HomeMy WebLinkAboutSW8940120_CURRENT PERMIT_19991201STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 qLAO I 9,c)
DOC TYPE
14 CURRENT PERMIT
E] APPROVED PLANS
El HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
�Lo k
YYYYMMDD
State of North Carolina
Department of Environment
and Natural Resources
Wilmington Regional Office
James B. Hunt, Jr., Governor
Bill Holman, Secretary
Division of Water Quality
December 1. 1999
Mr. Jerry Porter, Owner
5501 Market Street
Wilmington, NC 28405
Dear Mr. Porter:
NZI.IWA
4
-=�X
NCDENVI
No� C�ou� D�mm� or
Emvmommew �D N�R� R�URC�
Subject: Permit No. SW8 940120 Modification
Jerry Porter Auto Dealership
High Density Stormwater Project
New Hanover County
The Wilmington Regional Office received a complete modification to the Stormwater Management Permit
Application for Jerry Porter Auto Dealership on November 30, 1999. Staff review of the plans and specifications
has deteralined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A
NCAC 2H. 1000. We are forwarding Permit No. SW8 940120 Modification dated December 1, 1999, for the
construction of Jerry Porter Auto Dealership.
This permit shall be effective from the date of issuance until December 1, 2009, and shall be subject to the conditions
and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in
this perm�t. Faure to establish an adequate system for operation and maintenance of the stormwater management
system will result in future compliance problems.
If any parts, requirements, or limitations contained in thiso,�errmt are unacceptable, you have the right to request an
adjudicatory hearing upon written request within thirty (3 days following receipt of this permit. This request must
be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands
are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me
at (910) 395-3900.
Sincerely,
Shiver
Water Quality Regional Supervisor
RSS/arl: S:\WQS\STORMWAT\PERNflT\940120.DEC
cc: Phil Tn" p P.E.
Tony RoLrts, New Hanover County Inspections
Beth Easley, New Hanover County Engineering
Linda Lewis
Wilmington Regional Office
Central Files
127 Cardinal Dr. Ert, Wilmington, North Carolina 28405 Telephone 910-395,3900 FAX 910-350-2004
An Equal Opportunity Affirmative Acdon Employer 50% recycled/1 0% post-commmer paper
State Storrriwater Management Systems
Permit No. SW8 940120 Modification
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISIONOF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMI
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and
9ther appiicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Mr. Jerry Porter, Owner
Jerry Porter Auto Dealership
New Hanover County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC
2H A 000 (hereafter referred to as the "stormwater rules,') and the approved stormwater management plans and
specifications and other supporting data as attached and on file with and approved by the Division of Water Quality
and considered a part of this permit.
This permit shall be effective from the date of issuance until December 1, 2009 and shall be subject to the following
specified conditions and limitations:
1. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater described in the
application and other supporting data.
2. This stormwater system has.been approved for the management of stormwater runoff as described on page
3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from
152,598 square feet of impervious area.
3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts
of the permit.
4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per
approved plans.
PA
State Storinwater Management Systems
Permit No. SW8 940120 Modification
DIVISION OF WATER QUALITY
PROJECT DESIGN DATA SHEET
Project Naine:
Permit Number:
Location:
Applicant:
Mailing Address:
Application Date:
Name of Receiving Sti-cam/Index 4:
Classification of Water Body:
If Class SA, chloride sampling results:
Pond Depth, feet:
Permanent Pool Elevation, FMSL:
Drainage Area, acres:
Total Impervious Surfaces, ft2:
Offsite Area entering Pond, III:
Required Surface Area,ft2:
Provided Surface Area, ft2:
Required Storage Volume, ft3:
Provided Storage Volume, ft3:
Temporary Storage Elevation, FMSL:
Controlling Orifice:
Jerry Porter Auto Dealership
SW8 940120 Modification
New Hanover County
Mr. Jerry Porter, Owner
5501 Market Street
Wilmington, NC 28405
November 30, 1999
S pring Branch / (CFR 18-46-3)
11C Sw"
n/a
6.5
35
4.16
152,598
n/a, per Engineer
7,706
7,781
12,200
14,801
36.7
1.75"� pipe
3
State Stormwater Management Systems
Permit No. SW8 940120 Modification
11. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in it's entirety, vegetated and operational for its
intended use prior to the construction of any built -upon surface except roads.
2. During construction, erosion shall be kept to aminimurn and any eroded areas of the system will be repaired
immediately.
3; The permittee shall at all times provide the operation and maintenance necessary to assure the permitted
stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must
be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited
to:
a. Semiannual ' scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device and catch basins and pip . ing.
9. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to authorized personnel
of DWQ. The records will indicate the date, activity, name of person performing the work and what actions
were taken.
5. Decorative spray fountains will not be allowed in the stormwater treatment system.
6� The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless
the facilities are constructed in accordance with the conditions of this permit, the approved plans and
specifications, and other supporting data.
7. Upon completion of construction, prior to issuance of a Certificate Of Occupancy, and prior to operation of
this permitted facility, a certification must be received from an appropriate designer for the system installed
certifying that the permitted facility has been installed in accordance with this permit, the approved plans
and specifications, and other supporting documentation. Any deviations from the approved plans and
specifications must be noted on the Certification.
If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior
to operation as a stormwater treatment device, and prior to occupancy of the facility.
9. The following items will require a modification to the permit:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property
owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, altering, or piping of any vegetative conveyance shovni on the approved plan.
10. The Director may determine that other revisions to the project should require a modification to the permit.
11
State Stormwater Management Systems
Permit No. SW8 940120 Modification
11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum
of ten years from the date of the completion of construction.
12. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities
shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale
of any portion of the property.
13. The permittee is responsible for verifying that the proposed built -upon area does Dot exceed the allowable
built -upon area.
14. The runoff from all built -upon area on the project must be directed into the permitted stormwater control
system.
15. The Director may potify the permittee when the permitted site does not meet one or more of the minimum
requirements ofthe permit. Within thetimeframe specified in the notice, the permittee shall submit awritten
time schedule to the Director for modifying the site to meet minirriurn requirements. The permittee shall
provide copies of revised plans and certification in writing to the Director that the changes have been made.
111. GENERAL CONDITIONS
This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there
is a name change of the Permittee, a formal permit request must be submitted to the Division of Water
Quality accompanied by an application fee, documentation from the parties involved, and other supporting
materials as may be appropriate. The approval of this request will be considered on its merits and may or
may not be approved.
2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute
143-215.6A to 143-215.6C.
The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinances which may be imposed by other government agencies (local, state, and federal)
which have jurisdiction.
In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions,
the Permittee shall take immediate corrective action, including those as may be required by this Division,
such as the construceion of additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all
components of the permitted stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a
permit modification, revocation and reissuance or termination does not stay any permit condition.
Permit issued this the Ist day of December, 1999.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
t-)- -A (_ A 4 - J A
Kerr T. Stevens, Direc��
Division of Water Quality
By Adthority of the Environmental Management Commission
Permit Number SW8 940120 Modifleation
State Stormwater Management Systems
Permit No. SW 940120 Modification
Jerry Porter Auto Dealership
Stormwater Permit No. SW8 940120 Modification
New Hanover County
Designer's Certification
1, , as a duly registered in
the State of North Carolina, having been authorized to observe (periodically/weekly/full 'time) the construction of
the project,
ect)
for (Project Owner)hereby state that, to the bestof my abilities, due care
and diligence was used in the observation of the project construction such that the construction was observed to be
built within substantial compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
4W."
Signature
Registration Number
Date
State Stormwater Management Systems
Permit No. SW8 940120 Modification
Certification Requirements:
I . The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -upon area.
3. All thebuilt-upon area associated with the project is graded suchthatthe runoffdrainsto the system.
4. The outlet/bypass structure elevations are per the approved plan.
5. The outlet structure is located per the approved plans.
6. Trash rack is provided on the outlet/bypass structure.
.7. All slopes are grassed with permanent vegetation.
8. Vegetated slopes are no steeper than 3: 1.
9. The inlets are located per the approved plans and do not cause short-circuiting of the system.
10. The permitted amounts of surface area and/or volume have been provided.
IL Required drawdown devices are correctly sized per the approved plans.
12. All required design depths are provided.
13. All required parts of the system are provided, such as a vegetated shelf, and a
forebay,
14. The overall dimensions of the system, as shown on the approved plans, are provided.
cc: NCDENR-DWQ Regional Office
Tony Roberts, New Hanover County Building Inspector
Date Received Fee Paid Permit Number
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENTPERMIT APPLICATION FORM
Thisform may be photocopiedfor use as an original
1. CENERAL INFORMATION
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project):
Jerly Porter
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
3. Mailing Address for person listed in item 2 above:
City: Wilmington — State: NC Zip: 28405
Telephone Number: 910-313-3200
4. Project Name (subdivision, facility, or establishment name — should be consistent with project name on
plans, specifications, letters, operation and maintenance agreements, etc.):
5. Location of Project (street address):
5501 Market Street
City: Wilmington Count),: New Hanover
6. Directions to project (from nearest major intersection):
Approx. 1200 If east from the intersection of US Hwy 17 and NC Hwy 132
7. Latitude : N 34' 14' 30" — Longitude: W 770 52' 00" ofprojcct
8. Contact person who can answer questions about the project:
Name: Phillip Tripp Telephone Number: 910-763-5100
PERMIT INFORMATION:
1. Specify whether project is (check one): —New Renewal X Modification
Form SWU-101 Version 3.99 Page I of 4
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list
The existing permit number SW8 940120 and its issue date (if known) __L/23/99
3. Spccif� the type of project (check one):
Low Density A_ High Density _ Redevelop General Permit Other
4. Additional Project Requirements (check applicable blanks):
— CAMA Major X Sedimentation/Erosion Control — 404//401 Permit — NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-977-623-6748.
III. PROJECT INFORMATION
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
stonriwater detention pond
2. Stormwator runoff from this project drains to the Cape Fear River basin.
3. Total Project Area: 4.16 acres
5. How many drainage basins does the project have? I
4. Project Built Upon Area: 84.2 %.
6. Complete the following infonuation for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same forruat as below.
On -site Buildings 8,092 sf
-site Streets 0
On -site Parking 49,781 sf
-site Sidewalks 365 sf
Other on -site existing 94,360 sf
Off -site 0
Total: E=152,598 sf 2:=
* Inmervious area is defined as the built upon area including, but not limited to, buildings, roads, parking
areas sidewalks, gravel areas, etc.
Form SWU-101 Version 3.99 Page 2 of 4
7. How was the off -site impervious area listed above derived'?
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a
table listing each lot number, size and the allowable built -upon area for each lot must be provided as an
attachment.
1. 77iefollowing covenants are intended to ensure ongoing compliance with state slormwater managementpermit
number SW8 940120 — as issued by the Division of Water Qualify. 7-hese covenants may
not be cjiinged —or deleted without the consent oftheState.
2. No more than NA squarefeet ofany lot shall be covered by structures ofimpervious materials.
Impervious materials include asphalt, gravel, concrete, brick stone, slate or similar material but do not include wood
de eking a r th e wa te r su rfa ce of sw im m ing po o Is.
3. SWalesshall not befilled in, piped or altered except as necessary to provide driveway crossings.
4. Built -upon area in excess ofthe permitted amount requires a state stormwater management permit modification prior
to construction.
5. All permitted runoflfroni ouiparcels or./mure developmcni shall be directed into the permitted stormwater control
system. 7 hese connections to the stormwater controlsystem shall be performed in a manner that maintains the
integrity andperformance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and
persons claiming under them, that they will run with the land, that the required covenants cannot be changed or
deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for
each BMP specified for this project. Contact the Stornawater and General Permits Unit at (910) 733-5083 for
the status and availability of these forms.
Form SWU- 102
Form SWU-103
Form SWU-104
Form SWU-105
Form SWU-106
Form SWU-107
Form SWU-108
Form SWU-109
Wet Detention Basin Supplement
Infiltration Basin Supplement
Low Density Supplement
Curb Outlet System Supplement
Off -Site System Supplement
Underground Infiltration Trench Supplement
Neuse River Basin Supplement
Innovative Best Management Practice Supplement
Form SWU-101 Version 3.99 Page 3 of 4
V1. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
I . Please indicate that you have provided the following required information by initialing in the space
provided next to each item.
Initials
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of stormwater treatment/management
Two copies of plans and specifications, including:
- DevelopinentlProject nanic
- Engineer and firm
- Legend
- North arrow
Scale
Revision number and date
Mean high water line
Dimensioned property/project boundary
Location inap with named streets or NCSR numbers
Original contours, proposed contours, spot elevations, finished floor elevations
Details of roads, drainage features, collection systems, and stormwater control measures
Wetlands delineated, or a note on plans that none exist
Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
Drainage areas delineated
Vegetated buffers (where required)
vil. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm): Tripp Engineering, P.C.
Mailing Address: 419 Chestnut Street
City: Wilmington State: NC Zip: 28,101
Phone: Fax: — (910) 763-5631 —
Vill. APPLICANT'S CERTIFICATION
1, lJ)rint or type name ofperson listed in General Information, item 2) Jerry Porter
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC 2H 1000.
Signature: Date:
Form SWU-101 Version 3.99 Page 4 of 4
Stormwater Narrative
July 26, 1999
Re: Jerry Porter — Stormwater Permit Modification
New Hanover County, City of Wilmington
TE 99059
The total drainage area of this project is 4.16 acres. Two existing buildings totaling 8,092
sf will remain. An asphalt access and parking area for both buildings will total 49,781 sf.
94,360 sf of asphalt access and parking area are already permitted. A complete 152,598
sf of impervious area (365 sf of sidewalk) brings the total built upon area to 84.2%
impervious.
Stormwater runoff will be handled by a wet detention pond designed to exceed the states
requirement of the first one inch of runoff. This pond will drain to Smith Creek with a
classification of C-SW. A vegetated filter is not required due to the 90% TSS removal
used in the wet detention design.
TE 99059
Permit No. .5 'qec��
4)6
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
Thisform may be photocopiedfor use as an original
DWO Stormwater Management Plan Review:
A complete stormwater management plan submittal includes a wet detention basin supplement for each basin,
design calculations, plans and specifications showing all basin and outlet structure details, and a signed and
notarized operation and maintenance agreement.
PROJECT INFORMATION (please complete the following information):
Project Name: Jerry Porte
Contact Pei -son: �HiTri �_ Phone Number: ( 910 ) 763-5 100
For projects with multiple basins, specify which basin this worksheet applies to: I
elevations
Basin Bottom Elevation 28.5 ft. (floor of the basin)
Permanent Pool Elevation 35.0 ft. (elevation of the oryice)
Temporary Pool Elevation 36.7 ft. (elevation of the discharge structure overflow)
areas
Permanent Pool Surface Area .7 781_ sq. ft. (walersurface area at the orifte elevation)
Drainage Area ... A. 16 �T_ sq-ft, (on -site and off -site drainage to the basin)
Impervious Area 3.50 ac. (on-sile and off-sitc drainage to the basin)
volumes
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
SA/DA'
Diameter of Orifice
Design Rainfall
DesignTSS Removal2
�33 186 cu.11. (combined volume of main basin andforebay)
14801 cu.11. (volume detained above the permanent pool)
.6623_cu.ft. (approximately 20016 of total volume)
0.0430 (surface area to drainage area ratioftom DWQ table)
1.75 in. (2 to 5 day temporary pool draw -down required)
1- in.
90-% (minimum 85% required)
ForinSWU-102 Rev3.99 Page I of 4
Footnotes:
I . When using die Division SA/DA tables, the correct SA/DA ratio for permatient pool sizing should be computed based upon the
actual impervious % and pernianent pool depth. Linear interpolation should be employed to determine the correct value for non-
standard (able entries.
2. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90%. TSS removal. 'nie NCDENR BNW manual provides design tables for both 85% TSS removal and 90% TSS removal,
11. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H . 1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documenfation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applic.ap,V Initials
a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
b. The forebay volume is approximately equal to 20% of the total basin volume.
c. The temporary pool controls runoff from the design storm event.
d. The temporary pool draws down in 2 to 5 days.
e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations),
f. The basin length to width ratio is greater than 3: 1.
g. The basin side slopes above the permanent pool are no steeper than 3: 1.
h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
i. Vegetative cover above the permanent pool elevation is specified.
j. A trash rack or similar device is provided for both the overflow and orifice.
k. A recorded drainage easement is provided for each basin including access to nearest right-
K of -way.
1. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified to be performed prior to use as a wet detention basin
m. A mechanism is specified which will drain the basin for maintenance of an entergency.
Ull. WETDETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) 0 does X does not incorporate a vegetated filter at the outlet.
This system (check one) 0 does X does not incorporate pretreatment other than a forebay.
ForniSWIJ-102 Rev3.99 Page 2 of 4
. Maintenance activities shall be performed as follows:
After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition. I
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs
within 2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to
maintain proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed
of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality
(i.e. stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads 4.875 feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads 2.25 feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blanks)
Permanent Pool Elevation 35.0
Sediment R�noval El. 32.75
---------- T Sediment Removal Elevation 30.125 175%
Bottom fNevation 32.0
Bottom Elevation
FOREBAY MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. if the basin must be drained for an emergency or to perform maintenance, the flushing of sediment
through the emergency drain shall be minimized to the maximum extent possible.
ForniSWU-102 Rev3.99 Page 3 of 4
7.- - All components of the wet detention basin system shall be maintained in good working order,
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print name: Jerry Porter
Title: Owner
Address: 5501 Market Street, Wilmington, NC 28405
Phone: 910-313-3200 r,�
Signature:
Date:
Note: The legally responsible party should not be a homeowners association unless niore than 50% of the lots have been sold and
a resident of the subdivision has been nanied the president.
1, Monica V. Louvhli I a Notary Public for the State of North Carolina I
County of New Hanover do hereby certify that Jer[y Porter
personally appeared before me this AA day of I A __L999. and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
*OIARj,
Ij B
%1�10VER
"IN1111111B
91M
My commission expires 08/07/01
Forni SWU-102 Rev 3.99 Page 4 of 4
State Stormwater Management Systems
Pern�t No. SW8 940120
Jerry Porter Lincoln, Mercury, Isuzu
Stormwater Project No. 940120
New Hanover County
r'luill r )
� , oe S Certification
I, Phillip G. Tripp —, as a duly registered Professional Engineer in the State of
North Carolina, having been authorized to observe (periodically#week17yftft-7ffme) the construction of the
project,
Jerry Porter Lincoln, Mercury, Isuzu - (Project)
for Jerry Por ' ter _(Project Owner) hereby state that, to the best of my abilities, due
care and diligence was used in the observation of the project construction such that the construction was
observed to be built within substantial compliance and intent of the approved plans and specifications.
Signature
Registration Number 17374
Date 11/20/98
(ZrISEAL
-y 2
r 7374
;�e AA
ns
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
February 22, 2011
Mr. Jerry Porter, Owner
5501 Market St.
Wilmington, INIC 28405
Division of Water Quality
Coleen H. Sullins
Director
Subject: Permit Extension, Session Laws 2009-406 and 2010-177
Stormwater Permit #SW8 940120
High Density — Jerry Porter Auto Dealership
New Hanover County
Dear Mr. Porter:
Dee Freeman
Secretary
On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any
development approval issued by the Division of Water Quality under Article 21 of
Chapter 143 of the General Statutes, which is current and valid at any point between
January 1, 2008, and December 31, 2010. The law extends.the effective period of any
.stormwater permit that is set to expire during this time frame to three (3) years from its
current expiration date. On August 2, 2010, the Governor signed Session Law 2010-
177 which grants an extra year for a total of four (4) years extension.
Accordingly, Stormwater Permit # SW8 940120, which has already expired on
December 1, 2009, is now in effect until December 1, 2013. Please resubmit the
renewal application and fee at least 180 days prior to December 1, 2013, which would
be June 1, 2013,A copy of the Renewal Application can be obtained from the following
website: hftp://portal.ncdenr.org/web/wq/ws/su/statesw/forms—docs.
If you have any questions, please contact the Division of Water Quality in the
Wilmington Regional Office at 910-796-7215.
Sincerely,
Georgette' Scott
Stormwater Supervisor
Division of Water Quality
S:\WQSkSTORMWATER 2011 02 permit— extension 940120
cc: Wilmington Regional Office
WIRO
Wilmington Regional Office
0
127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One
Phone: 910-796.7215 k FAX: 91 0-350�2004 \ Customer Service: 1-877-623-6748
Internet; wAv.nc%vaterquality.org NorthCarolina
An Equal Oppantuntly � Affinnafive Acton Employer