Loading...
HomeMy WebLinkAboutSW8110706_HISTORICAL FILE_20110722STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 .11 07 06 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2011 07 22 YYYYMMDD Ina= NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director July 22, 2011 Mark Maynard, Manager The Sneads Ferry inn, LLC Post Office Box 1229 Wilmington, NC 28402 Subject: State Stormwater Management Permit No. SW8110706 The Sneads Ferry Inn High Density Commercial Wet Detention Pond Project Onslow County Dear Mr. Maynard: Dee Freeman Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for The Sneads Ferry Inn on July 22, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8110706 dated July 22, 2011, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until July 22, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a petition with the Office of Administrative Hearings (OAH). The petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The OAH accepts filings Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m., except for official state holidays. The petition may be filed by facsimile (fax) or electronic mail by an attached file (with restrictions) - provided the signed original, one (1) copy and a filing fee (if a filing fee is required by NCGS §150B-23.2) is received in the OAH within seven (7) business days following the faxed or electronic transmission. Unless such demands are made this permit shall be final and binding. You should contact the OAH with all questions regarding the filing fee and/or the details of the filing process. The mailing address, telephone and fax numbers for the Office of Administrative Hearings are: 6714 Mail Service Center, Raleigh, NC 27699-6714. Telephone 919-733-2698. FAX 919-733-3378. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, at (910) 796-7215. sin rely, For Coleen Sullins, Director Division of Water Quality GDS/ csb: S:1WQS1StormwateAPermits & Projects12011\110706 HD12011 07 permit 110706 cc: David L. Menius, P. E., Stroud Engineering, P. A. Onslow County Building Inspections Wilmington Regional Office Stormwater File Wilmington Regional Office One 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 NorthCarolina Phone: 910-796.72151 FAX: 910-350-20041 Customer service: 1.877-623-6748 �n�/,Nn��� Internal: .ncwaterquatty.org [s a LL 1 do Lea a � j State Stormwater Management Systems Permit No. SW8 110706 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO The Sneads Ferry Inri, LLC The Sneads Ferry Inn 1325 NC Highway 210, Sneads Ferry, Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until July 22, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 27,050 square feet of impervious area. 3. A 50' wide vegetative buffer must be provided adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 1,450 square feet. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 110706 7 The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft : Offsite, ft2: b. Total Impervioul Surfaces, ft2: Onsite, ft : Offsite, ft2: C. Design Storm, inches: d. Average Pond Design Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSI�: gg Permanent Pool Surface Arei, ft h. Permitted Storage Volume, ft : i. Temporary Storage Elevation, FMSL: j. Pre-dev. 1 yr-24 hr. discharge rate, cfs k. Controlling Orifice: I. Orifice flowrate, cfs: M. Permitted Forebay Volume, ft3: n. Fountain Horsepower o. Receiving Stream/River Basin: P. Stream Index Number: q. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 0.96 41,624 N/A 27,050 27,050 N/A 1.5 3 90 29.5 3,336 3,303 30 1.3 1 "0 pipe 0.1 896 N/A UT to Mill Creek / White Oak 19-39-3-1 "SA;HQW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall, at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 110706 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 110706 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours fof the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 22 day of July, 2011. NURTH CAROLINkENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 110706 The Sneads Ferry Inn Stormwater Permit No. SW8 110706 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 110706 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 7 of 7 WET DETENTION POND ANALYSIS -ALL RULES FILE NAME: S:1WQSIIST0RMWATERIEXCELSPREADSHEETSIP0NDI110706 PROJECT #: SWB [110706 _ REVIEWER: c. baker Initial Run Date 27-Jul-11 PROJECT NAME: The Sneads Ferry Inn _ _ _ ] Last modified 22-Jul-11 Receiving Stream: UT to Mill Creek Class: SA;HQW Drainage Basin: 1White Oak ] Within 1/2 mile SA? Index No. 119-39-3-1 1 Site Area NO acres TDrainage Area 41624.00 square feet DA Area 0.96 acres Rules-"2008"or "Ph2" 2008 Buildings 6208.00 square feet 1 Street 16619.00 square feet 0.98 SW 2773.00 square feet 0.95 _ Future 1450.00 square feel 0.95 Offsile square feet 0.95 Other square feet 0.95 BUA at diff. DSQ _ __ _ square feet 0.95 _. TOTAL 27050.00 square feet SURFACE AREA CALCULATION (with added DA and BUA at different design storm) Overall % Impervious 64.99% Average Design Depth 3 feet TSS, 85 or 90: 90 % VOLUME Drainage Aream BUA Post development Rv= Old BUA Design Storm Old BUA Design Volume 1.5" New BUA Design Storm Volume 1 yr. 24 hour precipitation depth (inches) Predevelopment Rv value 1 yr. 24 hr. Pre -development volume 1 yr. 24 hr, Post -development volume SA/DA Ratio 7.55% Req. SA 3142 sf Prov. SA 3336 sf Old BUA 0,00 from NOAA chart D5 Use 005 Hno existing BUA 0 cubic feet 0 cubic feet 2008 Design Volume 3305 cubic feet Phase 2 Design Volume 3305 1 cubic feet Required Volume 3305 cf Area, sf h Top of Sediment 23.50 msl ......... 66.00 Bottom of Shelf 28.50 msl.......... 11.00 Permanent Pool 29.00 must......... 36.00 Top of Shelf 29.50 msl.......... 28.00 j46 Temporary Pool 30.00 m ll......... 16.00 Volume met at elev 30.30 msl FOREBAY Vol. Prov. at TP 4577.00 cf Perm. Pool Volume= Req. Forebay Volume= Provided Volume= ORIFICE CALCULATION Average Head Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = 1 yr 24 hr intensity, In/hr Runoff Coefficient 1 yr 24 hr peak Orifice flow<ty24hr? feet Q2 Area = 1.01 cfs Q5 Area = 0.40 cfs Orifice Area = 0.79 Avg. Flow Q=1 0.015 or weir H x W in x days '# of end contractions, N = NOAA chart ®t discharge coefficient, C = unitless Effective weir length, L cfs sq. inches sq. inches sq. inches cfs 0.32 0.019 0.008 1 1.00 2.6 3.31 0.72 0.00 NO 7 STROUD ENGINEERING, P.A. 102-D Cinema Drive WILMINGTON, NC 28403 (910) 815-0775 TO 67^ WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via ❑ Shop drawings ❑ Prints ❑ Plans ❑ Copy of letter ❑ Change order ❑ ILCE44CI1�2 OCR 4 n ^ MMETU1d DATE If 2p / AITENIIIM Jwne�'►" R,rs` it RE: �r'r � •r rS� C Mrs S4✓ A � �.a..�,h—. ❑ Samples the following items: ❑ Specifications COPIES DALE NO. DESCRIPTION Z wn THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ For your use ❑ As requested ❑ For review and comment ❑ FORBIDS DUE REMARKS '.,l V ld JUL 1 9 2011 ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US COPY If enclosures are not as noted, kindly notify us of once. LC*. � i, �c s�, `.. .. . i�' � •. •.rS,,\ ,�'. -- 1 t ' I ; ' 1 :i 1'. � �. .. , ..l .� �� , DWQ USE ONLY Date Received Fee Paid Permit Number sw llo �o Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM Thisform may be photocopied fi?r use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): The Sneads Ferry Inn 2. Location of Project (street address): 1325 NC Highway 210 City: Sneads Ferry County: Onslow Zip: 28460 3. Directions to project (from nearest major intersection): From the intersection of NC 210 and Old Folkstone Road (NCSR 1518), take NC 210 south for 500'. Project is 4. Latitude: 34° 31' 28" N Longitude: 77 26' 05" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System []Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control:1.1 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: JUL 1 9 2011 Form SWU-101 Version07Jun2010 Page I of y III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the proiect): Applicant/Organization: The Sneads Ferry Inn LLC Signing Official & Title: Mark Maynard Manager b.Contact information for person listed in item 1a above: Street Address: 1510-A South Third Street City: Wilmington State: NC Zip: 28401 Mailing Address (if applicable): PO Box 1229 City: Wilmington State: NC Zip: 28402 Phone: ( 910 ) 612-3633 Fax: Email: mleemaynard@gmail.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/i Signing Official & b.Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if City:_ Phone: State: Fax: 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: City:_ Phone: Email: State: Fax: 4. Local jurisdiction for building permits: Onslow County _ Point of Contact: Planning and Development Phone 4: ( 910 ) 455-3661 _ JUL 1 9 2011 Form S WU-101 Version 07Jun2010 Page 2 of 6 I , IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Runoff from impervious surfaces will be collected in the narking lot and conveyed to a wet detention basin which is sized to provide 90% TSS removal for a 1 5" storm 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 0.96 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':0.96 acres Total project area shall be calculated to exclude the following the normal pool of imyounded structures, the area between the banks ofstreanis and rivers, the area below the Normal High Water (NM line or Mean High Water (MHW) line, and coastal wetlands landward front the NHW (or MHI� line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line nmy be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 65.0 % 9. How many drainage areas does the project have? 1 (For high density, count 1 for each proposed engineered storntwater BMP. For low density and other projects, use 1 for the, whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area _ Drainage Area Drainage Area _ Drainage Area Receiving Stream Name UT to Mill Creek Stream Class * SA; HQW Stream Index Number * 19-39-3-1 Total Drainage Area (so 41,624 On -site Drainage Area (so 41,624 Off -site Drainage Area (so 0 Proposed Impervious Area** (so 1 27,050 % Impervious Area** total 65.0 Impervious** Surface Area Draina e Area _ Draina a Area _ Draina e Area _ Draina e Area _ On -site Buildings/Lots (so 6,208 On -site Streets (so 0 On -site Parking (so 16,619 On -site Sidewalks (so 2,773 Other on -site (so 0 Future (so 1,450 Off -site (sf) 0 Existing BUA*** (so 0 Total (so: 27,050 * Stream Class and Index Number can be detennined at: ht!p.aortal.ncdetir.org/toebhuq/pslcsu/classifications *" hn ervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ***Report only that amount of existing BUA that will rentain after development. Do not report any existing BUA that is to be renwved and which will be replaced by new BUA. JUL 1 Form SWU-101 Version 07Jun2010 Page 3 of 2011 11. Flow was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http1/portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at hW2://portal.ticdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wg/ws/su/statesw/forms does. Igitials 1. Original and one copy of the Stormwater Management Permit Application Form. t+ 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants N� Form. (if required as per Part VII below) I 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M M agreement(s) for each BMP. I 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to l•� httQ//www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 1 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor tti the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MFIW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. F-- - — -- n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. I — o. Drainage areas delineated (included in the main set of plans, not as a separate document). JUL 1 9 2011 p. Vegetated buffers (where required). Form SWU-101 Version 07Jun2010 Page 4 of 6 a III] 11. Copy of any applicable soils report with the associated S14WT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) f A copy of the most current property deed. Deed book: 3555 Page No: 63 w For corporations and limited liability corporations (LLC): Provide documentation from the NC —� Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corl2orations/`CSearch.aVx VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from ht_pt ://portil.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: David L. Menius, P.E. Consulting Firm: Stroud Engineering, P.A. Mailing Address: 102-D Cinema Drive City: Wilmington State: NC Zip: 28403 Phone: ( 910 ) 815-0775 Email: Imenius@stroudengineer.com Fax: ( 910 ) 815-0593 IX. PROPERTY OWNER AUTHORIZATION (if Contact Infornmtion, itern 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or h/pe name of person listed in Contact Information, item la) with (print or hype name of organization listed in Contact Information, item 1n) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. JUL 1 9 2011 Form S W U-101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Date: a Notary Public for the State of . County of do hereby certify that before me this _ day of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Information, item 1a) Mark Maunard certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 21-I .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. SignAure✓�1 //� ���_ Date: 7�9 j mot/ 1, a Notary Public for the State of k1binYl o Ilnot., Countyof ,gtW do hereby certify that IU VIL before me this f �* day of 711 t� �)L and a stormwater permit. Witness my hand and official seal,_ `,`,Ntilt�Uryri `�� P\E A ✓D9 ii�� �P�orgq� %y% ' S .......... i�JJ OVER SEAL personally appeared My commission expires ��uVll 9a gUlS JUL 1 9 2011 Form SWU-101 Version 07Jun2010 Page 6 of 6