HomeMy WebLinkAboutSW8970713_CURRENT PERMIT_20220810STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 T10-113
DOC TYPE
® CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2022 o8io
YYYYMMDD
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
August 10, 2022
Antiqua Apartments, LLC
Attn: Mark L. Maynard, Manager
332 Military Cutoff Road
Wilmington, NC 28405
NORTH CAROLINA
Environmental Quality
Subject: Permit Renewal
Post -Construction Stormwater Management Permit No. SW8 970713
Antiqua Apartments
New Hanover County
Dear Mr. Maynard:
Effective August 1, 2013 the Post -Construction Stormwater Management Program has been transferred from the
Division of Water Quality ("DWQ") to the Division of Energy, Mineral and Land Resources ("DEMLR"). All
previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified.
Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit.
On August 5, 2009, the Governor signed Session Law 2009406. This law impacted any development approval
issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which
was current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the
effective period of any permit that was set to expire during this time frame to three (3) years from its current
expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for
a total of four (4) years extension.
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on August 5, 2022. The Division is hereby notifying you that permit SW8970713 has been
renewed, updated, and re -issued on August 10, 2022, as attached. Please be aware that the renewal and re -
issuance of this stormwater permit does not imply that the site is currently in compliance.
This permit shall be effective until January 9, 2030, which includes all available extensions, and does not
supersede any other agency permit that may be required. The project shall be subject to the conditions and
limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it
clarifies the rules and requirements of this program to provide you with a better understanding of your obligations
under this permit. Failure to comply with these requirements will result in future compliance problems. Please
note that this permit is not transferable except after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional
Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely,
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
D_E Q�� North Carolina Department of Environmental QuaOty I Division of Energy. N lneral and land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
910.796.7215
State Stormwater Permit No. SW8 970713
Page 2 of 2
Enclosures:
DES/ams:
cc:
Attachment C — Permitting History
Renewal Application Documents
%Stormwater\Permits & Projects\ 1 997\970713 HD\2022 08 permit 970713
Justin C. Bishop, PE; Malpass Engineering & Surveying; 1134 Shipyard Blvd; Wilmington, NC 28412
Wilmington Regional Office Stormwater File
D QM��
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1127 Cardinal Drive Extension I Wiimington, North Carolina 28405
910.796,7215
Post -Construction Stormwater Management
Permit No. SW8 970713
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143. General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Antiqua Apartments, LLC
Antiqua Apartments
3810 Portifino CL, Wlimington, New Hanover County
FOR THE
construction, operation and maintenance of one wet detention pond(s) in compliance with the
provisions of 15A NCAC 2H A000 effective September 1, 1995 (hereafter referred to as the
"stormwater rules') and as outlined in the application, approved stormwater management plans,
supplement, calculations, operation and maintenance agreement, recorded documents,
specifications, and other supporting data (the "approved plans and specifications") as attached and/or
on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or
"DEMLR"). The project shall be constructed, operated and maintained in accordance with these
approved plans and specifications. The approved plans and specifications are incorporated by
reference and are enforceable part of this permit.
This permit shall be effective from the date of issuance until January 9, 2030 and shall be subject to
the following specified conditions and limitations. The permit issued shall continue in force and effect
until the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any condition. The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H.1000 and NCGS 143-215.1 et.al.
1. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.6 on page 2 of this permit. The stormwater control has been designed to
handle the runoff from 292,850 square feet of impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and
per approved plans. The built -upon area for the future development is limited to 0 square feet.
4. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements. The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans.
Page 1 of 5
Post -Construction Stormwater Management
Permit No. SW8 970713
Q
The runoff from all built -upon area within the permitted drainage area(s) of this project must be
directed into the permitted stormwater control system.
The following design criteria have been provided in the wet detention pond and must be
maintained at design condition:
a. Drainage Area, acres:
Onsite, ft2:
Offsite, ft2:
b. Total Impervious Surfaces, ft2:
C. Design Storm, inches:
d. Average Pond Design Depth, feet:
e. TSS removal efficiency:
f. Permanent Pool Elevation, FMSL:
g. Permanent Pool Surface Area, ft2:
h. Permitted Storage Volume, ft3:
i. Temporary Storage Elevation, FMSL:
j. Controlling Orifice:
k. Permitted Forebay Volume, ft3:
I. Fountain Horsepower, HP
M. Receiving Stream/River Basin:
n. Stream Index Number:
o. Classification of Water Body:
II. SCHEDULE OF COMPLIANCE
10.52
458.251
0
292,850
1
7.5
90%
10
15,073
30,699
11.5
2"0 pipe
7,623
1 /8
Barnard's Creek / Cape Fear
18-80
"C Sw"
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
3. The permittee shall at all time provide the operation and maintenance necessary to assure the
permitted stormwater system functions at the design condition. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch
basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of DEMLR. The records will indicate the date, activity, name of person
performing the work and what actions were taken.
5. Decorative spray fountains are allowed in the pond, subject to the following criteria:
a. The minimum permanent pool volume is 30,000 cubic feet.
b. The fountain must draw its water from less than 2' below the permanent pool surface.
C. Separated units, where the nozzle, pump and intake are connected by tubing, may be
used only if they draw water from the surface in the deepest part of the pond.
d. The fountain may not be placed into the forebay.
e. The falling water from the fountain must be centered in the main pond, away from the
shoreline.
f. The maximum horsepower for a fountain in this pond is 1/8 horsepower.
Page 2 of 5
Post -Construction Stormwater Management
Permit No. SW8 970713
6. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility.
9. Access to the stormwater facilities for inspection and maintenance shall be maintained via
appropriate recorded easements at all times.
10. The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
11. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
III. GENERAL CONDITIONS
CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement on -site
stormwater systems. These additional or replacement measures shall receive a permit from
the Division prior to construction.
2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to
the expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H.1045(3).
Page 3 of 5
Post -Construction Stormwater Management
Permit No. SW8 970713
3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION.
The permittee shall submit a completed Permit Information Update Application Form to the
Division within 30 days to making any one of these changes.
4. TRANSFER. This permit is not transferable to any person or entity except after notice to and
approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit.
a. TRANSFER REQUEST. The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This
request must be submitted within 90 days of the permit holder meeting one or more of
the following:
i. A natural person who is deceased;
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved;
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur
V. The assignment of declarant rights to another individual or entity;
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2);
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on -site stormwater system complies with
the permit conditions. Records of maintenance activities performed to date may be
requested. Projects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met.
5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of
this permit until the Division approves the transfer request.
a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee at
all times.
b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the stormwater
rules is subject to enforcement procedures as set forth in NCGS 143 Article 21.
d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an
annual certification completed by either the permittee or their designee confirming the
projects conformance with permit conditions
Page 4 of 5
Post -Construction Stormwater Management
Permit No. SW8 970713
e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted
site does not meet one or more of the minimum requirements of the permit. Within the
time frame specified in the notice, the permittee shall submit a written time schedule to
the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of modified plans and certification in writing to the Director that the
changes have been made.
f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances, which may be imposed by any other Local, State or Federal government
agency having jurisdiction. Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals to
do so are considered violations of NCGS 143-215.1, and subject to enforcement
procedures pursuant to NCGS 143-215.6.
Permit renewed, updated and reissued this the 10th day of August 2022.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Cif- ,
Arian Wrenn, Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 5
Attachment C - Permitting History
Antiqua Apartments
Permit No. SW8 970713
Approval
Date
Permit
Action
BIMS
Version
Description of the Changes
1/9/1998
Original
Approval
1.0
construction, operation and maintenance of one wet detention
pond(s) in compliance with the provisions of 15A NCAC 2H
.1000 effective September 1, 1995 ; The stormwater control has
been designed to handle the runoff from 292,850 square feet of
impervious area; The built -upon area for the future development
is limited to 0 square feet.
4/16/2009
Renewal
2.0
Expired January 9, 2022 (received four year extension: SL 2009
406 and SL 2010-177)
8/10/2022
Renewal
3.0
Expires January 9, 2030
DEMLR USE ONLY
Date Recei ed
Fee Paid
Permit Number
8
5 as190
u) 70713
STATE STORMWATER:
PERMIT INFORMATION UPDATE APPLICATION FORM
There is NO FEE for updating project name or permittee information.
This form is to only to be used by the current permittee to notify the Division of.-
1) changes to the Point of Contact (signing official) for the current permittee (LLC, Corporation, HOA or POA);
2) changes to the mailing address, phone number or email address of the current permittee;
3) changes to the name of the project; and
4) changes to the legal corporate name as documented by a Name Change or Merger filed with the NCSOS.
A. NEW PERMIT INFORMATION
State Stormwater Permit Number: S W8 970713
Are you updating
(check all that apply):
If so, please provide the updated information:
❑ Project name
❑ Corporation Name'
❑ Permit Contact Name' .3
❑ Permit Contact Title
® Mailing Address3
332 Military Cutoff Rd, Wilmington, NC 28405
❑ Phone number
_
® Email address
c*�b`Ccx�t\ =CcXY\
Provide documentation such as a Name Change /Merger filed with the NCSOS.
Provide supporting documentation such as NCSOS filing. The permit contact's position must be in accordance
with 15A NCAC 021-1.10400 ).
If more than one point of contact or mailing address is being changed, please attach a separate sheet.
B. CERTIFICATION OF PERMITTEE
1, Mark L. Maynard, Sr. , the current permittee, hereby notify DEMLR that I am making the changes as listed
in Section A above. I further attest that this application for an update to the permit information currently on file is accurate
and complete to the best of my knowledge.
Signature:
M. D
I, a Notary Public for the State of Ncrl1' C3rcl m.
County of New f 0'-Cr do hereby certify that Mark L hA4013C 1 Sr.
before me this the 1—day of Av 4n4- 20, and acknowledge the due
)ing instrument. Witness my hand and officia eal,
1Aq
y sea
�f
IOU BoO
My coWlilssion expi s A 3 IL 3t 2e�5
Stormwater Permit Information Update Farm Page 1 of 1
AUG 0 5 2022
BY:_
May 11, 2017
POND AZAINTENANCE REQUIREMENTS
Project Name: _opal f mep4
Per mtittec: hnyq 4adnenk LLC
Address:_1810X 12z9 1111 �-1 21 1 PhoneNo.110-251-5030
I. Mond-dy, or ifter every runoff producing rainfall event, whichever comes first:
A. Inspect the trash rack; remove accumulated debris, repair/replace if it is not functioning.
B. Inspect and clear the orifice of any obstructions.- If a pump is used as the drawdown
mechanism, pump operation will be checked. A log of test runs of the pump will be kept
on site and made available to DWQ personnel upon request.
C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded areas
before the next rainfall event.
D. If the pond is operated with a vegetated filter, the filter will be checked for sediment
accumulation, trash accumulation, erosion and proper operation of the flow spreader
mechanism. Repairs/cleaning will be done as necessary.
H. Quarterly (Four times a year):
A. Inspect the collection system (ie. catch basins, piping, grassed swales) for proper
functioning. Accumulated trash will be cleared from basin grates, basin bottoms, and piping
will be checked for obstructions and cleared as required.
B. Pond inlet pipes will be checked for undercutting. Ripmp or other energy dissipation
structures will be replaced, and broken pipes will be repaired.
III. Semi-annually (twice a year):
A. Accumulated sediment from the bottom of the outlet structure will be removed.
B. T9re forebay depth will be checked at various points. Sediment removal is required when the
depth is reduced to 75 % of the original forebay design depth of _ 7,5'
C. Grassed swales, including the vegetated filter if applicable, will be reseeded twice a year as
necessary.
POND MAINTENANCE REQUIREMENTS
PAGE 2
IV. Annually (Once a year):
A. The pond depth will be checked at various pourts. Sediment removal is required when the
depth is reduced to 75% of the original design depth or T, whichever is greater. Design
depth is 75/ , measured vertically from the orifice down to the pond's bottom.
Sediment must be removed to at least the original design depth.
V. General:
A. .:. Mowing of,the,side slopes will be accomplished according to the season.. Maximum grass
height will be 6".
B. Cattails are encouraged along the pond perimeter, however they will be removed when they
cover more than 1/2 the surface area of the pond. The best time to cut them is at the end of
the growing season, in November. Environmentally sensitive chemicals for use in killing
cattails can also be used. Contact your nearest Agricultural Extension Agent.
C. The orifice/pump is designed to draw down the pond in 2-5 days. If drawdown is not
accomplished in that time, the orifice will be replaced with a larger or smaller orifice. Slow
dmwdown may be attributed to a clogged system. The source of the clogging will be found
and eliminated.
D. All components of the detention pond system will be kept in good working order. Repair
or replacement components will meet the original design specifications as per the approved
stonnwater plan. If previously approved components are determined to be ineffective, the
component must be redesigned and/or replaced.
VI. Special Requirements:
I, (i r- V-)L m�}/-�—/, J_ hereby acknowledge that I am the financially
(please print or type name clearly)
responsible party for maintenance of this detention pond. I will be responsible for the performance of the
maintenance as outlined above, as part of the Stormwater Management Permit received for this project
Signature;_— Date: / Z- Z`7-ot-
Revised 2/25/97
DEMLR USE ONLY
Date Re iv d
Fee Paid
Permit Number
s as
I it-d0030 aI 4,5s
stoR 470-713
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 80. (c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 970713
2. Project name: Antiqua Apartments
3. Project street address: 3810 Portofino Ct
City: Wilmingon County: New Hanover Zip : 28412
4. What, if any, changes have been made to the project as permitted? None
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: https:Hdeg.nc.goviabout/divisions/energy-
m i neral-la nd-resources/en ergo -mineral -Ian d-rules/stormwater-grog ram/postconstruction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: httr)s•//deo nc gov/about/divisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State StormwaterPermits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: Antiqua Apartments LLC
2. Signing Official's Name: Mark L. Maynard, Sr.
3. Signing Official's Title: Manager
4. Mailing Address: 332 Military Cutoff Rd
City: Wilmington State: NC ZIP: 28405
5. Street Address: 332 Military Cutoff Rd
City: Wilmington State: NC Zip : 28405
6. Phone: 9( 10 ) 251-5030 Email mo. -,. OCMNQWM`;_c(`(`f\
AUG 0 5 2022 : �l b M
BY..---
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
' •1
_. -
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include till required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information Is provided in the application package:
1. A permit application processing fee of $505.00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
N/A 3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
4. O&M Agreements, Please select one:
® 1 have a copy of the current reeerded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
le+ 5. Designer Certifications, Please select one:
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
s✓ 6. [IF APPLICABLE) If the project has been built, one original hard copy and one electronic copy of a
J signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www,sosnc.gov/onIine services/search/by title/ Business Registration
AUG 0 5 2022 11
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
1, Mark L. Maynard, Sr. , the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, correctWd complete.
Signature: _ Date
NOTARIZATION
I, J?^n L , a Notary Public for the State of
ni ( -,County of NAo f)ann_g-r , do hereby certify
that L. H1 a Srpersonally appeared before me
this tl�gap r�t� 1 day of Av., •f 1 20�_, and acknowledge the due
plltW IPQAf.�14. glgoing instrument. Witness my hand and official seal,
.iA9y -cp
o(ary Seal) V
70UB��f'
My can'Sl 196"on expires A );i A '90S
AUG 0 5 2022
BY,•�
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
State Stormwater Management Systems
Permit No. SW8 970713
Antiqua Apartments
Stomtwater Permit No. SW8 970713
New Hanover County
Engineer's Certification
1, very 55 as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the pro. ct, �✓st 5 n,yr JA. re wGr.er f ✓w.l w�S cv.VS �.�—/L
,/
for NatilQn `xIQQQi� (Project Owner) hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the project construction such that the construction was observed to be built within
substantial compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification:
P;P:ny 4- Wr'!ggbM fvrp, ;nclua!'3 a small Pump 65el were insla�le�,
{��aG� d- CRUD iG0.5fl W81Y Coil s;ra:;e� ;n y�P f14(d Of ah Qraralehi 004ni
The Iotanon II,�II S,�P�)vl�k5 "ITofa Papl, inD1ff''bJ4i Welt_ ad vf�
USed on ;nLUJ1 ) qc-bv114 drv,,-nj tbe. PUA on-5,k Oes no-f
by Sherwin Cnbbv
Signature
Registration 11furnber "l f
Date I ` ( — o- l
per BUS.
SEAL
RECEIVED
APR 12009
BY:_---
6