Loading...
HomeMy WebLinkAbout20181034 Ver 1_Notice of Initial Credit Release - NCDMS UT to Rush Fork_20221007 (2)Mitigation Project Name DMS ID River Basin Cataloging Unit County Ki m berly T. UT to Rush Fork 100068 French Broad 06010106 Haywood Isenhour USACE Action ID 2018-01171 DWR Permit 2018-1034 Date Project Instituted 4/23/2018 Date Prepared 8/23/2022 Stream/Wet. Service Area French Broad 06010106 Digitally signed by Kimberly T. Isenhour Date: 2022.10.07 14:28:37-04'00' Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Cold Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,060.083 1,060.076 0.000 1,060.076 2022 8/23/2022 3 - Year 1 Monitoring 10.00% 353.361 2023 4 - Year 2 Monitoring 10.00% 353.361 2024 5 - Year 3 Monitoring 10.00% 353.361 2025 6 - Year 4 Monitoring 5.00% 176.681 2026 7 - Year 5 Monitoring 10.00% 353.361 2027 8 - Year 6 Monitoring 5.00% 176.681 2028 9 - Year 7 Monitoring 10.00% 353.361 2029 Stream Ban full Standard 10.00% 353.361 2026 Totals 1,060.076 Total Gross Credits 3,533.610 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,060.076 Total Percentage Released 30.00% Remaining Unreleased Credits 2,473.534 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Cold Stream Restoration 2,843.580 Cold Stream Enhancement I 818.300 Cold Stream Enhancement II 361.240 UT to Rush Fork French Broad 06010106 1 of 2 Mitigation Project Name UT to Rush Fork DMS ID 100068 River Basin French Broad Cataloging Unit 06010106 County Haywood USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/ Wet. Service Area 2018-01171 2018-1034 4/23/2018 8/23/2022 French Broad 06010106 Debits Cold Stream Restoration Credits Beginning Balance (mitigation credits) 3,533.610 Released Credits 1,060.076 Unrealized Credits 0.000 Converted Credits 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 1,060.076 Remaining Balance (Unreleased credits) 2,473.534 Total Remaining Balance (Released and Unreleased credits) 3,533.610 UT to Rush Fork French Broad 06010106 2 of 2