Loading...
HomeMy WebLinkAboutWLS Yadkin 01 UMBI_Rolling Meadows Mitigation Site_ Approval Letter SAW-2021-01538DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 Regulatory Division Action ID No. SAW-2021-01538 October 19, 2022 Re: NCIRT Review and USACE Approval of the WLS Yadkin 01 UMBI / Rolling Meadows Mitigation Project/ Davidson County Mrs. Catherine Roland Water & Land Solutions, LLC 7721 Six Forks Road, Suite 130 Raleigh, North Carolina 27615 Dear Mrs. Roland: This letter is to inform you that the Wilmington District, Corps of Engineers (Corps) has reviewed and approved the Rolling Meadows Mitigation Site Final Mitigation Plan, a modification to the Water & Land Solutions Yadkin 01 Umbrella Mitigation Bank, dated September 2022. As bank sponsor, you are required to comply with the approved Yadkin 01 UMBI and Rolling Meadows Mitigation Project Final Mitigation Plan. You will also be required to comply with the NWP 27 verification letter, once issued, and the Corps' regulations regarding compensatory mitigation (33 CFR 332). The bank sponsor accepts all risk, liability, and responsibility for the success of all mitigation activities associated with the approved mitigation bank site. In accordance with the Rolling Meadows Mitigation Project Final Mitigation Plan, the bank sponsor must prepare and submit annual monitoring reports to document whether the stream (7,037 linear feet) restoration and enhancement and wetland re-establishment and preservation (8.68 acres) on the project site meets the necessary interim and final performance standards. When credits are debited from the mitigation site, the bank sponsor must provide the Corps with an updated credit ledger, and a signed mitigation transfer form identifying the purchaser of the credits, the project name, the permit number, and the number and type of credits to be debited. When all stream [7,505 stream mitigation units (SMUs)] and wetland [7.93 wetland mitigation units (WMUs)] credits have been debited, no more credits may be sold from this mitigation site. The next phase in the establishment of the WLS Yadkin 01- Rolling Meadows Mitigation Project includes recording the conservation easement to protect the mitigation site, marking the boundary of the site with permanent signs, providing documentation of the long-term endowment, obtaining the 404/401 permits, and executing the necessary financial assurances. Once the conservation easement has been recorded and this office is in receipt of the required documents, the Corps will be in a position to approve an initial credit release for fifteen percent (15%) of the total stream and wetland mitigation credits, in addition to 100% of the wetland preservation credits. We look forward to working with you to ensure the Rolling Meadows Mitigation Project complies with the requirements of the approved UMBI and site -specific mitigation plan. In all future correspondence concerning this matter, please refer to our file number, SAW-2021-01538. If you have any questions regarding this letter, the mitigation plan review process, or the requirements of the Mitigation Rule, please contact Kim Isenhour by email at Kimberly.D.Browning([)c,usace.army.mil or at (919) 946-5107. Sincerely, Todd J. Tugwell Mitigation Project Manager Regulatory Division Enclosures Electronic Copies Furnished: NCIRT Distribution List Daniel Ingram, WLS