HomeMy WebLinkAboutSW8960705_CURRENT PERMIT_20220715STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 qu wl 05
DOC TYPE
® CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2 0 22 01 k 5
YYYYMMDD
ROY COOPER
Covemor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
July 15's, 2022
Southern Crescent, LLC
Attn: Michael K Alford, Manager
121 Tweed Dr.
Jacksonville, NC 28540
NORTH CAROLINA
Envtronmentut QuaUty
Subject: Permit Renewal
Post -Construction Stormwater Management Permit No. SW8 960705
Marine Chevrolet
Onslow County
Dear Mr. Alford:
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on July 15'", 2022. The Division is hereby notifying you that permit SW8 960705 has been
renewed, updated, and re -issued on July 15`s, 2022, as attached. Please be aware that the renewal and re -issuance
of this Stormwater permit does not imply that the site is currently in compliance.
This permit shall be effective until May 9'", 2030 and does not supersede any other agency permit that may be
required. The project shall be subject to the conditions and limitations as specified therein. This permit does not
impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program
to provide you with a better understanding of your obligations under this permit. Failure to comply with these
requirements will result in future compliance problems. Please note that this permit is not transferable except
after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAI4 within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
This project will be kept on file at the Wilmington Regional Office. If you have any questions concerning this
permit, please contact Dylan McPeake in the Wilmington Regional Office, at (910) 796-7215 or
dylan.mcpeake@ncdenr.gov.
Sincerely,
a, Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
Renewal Application Documents
DES/DM: %StormwaterWermits & Projects\1996\960705 HD\2022 07 permit 960705
cc: Anthony 0. Moctezuma, El; Tidewater Associates, Inc; PO Box 976; Jacksonville, NC 28541-0976
Wilmington Regional Office Stormwater File
D_E QZ� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
��\ 910.796.7215
Post -Construction Stormwater Management
Permit No. SW8 960705
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Southern Crescent, LLC
Marine Chevrolet
1408 Western Blvd, Jacksonville, Onslow County
FOR THE
construction, operation and maintenance of two areas of high density being treated by one (1)
onsite wet pond (Drainage Area 1) and one (1) offsite wet pond (Drainage Area 2) in compliance
with the provisions of 15A NCAC 2H .1000 (the "stormwater rules') and s outlined in the
application, approved stormwater management plans, supplement, calculations, operation and
maintenance agreement, recorded documents, specifications, and other supporting data (the
"approved plans and specifications") as attached and/or on file with and approved by the
Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall
be constructed, operated and maintained in accordance with these approved plans and
specifications. The approved plans and specifications are incorporated by reference and are
enforceable part of this permit. The stormwater runoff from the site within Drainage Area 2 will
be routed to the offsite wet pond operated and maintained by the City of Jacksonville (the
"Master Permittee") under the terms and conditions set forth in the latest version of Stormwater
Management Permit No. SW8 950417 (the "Master Permit")
This permit shall be effective from the date of issuance until May 9'", 2030 and shall be subject
to the following specified conditions and limitations. The permit issued shall continue in force
and effect until the permittee files a request with the Division for a permit modification, transfer,
renewal, or rescission; however, these actions do not stay any condition. The issuance of this
permit does not prohibit the Director from reopening and modifying the permit, revoking and
reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and
regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al.
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
The tract will be limited to a total of 418,247 square feet of built -upon area and per the
approved plans and specifications. The project and drainage areas will be limited to the
amounts of built -upon area indicated in Sections 1.3, 1.4 and 1.8.
Page 1 of 5
Post -Construction Stormwater Management
Permit No. SW8 960705
3. The onsite wet pond (Drainage Area 1) has been approved for the management of
stormwater runoff as described in Section 1.8 of this permit. This stormwater control has
been designed to handle the runoff from 327,381 square feet of impervious area.
4. The runoff within Drainage Area 2 has been approved to be discharged into an offsite
stormwater system, a wet detention pond, permitted under the latest version of the
Master Permit. The built -upon area allocated to this development by the Master Permit,
is 90,866 square feet. This project proposes 86,793 square feet. The amount available
for future development is 4,073 square feet. This drainage area is limited to the amount
of built -upon area indicated in this permit and the approved plans and specifications. The
project must maintain a built -upon area less than or equal to the amount permitted under
the Master Permit. A total built -upon area in excess of the maximum allowed amount will
require a modification to the Master Permit prior to construction and/or the construction
of additional stormwater control measures.
5. The proposed onsite wet pond must be operated with a vegetated filter.
6. All stormwater collection and treatment systems must be located in either dedicated
common areas or recorded easements. The final plats for the project will be recorded
showing all such required easements, in accordance with the approved plans.
7. The runoff from all built -upon area within the permitted drainage areas of this project
must be directed into the permitted stormwater control system.
8. The following design criteria have been permitted for the detention pond and must be
provided and maintained at design condition:
Original Application Date:
April 14, 2008
Water Body Receiving Stormwater Runoff:
Mill Creek
Classification of Water Body:
"SC NSW"
Pond Depth:
6 feet
Permanent Pool Elevation:
44.5 MSL
Total Impervious Surfaces Allowed:
327,381 square feet
Future
10,572 square feet
Offsite Area entering Pond:
N/A
Green Area entering Pond:
76,548 square feet
Required Surface Area:
18,834 square feet
Provided Surface Area:
22,035 square feet
Required Storage Volume:
26,238 cubic feet
Provided Storage Volume:
31,392 cubic feet
Temporary Storage Elevation:
45.8 MSL
Controlling Orifice:
2" pipe
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. This permit is issued contingent on the construction of the permitted off -site stormwater
system being complete and in compliance with the latest version of the Master Permit,
issued to the Master Permittee, and as subsequently modified, transferred, or renewed.
Prior to the construction of any built -upon area associated with this permit, the Master
Permittee shall have constructed, operated, maintained, and certified the off -site
stormwater system in compliance with the Master Permit.
3. Records of maintenance activities must be kept and made available upon request to
authorized personnel of the Division. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
Page 2 of 5
Post -Construction Stormwater Management
Permit No. SW8 960705
4. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately. If the stormwater system was used as an Erosion
Control device, it must be restored to design condition prior to operation as a stormwater
treatment device, and prior to occupancy of the facility.
5. The permittee shall at all times provide the operation and maintenance necessary to
assure the permitted stormwater system functions at the design condition. The approved
Operation and Maintenance Plan must be followed in its entirety and maintenance must
occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader,
catch basins and piping.
g. Access to the outlet structure must be available at all times.
6. Decorative spray fountains will not be allowed in the stormwater treatment system until
calculations are provided documenting the permeant pool volume is greater than 30,000
cubic feet.
7. The facilities shall be constructed, operated and maintained in accordance with the
provisions of this permit, the approved plans and specifications, and the supporting
documents attached to this permit and on file with the Division
8. Access to the stormwater facilities shall be maintained via appropriate easements at all
times.
9. The Director may notify the permittee when the permitted site does not meet one or
more of the minimum requirements of the permit. Within the time frame specified in the
notice, the permittee shall submit a written time schedule to the Director for modifying
the site to meet minimum requirements. The permittee shall provide copies of revised
plans and certification in writing to the Director that the changes have been made.
10. No person or entity, including the permittee, shall alter any component shown in the
approved plans and specifications. Prior to the construction of any modification to the
approved plans, the permittee shall submit to the Director, and shall have received
approval for modified plans, specifications, and calculations including, but not limited to,
those listed below. For changes to the project or SCM that impact the certifications, a
new or updated certification(s), as applicable, will be required and a copy must be
submitted to the appropriate DEQ regional office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size
including the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included
in the approved plans and specifications.
g. Other modifications as determined by the Director.
Page 3 of 5
Post -Construction Stormwater Management
Permit No. SW8 960705
11. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, a certification must be received from an
appropriate designer for the system installed certifying that the permitted facility has
been installed in accordance with this permit, the approved plans and specifications, and
other supporting documentation. Any deviations from the approved plans and
specifications must be noted on the Certification. A modification may be required for
those deviations.
III. GENERAL CONDITIONS
CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement
on -site stormwater systems. These additional or replacement measures shall receive a
permit from the Division prior to construction.
PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days
prior to the expiration date of this permit. The renewal request must include the
appropriate application, documentation and the processing fee as outlined in Title 15A
NCAC 02H.1045(3).
CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT
INFORMATION. The permittee shall submit a completed Permit Information Update
Application Form to the Division within 30 days to making any one of these changes.
TRANSFER. This permit is not transferable to any person or entity except after notice to
and approval by the Director. Neither the sale of the project and/or property, in whole or
in part, nor the conveyance of common area to a third party constitutes an approved
transfer of the permit.
TRANSFER REQUEST. The transfer request must include the appropriate
application, documentation and the processing fee as outlined in 15A NCAC
02H.1045(2). This request must be submitted within 90 days of the permit holder
meeting one or more of the following:
i. A natural person who is deceased;
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved;
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur;
V. The assignment of declarant rights to another individual or entity;
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2);
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on -site stormwater system complies
with the permit conditions. Records of maintenance activities performed to date
may be requested. Projects not in compliance with the permit will not be
transferred until all permit and/or general statute conditions are met.
Page 4 of 5
Post -Construction Stormwater Management
Permit No. SW8 960705
5. COMPLIANCE. The permittee is responsible for compliance with the terms and
conditions of this permit until the Division approves the transfer request.
a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved
plans, application, supplement, operation and maintenance agreement, all
applicable recorded documents, and specifications shall be maintained on file by
the permittee at all times.
b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the
stormwater rules is subject to enforcement procedures as set forth in NCGS 143
Article 21.
d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the
Division an annual certification completed by either the permittee or their designee
confirming the projects conformance with permit conditions
e. OBTAINING COMPLIANCE. The Director may notify the permittee when the
permitted site does not meet one or more of the minimum requirements of the
permit. Within the time frame specified in the notice, the permittee shall submit a
written time schedule to the Director for modifying the site to meet minimum
requirements. The permittee shall provide copies of modified plans and certification
in writing to the Director that the changes have been made.
OTHER PERMITS. The issuance of this permit does not preclude the permittee
from complying with and obtaining any other permits or approvals that are required
for this development to take place, as required by any statutes, rules, regulations,
or ordinances, which may be imposed by any other Local, State or Federal
government agency having jurisdiction. Any activities undertaken at this site that
cause a water quality violation or undertaken prior to receipt of the necessary
permits or approvals to do so are considered violations of NCGS 143-215.1, and
subject to enforcement procedures pursuant to NCGS 143-215.6.
Permit modified and reissued this the 151 day of July, 2022.
NORTH AROLI A ENVIRO[VMENTAL MANAGEMENT COMMISSION
,;Brian Wrenn,Uire�tur
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 5
Attachment C - Permitting History
Marine Chevrolet
Permit No. SW8 960705
Approval
Permit
BIMS
Description of the Changes
Date
Action
Version
10/8/1996
Original
10
Approval
5/9.2008
Renewal
2.0
Expires on 5/9/2022
- Clarifying the permittee is Southern Crescent, LLC.
- Documenting the use of future BUA to develop the out parcel for additional
Major
parking.
4/3/2018
Modificati
2.1
- An additional 2.01 acre parcel was obtained to expand the project. This
on
additional area and runoff is being treated in an offsite pond permitted under
SW8 950417.
7/15/2022
Renewal
3.0
Expires on5/9/2030
SWS 96 v706-
Wet Detention Basin Inspection and Maintenance Agreement
1 will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the 13MP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
does ;< does not incorporate a vegetated filter at the outlet.
This system (check one):
does 04 does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
— If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
— Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of inspection and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potential roblem:
Clow I will remediate theproblem:
The entire BMP
Crash/debris is present.
Remove the trash/debris.
The perimeter of the wet
Areas of bare soil and/or
Iiegrade the soil if necessary to
detention basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide time and a
one-time fertilizer application.
_
Vegetation is too short or too
Maintain vegetation at a height of
I
long.
approximately six inches.
BMP element:
Potential roblem:
How 1 will remediate theproblem:
The inlet device: pipe or
swale
The pipe is clogged.
Unclog the pipe. Dispose of the
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the swale if necessary to
swale.
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
The forebay
Sediment has accumulated to
a depth greater than the
original design depth for
sediment storage.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The vegetated shelf
Best professional practices
Prune according to best professional
show that pruning is needed
practices
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The main treatment area
Sediment has accumulated to
a depth greater than the
original design sediment
storage depth.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Algal growth covers over
50% of the area.
Consult a professional to remove
and control the algal growth.
Cattails, phragmites or other
Remove the plants by wiping them
invasive plants cover 50% of
with pesticide (do not spray).
the basin surface.
BMP element:
Potentialproblem:
Flow 1 will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair.
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
damage have occurred at the
outlet.
Contact the local NC Division of
Water Quality Regional Office, or
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads _ 5 feet in the main pond, the
sediment shall be removed.
When the permanent pool depth reads ---I_ feet in the forebay, the sediment
shall be removed.
Sediment Removal
Bottom
BASIN DIAGRAM
(rill in the blanks)
� n Min.
Sediment
Storage
Permanent Pool Elevation ro.7
Pool -2&
Sediment Removal Elevation _35- Volume
----------------------------- i
Bottom Elevation
POREBAY MAIN POND
Storage
R) �
: : �
; ; �
I acknowledge and agree by my signature below that 1 am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Print name: I ' , CWv—1 Q'
Title: G 0
Address: [90B WEST}e'n vj
Phon
Signt
Date
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
1 �� hats �'Crtir�kt G. a Notary Public for the State of
Novlti CAWIiNA , County of_QyjsLD" do hereby certify that
-AAAt-le, VL 160pZ5 personally appeared before me this 22.
day of �if { (91n'�V 1and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal,
NOTARY s
o PUBLIC
ZO
IV C
SLAL
My commission expires '@!4 Z
UtMLP( USt UNLY
D to Received Fee Paid Permit Number
/IS 202Z 0713 Soy °L Sw$ a 07 o S
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 160 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (Sa 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 960705
2. Project name: Marine Chevrolet
3. Project street address: 1408 Western Boulevard
City: Jacksonville County: Onslow —zip: 28540
4. What, if any, changes have been made to the project as permitted? None
If the project has changed from the original approved plans, please complete SWU-tut ror a ma/or
Modification or Minor Modification Application form available at: https;I/deq.nc.gov/about/divisions/e
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https:///den r_(,c,gov/abouVdivlsions/energ)tmineral-land-
rwcnePrcps/anernv-minsral-land-rules/stormwater-nroeram/noslconstruction. State Slormwater Permits do not
with the sale of the property.
1. Current Permit Holder's Company Name/Organization:
2. Signing Official's Name:
3. Signing Official's Title: ,
Southern Crescent, LLC
4. Mailing Address: I LI I weeu yr
City: Jacksonville State: NC zip: 2854(
5. Street Address: 121 Tweed Dr.
City: Jacksonville State: N0_—.zip: 2B 40
6. Phone:
Email:
ECEIVE
JUL 5 2022
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
I
I,
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/0RI9. Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
/j 1. A permit application processing fee of $505.00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
rVIA 3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
A(,#*) 4. O&M Agreements, Please select one:
® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
urM 5. Designer Certifications, Please select one:
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
AIIA 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
_AE— 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
httos://www.sosnc.gov/online services/search/by title/ Business Registration
00 0.o ti O l� eL ,
JUL 0 5 2022
Stormwater Permit Renewal Application Form Page 2 of 3
May 11, 2018
I`
D. PERMITTEE'S CERTIFICATION
Michael K. Alford , the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All Information provi d on this permit renewal application is, to the best of my
knowledge, correct I
and complete.
Signature: Date:
NOTARIZATION:
day of
of the forgoll
GBLIC ;
County of
Witness my hand and official seal,
a Notary Public for the State of
do hereby certify
personally appeared before me
20 c1!=)- , and acknowledge the due
ECEIVE
JUL 15 2022
Stormwater Permit Renewal Applica8on Form Page 3 of 3 May 11, 2018
I
1
Permit No. 5`(9. 9 0700
(to be provided by DEMLR)
State of North Carolina
Department of Environment and Natural Resources
Division of Energy, Mineral and Land Resources
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
OFF -SITE SYSTEM SUPPLEMENT
FOR DEVELOPMENT DRAINING TO PERMITTED OFF -SITE TREATMENT SYSTEMS
This form may be photocopied for use as an original
DEMLR Stormwater Management Plan Review:
A complete stormwater management plan submittal includes a stormwater management permit application, an
off -site system supplement for each off -site stormwater treatment system, appropriate supplement forms for any
on -site stormwater treatment systems, and plans and specifications showing all stormwater conveyances and
drainage details for the project.
I. PROJECT INFORMATION
Project Name : Marine Chevrolet Addition
Contact Person: Michael Hoopes, General Manager Phone Number: ( 910)455-2121
Is all drainage from the project directed to the off -site system? (check one): ® Yes ❑ No
II. OFF -SITE SYSTEM INFORMATION (please complete the following inf I %lYtee off-f- 't system
that will treat runoff from your project): BAN Z b 2
Permit No. SW8 950417 BY:
Project Name: Richard Ray Amphitheater at Jacksonville Commons
Type of System (wet pond, infiltration basin, etc.): Wet Detention Pond
Lot No. (if part of a subdivision): n/a
1-low much built upon area draining to the permitted treatment system has been allocated to this project?
90,866 SF
III. REQUIRED ITEMS CHECKLIST
Prior to issuing an off -site permit, verification of the following information must be provided. Initial in the
space provided to indicate that the following requirements have been met and supporting documentation is
attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the
agent may initial below. If a requirement has not been met, attach justification.
Form SW40 I -Off-Site System-Rev.I Page I of 2
Applicants Initials
M1" a. Deed restrictions limiting the built -upon area on the site have been recorded.
4o COT b. Engineers certification for the existing off -site system has been submitted to DEMLR.
its c. There are no outstanding Notices of Violation for the off -site system.
`/ d. Off -site system is in compliance with the issued permit.
IV. STORMWATER COLLECTION SYSTEM MAINTENANCE REQUIREMENTS
Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at
any time.
2. Accumulated sediment and trash will be removed from the collection system as necessary. Swales and
ditches will be reseeded or sodded following sediment removal.
Eroded areas of swales and ditches will be repaired and reseeded. Swales and ditches will be revegetated as
needed based on monthly inspections.
4. The collection system, including catch basins, curb cuts, velocity reduction devices, and piping, will be
inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be
cleared away from grates, curb cuts, velocity reduction devices, and piping.
5. The collection system may not be altered in anyway without prior approval from NCDENR Division of
Energy, Mineral and Land Resources.
I acknowledge and agree by my signature below that I am responsiblpprqmaintai�jirig the st�rmwater collection
IiN b
system in accordance with the five maintenance procedures listed ab Lagree to notify DEMLR of any
problems with the system or prior to any changes to the system or res sible party./
Print Name and Title: Michael K. Alford, Manager - Southern Cresent, LLC.
Address: 121 Tweed Drive / Jacksonville / NC / 28540
Date: 9/28/17
Note: The legally responsible party .should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision has been named the president.
I, L�A• 1 1e' , a Notary Publi for the State of_ Y 1(. , County of
do hereby certify that �I(W r. 14oY� personally appeared before me this.+
day of bc� , al and acknowledge the due execution of the forgoing document including the stormwater
collection systegl Maintenance requirements. Witness my hand and official seal,
PSSIE °j�. .'�?VEFA
prT 0 3 2017
`s to O 2 ? Notary I blic M �1 B�
@TdJ ZSI:�I`� p r' My commission expires U l
G-
Form N!>-IOJOY4"'A9 Page 2 of 2
EV I C
IV
co
„ . •. Al