Loading...
HomeMy WebLinkAboutAlliance Headwaters_MY2 and MY3_Site Visit Notes_2022-10-21Restoration Systems, LLC 1101 Haynes St. Suite 211 Raleigh, North Carolina Ph: (919) 755-9490 October 21, 2022 Fx: (919) 755-9492 Lindsay Crocker NC DEQ— Division of Mitigation Services 1652 Mail Service Center Raleigh, North Carolina 27699-1652 Subject: MY2 (2021) and MY 3 (2022) IRT Site Visit Alliance Headwaters Stream & Riparian Riverine Wetland Mitigation Site DMS Contract #: 6832; DMS Project ID: 95017; RFP # 16-006477 USACE Action ID No. SAW-2016-00882; DWR ID No. 20160405 MY2 (2021) and MY 3 (2022) IRT Site Visit: Site Visit Notes On October 20, 2022, Restoration Systems (RS) held an on -site meeting with regulatory agencies to discuss the MY2 (2021) monitoring data and the MY 3 (2022) interim data for the Alliance Headwaters Mitigation Site. Below is a list of attendees and general site visit notes. Attendees: USAC E: - Todd Tugwell - Casey Haywood NC DWR: - Erin Davis Restoration Systems: - Raymond Holz - Alex Baldwin Division of Mitigation Services: - Lindsay Crocker Site Visit Notes: - IRS will include a random vegetation transect through the UT 2 Wetland Enhancement Area during MY4 (2023). - IRS will ensure proper easement signage/marking along all Site's agriculture boundaries. This effort will include the southern easement boundary of the eastern tract along the gravel ag. road. This effort will consist of treated 6-inch fence posts at all easement corners and adequate marking every 200 feet with easement signage. - IRS will implement an initial treatment to pines throughout the easement in Q1 2023 — paying particular attention to pines on and along stream banks. IRS will also plant live stakes in areas where pines are removed from the stream banks. - Between groundwater gauges 24 and 30, IRS will install a shorter/shallower groundwater gauge to see if the deeper gauges (24 and 30) have punctured through the restrictive soil layer. - If 2022 photos are available that show the streams/site in a wetter condition, IRS will provide them in the MY 3 (2022) monitoring Report. - In the MY 3 (2022) monitoring report, IRS will provide pictures of the improved road outlets. This includes the additional outlet constructed near groundwater gauge 19 — installed in August of 2022. The purpose of these outlets is to allow surface hydrology to enter the Site from adjacent agricultural fields. - IRS will perform groundwater gauge maintenance across the Site, ensuring bentonite caps are in place and level with the surrounding ground elevation. - IRS will review alternative approaches to monitoring stream flow and switch stream -flow gauges if appropriate. 1101 Haynes St., Suite 211 • Raleigh, NC 27604 • www.restorationsystems.com • Ph 919.755.9490 • Fx 919.755.9492