HomeMy WebLinkAbout20221330 Ver 1_USACE Permit_20221115Baker, Caroline D From: Standridge, Billy W CIV USARMY CESAW (USA) <Billy.W.Standridge@usace.army.mil> Sent: Tuesday, November 15, 2022 7:58 PM To: Mark Nottingham Cc: Tankard, Robert Subject: [External] Green Mill Run - Bank Stabilization Project - SAW-2022-01345 Attachments: SAW-2022-01345_Green Mill Run Stabilzation_NWP-13_16Nov2022.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Mark, Please see the attached NWP-13 verification for the subject project. I appreciate your patience on this one. Thanks, Billy Billy W. Standridge Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4595 CU.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2022-01345 County: Pitt U.S.G.S. Quad: NC -Greenville SE GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: City of Greenville Mr. Mark Nottingham Address: 2000 Cedar Lane Greenville, NC 27858 Telephone Number: (252) 329-4567 E-mail: mnottinghamnn,greenvillenc.gov Size (acres) 0.1 Nearest Town Greenville Nearest Waterway Greens Mill Run River Basin Pamlico USGS HUC 03020103 Coordinates Latitude: 35.6020 Longitude: -77.3558 Location description: The project area is located on the north bank of Green Mill Run adjacent to the Green Mill Run Greenway and a student apartment complex located in Greenville, Pitt County, North Carolina. Description of projects area and activity: This verification authorizes the bank stabilization/installation of gabion baskets to 75 feet of Green Mil Run on the above -described project area. Applicable Law(s): N Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide Permit 13 for Bank Stabilization SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 6/17/2022, and the enclosed plans Site Plan — Green Mill Run Stabilization. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contactBillW. S andrid e at 910 251-4595or Billy.w.standridge(&,usace.army.mil. Corps Regulatory Official: Expiration Date of Verification: 3/14/2026 Date: 11/16/2022 Action ID Number: SAW-2022-01345 County: Pitt Permittee: City of Greenville, Mr. Mark Nottingham Project Name: Green Mill Run Streambank Stabilization / 1110 E l0th Street / Greenville NC / Pitt County Date Verification Issued: 11/16/2022 Project Manager: Billy W. Standridge Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Billy W. Standridge Washington Regulatory Office U.S Army Corps of Engineers 2407 West Fifth Street Washington, North Carolina 27889 or Bi11y.w.standridge@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date aro Mitg-t Site Data NC CRID - NAD 83 N 678060.48 E 2488752.26 N 678060.48 PROTECT ADJOINING PROPERTY (TYP) RECREATION SPACE, GREENWAY AND DRAINAGE EASEMENT (MB. 42, PG. 97) N 79° 33' 41" MAG. NAIL SET ` LOD LOD LOD _� LOB (CONTROL) - �6D--��OD- - - - - O v ' E 2488732.26 /1615 q / - / I -/13-2� _ _ � v _/ ---10 I -I ��� WA ERS E/ // ___ Igo OD WP- R v00 g4.23' ASPHALT GREENWAY PATH 10' OD1110011 0E LINK N / N 678075.74 E 2488815.10 MAG. NAIL SET (CONTROL) - ° GNAI'x 16 fig= �7/_� �o 7 LOD- 1 13 7- - Of \F 7.0,11 9 TopEA�AO '���, •Ti�ESI TRH � - - � \-\ - - QO - GONG. BR°KEN WA TE F SHEL WATER SNEL TOP OF FALLEN TEEN 118 0 I' II ' I I �I J REMOVE/ / / / / / >o" // - / TREE /- / / / - /- - -�✓ / J PROTECT ADJOINING r- // //1�/ / /// / , // \ �\ i//�0 (/ \ \/ / \ //// ram- � - _ o- �-3 16, I-1 ,- I I owl \ oo IV 0 • I I FL°W \ \ N i 1 I I r /� / :,:zz,----------- -- - jam/ ��- I I / j / / � // 7- -j i I I // // / �/ /7 . -- T-o- �i / / /" sEo>_t2.11 ____________---_____Ti;--- �/ 6i/ N_ - _ /- - T2�E74-ii_ f ___- I oM °F gA� / EL �00 i / P�F'FtEpGE 1/� ��' �Pj�R// i/9� // 10 / / WAT / // RECREATION SPACE, GREENWAY AND DRAINAGE EASEMENT (M B. 42, PG. 97) N 79' 33' 41" ���o� MAG. RAIL SET LOD LOD -_ - +18.16 / (CONTROL) {OD-_- LDA- - - - - - - - I r •o, r6 TOP 'ems, 0 0 9S _ \ gOL // /J /1 _ PROPERTY (TYP) TOM OF ggN1 J//�/ - -/ - / 3 // -j- /TOP - - �/ / 84.23' 3 �NOE LT GREENWAY:A7H m`' 0 ENE ' ° + ASPHA / + + 10 FENGE `'+ + +++1g.+5+�++ LINK +/++++ +++++ + + 1 Er + �6++ +++++/4 + ++ 15FGAF p + + i --+7 +_-+_�' + + + wj+ . +-++++ __+- +++ ++ +++ ++'+. 9 -tom+ + + + + + - + - r • 5 +-+- + -�+ 13a8+ + + + +/ +/+ „ +-+�+ 1 jar + +_-+ -+ + � +�+�,r1 , }+/+/+ + 6 /+ -+ + - '4., _+- +±+++++++� +�+ + i +� +�+/+ + - ++/+++ ++ + + + �+ ++69-� + + +\+/+ ----+- + 6 LOD 03 GHAIf >6 s / �++ + �+ 11B8+ + -+ + +�+ + + + ++- '-+ + + + + + + + �+'+ + + /+ } + +"+/+ + �i+ + - + + -< + + + + + + + + + + +/+ '+- + er + + tr $A� + +l+ + + + + + fir/ + + + 1$,.7Plr �- ++ + + b$ / �F+ + } ` + + + + + + + } +l + + +- + + � + + + _- i,r 4 + 4 + + + +LC + + + /+/ +/ +�+ + -r +/+ + + + + + +-+ +� + + } �+ +. + + +-+.+ -+ +x + + +'+ + yr -+ + fir--+ =+ 1 /+ + + +/+/ + + -/+/+ + + + ++ + + + 7 / +/ .6 + + + +-+_.. + - +- +7+/+ -1- � �- ` ' +_-r � +r+� -r + + v 4,1 + +IR:/ 0,6 ' 1 WATER _- �5.97 + �c10 9.-+ _r F6 `l 7,41 Vo0 \.p0 0 +7.39 I6.93.67 \,W2/� W FL° \ �9 `- \ �0 7.-7-9 kgffi LOk/ o goo �P ERS EpG 75' />8 + 6.31 + 6.25 / / 6.44 k.00 +6j N 678075.74 E 2488815.10 MAG. NAIL SET (CONTROL) 17.30 7.03 + 16.84 12' 12 11 .if ill V / 6,/ + 6.22 4.98 1 GONG. BR°KEN ERIP'RPP 6.86 + 5.90 6.13 / 1 7,26 10�/// 1,167 ///715.46 + 6.02 + 6.22 iERS / I / ,12 / / / //) / 4 13 / / j / j j / , /1�ce' / ' i%/� ///�8� // o _ / // 0 / / / / // - -i G //r, / // // // 65 -r 9.96-/0- /+ 11� / / j'/ 7.30 \ 0 67 / / + 6.25 / +-7.90 TOM OF gA as \ BOT /-_ 3 r OP / 6.50 17.00 - TOP OF BANK / TOP OF GABION 18.91 - EDGE OF PAVEMENT ---- • / ' 12 3' j's'i 3 3' 12' 3 3' / 6.72 - BOTTOM OF BANK 5.00 - BOTTOM OF GABION Gabion Basket Count BASKETS LAYER1 20 EA - 9' x 3' x 3' 20 EA - 6' x 3' x 3' LAYER2 15 EA - 9' x 3' x 3' 15 EA - 6' X 3' X 3' LAYER3 10 EA - 9' x 3' x 3' 10 EA - 6' X 3' X 3' LAYER4 5EA-9'x3'x3' 5EA-6'X3'X3' TOTAL FILL MATERIAL 60 yd3 40 yd3 45 yd3 30 yd3 30 yd3 20 yd3 15 yd3 10 yd3 250 yd3 i i • P • i • / •- TOTAL ACREAGE IN SITE: CURRENT ZONING: TAX PARCEL NUMBER: REFERENCES: ADDRESS: 0.05± AC OR (MULTI-FAM / BUSINESS) 06409 M.B. 42, PG. 97 1116 E. TENTH STREET 17.45 - EDGE OF PAVEMENT LAR k; X ' R ,'' ,I- �X -SAYE - ;- j 9 9. R = 6,/� ;� LAYE J' 9 i - 6 9' • 7.46 APPROXIMATE NORMAL WATER LEVEL Engineer Ark Consulting Group, PLLC 2755 Charles Blvd - Suite B Greenville, NC 27858 (252) 558-0888 Contact: First Last, PE XXXXX@arkconsultinggroup.com • E. 10TH ST SITED GARDEN CT. 4 0 0 co m Vicinity Map SCALE: 1" = 1000' General Notes: 17.00 - TOP OF BANK / TOP OF GABION Owner / Developer 1. CONTACT NORTH CAROLINA ONE -CALL CENTER, INC. (NC ONE -CALL) AT 811 TO HAVE ALL UNDERGROUND UTILITIES LOCATED PRIOR TO EXCAVATING OR TRENCHING. 2. PORTIONS OF THIS PROPERTY ARE LOCATED IN FLOOD ZONE AE (AREA DETERMINED TO BE INSIDE THE 1% ANNUAL CHANCE FLOOD) AS SHOWN ON THE FEMA FLOOD INSURANCE RATE MAP NUMBER 3720468700K, EFFECTIVE JULY 7, 2014. (BASE FLOOD ELEVATION = 21.5± NAVD 1988) 3. THIS PROJECT DISTURBS LESS THAN 1 ACRE. EROSION CONTROL PLAN APPROVAL IS NOT REQUIRED. 6.72 - BOTTOM OF BANK 5.00 - BOTTOM OF GABION 7 6.44 APPROXIMATE NORMAL WATER LEVEL Company Name / Person XXXX Street Address City, NC ZIP (XXX) XXX-XXXX Contact: First Last email@company.com Sheet Index Title C1.0 C2.0 C3.0 C3.1 Site Plan Erosion Control Notes Details Details REF Survey - Gary S. Miller & Assoc. (1 sheet) Survey Note: BOUNDARY AND TOPOGRAPHIC INFORMATION SHOWN HEREON WAS PREPARED BY GARY S. MILLER AND ASSOCIATES, P.A., AS SHOWN ON DRAWING ENTITLED "PARTIAL TOPO FOR CITY OF GREENVILLE GREEN MILL RUN GREENWAY", DATED FEBRUARY 8, 2022, ATTACHED TO THIS DRAWING SET FOR REFERENCE. 10' 0 5' 10' co co 0 tup co co CO E 0 in • co DESCRIPTION w 1- 0 REVISIONS: z a J a cn .1 Z co cni- City of Greenville, Pitt County, North Carolina LADE 2755-B Charles Blvd. 'CV°, Project Manager: BCF Drawn By: CED Checked By: STA Project Number: 22001 Drawing Number: D-1326 C 1 . 0 KNOW WHAT'S BELOW CALL BEFORE YOU DIG! 1-800-632-4949 SCALE 1 inch = 10 ft Date: 4-4-2022 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION will not dislodge the soil. Use one of the Stabilize the ground sufficiently so that rain techniques in the table below: Temporary Stabilzation Permanent Stabilzation • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenleyh distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt, or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. A D\ v 0 0 0) V i°/ A r �oTR� oEu �E;�a `Ea`MN I PLAN ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER SANDBAGS v.I ORSTAP SECTION A -A 1. ACTUAL LOCATION DETERMINED IN FIELD MAINTAINED WHEN WASHOUT DAND/ORSOLDREACHES 7516 OF THE STRUCTURES CAPACITY. 3.CONCIRETE WASHOUT STILICTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TOM,. Mar _..NJ-7A \ / MPx B <°\ v=v/°> <0> <o> <0> <0> <0/ ORn.PGSmP) GS (TYP1 1.01,411. PLASTIC LINING SIDE SLOPE SECTION B-B ACTUAL LOCATION DETERMINED IN FIELD .�N`�NOOEuw�Elie�xzEGmix.l T:CITI E. AND/o11501nRE. ES'S%OFTRE SHILICTURES CAPACIMO PROVIDE ADEQUATE PLAN ICONCFIETE WASHOVE STRUCTURE NEEDS TO BE GLEAM' MARKED WITH SIGNAGE NOTING ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01 / 19 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self below. personnel which greater performed were -inspections are required during When adverse weather or to be in jeopardy, the inspection it is safe to perform the inspection. than 1.0 inch occurs outside upon the commencement delayed shall be noted in the Inspect I Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un-attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as 'zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SD0s) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground stabilization measures NOTE: The rain After each phase of grading inspection resets 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, tloestteg1J hedoa calendar day inspection requirement. redevelopment permanent around cover) 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be documented in the manner 1. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC Plan. Initial and date each E&SC Measure on a copy of the approved E&SC Plan or complete, date and sign an inspection report that lists each E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC Plan. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC Measures have been performed. Complete, date and sign an inspection report. e Corrective actions have been taken ( ) to E&SC Measures. Initial and date a copyof the approved E&SC PP Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Formprovided bythe Division or q p a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] SECTION 1. 2. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING C: REPORTING Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. •If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(1)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence o the noncompliance. [40 CFR 122.41(1)(6). .rli,,icinn cfnff mm, m,ni,, fK r irarn of fnr n min -if fAn ri.nnrf nn n Grading Notes: 1. ALL AREAS WITHIN LIMITS OF DISTURBANCE SHALL BE CLEARED AND GRUBBED. 2. CONTRACTOR SHALL REMOVE EXISTING VEGETATION AND IMPROVEMENTS WITHIN LIMITS OF DISTURBANCE UNLESS NOTED OTHERWISE. 3. TREES OUTSIDE OF CONSTRUCTION LIMITS OR TREES NOT INDICATED TO BE REMOVED SHALL BE PROTECTED. 4. THE BURNING OF CLEARED MATERIAL AND DEBRIS SHALL NOT BE ALLOWED UNLESS CONTRACTOR GETS WRITTEN AUTHORIZATION FROM THE LOCAL AUTHORITIES. 5. ALL DEMOLITION WASTE AND DEBRIS SHALL BE REMOVED BY THE COS ACTOR AND DISPOSED OF IN A STATE APPROVED WASTE SITE AND IN ACC• ANCE WITH ALL LOCAL AND STATE CODES AND PERMIT REQUIREMENTS. 6. CONTRACTOR TO GRADE ALL AREAS WITHIN THE LIMITS OF DISTURB FROM BUILDING TO PROPERTY LINES AND TO EDGE OF PAVEMENT ON S SIDES, INCLUDING ROW. 7. TOP SOIL SHALL BE STRIPPED FROM ALL CUT AND FIL REDISTRIBUTED OVER GRADED AREAS. PROVIDE ERO SEDIMENTATION CONTROLS AROUND STOCKPILES DU 8. 9. 10. 11. TILL SOIL TO A DEPTH OF 4" MINIMUM. REMOVE ALL ROCKS LARGER THAN 1" MEA GRADE ALL AREAS TO MAINTAIN POSITIVE SLO ALL GRADED AREAS TO RECEIVE S 1 OR SOD, TO UNTIL A HEALTHY STAND OF GRAS OBTAINED. 12. INSTALL TEMPORARY TURF REINFOR THAN 3:1. MATTING SHA CONT 13. REFER TO SHEET XX FOR DETA 14. DUMPSTER PAD LESS THAN 4" BE #4 REBA IN UPPER 1/ 15. RECEIVING DOO REINFORCING SHA D IN UPPER 1 EAS, STOCKPILED AND CTION. D IN LARGES CTION. WAY FROM BUILDING. IL, STRAW AND WATER ENT MATTING ON ALL SLOPES STEEPER LANDLOK C2 OR EQUAL. ENT IN PARKING AND DRIVE AREAS. D APRON SHALL : - HICK 4,000 PSI CONCRETE OVER NOT OMPACTED AGGREGATE BASE COURSE. REINFORCING SHALL 2" 0 CENTER IN EACH DIRECTION. REBAR SHALL BE LOCATED ND SUPPORTED ON CHAIRS. E 11'x8' 4" THICK 3,500 PSI CONCRETE. 1.4xW1.4 WELDED WIRE FABRIC. WWF SHALL BE SLAB. UIPMENT PAD SHALL BE 6" THICK 3,500 PSI CONCRETE. REINFORCING REBAR @ 12" ON CENTER IN EACH DIRECTION. REBAR SHALL BE ER 1/3 OF SLAB AND SUPPORTED ON CHAIRS. SIZE OF PAD S BE COORDINATED WITH M.E.P. PLANS AND BASED UPON ACTUAL EQU NT SIZES WITH PROPER CLEARANCES. 17. ALL SID ALKS SHALL BE CONSTRUCTED OF 4" THICK 3,500 PSI CONCRETE REINFORCED WITH 6x6 W1.4xW1.4 WELDED WIRE FABRIC. ALL SIDEWALKS SHALL HAVE TOOLED CONTROL JOINTS NOT EXCEEDING 5' SPACING IN ANY DIRECTION. 18. ALL BUILDING, SIDEWALK, AND PAVEMENT SUB -GRADES SHALL BE COMPACTED TO 100% OF ASTM D698 TO A DEPTH OF 24" AND TO 95% OF ASTM D698 BELOW 24" DEPTHS. ALL OTHER NON-STRUCTURAL AREAS SHALL BE COMPACTED TO 90% OF ASTM D698. 19. ALL BUILDING, SIDEWALK, AND PAVEMENT SUB -GRADE COMPACTIONS SHALL BE INTERMEDIATELY TESTED AND APPROVED BY THE GEOTECHNICAL ENGINEER. ALL SUB -GRADES SHALL BE THOROUGHLY PROOF -ROLLED TO IDENTIFY SMALL LOCALIZED AREAS OF UNSUITABLE SOILS. ALL UNSUITABLE SOILS SHALL BE UNDERCUT, REPLACED WITH STRUCTURAL FILL, AND COMPACTED AS DESCRIBED ABOVE. 04/04/2022 - 1:23:30 PM SEEDING AND MULCHING: The kinds of seed and fertilizer, and the rates of application of seed, fertilizer, and limestone, shall be stated below. During periods of overlapping dates, the kind of seed to be used shall be determined. All rates are in pounds per acre. March 1 - August 31 50# Tall Fescue 10# 25# 500# 4000# Centipede Bermudagrass (hulled) Fertilizer Limestone All Roadway Areas September 1 - February 28 50# Tall Fescue 10# 35# 500# 4000# Centipede Bermudagrass (hulled) Fertilizer Limestone Water and Borrow Locations March 1 - August 31 September 1 - February 28 75# 25# 500# Tall Fescue Bermudagrass (hulled) Fertilizer 75# 35# 500# Tall Fescue Bermudagrass (hulled) Fertilizer 4000# Limestone 4000# Limestone Note: 50# of Bahiagrass may be substituted for either Centipede or Bermudagrass only upon Engineer's request. 2nd Millennium Avenger Barlexas Barlexas II Barrera Barrington Biltmore Bingo Bravo Cayenne Chapel Hill Chesapeake Constitution Chipper Coronado Coyote Davinci Dynasty Dominion Duster Endeavor Escalade Falcon II, III, IV & V Fidelity Finesse II Firebird Approved Tall Fescue Cultivars Focus Masterpiece Grande II Matador Greenkeeper Matador GT Greystone Inferno Justice Jaguar 3 Kalahari Kentucky 31 Kitty Hawk Kitty Hawk 2000 Lexington Magellan Millennium Montauk Mustang 3 Olympic Gold Padre Paraiso Picasso Piedmont Pure Gold Prospect Quest Rebel Exeda Rebel Sentry Regiment II Rembrandt Rendition Scorpion Shelby Signia Silverstar Southern Choice II Stetson Tarheel Titan Ltd. Titanium Tomohawk Tacer Trooper Turbo Ultimate Watchdog Wolfpack PUBLIC WORKS DEPARTMENT 1500 Beatty Street Greenville, North Carolina 27834 CITY OF GREENVILLE, N.C. USE WITH THE CITY OF GREENVILLE, N.C. STANDARD SPECIFICATIONS ONLY www.greenvillenc.gov No. Date Description 9/16/11 APPROVAL EROSION CONTROL GUIDE S ale: I Sheet #: I Detail # not to scale 2 or 3 310.01 04/04/2022 - 1:23:30 PM On cut and fill slopes 2:1 or steeper Centipede shall be applied at a rate of 5 pounds per acre and add 20# of Sericea Lespedeza from January 1 - December 21. Fertilizer shall be 10-20-20 analysis. A different analysis of fertilizer may be used provided the 1-2-2 ratio is maintained and the rate of application adjusted to provide the same amount of plant food as a 10-20-20 analysis and as directed. All areas seeded and mulched shall be tacked with asphalt. Crimping of straw in lieu of asphalt tack shall not be allowed on projects. CRIMPING STRAW MULCH: Crimping shall be required on projects adjacent to any section of roadway where traffic is to be maintained or allowed duringconstruction. In areas within six feet of the edge of pavement, straw is to be applied and then 9 PP crimped. After the crimping operation is complete, an additional application of straw shall be applied and immediately tacked with a sufficient amount of undiluted emulsified asphalt. Straw mulch shall be sufficient length and quality to withstand the crimping operation. Crimping equipment including power source shall be subject to the approval of the Engineer providing that maximum spacing of crimper blades shall not exceed 8". PUBLIC WORKS DEPARTMENT 1500 Beatty Street Greenville, North Carolina 27834 CITY OF GREENVILLE, N.C. USE WITH THE CITY OF GREENVILLE, N.C. STANDARD SPECIFICATIONS ONLY www.greenvillenc.gov No. Dale Description 9/16/11 APPROVAL S ale: S eet #: I Detail # not to scale 3 of 3 310.01 2755-B Charles Blvd. O Q O bA nip 00 00 0 0 00 Ill i Lfi CO N DESCRIPTION w 0 REVISIONS: 1- 0 Z J 0 I.L 1- Z 0 V Z 0 cn W City of Greenville, Pitt County, North Carolina s rn Z w E J J Z J as Z Y/ ZOW VWW Cley "\y0(3 k>>0\09 Go Project Manager: BCF Drawn By: CED Checked By: STA Project Number: 22001 Drawing Number: D-1326 C2.0 NCGO1 SELF -INSPECTION, RECORDKEEPING AND REP bRTING cuse-uy-cuse pasts. EFFECTIVE: 04/01/19 EROSION CONTROL GUIDE Date: 4-4-2022