Loading...
HomeMy WebLinkAboutRE_ Oct 24 Arrington Bridge Close-OutFrom: Davis, Erin B To: Baker, Caroline D Subject: FW: [External] RE: Oct 24 Arrington Bridge Close -Out Date: Monday, November 7, 2022 4:27:06 PM Attachments: Figure 2 - ABIII Site MY7 CCPV Map Closeout.pdf Laserfiche Upload: Email & Attachments DW R#: 20140189 v.1 Doc Date: 10/31/22 Doc Type: Mitigation — Mitigation site visit Doc Name: closeout site visit follow up From: Ryan Medric <rmedric@res.us> Sent: Monday, October 31, 2022 12:00 PM To: Kim Browning < Kimberly. D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV USARMY CEMVP (USA) <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Cc: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>; Jamey Mceachran <jceachran@res.us> Subject: [External] RE: Oct 24 Arrington Bridge & Buffalo Branch Close -Outs CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Arrington Bridge III closeout site visit follow up We replaced all the HOBOS on 10127 and plan to download and process the data after the growing season ends on 11122. 1 have attached a photo of the encroachment repair at the east end of the project where the dirt stockpile was. Between last Monday and Thursday the pile was moved away from the easement so the new markers are much more obvious. We will add signs to the PVC when we are out there again in November. We also mapped the cattail treatment areas where we experienced tree mortality. Those areas are shown on the attached CCPV and represent 1.4 acres. Please let me know if you'd like us to replant the cattail areas this winter. Thanks, Ryan Medric Project Manager RES I res.us D: 919.741.62681 M: 703.424.6313 From: Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.D.Browning(@usace.army.mil> Sent: Thursday, October 20, 2022 2:20 PM To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell(@usace.army.mil>; Davis, Erin B <erin.davis @ncdenr.gov>; Haywood, Casey M CIV USARMY CEMVP (USA) <Casey.M.Haywood(@usace.army.mil>; Wilson, Travis W. <travis.wilson(@ncwildlife.org> Cc: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey @usace.army.miI>; Ryan Medric <rmedricna res.us>; Jamey Mceachran <imceachranna res.us> Subject: [EXTERNAL] Oct 24 Arrington Bridge & Buffalo Branch Close -Outs Just to confirm, we had to move the meet time for these two sites to 10:00 am. RES Neu -Con: Arrington Bridge III year 7 and Buffalo Branch year 7 We will plan to meet at Arrington Bridge at 10:00 and then travel to Buffalo Branch, which is —30 minutes away and back towards Raleigh. Arrington meeting location: 35.35003953908373,-78.0148981943754 Buffalo meeting location: 35.60519203241926,-78.29498008074894 Thanks Kim Kim Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1 919.946.5107