registration No. / 706 9'
Mail this Certification to: . Attn: Ron Berry
Complex Permitting Unit
DENR/DWRJWater Quality Programs
1617 Mail Service Center
Raleigh, NC 27699-1617
ArA
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory John E. Skvarla, III
Governor Secretary
August 14, 2014
Kenneth L. Metcalf
Town Manager
Town of Spring Lake
P. O. Box 617
Spring Lake, North Carolina 28390-0617
SUBJECT: Authorization to Construct
A to C No. 030970A03
Town of Spring Lake
Spring Lake WWTP
Dear Mr. Metcalf:
A Permit Application package for an Authorization to Construct (ATC) Permit was received
August 13, 2014, by the Division of Water Resources (Division).
This Authorization to Construct Permit is issued based solely upon the North Carolina
Licensed Professional Engineer's certification and the Applicant's certification of the ATC
Permit Application package. The Division has waived the technical review of the plans,
specifications, calculations and other supporting documentation included in the subject ATC
Permit Application package. Note that the ATC Permit Application package may be subject to a
Division audit.
This ATC results in no increase in design or permitted capacity of the existing Town of Spring
Lake 1.5 MGD Spring Lake WWTP facility and is hereby issued for the construction of the following
specific modifications:
Installation of new 5 HP mechanical grinder system designed for 7.1 MGD peak flow
including new channel with bypass overflow, and controls; in conformity with the project
plans, specifications, and other supporting documentation comprising the ATC Permit
Application package submitted to the Department of Environment and Natural Resources.
This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No.
NC0030970 issued effective August 1, 2012, and shall be subject to revocation unless the wastewater
treatment facilities are constructed in accordance with the conditions and limitations specified in
Permit No. NC0030970.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Phone: 919-807-63001 Internet wwuw.ncwaterquality.org
An Equal OpportunitylAffirmative Action Employer
Kenneth L. Metcalf, Town Manager
August 14, 2014
Page 2 of 3
It is the Owner's responsibility to ensure that the as -constructed project meets the requirements
of all applicable regulations and statutes, the ATC Permit Application package, and all of the
requirements contained herein. Failure to comply may result in penalties in accordance with North
Carolina General Statute § 143-215.6A through §143-215.6C.
The sludge generated from these treatment facilities must be disposed of in accordance with
G.S. 143-215.1 and in a manner approved by the Division.
In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required by
the Division, such as the construction of additional or replacement wastewater treatment or disposal
facilities.
The Fayetteville Regional Office, telephone number (910) 433 - 3300, shall be notified at least
forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can
be made. Such notification to the regional supervisor shall be made during the normal office hours
from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays.
Upon completion of construction and prior to operation of this permitted facility, a certification
must be received from a Professional Engineer certifying that the permitted facility has been installed
in accordance with the NPDES Permit and the ' ATC Permit Application package. Mail the
Certification to: NPDES Unit, DWR/DENR, 1617 Mail Service Center, Raleigh, NC 27699-1617.
Upon classification of the facility by the Certification Commission, the Permittee shall employ
a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater
treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or
greater than the classification assigned to the wastewater treatment facilities by the • Certification
Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and grade
to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I
facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and
holidays, must properly manage the facility, must document daily operation and maintenance of the
facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the project plans and specifications shall be maintained on file by the Permittee
for the life of the facility.
During the construction of the proposed additions/modifications, the Permittee shall continue to
properly maintain and operate the existing wastewater treatment facilities at all times, and in such a
manner, as necessary to comply with the effluent limits specified in the NPDES Permit.
You are reminded that it is mandatory for the project to be constructed in accordance with the
North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam
Kenneth L. Metcalf, Town Manager
August 14, 2014
Page 3 of 3
Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall
be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
The issuance of this ATC does not preclude the Permittee from complying with any and all
statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local,
state, and federal) which have jurisdiction.
If you have any questions or need additional information, please contact Ron Berry at
telephone number (919) 807-6396.
Sincerely,
Thomas A. Reeder, Director
Division of Water Resources/NCDENR
With Engineer's Certificate attached:
cc: Gary S. MacConnell, P.E.
MacConnell & Assocaites, P.C.
P. 0. Box 129
Morrisville, NC 27560
DWR Fayetteville Regional Office, Water Quality Programs
Central Files
NPDES File
Without Engineer's Certificate attached:
Cumberland County Health Department